www.lightsource.ca hxma bl status update @ cls aum 07 june 15, 2007 xafs: operational; microprobe:...
TRANSCRIPT
www.lightsource.ca
HXMA BL Status UpdateHXMA BL Status Update@ CLS AUM 07@ CLS AUM 07June 15, 2007June 15, 2007
• XAFS: operational;
• Microprobe: opening for letter of intent;
• Diffraction: under commissioning.
www.lightsource.ca
XAFS EndstationXAFS EndstationStatus: operational:Beam modes: Mono only & M-mono-MGeneral User program: successfully performing general users' experiments since Jan. 2007Detectors available & will be available:
•Straight ion chamber (CLS);•Lytle (CLS);•Single element Vortex (CLS);•4 elements Vortex (CLS);•Single Ge detector (CLS);•32 element Ge detector (Graham & Ingird);
Low temperature sample environment:•ARS, MIN DE-202X-G-T (CLS);•Oxford, CF1208 (Helen);
www.lightsource.ca
GU program (XAFS)GU program (XAFS)
Beamline New Proposals
BeamtimeRenewals
Cycle #6
Far IR 4 N/A
HXMA 20 7
SM 19 N/A
SGM 16 12
PGM 9 3
Total 68 21
Cycle #5
Far IR 0 N/A
Mid IR 11 N/A
HXMA 19 N/A
SGM 22 12
PGM 6 5
Total 58 17
Cycle#5 Cycle#6
Total GU proposals 19 27
Proposals allocated 12 13
Allocated / Total (proposal)
63% 48%
Total shifts requested 150 334
Shifts allocated 63 77
Allocated / Total (shifts) 42% 23%
Note: In cycle#5, 11 GU experiments have performed, 1 canceled because CLS machine failure.
www.lightsource.ca
Beam time available for cycle#6Beam time available for cycle#6Actual % %
HXMA Allocation 292 275
Unknown - Possible unstable beam after October startup (1st 2 weeks unknown) 17
CLS Beamline Scientist (≤10%) 28 10 27.5
Maintenance & upgrades (≤10%) 28 10 27.5
Purchased Allocation (≤25%) (69 available, requesting 52) 52 25 68.75
Beam Team Allocation (≤15% of available time) 15 41.25
Discretionary (% undefined) (fee for service shifts not used) 18 0
General User Allocation (>%) (Requested 265) 77 40 110
100 275
BT member (s) Time request (shifts)
1 Graham and Ron 60 (20 days)
2 Ron 6
3 John 20+N
4 Dean 15 (5 days)
5 Jeanne 8
Microprobe / letter of intent 12
total 121+NBL commissioning time?
www.lightsource.ca
Diffractometer & microprobe Diffractometer & microprobe
Future development:
GIXRD, DAFS, SEXAFS,
Resonant Anomalous Scattering
Sample environment:
Complete control of diffractometer, point detector and Vortex through spec@ software
Target: Letter of Intent during cycle 8. Operational in cycle 9.
Beamsize 10 x 30 m2 (V x H)
with Rh coated KB mirror pairs
1.891.88
1.871.86
1.851.84
Vertical Position (mm
)
2.802.752.702.652.60
Horizontal Position (mm)
10 x 30 m2 (V x H)
User interface
optical lens system, data collectionBeam size, flux, stability
Target: Operational in cycle 8 (2008)
www.lightsource.ca
Microprobe commissioning Microprobe commissioning
Cu (line)profile
Selenium in Umangite (Cu3Se2) mineral specimen
Commissioning exercise data R Cavell, March 2007
Spot size approx 20 m, scan step 15 m,
Excitation energy 13500 eV, Vortex silicon drift detector.
Area examined (and illustrated ) approx 3200 m × 1600 m
Software by Sam Webb (SSRL)
4100
Mapping the Umangite Mineral
0
Co
As
Fe
Se
Cu
0 3200 microns
4100
www.lightsource.ca
Long term Development Plan (1)Long term Development Plan (1)
Plan (1): 2nd mono @ POE
www.lightsource.ca
Wiggler relocation and Plan (2)Wiggler relocation and Plan (2)
•Preliminary planed scheduled in October•Plan (1): 2nd ID source
www.lightsource.ca
BL maintenanceBL maintenance
• BL optical component realignment after long shutdown:– Primary slits– Mirrors and mono
• Mechanical: survey• Optical (mono only & m-mono-m modes);
– Modification of BL BPMs @ Frontend (1) and pOE (2);
– Collimating mirror conditioning for UV and soft x-ray;
www.lightsource.ca
BL study and upgradeBL study and upgrade
• X-ray beam stability at XAFS focus point (pressure, frequency of mono cooling LN2, cooling water, turbo pump…);
• BL BPM @ sOE;• BL harmonic rejection mirror;• Mono 2 detune effect; • BL single element Ge detector;• BL single element Vortex detector;• BL 4 element Vortex detectorBL maintenance, BL study and upgrade
needs more 10% beam time.