Page 1: Www.lymmostudy.com MetroPlan Orlando Citizens’ Advisory Committee Refined North/South Corridor Update - September 28, 2011

www.lymmostudy.com

MetroPlan OrlandoCitizens’ Advisory Committee

Refined North/South Corridor Update - September 28, 2011

Page 2: Www.lymmostudy.com MetroPlan Orlando Citizens’ Advisory Committee Refined North/South Corridor Update - September 28, 2011

Purpose of Today’s Update Provide study progress to date Review status of East/West and

the Parramore BRT corridors Present refined North/South

Corridor alternatives Present summary of public input Review study schedule

www.lymmostudy.com

Page 3: Www.lymmostudy.com MetroPlan Orlando Citizens’ Advisory Committee Refined North/South Corridor Update - September 28, 2011

Study Progress To Date

www.lymmostudy.com

Since March 2010 – Evaluated possible expansion of LYMMO based on technical analysis and public input East/West Corridor Parramore Corridor North/South Corridor System Analysis

Page 4: Www.lymmostudy.com MetroPlan Orlando Citizens’ Advisory Committee Refined North/South Corridor Update - September 28, 2011

Current Status

www.lymmostudy.com

Initial Alternatives

Analysis

Refined Alternatives

Analysis

Locally Preferred

Alternative

Agency/Jurisdiction

Approval

Environmental Study

Design/ Build

Funding Application

East/West Corridor

Parramore Corridor

North/South Corridor

We Are Here

System Analysis Model

Development Underway

Not Currently Funded

System AA Report

Page 5: Www.lymmostudy.com MetroPlan Orlando Citizens’ Advisory Committee Refined North/South Corridor Update - September 28, 2011

LYMMO East/West and Parramore CorridorsLocally Preferred Alternatives

www.lymmostudy.com

Page 6: Www.lymmostudy.com MetroPlan Orlando Citizens’ Advisory Committee Refined North/South Corridor Update - September 28, 2011

Initial North/South Corridor Alternatives

www.lymmostudy.com

North South

Page 7: Www.lymmostudy.com MetroPlan Orlando Citizens’ Advisory Committee Refined North/South Corridor Update - September 28, 2011

Corridor Screening Process

Subarea OptionsEast/WestParramoreNorthSouth

Subarea OptionsEast/WestParramoreNorthSouth

Refined Option(s)

Refined Option(s)

Base Build Alternatives

Base Build Alternatives

Refined Alternatives

Refined Alternatives

www.lymmostudy.com

Screening evaluation based on the six goals:1. Improve Mobility and Transit Accessibility

2. Assure Equitable Transportation Options

3. Enhance the Quality of the Environment

4. Enhance the Social Integrity of the Community

5. Develop Transportation Options that are Financially Viable

6. Promote Economic Development

Page 8: Www.lymmostudy.com MetroPlan Orlando Citizens’ Advisory Committee Refined North/South Corridor Update - September 28, 2011

Public Input

www.lymmostudy.com

Meetings/events were held to solicit public input on the North/South Corridor College Park Neighborhood Association – February 7

Downtown South Main Street (Board of Directors) – February 10

Lake Formosa Neighborhood Association – July 19

Park Lake Highland Neighborhood Association – July 21

Mills50 Main Street (Design Committee)– August 2

Wadeview Park Neighborhood Association – August 8

Ivanhoe Village Main Street (Board of Directors) – August 10

Ivanhoe Village Main Street (Merchant Mixer) – August 15

South Corridor Neighborhood Update – August 29

Page 9: Www.lymmostudy.com MetroPlan Orlando Citizens’ Advisory Committee Refined North/South Corridor Update - September 28, 2011

North CorridorProposed Refined Alternatives

www.lymmostudy.com

1. Alden Rd./Hospital 2. Orange Ave./Hospital/College Park

Page 10: Www.lymmostudy.com MetroPlan Orlando Citizens’ Advisory Committee Refined North/South Corridor Update - September 28, 2011

North CorridorProposed Refined Alternatives

www.lymmostudy.com

4. Orange Ave./Hospital/College Park/Mills Park via Rollins St./Princeton St. (Two Routes)

3. Orange Ave./Hospital/Mills Park via Rollins St.

Page 11: Www.lymmostudy.com MetroPlan Orlando Citizens’ Advisory Committee Refined North/South Corridor Update - September 28, 2011

North CorridorProposed Refined Alternatives

www.lymmostudy.com

5. Orange Ave./Hospital/Mills Park via Princeton St./Virginia Dr.

Page 12: Www.lymmostudy.com MetroPlan Orlando Citizens’ Advisory Committee Refined North/South Corridor Update - September 28, 2011

North CorridorPublic Comments

www.lymmostudy.com

• Majority preferred Alternative 4 with some combinations:

Alternative 4 with a loop on Virginia Drive Alternative 4 and 5 (most preferred) Alternative 5 with connection to College Park Alternative 2 and 5

Alternative 4 Alternative 5Alternative 2

Page 13: Www.lymmostudy.com MetroPlan Orlando Citizens’ Advisory Committee Refined North/South Corridor Update - September 28, 2011

North CorridorPublic Comments

www.lymmostudy.com

• Other alternatives (provided by Ivanhoe Village)

Connect to Baldwin Park Further north/south on Edgewater Drive Further south on Mills Avenue

Page 14: Www.lymmostudy.com MetroPlan Orlando Citizens’ Advisory Committee Refined North/South Corridor Update - September 28, 2011

South CorridorProposed Refined Alternatives

(South St. to Miller Ave.)

www.lymmostudy.com

1. Lucerne Ter./Sligh Blvd. 2. Orange Ave./Gore St./Sligh Blvd. 3. Orange Ave./Columbia St./Sligh Blvd.

Page 15: Www.lymmostudy.com MetroPlan Orlando Citizens’ Advisory Committee Refined North/South Corridor Update - September 28, 2011

South CorridorPublic Comments

www.lymmostudy.com

• Majority preferred Alternative 3 with a combination of either Alternative 2 or 3

Alternative 3Alternative 2

Page 16: Www.lymmostudy.com MetroPlan Orlando Citizens’ Advisory Committee Refined North/South Corridor Update - September 28, 2011

South CorridorProposed Refined Alternatives

Southern End Options (Miller Ave. to Michigan St.)

www.lymmostudy.com

1. Stop at Sodo via Orange Ave. 2. 2-Way on Orange Ave. 3. Orange Ave./Delaney Ave./Miller Ave. Loop

Page 17: Www.lymmostudy.com MetroPlan Orlando Citizens’ Advisory Committee Refined North/South Corridor Update - September 28, 2011

South Corridor (Southern End Options)

Public Comments

www.lymmostudy.com

• Majority preferred Alternative 2 and 3with some combinations:

Alternative 1 and 2 without entering Sodo Alternative 2 and 3 without entering Sodo Phase in Alternative 1, 2 and 3 Access Sodo in front of Target via Crystal Lake Street Alternative 1 and 2 - Alternative 2 could be phased in once

development occurs near Michigan Street

Alternative 2 Alternative 3Alternative 1

Page 18: Www.lymmostudy.com MetroPlan Orlando Citizens’ Advisory Committee Refined North/South Corridor Update - September 28, 2011

Study Schedule July to October 2011 - LYMMO North/

South Corridor refined alternatives analysis (including Trunk Corridor)

November to December 2011 – Added public outreach and identify Locally Preferred Alternative (LPA)

January to February 2012 – Complete System AA

North/South Corridor LPA evaluation Connections to East/West and Parramore

BRT System implementation strategy

www.lymmostudy.com

Page 19: Www.lymmostudy.com MetroPlan Orlando Citizens’ Advisory Committee Refined North/South Corridor Update - September 28, 2011

Contact Information

Alan DanaherProject ManagerPB Americas, [email protected]

Ginger CorlessPublic Outreach CoordinatorHHI Design407.838.2559 (office)407.616.5500 (cell)[email protected]

www.lymmostudy.com

Tony WalterDirector of [email protected]