7/23/2019 X 904 Recommended Practice http://slidepdf.com/reader/full/x-904-recommended-practice 1/4 Recommended Practice for Crane Suspended X -904 Offshore Personnel Transfers Purpose This recommended practice is intended to assist all oshore employers in the development of safe work practices relative to the task of transferring personnel to-and-from oshore facilities utilizing a Billy Pugh Co. X-904 personnel transfer device. This recommended practice addresses the minimum requirements promul- gated by both regulation, industry, and rened for the use of this unit. Each oshore employer is encouraged to follow these recommendations and to proactively modify or supplement them with additional benecial practices or equipment, or environmental conditions. Scope This recommended practice is intended for application by oshore employers working in a marine oshore environment who transfer, move, or transport their workforce by Billy Pugh X-904 personnel carrier. The ele- ments of this recommended practice should be applied as appropriate with due consideration made for any additional special hazards identied by the employer as a result of a thorough Job Hazard Analysis (JHA). Responsibilities It is the responsibility of the oshore employer to en- sure this recommended practice is applied appropriately within their organizations. Management of oshore personnel transfer safety should be an integral compo- nent of the employers existing Safety and Environmental Management Plan (SEMP). A systematic management process used to identify and control safety and environmental hazards in design, construction, start-up, operation, inspection, and main- tenance as promulgated in API RP-75 Definitions *In Service Date: The date the X-904 is unwrapped is the “In Service Date”. That date wil be noted on the X-904 certicate and the yellow sticker at- tached to the center pole. The “In Service Date” is used as the date for aging the device for inspections and replacement. If during inspection it is found that there is not an “In Service Date” recorded, then the “In Service Date” will defer back to the “Manufacturing Date”which is noted on tags and paperwork. Rigging Load lines, master links, safety slings, and hard- ware that attach the personnel carrier to the crane hook or block device. Qualified Person A person designated by the employer who has the experience and formalized training to safe- ly operate the crane, rigging, and associated lifting devices assigned at the work location Qualified Inspector A person so designated by the employer who by reason of appropriate experience and train- ing, in addition to meeting the requirements of a qualied person, has attended formal train- ing in inspection, maintenance, and trouble- shooting of cranes, rigging, and lifting devices. Excellence in offshore personnel safety www.billypugh.com X -904 Recommended Practice

Upload: user123

Post on 18-Feb-2018

229 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: X 904 Recommended Practice

7/23/2019 X 904 Recommended Practice

http://slidepdf.com/reader/full/x-904-recommended-practice 1/4

Recommended Practice for

Crane Suspended X -904 Offshore Personnel Transfers

PurposeThis recommended practice is intended to assist all

oshore employers in the development of safe work

practices relative to the task of transferring personnel

to-and-from oshore facilities utilizing a Billy Pugh Co.

X-904 personnel transfer device. This recommended

practice addresses the minimum requirements promul-

gated by both regulation, industry, and rened for the

use of this unit. Each oshore employer is encouraged

to follow these recommendations and to proactively

modify or supplement them with additional benecial

practices or equipment, or environmental conditions.

Scope

This recommended practice is intended for application

by oshore employers working in a marine oshore

environment who transfer, move, or transport their

workforce by Billy Pugh X-904 personnel carrier. The ele-

ments of this recommended practice should be applied

as appropriate with due consideration made for anyadditional special hazards identied by the employer as

a result of a thorough Job Hazard Analysis (JHA).

Responsibilities

It is the responsibility of the oshore employer to en-

sure this recommended practice is applied appropriately

within their organizations. Management of oshore

personnel transfer safety should be an integral compo-

nent of the employers existing Safety and Environmental

Management Plan (SEMP).

A systematic management process used to identify and

control safety and environmental hazards in design,

construction, start-up, operation, inspection, and main-

tenance as promulgated in API RP-75

Definitions

*In Service Date: The date

the X-904 is unwrapped

is the “In Service Date”.

That date wil be noted on

the X-904 certicate and

the yellow sticker at-

tached to the center pole.

The “In Service Date” is

used as the date for aging

the device for inspections and replacement. If during

inspection it is found that there is not an “In Service

Date” recorded, then the “In Service Date” will defer back

to the “Manufacturing Date”which is noted on tags and

paperwork.

Rigging

• Load lines, master links, safety slings, and hard-

ware that attach the personnel carrier to thecrane hook or block device.

Qualified Person

• A person designated by the employer who hasthe experience and formalized training to safe-ly operate the crane, rigging, and associatedlifting devices assigned at the work location

Qualified Inspector

• A person so designated by the employer who

by reason of appropriate experience and train-ing, in addition to meeting the requirements ofa qualied person, has attended formal train-ing in inspection, maintenance, and trouble-shooting of cranes, rigging, and lifting devices.

Excellence in offshore personnel safety

www.billypugh.com

X -904 Recommended Practice

Page 2: X 904 Recommended Practice

7/23/2019 X 904 Recommended Practice

http://slidepdf.com/reader/full/x-904-recommended-practice 2/4

Excellence in offshore personnel safetywww.billypugh.com

X -904 Recommended P

ELEMENT 3: Inspection Procedures

All inspections should be performed by a qualied

person and should always incorporate an operator’s

pre-use inspection. The next two pages of the “Best

Practices” include both the daily and the semi-annual

inspection procedures for the X-904. Plastic laminated

versions have also been included with this booklet for

your convenience.

ELEMENT 4: Operational/AdministrativePractices

The following minimum lifting practices are recommend-

ed for all crane assisted personnel transfer net devices:

• Any oshore facility making personnel trans-fers with a personnel carrier should have a

written procedure for this task.

• A pre-use inspection should be conducted priorto any personnel carrier transfer.

• Cranes assigned to personnel lifting dutiesshould be suitable for this purpose per relevantAPI spec.

• Crane operators assigned to personnelduties should be certied and competeperform this task.

• A snag resistant tag line should be axpersonnel carriers.

• Crane hooks used for personnel transfhave a positive locking latch.

• Only approved personnel carriers shouused for lifting personnel per API speciPersonnel carriers should not be used aworkbasket or cargo net.

• Personnel carriers should be legibly mawith the maximum number of passeng

• The X-904 is equipped with areas desiglight luggage. Luggage should be stowethe lift is made and easily accessible fo

kation. No large or heavy items (bigger storage area) should be allowed on theLarge or heavy items should be sent upcargo basket.

• Personnel carriers should not be utilizeweather, wind, or sea conditions that thed person considers to be unsafe.

Case for Action

nalysis of available accident/injury data reveals that

shore personnel transfers are not involved in high

tes of accidents relative to the number of transfers

rried out worldwide. But due to the sheer number of

ersonnel basket transfers, the potential does exist for

cidents to occur. Safe and consistent methods need

be incorporated into the procedures of those utiliz-

g “crane assisted” transfer devices. A safety system,

hich addresses the specic areas of eective manage-

ent relative to oshore personnel transfers, will be re-

uired so that industry can sustain and maximize overall

fety performance while showing a process of contin-ous improvement. The X-904 is the next step in this

ntinual improvement in boat to rig crane transfers.

afety System Elements

he following are considered to be key elements of an

ective safety system for management of crane sus-

ended oshore personnel transfers.

ELEMENT 1: Minimum Training Require-ments

n on-site competency based orientation & JSA on the

fe use of personnel carrier devices should be adminis-

red by a qualied person before employees or visitors

nfamiliar with the device are loaded or lifted. At a

inimum the following elements should be included

this orientation curriculum:

• Safe loading & unloading procedures.

• Crane actions, movements, and signals.

• Body positions, pinch points, and personalstability.

• Personnel baggage loading procedures.

• Personnel protective equipment requirements.

• Exceptions or anomalies to any of the above.

In addition to the training elements, the qualied per-

son should ascertain whether any persons are feeling

ill, suering from vertigo, or have any anxiety regarding

the transfer. These individuals should be discouraged

from suing this form of personnel transfer. The excep-

tion would be suing the X-904 stretcher capability as

described in the safety CD provided with the unit.

ELEMENT 2: Personnel Carrier RiggingConfigurations

The following rigging congurations are recommended

for all crane assisted personnel carrier devices:

• Double load lines: *Billy Pugh personnel nets as well as the X-904

have a backup ber rope safety line contained

within the stabilizer unit.

• Snag Resistant Tag Line 

We recommend that the BPC semi-rigid, snag

resistant tag line should be axed to all of our

personnel transfer devices. Tag lines should

have a minimum length of 10 ‘(3.05m). Tag line

should be attached to either the center deck

lashing pint, or the outside bottom platform

ring in such a manner that minimizes tag line

damage when carrier is resting on a surface

and attach with a minimum 5/8” {190 mm)

bolt type anchor shackle. Personnel transfer

device tag lines should be identied by a high

visibility color. These tag lines can be obtained

by specifying “Billy Pugh Tag Line” followed by

the length. A normal length for these units is

15 ft. This recommendation is consistent with

API-RP 2D (Annex C). Our tag lines (PTL and STLproduct codes) both conform to this API speci-

cation and work well with all slung loads as well

as personnel transfer devices.

Page 3: X 904 Recommended Practice

7/23/2019 X 904 Recommended Practice

http://slidepdf.com/reader/full/x-904-recommended-practice 3/4

X -904 Recommended P

References

American Petroleum Institute (API) –“API RP-2D Rec-

ommended Practice for Operation & Maintenance of

Oshore Cranes”

International Association of Drilling Contractors (North

Sea Chapter)- IMCA SEL 08/01 “Transfer of Personnel by

Basket on the UK Continental Shelf”

Moxie Media Corporation – “Personnel Basket Safety

Video Training Series” June 27, 2001 Issue 1 Rev 0 7

International Marine Contractors Association (IMCA) –

“Task Risk Assessment Study 8/2000”

National Research Council, Assembly of Engineering

Marine Board –“Committee on Assessment of Safety of

OCS Activities”

Billy Pugh company, Inc. – “Procedures for Maintenance

& Inspection of Personnel Baskets”

Kennedy Wire Rope & Sling Company – “Procedures

for Inspection & Maintenance of Wire Rope Slings and

Rigging”

Department of the Interior, Minerals Management

Service – “Safety Alert No. 190-1/22/00 & Safety Alert No.

193-2/28/01”

Global Drilling Leadership Initiative – “Recommended

Practice #6

Excellence in offshore personnel safetywww.billypugh.com

• Before any attempt is made to lift personnelwith a carrier, clear instructions should be giv-en to all persons involved.

• No person suering from acute seasicknessor vertigo shall be transported by personnelcarrier. If the transfer is necessary, the aectedperson should be put inside stokes stretcherand the stretcher shackled to the rigging in thearea provided inside the unit. (Someone shouldride up with this individual on the transfer aswell).

• Any individual has the right to refuse transferby a personnel basket.

• All personnel riding on a personnel carriershould wear an approved life vest or life pre-server. An approved Type I illuminated PFDmaybe required for all transfers conductedat night (depending on operator/contractorpolicy). Many contractors incorporate Type I aswell for rough sea/bad weather transfers.

• All personnel riding the X-904 carrier shouldstand on the inside of the unit and grasp theinner rigging. Passenger forearms should beinterlocked.

• If crane operator’s view of the primary signal-man is obstructed, the personnel carrier shouldnot be moved until alternative communicationor signal devices are placed in service.

• A designated primary landing zone should bemarked in a safe area as determined by a JobHazard Analysis (JHA).

• When transferring personnel, the personnelcarrier should be lifted only high enough toclear obstructions. Is should then be gently

lowered to the deck.

• A loaded personnel carrier should not be raisedor lowered directly over a vessel.

• The crane operator may refuse to lift any per-son who does not comply with the operator’sinstructions.

• An experienced escort should be provided forpersons who are not condent performing apersonnel carrier transfer.

• Injured, ill, or uncondent persons may ride ina sitting position, on the inside of the personnelcarrier, with a qualied person as an escort.

NOTE: Depending on company policies, attaching the

man positioning lanyard to the riders’ PFDs may be op -

tional during transfers on the X-904. Billy Pugh Company

encourages the use of this lanyard but is not a require-

ment to meet this recommended practice.

X -904 Recommended P

Page 4: X 904 Recommended Practice

7/23/2019 X 904 Recommended Practice

http://slidepdf.com/reader/full/x-904-recommended-practice 4/4