X-band high gradient activities at KEK. May 13-15, 2008 2 nd Collaboration meeting on X-band Accelerator Structure Design and Test Program T. Higo, KEK. Roadmap by DG, Mar. 08. J-PARC construction. KEKB : 1 (ab) -1. operation. & upgrade. Photon Factory. ERL R&D. 1 st results. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: X-band high gradient activities at KEK

X-band high gradient activities at KEK

May 13-15, 20082nd Collaboration meeting on X-band Accelerator Structure

Design and Test Program

T. Higo, KEK

Page 2: X-band high gradient activities at KEK

2007 2008 2009 2010 2011 2012

Timeline of Current Project

KEKB : 1 (ab)-1

ILC R&D EDR

Photon Factory& upgrade operation

LHC1st resultsoperation

J-PARC construction

ERL R&D

Roadmap by DG, Mar. 08

2008/5/13-15 22nd collaboration meeting on X-band

Page 3: X-band high gradient activities at KEK

Roadmap -High Energy Physics-

• According to the JAHEP community’s master plan,– Highest priority is given to ILC– Before ILC, promote flavor physics at KEKB and J-PARC

• Action before the ILC approval– ILC R&D– Completion/commissioning of J-PARC

• Considering the world competition, it is urgent to improve neutrino intensity

– Continuation of KEKB/Belle with upgrade

Energy FrontierILC R&D Construction Experiment

LHC

Flavor Physics at Luminosity/Intensity Frontier, K, ,... at J-PARC

b, c, ,... with upgraded- KEKB/Belle

Roadmap by DG, Mar. 08

2008/5/13-15 32nd collaboration meeting on X-band

Page 4: X-band high gradient activities at KEK

KEK Testing Programs toward X-band CLIC

Control Modulator

Bunker

Klystrons

Low-loss WG

• The system can be run continuously during the linac operation. • Linac operators take care of the system. • More than 6000 hrs/year will be possible for running.

MOU : KEK - CERN (July 2007)

Appeared in the Roadmap by DG, Mar. 08, just as a basic research for high energy machine.

Page 5: X-band high gradient activities at KEK

KEK roadmap and X-band stance

• J-Parc: On going at top priority• Super B: Higher luminosity after 1ab-1

• ILC: Toward higher energy based on SCC• Next: Mini ERL as a prototype machine

X-band R&D• We continue as a basic research for one of the key

technologies of the high-gradient acceleration.• Accelerator laboratory set the high-frequency and high-

gradient acceleration as one of its missions.

2008/5/13-15 52nd collaboration meeting on X-band

Page 6: X-band high gradient activities at KEK

Boundary conditions of X-band research activities at KEK

• For high energy machine– Driven as one of the KEK missions, “high energy”

• For application– Collaboration with Tokyo Univ.

• Budget source– Some from ACC operation/maintenance funding– CERN CLIC collaboration– US/Japan cooperation for high energy physics

• Manpower – ACC: X-band G in KEKB injector with the help by operators of KEKB– MEC: Based on previous X-band people

• Collaboration– CERN, SLAC

2008/5/13-15 62nd collaboration meeting on X-band

Page 7: X-band high gradient activities at KEK

Wandering of X-band test stand

Nextef2007-08

GLCTA before ITRP2003-04

XTF after ITRP2004-06

Previous

Present

MovingEarly 2007

1 klystron setupKT-12007

2008/5/13-15 72nd collaboration meeting on X-band

Page 8: X-band high gradient activities at KEK

KT-1

Single klystron for various tests

High field study with narrow-cross section waveguide

Test stand for klystron itself, component, high field study, etc.

2008/5/13-15 82nd collaboration meeting on X-band

Page 9: X-band high gradient activities at KEK

High field study with Narrow WaveGuide

Cu case

2008/5/13-15 92nd collaboration meeting on X-band

Page 10: X-band high gradient activities at KEK

Nextef progressEstablishing power generation and transport in 2007

2008/5/13-15 102nd collaboration meeting on X-band

Page 11: X-band high gradient activities at KEK

Nextef inside shield roommost basic components are now in line.

2008/5/13-15 112nd collaboration meeting on X-band

Page 12: X-band high gradient activities at KEK

Nextef recent footprint• 2007 Feb. Moved to KEKB Injector area.• 2007 Jun. Each klystron tested at new stand, both driven by one pulse

transformer.• 2007 Aug. Power combination was done.• 2007 Nov. Drive KX03 for a moment.• 2008 Feb. Tried to establish more power in a stable condition.• 2008 Mar. Lounine load was found degraded. 400ns, 25Hz, 40MW.• 2008 Apr. Power establishing with two Ohtsuka loads. Some waveguide

components are found arcing at 400ns, 25Hz, 50MW.• 2008 May Back to KX03 system to finally establish breakdown study

system.• 2008 Jun. Start actual study of CLIC_VG1 (T18_VG2.4_Disk)• 2008 Jul. KEKB summer shutdown. Need to stop Nextef?

2008/5/13-15 122nd collaboration meeting on X-band

Page 13: X-band high gradient activities at KEK

Status and problems encountered in Nextef commissioning stage

• Problems in establishing power level– Realized 50MW level for 300ns at the structure input, but ….– Power reading uncertainty exists,

• Among crystals, calorimetric and peak power meter, +-10% level?• 70MW at 2-klystron combiner and 50MW at accelerator structure. Is this consistent to the

estimated transmission loss of ~20%?

– We have not established enough power even for low vg structure?• More power will be confirmed in a system with a structure KX03.

• Problems in establishing quality and stability– Only square pulse shape is available

• Deformed in 20% level at ramping .– Power jitters typically by a few percents

• It depends on klystron working point and should be estimated/optimized.– System breakdowns at a rate ~ 1BD/hr

• Mostly at loads and waveguide components.• We hope it will be gradually improved.

2008/5/13-15 132nd collaboration meeting on X-band

Page 14: X-band high gradient activities at KEK

Nextef planning5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12

2008 2009

Establish system with KX03

T18_VG2.4_Disk #2

TD18_VG2.4_Quad

TD18_VG2.4_Disk

T18_VG2.4_Disk #3

T18_VG2.4_Disk #4

?????C-band test at same place

2008/5/13-15 142nd collaboration meeting on X-band

Page 15: X-band high gradient activities at KEK

Structures planned to be tested at Nextef

• T18_VG2.4_Disk #2– startup Nextef

• TD18_VG2.4_Quad– Taste quad

• TD18_VG2.4_Disk– comparison disk/quad

• T18_VG2.4_Disk #3?– Statistics? – Diff. treatment? – etc.

• T18_VG2.4_Disk #4?– ??

• Plan from this meeting– ??

2008/5/13-15 152nd collaboration meeting on X-band

Page 16: X-band high gradient activities at KEK

Accelerator structure fabrication• Main resource: MEC

– Fabrication• High precision turning and

milling• High temperature bonding• Chemical surface treatment

– Evaluation• 3D coordinate measurement• RF low power measurement by

ACC• High power evaluation by Nextef

and other labs, SLAC and CERN.

• Cultivating outside companies– Vendors

• Previous: Morikawa as in GLC era• New comer: Hitachi, U-corp and

others

– Strategy• Taking the vendor’s facilities and

experiences• Discussing technical details to some

depth– Hopefully freely between KEK and

vendor, as long as apparent problems exist

• Reflect the discussion back to the design

2008/5/13-15 162nd collaboration meeting on X-band

Page 17: X-band high gradient activities at KEK

Fabrication activities at KEK

RF meas.

3D CMM

H2 furnace

Diamond turning

Chemical treatment

2008/5/13-15 172nd collaboration meeting on X-band

Page 18: X-band high gradient activities at KEK

Disk based fabrication

CLIC_VG1 by outside vendor

HDDS outside vendor + KEK final

M1 RDDS1Sharp edge but precise dimension control

DDS

DS

2008/5/13-15 182nd collaboration meeting on X-band

Butterfly cell;Cuts are fully extended out

Page 19: X-band high gradient activities at KEK

From ultra-precision turning to precise milling• Disk without damping

– Ordered to outside, such as T18_VG2.4_Disk• Disk with medium damping

– Milling by outside vendor + precise turning by KEK, such as HDDS of GLC stage

• Disk for heavy damping– No recent experience, but should be an extension of HDDS

• Quadrant for heavy damping– Being studied

• We have enough experience of disk-based fabrication and hope to obtain a quadrant-type fabrication smoothly.

2008/5/13-15 192nd collaboration meeting on X-band

Page 20: X-band high gradient activities at KEK

Quadrant fabrication in three stages

A complete structure for high power test.

2007Apr. 2008

Summer 2008

2008/5/13-15 202nd collaboration meeting on X-band

Page 21: X-band high gradient activities at KEK

Present Ra ~ 0.2—0.4 micron

To be studied whether absolutely needed to reach specified Ra~0.1 micron. This spec is related to the surface treatment.

& Big but smooth variation should be OK. The cutoff wave length can be larger.

Surface roughness

2008/5/13-15 212nd collaboration meeting on X-band

Page 22: X-band high gradient activities at KEK

OK with present carbide tool or need diamond tool in future??

21

3

2008/5/13-15 222nd collaboration meeting on X-band

Page 23: X-band high gradient activities at KEK

Dimension controlKEK meas. vs. Vendor meas.

0 5 10 15 20 25

-0.01-0.009-0.008-0.007-0.006-0.005-0.004-0.003-0.002

-0.0009999999999999990

2a

0 5 10 15 20 25

-0.020

-0.015

-0.010

-0.005

0.000

0.005

0.010

0.015

Deviation from +-2.5 microns

Meas. by KEK

a

b

CL-OUT

CL-OUT

Tempera

ture?

Deformation?

Difference! Present level is about 10 microns. We understand the need of the improvement by at least a factor two.

2008/5/13-15 232nd collaboration meeting on X-band

Page 24: X-band high gradient activities at KEK

Structure fabrication planning/proposal

5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 122008 2009

TD18_VG2.4_Quad

TD18_VG2.4_Disk

T18_VG2.4_Disk #3

T18_VG2.4_Disk #4

Baking 650CBonding at SLACFabrication by KEK High gradient

Next step?? Depend on the discussion in this meeting.

2008/5/13-15 242nd collaboration meeting on X-band

Page 25: X-band high gradient activities at KEK

Study for higher field and to understand physics behind

2008/5/13-15 252nd collaboration meeting on X-band

On various Materials, Shapes, Surface treatments Crystal structures etc.

are prepared by KEK (Higashi’s talk) and being tested at SLAC test stand.

Page 26: X-band high gradient activities at KEK

Conclusion: Work to be done in near future (1)• Establish the Nextef, at the top priority, as soon as possible for

a series of high gradient tests to meet the demand given from the discussion of this meeting.

• Conduct the X-band long-term run at practical field level at Nextef.

• Establish the fabrication of damped structure with cultivating outside vendors.

• Collaborate with CLIC to get essential idea and technology on high gradient to confirm feasible level of gradient.

• Collaborate with SLAC to gain understanding and technology for higher field and higher power.

• Make a collaboration framework in Japan to make a wide range of team for high energy machine developments.

2008/5/13-15 262nd collaboration meeting on X-band

Page 27: X-band high gradient activities at KEK

Conclusion: Work to be done in near future (2)

• Propose a practical design of high-energy accelerator based on independent RF systems.

• Try to find a place to accelerate a beam in a high gradient and test various performance including other features than high gradient.

• Try to find a place of practical accelerator application using the present X-band RF technology, with possibility to taste high gradient performance.

• Conclusion: In order to plan these activities, the input from this meeting is critical.

2008/5/13-15 272nd collaboration meeting on X-band