x:drawings50388x keystone xl6000 699901 - keystone xl...

2
G F E D c B A L 12 1 1 10 9 8 7 6 5 •· . I I I I 8335' HORIZONTAL DISTANCE 4 3 DRAWING IS FOR INFORMATIONAL USE ONLY. CENTERLINE STATIONS AND MILE POST ARE BASED ON AUGUST 15, 2012 CENTERLINE AND MAY BE SUBJECT TO CHANGE. 8721' PULLBACK MAKE-UP SHOWN COUNTY 2 1 INSTAUATION NOTES 1) ACCESS: ALL EQUIPMENT MUST ACCESS THE SITE ALONG THE CONSTRUCTION RIGHT-OF-WAY FROM PUBLIC OR APPROVED PRIVATE ROADS. 2) VEHICLE AND EQUIPMENT ACCESS CROSSING MAY BE INSTAU.ED IF APPROVED BY THE ENVIRONMENTAL INSPEI:TOR. 26DO 2600 J) WORK SPACE: WORK SPACE LIMITS ARE DEPICTED. CL.EARING WILL BE RESTRICTED TO THE WORK SPACES INDICATED AT THE ENTRY AND EXIT POINTS AND PUL.L8'CK MAKE-UP AREA ALONG THE RIGHT-OF-WAY. CL.EARING BETWEEN THE ENTRY AND EXIT POIN'ffi IS LIMITED TO THE MINIMUM AMOUNT NECESSARY TO STRING LOCATION WIRES AND HDD ENTRY POINT STA: 0+90.00 2200 1-- -+---+ ELEV: 2347.48' POINT OF CURVATURE STA: 17+07.51 1800 !-- -+---+--+---+---+--+---+---+--+---+- ELEV: 2003.67' 1400 GROUND PROFILE WAS GENERATED FROM D.E.M. DATA AND CIVIL SURVEY WHERE AVAILABLE. POINT OF TANGENT STA: 24+55.99 --+---+---+--+---+---+- ELEV: 1925.00' POINT OF CURVATURE STA: 61+23.25 +---+---+-----l----+---+---+---+---+---+---+-- ELEV: 1925.00' uses SOIL CLA$Slflr.A.TIQN (.', ro:J GRADED (;"\ 99•9•9 SP=POORL Y GRADED f9\ F///) PLASTICITY (.";'\ P771 OH-HIGH PLASTIC TY @E:"'"J Q i:"'El \.V •1:..1... \.:::./ •e•e•e SAND \V .... ,.. \!.:::.) tL:.:.::.J ORGANIC SILT/CLAY 17 t::::::::::::J SHALE t;;J;;;j LIMESTONE r.;\ I § .• ·· I v GRADED ,.., FIRl'l QI rmm OL·LOW PLASTlCrIY = =[:RI 0 ,;;;;, i==i \.V ei . . •1:..1... t1BJ:I SM=SILTY SANO lli.l.UJ ORGANIC SILT/CLAY & WATER RAVEL '81 § MUOSTONE l- -f-----+--+---f-----+--+---+---+---+---+----+---+--- +l 0[Ilfil GM•SILlY GRA\£1... SC=CLAYEY SAND @IIIIID PLASTICITY @D SANDSTONE @p::s::::::J MARL POINT OF TANGENT STA: 68+71.74 ELEV: 2003.67' 24DO 22DO 20DO 18DO 1600 1400 INSTALL PUMPS AND PIPING TO OBTAIN WATER (WHERE APPROVED). 4) WATER SOURCE: DRILL WATER AND PRE-INSTAl.l.ATION HYDROSTATIC TEST WATER SHALL BE OBTAINED FROM AN APPROVED SOURCE. THE CONTRACTOR SHALL SCREEN THE INTAKE HOSE TO PREVENT THE ENTRAINMENT OF FISH OR DEBRIS AND IN ACCORDANCE WITH THE CONSTRUCTION M111GA110N AND RECLAMATION PLAN (CMRP) AND PROJECT REQUIREMENTS. THE HOSE SHALL BE KEPT OFF THE BOTTOM Of THE WATER BODY. 5) HYDROSTATIC TEST: PRE-INSTALLATION HYDROSTATIC TEST SHALL BE CONDUCTED IN ACCORDANCE WITH PERMIT REQUIREMENTS. THE CONTRACTOR SHALL DISCHARGE HYDROSTATIC TEST WATER IN ACCORDANCE WITH PROJECT PERMITS. DISCHARGES WILL BE SENT BA.Cl< TO THE WATER SOURCE UNLESS OTHERWISE OIRECTED BY THE EN\/IRONMENTAL INSPECTOR. DISCHARGES SHALL NOT CAUSE EROSION OR SEDIMENTATION. TO REDUCE THE VELOCITY OF THE DISCHARGE, THE CON'mACTOR SHALL UTILIZE AN ENERGY-DISSIPATING DEVICE DESCRIBED IN THE CMRP. 6) SPILL-PREVENTION: ALL PUMPS SHALL BE SET IN SECONDARY CONTAINMENT AND IN ACCORDANCE WITH THE SPILL PREVENTION CONTROL AND COUNTERMEASURE PLAN (SPCC). EQUIPMENT AND PUMPS OPERATING WITHIN 100 FEET OF ANY WATER BODY OR WETl.AND SHALL BE OPERATED AND REFUELED IN ACCORDANCE WITH THE SPCC PL.AN. EQUIPMENT REFUBJNG AND STORAGE OF HAZARDOUS IMTERIALS, FUB.S, ETC. SHALL BE CONDUCTED AT LEAST 100 FEET FROM WATER BODIES AND WETl.ANDS. EACH CONSTRUCTION CREW SHALL Kl.VE ON HAND SUFFlCIENT TOOLS AND MATERIALS TO STOP LE'AKS AND SUPPi.JES Of ABSORBENT AND 8'RRIER IMTERIALS TO ALLOW RAPID CONTAINMENT AND RECOVERY OF SPILLED MATERIALS. 7) EROSION AND SEDIMENT CONTROL: CONTRACTOR SHALL SUPPLY, INSTALL AND MAINTAIN SEDIMENT CONTROL STRUCTURES IN ACCORDANCE WITH CONTRACT DOCUMENTS. CONTRACTOR SHALL INSTALL ADDmONAL EROSION CONTROL STRUCTllRES OIRECTED BY THE ENVIRONMENTAL INSPECTOR. B) TOPSOIL SHALL BE STRIPPED REQUIRED BY PROJECT SPECIFICATIONS. 9) PRIOR TO PIPE PUL.L8'CK, CON'mACTOR'S ACTUAL DRILL PROFlLE SHALL BE SUBMITTED TO KEYSTONE FOR APPROVAL 1D) INSTAl.l.ATION: THE PIPE SECTION FOR THE DRILLED CROSSING SHALL BE MADE UP WITHIN THE RIGHT-OF-WAY AT THE DRILL EXIT SHOWN. CONmACTOR SHALL ASSESS THE NEED FOR AND SUPPLY APPROPRIATE BAL.LAST DURING PULL.BACK. 11) MUD OISPOSAL: CONTRACTOR SHALL DISPOSE OF EXCESS DRIWNG MUD DIRECTED BY THE COMPANY REPRESENTATIVE IN ACCORDANCE WITH PERMIT CONDITIONS. UNOER NO CIRCUMSTANCES SHALL DRIWNG FLUID BE OISPOSED OF IN WATER BODIES OR WETLANDS. ANY DRIWNG MUD WHICH INADVERTENTLY EXITS AT POIN'ffi OTHER THAN THE ENTRY AND EXIT POIN'ffi SHALL BE CONTAINED AND COLLECTED TO THE EXTENT PRACTICAL AND DISPOSED OF DIRECTED BY THE COMPANY REPRESENTATIVE IN ACCORDANCE WITH PERMIT CONDITIONS. 12} CLEANUP/STABILIZATION/RESTORATION: ALL DISTURBED AREAS SHALL BE RETURNED TO THE ORIGINAL CONTOURS. DISTURBED AREAS SHALL BE SEEDED SPECIFIED IN PROJECT DOCUMENTS. 1 J) NOMINAL WORKING SPACE DIMENSIONS ARE SHOWN. LARGER AREAS 1200 Horiz. Scale: 1 .. , = 4 , oo· @OTOPsoiL @[::::3siLrsTONE @t?iiilCLAvsroNE Vert. Scale: 1" = 20D' 1200 IMY BE REQUIRED IN IRREGULAR TERRAIN. UPDATED DIMENSIONS IMY BE PROVIDED AFTER LOCAL TOPOGRAPHICAL SURVEYS ARE PERFORMED. 14) PIPBJNE DATA: JS"O.D. x D.S1B· W.T. API 5l PSL 2-X70M W/ 14-2D MILS FBE le 16-2D MILS ARO (NOT TO EXCEED 40 MILS lOTAL) -8+00 -4+00 o+oo >::i 0 oFo +a 0 4+00 8+00 12+00 16+00 20+00 24+00 28+00 32+00 36+00 40+00 ? -" ..... +..: _, ..... I ffi 44+00 48+00 52+00 56+00 60+00 9 "' " ... +- _, "'"' I ffi 64+00 68+00 72+00 76+00 80+00 I "" ""' +..: "' I "'"' I I m 84+00 !z oo O"- ,Ot: 'i' 1:S .. "'" " I 88+00 92+00 15) PIPBJNE DATA: JS"O.D. X D.485• W.T. API 5l PSL 2-X70M W/ 14-2D MILS FBE LEGEND POINT Of INTERSECTION (P.I.) ENTRY OR EXIT POINT PIPELINE DATA f-------MLP-------+-------------------------------PIPEl.JNE DATA: 35• 0.0. X 0.7..a· W.T. API SL PSL 2-X70M W/ 14-20 MILS FBE &: 16-20 MILS ARO (NOT TO EXCEED 40 MILS TOTAL)----------------------------------------------+---------MLP--------< 0 " qi, GEOTECHNICAL BOREHOLE LENGTH SCALE: N.T.S. 250' TOPSOIL SALVAGE METHOD STREAMS WETLANDS TIMING CONSTRANTS MILEPOST MONITORING RECLAMATION SPECIAL CONSIDERATIONS REFERENCE DRAWINGS DRAWING No TITLE 4367-03-ML-02-028 ALIGNMENT SHEET TC_UD_BR.DWG 22X34 HDD ENTRY REV No A B DATE 2012-03-30 2012-09-07 REVISION DESCRIPTION ISSUED FOR REVIEW UPDATED CENTERLINE (2012-08-15) LIMIT OF PERMANENT EASEMENT PROJECT CODE 2095406 2095406 DRAFTER AH JB DRAFTING CHECKER YL YL APPROVAL DESIGNER BS BS DESIGN CHECKER REW KM PROJECT MANAGER RG RG COMPANY EXP EXP 15D' HDD EXIT PROFESSIONAL ENGINEER/RPT PERMIT/ ENG. APPROVAL RAYMOND E. WAl.l.ACE, JR. PE SD - 10070 DATE PRELIMINARY REV. NO. DATE PERMIT NUMBER: CADD DRAWING: DO NOT MAKE MANUAL REVISIONS FIA # SCALE TransCanada In business to deliver MLP --//-- .: .:1 I POWERPOLE MAINLINE PIPE PIPELINE FOREIGN PIPELINE EDGE OF WATER PRIVATE ACCESS SHOO FLY ROAD COUNTY BOUNDARY WATER LEVEL USA.COE CONSTRUCTION REFERENCE POINT WEllANDS PERMANENT EASEMENT TEMPORAR'I' WORKSPACE ADDmONAL TEMPORARY WORKSPACE exp Energy Services Inc. I: +1.850.365.54411 f: +1.850.385.5523 1300 Metropallan Blvd Taleih11B81111, FL 32306 USA www.up.ccm KEYSTONE XL (NPS 36 2014) FAITH SECTION 4367 CHAINAGE: MP 433.58 DISCIPLINE # 03 HOD INSTALLATION XL PROJECT SOUTH DAKOTA BRIDGER CREEK KEYSTONE HAAKON COUNTY, DRAWING No AS SHOWN 4367-03-ML-03-003 REV B PLOTIED SIZE: ANSI D (22x34)

Upload: others

Post on 29-Jan-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

  • G

    F

    E

    D

    c

    B

    A

    L

    12 1 1 10 9 8 7 6 5

    •·. I I I I

    8335' HORIZONTAL DISTANCE

    4 3

    DRAWING IS FOR INFORMATIONAL USE ONLY. CENTERLINE STATIONS AND MILE POST ARE BASED ON AUGUST 15, 2012 CENTERLINE AND MAY BE SUBJECT TO CHANGE.

    8721' PULLBACK MAKE-UP AREA~ SHOWN

    COUNTY

    2 1

    INSTAUATION NOTES

    1) ACCESS: ALL EQUIPMENT MUST ACCESS THE SITE ALONG THE CONSTRUCTION RIGHT-OF-WAY FROM PUBLIC OR APPROVED PRIVATE ROADS.

    2) VEHICLE AND EQUIPMENT ACCESS CROSSING MAY BE INSTAU.ED IF APPROVED BY THE ENVIRONMENTAL INSPEI:TOR.

    26DO 1----l--+----l--+----l--+--t"==!====+=====!====+=====!====+=====!====+=====!====+=====!====+=====!====+=====!====+=====!====+=====!====~8~4~17~''H~D=D~LE~N=GTH~=+====+=====!====+=====!====+=====!====+=====!====+=====!====+=====!====+=====!====+=====!====+=====!====~---l--+----l--+----1 2600 J) WORK SPACE: WORK SPACE LIMITS ARE DEPICTED. CL.EARING WILL BE

    RESTRICTED TO THE WORK SPACES INDICATED AT THE ENTRY AND EXIT POINTS AND PUL.L8'CK MAKE-UP AREA ALONG THE RIGHT-OF-WAY. CL.EARING BETWEEN THE ENTRY AND EXIT POIN'ffi IS LIMITED TO THE MINIMUM AMOUNT NECESSARY TO STRING LOCATION WIRES AND

    HDD ENTRY POINT STA: 0+90.00

    2200 1---+---+ ELEV: 2347.48'

    POINT OF CURVATURE STA: 17+07.51

    1800 !---+---+--+---+---+--+---+---+--+---+- ELEV: 2003.67'

    1400 GROUND PROFILE WAS GENERATED FROM D.E.M. DATA AND CIVIL SURVEY WHERE AVAILABLE.

    POINT OF TANGENT STA: 24+55.99

    --+---+---+--+---+---+- ELEV: 1925.00'

    POINT OF CURVATURE STA: 61+23.25

    +---+---+-----l----+---+---+---+---+---+---+-- ELEV: 1925.00'

    uses SOIL CLA$Slflr.A.TIQN

    (.', ro:J G0~,.-,!i11- GRADED (;"\ 99•9•9 SP=POORL Y GRADED f9\ F///) ~:'yLOW PLASTICITY (.";'\ P771 OH-HIGH PLASTIC TY @E:"'"J Q i:"'El \.V ~ •1:..1... \.:::./ •e•e•e SAND \V ~ ....,.. \!.:::.) tL:.:.::.J ORGANIC SILT/CLAY 17 t::::::::::::J SHALE ~ t;;J;;;j LIMESTONE r.;\ I § .• ·· I 00•,·.~°'' v GRADED ,.., FIRl'l QI rmm OL·LOW PLASTlCrIY = ~ =[:RI 0 ,;;;;, i==i \.V ei . . •1:..1... ~ t1BJ:I SM=SILTY SANO ~ lli.l.UJ ORGANIC SILT/CLAY & ~ WATER ~ ~ RAVEL '81 § MUOSTONE

    l--f-----+--+---f-----+--+---+---+---+---+----+---+---+l 0[Ilfil GM•SILlY GRA\£1... 0~ SC=CLAYEY SAND @IIIIID ~1~THIGH PLASTICITY @[?(~PEAT @D SANDSTONE @p::s::::::J MARL

    POINT OF TANGENT STA: 68+71.74 ELEV: 2003.67'

    24DO

    22DO

    20DO

    18DO

    1600

    1400

    INSTALL PUMPS AND PIPING TO OBTAIN WATER (WHERE APPROVED).

    4) WATER SOURCE: DRILL WATER AND PRE-INSTAl.l.ATION HYDROSTATIC TEST WATER SHALL BE OBTAINED FROM AN APPROVED SOURCE. THE CONTRACTOR SHALL SCREEN THE INTAKE HOSE TO PREVENT THE ENTRAINMENT OF FISH OR DEBRIS AND IN ACCORDANCE WITH THE CONSTRUCTION M111GA110N AND RECLAMATION PLAN (CMRP) AND PROJECT REQUIREMENTS. THE HOSE SHALL BE KEPT OFF THE BOTTOM Of THE WATER BODY.

    5) HYDROSTATIC TEST: PRE-INSTALLATION HYDROSTATIC TEST SHALL BE CONDUCTED IN ACCORDANCE WITH PERMIT REQUIREMENTS. THE CONTRACTOR SHALL DISCHARGE HYDROSTATIC TEST WATER IN ACCORDANCE WITH PROJECT PERMITS. DISCHARGES WILL BE SENT BA.Cl< TO THE WATER SOURCE UNLESS OTHERWISE OIRECTED BY THE EN\/IRONMENTAL INSPECTOR. DISCHARGES SHALL NOT CAUSE EROSION OR SEDIMENTATION. TO REDUCE THE VELOCITY OF THE DISCHARGE, THE CON'mACTOR SHALL UTILIZE AN ENERGY-DISSIPATING DEVICE ~ DESCRIBED IN THE CMRP.

    6) SPILL-PREVENTION: ALL PUMPS SHALL BE SET IN SECONDARY CONTAINMENT AND IN ACCORDANCE WITH THE SPILL PREVENTION CONTROL AND COUNTERMEASURE PLAN (SPCC). EQUIPMENT AND PUMPS OPERATING WITHIN 100 FEET OF ANY WATER BODY OR WETl.AND SHALL BE OPERATED AND REFUELED IN ACCORDANCE WITH THE SPCC PL.AN. EQUIPMENT REFUBJNG AND STORAGE OF HAZARDOUS IMTERIALS, FUB.S, ETC. SHALL BE CONDUCTED AT LEAST 100 FEET FROM WATER BODIES AND WETl.ANDS. EACH CONSTRUCTION CREW SHALL Kl.VE ON HAND SUFFlCIENT TOOLS AND MATERIALS TO STOP LE'AKS AND SUPPi.JES Of ABSORBENT AND 8'RRIER IMTERIALS TO ALLOW RAPID CONTAINMENT AND RECOVERY OF SPILLED MATERIALS.

    7) EROSION AND SEDIMENT CONTROL: CONTRACTOR SHALL SUPPLY, INSTALL AND MAINTAIN SEDIMENT CONTROL STRUCTURES IN ACCORDANCE WITH CONTRACT DOCUMENTS. CONTRACTOR SHALL INSTALL ADDmONAL EROSION CONTROL STRUCTllRES ~ OIRECTED BY THE ENVIRONMENTAL INSPECTOR.

    B) TOPSOIL SHALL BE STRIPPED ~ REQUIRED BY PROJECT SPECIFICATIONS.

    9) PRIOR TO PIPE PUL.L8'CK, CON'mACTOR'S ACTUAL DRILL PROFlLE SHALL BE SUBMITTED TO KEYSTONE FOR APPROVAL

    1D) INSTAl.l.ATION: THE PIPE SECTION FOR THE DRILLED CROSSING SHALL BE MADE UP WITHIN THE RIGHT-OF-WAY AT THE DRILL EXIT POINT~ SHOWN. CONmACTOR SHALL ASSESS THE NEED FOR AND SUPPLY APPROPRIATE BAL.LAST DURING PULL.BACK.

    11) MUD OISPOSAL: CONTRACTOR SHALL DISPOSE OF EXCESS DRIWNG MUD ~ DIRECTED BY THE COMPANY REPRESENTATIVE IN ACCORDANCE WITH PERMIT CONDITIONS. UNOER NO CIRCUMSTANCES SHALL DRIWNG FLUID BE OISPOSED OF IN WATER BODIES OR WETLANDS. ANY DRIWNG MUD WHICH INADVERTENTLY EXITS AT POIN'ffi OTHER THAN THE ENTRY AND EXIT POIN'ffi SHALL BE CONTAINED AND COLLECTED TO THE EXTENT PRACTICAL AND DISPOSED OF ~ DIRECTED BY THE COMPANY REPRESENTATIVE IN ACCORDANCE WITH PERMIT CONDITIONS.

    12} CLEANUP/STABILIZATION/RESTORATION: ALL DISTURBED AREAS SHALL BE RETURNED TO THE ORIGINAL CONTOURS. DISTURBED AREAS SHALL BE SEEDED ~ SPECIFIED IN PROJECT DOCUMENTS.

    1 J) NOMINAL WORKING SPACE DIMENSIONS ARE SHOWN. LARGER AREAS

    1200

    Horiz. Scale: 1 .. , = 4,oo· ©f:;'.od:;~u.GRAoEo ©ITIIIJ)~itTLowPLAs11arr @~ ~~1GHPLAsTic1rr @OTOPsoiL @[::::3siLrsTONE @t?iiilCLAvsroNE Vert. Scale: 1" = 20D' -1-1-1-1-1-11-1L---=;=~-~-~-~==-,.-~-~-~-=::::;::-~-~-~--'::::;::=--~-~-~-...;:::=~-~-~--,--:=::;--~-~-~-~-~J--l-1-1-1-1-1-1-i-1-1-1---i 1200

    IMY BE REQUIRED IN IRREGULAR TERRAIN. UPDATED DIMENSIONS IMY BE PROVIDED AFTER LOCAL TOPOGRAPHICAL SURVEYS ARE PERFORMED.

    14) PIPBJNE DATA: JS"O.D. x D.S1B· W.T. API 5l PSL 2-X70M W/ 14-2D MILS FBE le 16-2D MILS ARO (NOT TO EXCEED 40 MILS lOTAL)

    -8+00 -4+00 o+oo

    >::i 0 oFo +a 0

    4+00 8+00 12+00 16+00 20+00 24+00 28+00 32+00 36+00 40+00

    ? -" ..... +..: _, .....

    I

    ffi

    44+00 48+00 52+00 56+00 60+00

    9 "' " ... ~ +-_, "'"' I

    ffi

    64+00 68+00 72+00 76+00 80+00

    ~ I

    "" ""' +..: "' I "'"' I

    I m

    84+00

    !z oo O"-,Ot: 'i' 1:S .. "'" " I

    88+00 92+00 15) PIPBJNE DATA: JS"O.D. X D.485• W.T. API 5l PSL 2-X70M W/

    14-2D MILS FBE

    LEGEND POINT Of INTERSECTION (P.I.)

    ENTRY OR EXIT POINT

    PIPELINE DATA f-------MLP-------+-------------------------------PIPEl.JNE DATA: 35• 0.0. X 0.7..a· W.T. API SL PSL 2-X70M W/ 14-20 MILS FBE &: 16-20 MILS ARO (NOT TO EXCEED 40 MILS TOTAL)----------------------------------------------+---------MLP--------<

    0

    • " qi,

    GEOTECHNICAL BOREHOLE

    LENGTH SCALE: N.T.S. 250'

    TOPSOIL SALVAGE METHOD

    STREAMS

    WETLANDS

    TIMING CONSTRANTS

    MILEPOST

    MONITORING

    RECLAMATION

    SPECIAL CONSIDERATIONS

    REFERENCE DRAWINGS

    DRAWING No TITLE 4367-03-ML-02-028 ALIGNMENT SHEET

    TC_UD_BR.DWG 22X34

    HDD ENTRY

    REV No

    A

    B

    DATE

    2012-03-30

    2012-09-07

    REVISION

    DESCRIPTION

    ISSUED FOR REVIEW

    UPDATED CENTERLINE (2012-08-15)

    LIMIT OF PERMANENT EASEMENT

    PROJECT CODE

    2095406

    2095406

    DRAFTER

    AH

    JB

    DRAFTING CHECKER

    YL

    YL

    APPROVAL DESIGNER

    BS

    BS

    DESIGN CHECKER

    REW

    KM

    PROJECT MANAGER

    RG

    RG

    COMPANY

    EXP

    EXP

    15D'

    HDD EXIT

    PROFESSIONAL ENGINEER/RPT PERMIT/ ENG. APPROVAL

    RAYMOND E. WAl.l.ACE, JR. PE SD - 10070

    DATE

    PRELIMINARY

    REV. NO. DATE PERMIT NUMBER:

    CADD DRAWING: DO NOT MAKE MANUAL REVISIONS

    FIA #

    SCALE

    TransCanada In business to deliver

    MLP

    --//--

    .: .:1

    I

    POWERPOLE

    MAINLINE PIPE

    PIPELINE

    FOREIGN PIPELINE

    EDGE OF WATER

    PRIVATE ACCESS SHOO FLY ROAD

    COUNTY BOUNDARY

    WATER LEVEL

    USA.COE CONSTRUCTION REFERENCE POINT

    WEllANDS

    PERMANENT EASEMENT

    TEMPORAR'I' WORKSPACE

    ADDmONAL TEMPORARY WORKSPACE

    exp Energy Services Inc. I: +1.850.365.54411 f: +1.850.385.5523 1300 Metropallan Blvd Taleih11B81111, FL 32306 USA

    www.up.ccm

    KEYSTONE XL (NPS 36 2014) FAITH SECTION

    4367 CHAINAGE: MP 433.58 DISCIPLINE # 03

    HOD INSTALLATION XL PROJECT

    SOUTH DAKOTA

    BRIDGER CREEK KEYSTONE

    HAAKON COUNTY, DRAWING No

    AS SHOWN 4367-03-ML-03-003 REV B

    PLOTIED SIZE: ANSI D (22x34)

  • E

    D

    c

    B

    A

    f----+---+--+ --+---+---+---+---f-- --l- 2050' HORIZONTAL DISTANCE USCS SQIL C(,ASS!f!CATION 1920 H---+---+---+---+----+----+---+---+---+----+---+---+---+---H----+----+----+---+- ~00< -+----+----+---+---+--- 20ss· HDo LENGTH ---+----+---+---+---+---+---+---+---+-+---+----+----+---+---+---+----+---+---+---+---1 [:8:=::1 :';~GRADED ~WATER

    ~ ~~ [] ~ e:::: ~ ....1 ""' ~ g~ lIIIIl GM=SILTY GRAVR D TOPSOIL 1880 H---+---+---+---+----+----+---+---+---+----+---+---+---t---H----+----+---+ < ~~ -+---+----+---+---+---t---t----l----t---+---+---+----+---+---+---t---l-t---t----t---+---+---+---+----t---+---+-~ ..... f---1~

    m ~ ~ TOE OF SLOPE ~ TOP OF BANK C£:..9 ~~N~LL GRADED

    6' TOP OF BANK (;ll e::tlld T?P OF BIANK fr: ~t~ct=~~E~l~:_:~;;tf~~~=~r=rE~x:1s~TI~NfG~G~R~O~U1N~D~P'.:R:o::FrlLE:::...=1-=9--t--t1 ~~ 1860 ft---+---+---t---t----t---+---+---+---+----t---+---t---o--ln --ft- --'~++--+-~-+--7''-f---f----+----+---+--+- rop OF BANK =--t~~-+---+ . ALONG THE RIGHT-OF-WAY. CLEARING BETWEEN THE ENTRY ANO EXIT POINTS IS LIMITED TO THE MINIMUM AMOUNT NECESSARY TO STRING LOCATION WIRES ANO INSTALL PUMPS ANO PIPING TO OBTAIN WATER (WHERE APPROVED).

    4) WATER SOURCE: DRILL WATER ANO PRE-INSTALLATION HYDROSTATIC TEST WATER SHALL BE OBTAINED FROt.4 AN APPROVED SOURCE. THE CONTRACTOR SHALL SCREEN THE INTAKE HOSE TO PREVENT THE ENTRAINMENT OF FISH OR DEBRIS ANO IN ACCORDANCE WITH THE CONSTRUCTION MITIGATION ANO RECLAMATION Pl.AN (CMRP) ANO PROJECT REQUIREMENTS. THE HOSE SHALL BE KEPT OFF THE BOTTOM OF THE WATER BOOY.

    5) HYDROSTATIC TEST: PRE-INSTALLATION HYDROSTATIC TEST SHALL BE CONOUCTEO IN ACCORDANCE WITH PERMIT REQUIREMENTS. THE CONTRACTOR SHALL OISCH.l.RGE HYDROSTATIC TEST WATER IN ACCORDANCE WITH PROJECT PERMITS. OISCHARGES WILL BE SENT BAa< TO THE WATER SOURCE UNLESS OTHERWISE OIRECTED BY THE ENVIRONMENTAi.. INSPECTOR. DISCHARGES SHALL NOT CAUSE EROSION OR SEDIMENTATION. TO REDUCE THE VELOCITY OF THE DISCHARGE, THE CONTRACTOR SHALL UTILIZE AN ENERGY-DISSIPATING DEVICE AS DESCRIBED IN THE CMRP.

    6) SPILL-PREVENTION: AU. PUMPS SHALL BE SET IN SECONDARY CONTAINMENT AND IN ACCORDANCE WITH THE SPILL PREVENTION CONTROL ANO COUNTERMEASURE PLAN (SPCC). EQUIPMENT ANO PUMPS OPERATING WITHIN 100 FEET OF ANY WATER BODY OR Wm.ANO stW.L BE OPERATED AND REFUELED IN ACCORDANCE WITH THE SPCC Pl.AN. EQUIPMENT REFUBJNG AND STORAGE Of HAZARDOUS MATERIALS, FUB..S, ETC. SHALL BE CONDUCTED AT LEAST 100 FEET FROM WATER BODIES AND W£TL.ANOS. E'ACH CONSTRUCTION CREW SHALL HAVE ON HAND SUFFICIENT TOOLS AND MATERIALS TO STOP L.EAl