ITB 2013- 327 PAL 10-49740 /Construction of 300 Residential Units in Rafah Package #12: Infrastructure Works – Part A. SECTION 9: PRICE SCHEDULE (Bill of Quantities) SAUDI COMMITTEE FOR PALESTINIAN RELEIF Electronic copy of the BOQ shall be submitted along with the signed hard copy In case of any discrepancy between the soft and the hard copies, the hard co prevail.

Upload: lyngoc

Post on 22-Jun-2018

229 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: [XLS] · Web viewSummary Electrical Communication Works Water Works Concrete Works Road works Sheet1 fac fac fac facc facc facc No. Description Unit Quantity Total DESCRIPTION OVERALL

ITB 2013- 327PAL 10-49740 /Construction of 300 Residential Units in Rafah

Package #12: Infrastructure Works – Part A.

SECTION 9: PRICE SCHEDULE (Bill of Quantities)

SAUDI COMMITTEE FOR PALESTINIAN RELEIF

Electronic copy of the BOQ shall be submitted along with the signed hard copy thereof. In case of any discrepancy between the soft and the hard copies, the hard copy shall prevail.

Page 2: [XLS] · Web viewSummary Electrical Communication Works Water Works Concrete Works Road works Sheet1 fac fac fac facc facc facc No. Description Unit Quantity Total DESCRIPTION OVERALL

Package #12: Infrastructure Works – Part A. ITB 2013-327

Contractor's Signature and Seal

Bill No (1)Road Works

Description Unit Quantity

1.1 18,300

1.2 12,800

1.3 6,300

1.4 6,300

1.5 12,800

Item No.

Unit Rate US $

(letters)

Unit Rate US $

(Numbers)

Total Amount

US $ROAD PAVEMENT WORKS1. The Contractor has to submit Detailed Shop Drawings to be approved by the Engineer before commencement of the work, and all required materials should be supplied as specified and subject to the Engineer approval.

2. The Contractor has to fix,maintain and replace the under ground services that may be damaged during his work.

3. The Contractor should include in his price the costs of sampling and testing as required and according to technical specifications and work requirement.

4. Price includes cost of removing and/or relocating of all obstacles such as debris, garbage, trees, existing clay base, asphalt or concrete raod and existing services in addition to the required materials necessary for work completion according to engineer's instructions and specifications.

5.The Contractor should include in his price the cost of cut and removal of trees roots, backfilling, watering ,compaction in layers with clean sand as specified and according to the Engineer instructions, the price also include relocation of Power, Telephone poles and networks to sidewalk.6.Price includes cost of adjusting the levels of existing manholes (in any diameter) to the new design levels by adding rings with the same specification of the existing manhole (if necessary), replacing the damaged covers and frames and all materials and works required to complete the job.Note: the manhole cover neck should not more than 25 cm.7. Price includes costs of cleaning all sewage network using JetterClean, excavate, cut and fill carriageway & side walks with clean dense sand from natural ground level to the bottom of the sub-base layer design level including watering, compaction not less than 98% & CBR not less than 15% ,all according to drawing and technical specifications .Price includes transferring the surplus materials to a site identified by the engineer.

M2

Supply and lay approved crushed stone base coarse 20 cm thick in two layers( each layer10 cm thickness) with CBR > 80% for the carriage way to the levels shown in the drawings . Price includes watering & compaction to reach 100 % of maximum dry density .The Grader machine must be used in spreading and leveling the tow layers. The work includes all tests as per specifications & engineer instructions,

M2

Supply and lay approved Kurkar 20 cm thick with CBR > 30% for the side walks to the levels shown in the drawings . Price includes watering & compaction to reach 98 % of maximum dry density , the work includes all tests as per specifications & Engineer Instructions.

M2

Supply and istall and compact of colored interlock tile 6 cm thick for side walk. The price includes 5 cm clean sand under tiles, filling the bed joint between tiles with clean sand, compacting, and the work includes all test as per specification and engineer instruction.The shape and color of interlock tiles to be approved by engineer

M2

Supply, install and compact of interlock tiles 8 cm thick, for carriageway The price include casting concrete beam with B300 (size 20x40 cm) at the ends of interlock, Also supply and spread dune sand 5 cm thick under interlock, all the required tests, The work include connect the work with existing asphalt. all works are according to specifications, Drawings and Engineer instructions.The shape and color of interlock tiles to be approved by engineer

M2

Page 3: [XLS] · Web viewSummary Electrical Communication Works Water Works Concrete Works Road works Sheet1 fac fac fac facc facc facc No. Description Unit Quantity Total DESCRIPTION OVERALL

Package #12: Infrastructure Works – Part A. ITB 2013-327

Contractor's Signature and Seal

Bill No (1)Road Works

Description Unit Quantity Item No.

Unit Rate US $

(letters)

Unit Rate US $

(Numbers)

Total Amount

US $

1.6 L.M 2,850

Total

Supply & lay pre-cast concrete curbstones for side walks (17x30x100 cm) including all necessary excavations, filling with dune sand & compaction to 98% of MDD and the base coarse layer (30x10 cm) with compaction 100%, B250 plain concrete foundation (30x10cm) under the curb and (15x19cm) behind, spreading 2 cm mortar under the curbstone, filling joints between curbs with cement mortar and painting with one prime coat and two finishing coats of approved brand name painting material ,expansion joint every 12 m.r with selotex board and filling 3cm with SIkaflex ,all according to drawing and technical specifications.

Page 4: [XLS] · Web viewSummary Electrical Communication Works Water Works Concrete Works Road works Sheet1 fac fac fac facc facc facc No. Description Unit Quantity Total DESCRIPTION OVERALL

Package #12: Infrastructure Works – Part A. ITB 2013-327

Contractor's Signature and Seal

Bill No (2)Concrete Works

Description Unit Quantity

3. Approved additives and admixtures.

10. Preparation of workshop and detailed drawings

2.1 220

Total

Item No.

Unit Rate US $

(letters)

Unit Rate US $

(Numbers)

Total Amount

US $Rates of Concrete Works shall include:-1. All form works and shuttering (new lumber for shuttering) in any form, shape and size . Making chamfered and curved edges, allowing for and making grooves and sleeves, removal of forms and cleaning of all exposed tie wires and rods. 2. Supplying, casting, vibrating and curing as per specifications.

4.Testing cost such as New Concrete Job Mix Designs, Sampling , testing and providing test results certificates, storing and saving of samples.

5. Supplying reinforcement of any grade, size and length as detailed in the drawings.

6. Painting surfaces of burried concrete elements with two coats of hot bituminous paint (75/25) after primer layer , the strokes of each layer to be opposite to each other.

7.The work and price include Cleaning, excavation, cutting and backfilling for edge beams and retaining walls from natural ground level to the bottom level including watering and compaction not less than 98% ,all according to drawing and technical specifications .Price includes transferring the sand to site specified by engineer and all works according to engineer's instructions and specifications.

8. Compaction and testing under the foundation, ground beams, and retaining walls, the compaction must exceed 98% of MDD.9. The work and price include pf construction of expansion joint every 12 m.r with selotex board and filling 3cm with Sikaflex sealant ,all according to drawing and technical specifications.

Supply and cast ready mix reinforced concretet B-250 for edg beams and retaining walls. M3

Page 5: [XLS] · Web viewSummary Electrical Communication Works Water Works Concrete Works Road works Sheet1 fac fac fac facc facc facc No. Description Unit Quantity Total DESCRIPTION OVERALL

Package #12: Infrastructure Works – Part A. ITB 2013-327

Contractor's Signature and Seal

Bill No (3)Water Supply Works

Description Unit Quantity

3.1

No. 20

3.2 Ditto, but saddle 63/32 mm No. 50

Total

Item No.

Unit Rate US $

(letters)

Unit Rate US $

(Numbers)

Total Amount

US $Water Supply works1. All works must be coordinated with the water department at the Municipality.

2. The price includes the cost of excavation to depth indicated in drawings not less than 1m using retaining shuttering, shoring according to instructions of Engineer, bedding of 20 cm clean dune sand under around and above the pipe with compaction, backfilling the rest of the trench up to design level with sand in layers 25 cm thick each with compaction 98% MDD and all required tests.

3.The work includes removal of the surplus materials outside the site to places as instructed by the Engineer.

4.Supply and installation of elbows with any angles, Tees, Flanges, joints, metallic warning tap, and other accessories and thrust blocks according to details.

5.Cleaning ,disinfection and testing all the installed pipes according to technical specification, Engineers instructions and coordinating with water department in the municipality

6. All works are performed according to the drawings, specifications and Engineer’s instruction7.All tests costs to be included in the unit rate items,without any extra paid money.

8.The price include reinstate repairing any damage resulted from excavation, all according to specification & as per engineer instructions

9. The contractor has to submit detailed shop drawings of the coming items for the approval by the Engineer before starting the work.

Excavation , backfilling with clean sand on layers not to exceed 25 cm each , Supply and install house connection, the price includes approved Saddle 110/32mm , thrust block ,MDPE pipe 32 mm diameter to be connected to 1" steel pipe and all fittings according to drawing, specification and engineer instructions

Page 6: [XLS] · Web viewSummary Electrical Communication Works Water Works Concrete Works Road works Sheet1 fac fac fac facc facc facc No. Description Unit Quantity Total DESCRIPTION OVERALL

Package #12: Infrastructure Works – Part A. ITB 2013-327

Contractor's Signature and Seal

Bill No (4)Comunication Works

Description Unit Quantity

2. The Contractor has to visit the site for inspection.

4.1

No. 50

4.2

L.M 25

4.3 Ditto but double lines of PVC pipes 4" V2 L.M 25

Total

Item No.

Unit Rate US $

(letters)

Unit Rate US $

(Numbers)

Total Amount

US $Communication Works1.The contractor has to submit detailed shop drawings of the coming items for the approval by the PalTel Company before starting the work.

3.The price includes the cost of excavation to depth indicated in drawings and using retaining shuttering, shoring according to the instructions of Engineer, bedding of 15 cm clean sand under ,around and above the pipe with compaction, backfilling of the trench up to design level in layers 25cm thick for each with compaction 98% MDD and all required tests.4.The work includes connection of the manholes to the existing PalTel line after cleaning and adjusting the level and orientation of the existing pipes if needed according to engineer instructions.5.The holes of the manholes have to be done using core machine.6.The price includes reinstate repairing any damage resulted from the work, all according to specification & as per engineer instructions

Supply, install and join single line of flexible PVC pipes 3" diameter for the PalTel house connection including excavation in any ground for min. 1.5m depth, shoring, shuttering, safety measures, testing, sand beds, opining in the existing manholes and concrete around PVC pipes all according to the drawings, specifications and Engineer’s instruction.

Supply, install and join single line of PVC pipes 4" diameter V1. for the PalTel network with approved gasket rubber ring including excavation in any ground for min. 1.5m depth, shoring, shuttering, safety measures, testing, sand beds all according to the drawings, specifications and Engineer’s instruction.

Page 7: [XLS] · Web viewSummary Electrical Communication Works Water Works Concrete Works Road works Sheet1 fac fac fac facc facc facc No. Description Unit Quantity Total DESCRIPTION OVERALL

Package #12: Infrastructure Works – Part A. ITB 2013-327

Contractor's Signature and Seal

Bill No (5)Electrical Works

Description Unit Quantity

5.1 L.S. 1

5.2 Unit 2

Item No.

Unit Rate US $

(letters)

Unit Rate US $

(Numbers)Total Amount

US $

Supplying, installing, testing and commission of the electrical works as per drawings, specifications, and engineer's instructions. The prices of the follwing items include all necessary junction boxes, wires, conduits, clamps, bolts, connectors and connecting all new and existing cables to switch ,boards & Pillars. The price includes all measurement devices ,equipments , machinary,...., ets.All installation shall be in accordance with :* The drawings , specifications , instructions and demands of the engineer and coordination with GEDCO .* The electricity law and electrical code requirments of the BRITISH standards.*The contractor should repair any damage of the existing infrastructures.*The Ressistance of any Earthing system must be less than 2 Ω , and the contractor must find and do the solution to be < 2 Ω.

Supply, Install , Connect ,and Test 36 kV Switch Disconnector (Isolating Switch) on the existing pole with built-in arc interrupter , Master key lock , Compression Lugs with all needed Arms on the two existing poles to complet the work , six complete tension units (with its all Tension Glass Disks , Half Moons and all needed for Fixing & Connection ) , heatshrinc termination kits ,wires for earthing ,all needed clamps , and all acessories for Fixing & Installation .The price include all M.V ACSR wires to connect the new network to the closer existing network (between two poles) .All works must be According to supervisor Instructions and Approval of GEDCO.

Supply, Instal , Connect, and Test 24 kV, 630A Switchgear, and 16 kA Short Circuit Current Ring Main Unit SF6, 2 incoming switch Disconnectors, one Transformer Protection fuse switch combination (CTC) With 22 kV Porcelain Fuses 63 A. The price include connecting the existing cables to CTC.The Work Include wires , Clamps ,70mm2 wires for earthing ,Shielded Fore-Connectors with Cable Adapter & Jacket Seal for all in/out cables & all needed acessories .All works and materials must be According to supervisor Instructions and Approval of GEDCO.

Page 8: [XLS] · Web viewSummary Electrical Communication Works Water Works Concrete Works Road works Sheet1 fac fac fac facc facc facc No. Description Unit Quantity Total DESCRIPTION OVERALL

Package #12: Infrastructure Works – Part A. ITB 2013-327

Contractor's Signature and Seal

Bill No (5)Electrical Works

Description Unit Quantity Item

No.Unit Rate

US $ (letters)

Unit Rate US $

(Numbers)Total Amount

US $

5.3 No. 2

5.4 No. 2

5.5 Unit 2

Supply, Instal, Connect ,and Test 22/0.4 KV Low Losses , 3 phase , Indoor Distribution Transformer 1250 KVA Rating Type :3 phase oilimmersed Hermetically Sealed . Reference Manufacturing: IEC 60076 or DIN42500 Standards.Complete with all needed Bushings and Arms for Fixing the Cable beside the Transformer with cable ladder. The Work Includes connecting the existing cables and all needed new cables to connect CTC with Transformer and Transformer with LVDB , all needed Lugs, Clamps,70mm2 Wires for Earthing system for transformer.The item include supplying & fixing Fire Extinguisher , Emergency lighting & all needed steel wire mesh protection to isolate the Transformer.All works and materials must be According to supervisor Instructions and Approval of GEDCO.

Supply, Instal, Connect ,and Test L.V Distribution Board 2000A (bus bars system ) with Main CB IZM 2000A (7 Feeder). Bus Bars ,6 Vertical LTL 630/400A & 1Vertical LTL 160/100A (Jean Moeller Type or equivalent ) , Current and Voltage Instruments With CTs, LTL3*32/6A , MCB 3*32A , wires , Clamps ,70mm2 wires for earthing , all needed acessories & all components in the drawings.The price include connecting all the existing & newer feeder cables to the board. The size and specifications of board & all works and materials must be According to the drawing , supervisor instructions , specifications and approval of GEDCO.

Supply, Instal, Connect ,and Test 630A M.LV Pillar (bus bars system ) with main Vertical LTL (630/400 A) , 3 Vertical LTL (250/160A) ,(Jean Moeller Type) , Bus bars for phases + N + E , 4 Inch sleeves and all needed wires , accessories and PVC Terminals connections. The price include all needed civil structure according the drawing , specifications of GEDCO , supervisor instruction, and comply with the existing Pillars.The price include earthing system ( manholes , electrodes ,35mm2 wires , treatment of the soil, all accessories and all needed to be the Ressistance less than 2 Ω ) The work include connecting all the in/out feeder cables to the Pillar.All works and materials must be According to the drawing , supervisor instructions , specification and approved of GEDCO.

Page 9: [XLS] · Web viewSummary Electrical Communication Works Water Works Concrete Works Road works Sheet1 fac fac fac facc facc facc No. Description Unit Quantity Total DESCRIPTION OVERALL

Package #12: Infrastructure Works – Part A. ITB 2013-327

Contractor's Signature and Seal

Bill No (5)Electrical Works

Description Unit Quantity Item

No.Unit Rate

US $ (letters)

Unit Rate US $

(Numbers)Total Amount

US $

5.6 Unit 6

5.7 Unit 2

5.8 L.m. 120

5.9 L.m. 300

5.10 L.m. 2000

5.11 L.m. 90

Supply, Instal, Connect ,and Test 250A LV Pillar (bus bars system ) with main Vertical LTL (250/160 A) , 6 Vertical LTL (160/63A) , (Jean Moeller Type) , Bus bars for phases + N + E , 4 Inch sleeves and all needed wires , accessories and PVC Terminals connections. The price include all needed civil structure according the drawing , specifications of GEDCO , supervisor instruction, and comply with the existing Pillars.The price include earthing system ( manholes , electrodes ,35mm2 wires , treatment of the soil,all accessories and all needed to be the Ressistance less than 2 Ω ) The work include connecting all the in/out feeder cables to the Pillar.All works and materials must be According to the drawing , supervisor instructions , specification and approved of GEDCO.

Supply, Install Connect and Test external lighting HEIMEL Control Panel box , as the following:The panel must be made of water proof fiberglass , (80*60*25 cm) size, including :LTL 3*160/100A , 3ph KWHM , NZM1 3*80A , 3A Kaga photocell ,(no. 3) Moller Contactors DIL/M65 30KW , PSK Timer , over/under voltage relay protect ,triple switches , MCB's , wires , busbars , all according to the drawings & all needed connectors and accessories.The item include supplying & installing all needed cable XLPE 3*25+16 between LVDB and lighting panel , Cables Guards to protect the cables, and Cable Holders to fix the cables . All works must be According to drawing and supervisor Instructions .

Supply, Install Connect and Test 0.6/1KV , L.V Cable 3*150+75 mm 2 CU, XLPE. The work include the following :Excavation of the cable trenches in any soil with dim. ( 50 cm width & 110 cm depth ) .Supply & lay UPVC pipes (SN8- 6") at cross road trenches .Supply & backfill by clean sand around the cables,as drawings.Supply & fixed 45x45x5cm concrete slabs with flexural strength (5 Mpa), along the trenches including the warning tape after Backfill clean Sand 10 cm Thickness .All needed to complete the work The work includes watering & compaction to 100% of MDD each layer with 25cm depth as per drawings & supervisor instructions.All works must be According to drawings and supervisor Instructions .

Ditto but 3*50+25 mm2 CU, XLPE .

Supply, Instal, Connect ,and Test L.V Cable 4*16 mm 2 Cu., XLPE .The work include the following :Excavation of the cable trenches in any soil with dim. ( 40 cm width & 90 cm depth ) .Supply & lay spring pipe 3" at the trench .Supply & backfill by clean sand around the pipes, first layers with 50 cm depth. then warning tape and after Backfill clean Sand with 40 cm thickness.The work include all needed to connect the dwelling units M.D.Bs with electricity .All work must be according the drawings and Engineer approval .

Ditto but 4*25 mm2 CU, XLPE .

Page 10: [XLS] · Web viewSummary Electrical Communication Works Water Works Concrete Works Road works Sheet1 fac fac fac facc facc facc No. Description Unit Quantity Total DESCRIPTION OVERALL

Package #12: Infrastructure Works – Part A. ITB 2013-327

Contractor's Signature and Seal

Bill No (5)Electrical Works

Description Unit Quantity Item

No.Unit Rate

US $ (letters)

Unit Rate US $

(Numbers)Total Amount

US $

5.12 No. 35

5.13 L.m. 1000

5.14 L.m. 40

5.15 Unit 75

5.16 L.m. 2100

Supply and Install concrete base for future installation of Hot galvanized octagonal street light pole 8m long including bolts galvanized steel base and B200 concrete foundations 1*1*1m^3 , then cast concrete 0.5*0.5*0.2m^3 , the work Supply and Install 3" spring pipe layed at 80cm deep as following (pipe then 30cm soft sand then warning tape then 50cm sand).As per drawings and Engineer instruction.Ditto but UPVC 6'' SN8 for future XLPE 3*150+70mm cable at depth 110 cm

Supply and Install Octagonal lighting Pole 8m , the work include supplying and installing the following :- Single Arm , with 105 degree angle.-150W M.H Luminaire ,chock coil , condenser , ballast ( Type : Philips–Malaga-SGS102/SON-T150W ) .3*2.5mmsq cable inside 1 Inch flexible conduit for Luminaire.-control box with 1x10 A m.c.b. - All needed Bolts ,Nuts ,Washers,Terminal connections, Accessories, & all needed rinforced cement .All works must be According to drawing and supervisor Instructions

Supply, Instal, Connect ,and Test N2XY Cu cable 5*10mm 2.The work include the following :Laying the cables inside the existing or new spring pipes.Repairing any damages in the existing spring pipes as required.All works must be According to the drawing and supervisor instructions.

Page 11: [XLS] · Web viewSummary Electrical Communication Works Water Works Concrete Works Road works Sheet1 fac fac fac facc facc facc No. Description Unit Quantity Total DESCRIPTION OVERALL

Package #12: Infrastructure Works – Part A. ITB 2013-327

Contractor's Signature and Seal

Bill No (5)Electrical Works

Description Unit Quantity Item

No.Unit Rate

US $ (letters)

Unit Rate US $

(Numbers)Total Amount

US $

5.17 Unit 15

5.18 L.S. 1

5.19 Unit 4

Total

Supply and install 60 cm internal diameter precast circular reinforced concrete manhole for St. Light Earthing System, with iron cover with frame 8 ton capacity. The work includes excavation in any type of soil to any depth , backfilling with clean sand and compaction 98% MDD up to the design leveling of the roads.The item inclue all needed (4-Parallel, 18mm,3m Cu electrodes) with 3m minimum distance,Cu stranded wire 35mm2 in 2'' flixable pipe to connect between the electrodes and pole , clamps ,Chemical treatment of the soil, all accessories to be the Ressistance less than 2 Ω.The Manhole above one electrode only.All works must be According to the drawings and supervisor instructions.

Supply and install 35*3mm hot galvanized steel strip to connect between all existing and new earting manhols of Electrical Pillars with the proposed earthing system .The work includes excavation up to 100 cm depth , backfilling with clean sand and compaction 98% MDD up to the design leveling of the roads.The work includes all needed clamps , 70mm wires, accessories ,... , etc.The price includes suppy and install 60 cm internal diameter precast manhole , with iron cover with frame 8 ton capacity. The work includes excavation and backfilling , also all needed Cu electrodes, wires 35mm2, clamps .The number of manhols and electrodes is according to be the Resistance of earthing system less than 2 Ω.All works must be According to the drawings and supervisor instructions.

Supply and install 60 cm internal diameter precast circular reinforced concrete manhole , with iron cover with frame 8 ton capacity. The work includes excavation in any type of soil to any depth , backfilling with clean sand and compaction 98% MDD up to the design leveling of the roads.

Page 12: [XLS] · Web viewSummary Electrical Communication Works Water Works Concrete Works Road works Sheet1 fac fac fac facc facc facc No. Description Unit Quantity Total DESCRIPTION OVERALL

Package #12: Infrastructure Works – Part A. ITB 2013-327

OVERALL SUMMARY

DESCRIPTION Total Amount $

Bill No.1 ROAD WORKS

Bill No.2 CONCRET WORKS

Bill No.3 WATER SUPPLY WORKS

Bill No.4 TELCOMUNICATION WORKS

Bill No.5 ELECTRICAL WORKS

Sub Total $

Grand Total After Deduction

Total in numbers .........................................................................

Total in letters ..............................................................................

Name of the contractor ………….………..…………………………...

Authorized signature ……………...………………….………………..

Signature and Sealing………………………………………………….

Title ………………………………………..……………………………….

Telephone………………………………………………………………….

Fax ………………………………………………………………………….

Mobile …………………………………………………………………….

Deduction Ratio