Page 1: XTCAV X-Band Transverse Deflecting Cavity Project  Overview

XTCAVX-Band Transverse Deflecting Cavity Project Overview

 Patrick Krejcik

Yuantao Ding, Joe Frisch 

Page 2: XTCAV X-Band Transverse Deflecting Cavity Project  Overview

Layout of the Undulator to Dump Beam Line

Page 3: XTCAV X-Band Transverse Deflecting Cavity Project  Overview

OTRDMP

Simulation example - Yuantao Ding low charge 20pC soft x-rays

head

FEL ON FEL OFF

X-ray “measurement”Current “measurement”

Page 4: XTCAV X-Band Transverse Deflecting Cavity Project  Overview

XTCAV Proposed LocationPenetrationPenetration to B921

Page 5: XTCAV X-Band Transverse Deflecting Cavity Project  Overview

Conceptual sketch of the x-band structure and

waveguide on the beam line.

Page 6: XTCAV X-Band Transverse Deflecting Cavity Project  Overview

Structure Fabrication

• One structure built and tested• Second structure

• Support stand, beam line and vacuum installation

• ~$390k

Item Shop laborDirect labor M&S

Program support Indirects Total

Fab 2nd deflector structure $98,448 $16,800 $10,000 $1,680 $61,743 $188,671 1 m

Page 7: XTCAV X-Band Transverse Deflecting Cavity Project  Overview

B921 and undulator tunnel elevation view showing penetration for waveguide to the XTCAV

Page 8: XTCAV X-Band Transverse Deflecting Cavity Project  Overview

Excerpt from the floor plan of B921 with proposed modulator and klystron locations

Page 9: XTCAV X-Band Transverse Deflecting Cavity Project  Overview

B921 floor space for modulator and klystron

Penetration

Page 10: XTCAV X-Band Transverse Deflecting Cavity Project  Overview

B921 cross-section showing available elevation with respect to cable trays and ceiling

Page 11: XTCAV X-Band Transverse Deflecting Cavity Project  Overview

Commercially available Modulator installation housing the SLAC XL4 klystron.

• Much better pulse stability than SLAC modulator: 30 ppm versus 100 ppm• Complete system houses klystron, magnet, oil tank and output transformer• EPICS controls interface• “turn-key” system purchase price ~$650k• LCLS motivated to evaluate this modulator for other applications e.g. L1S

• Also purchased by LLNL, Trieste, CLS, CERN …

Page 12: XTCAV X-Band Transverse Deflecting Cavity Project  Overview

Output from the klystron goes through a mode converter to circular waveguide for lower power loss

Fabrication and installation of waveguide components: including converters splitters, couplers, loads and vacuum components,

all based on existing SLAC X-band designs

~$365k

Page 13: XTCAV X-Band Transverse Deflecting Cavity Project  Overview

LLRF Phase reference– Share the low-noise 476 MHz heliax from the linac

with the beam phase monitor– Beam based feedback corrects slow drifts

476 MHz

Cavity

XTCAV

Page 14: XTCAV X-Band Transverse Deflecting Cavity Project  Overview

EPICS Controls• LLRF - (next slide)• Vacuum - status of new pumps, gauges and valves• Profile Monitor OTRDMP - present camera is only 10 Hz (upgrade?)• Feedback

– orbit at BPMUE1, BPMUE2 and BPMUE3 after the XTCAV to stabilize the RF phase of cavity and keep the bunch at the zero phase crossing

• PPS– Modulator interlocked to Access state– Review to show existing BTMs give adequate coverage

• BCS– New spoiler at end of XTCAV– Review to show existing PICs give adequate coverage

• MPS– Set threshold of MPS BLMs lower than BCS PICs

Page 15: XTCAV X-Band Transverse Deflecting Cavity Project  Overview

Why PPS, BCS and MPS are important• Beam at the wrong phase can be kicked by up

to 10 mrad– Lowest energy beam, highest amplitude RF, phase at

crest• Beam leaves the beam pipe within the XTCAV

already• Existing safety systems

have large acceptance angle. e.g. BTMs

Page 16: XTCAV X-Band Transverse Deflecting Cavity Project  Overview

LLRF EPICS Controls• Use LCLS PADs and PACs with EPICS IOC and BSA• Use either MKSU II for klystron and modulator interlocks, or

Scandinova integrated controls• In the linac CAMAC PDU still provides timing to the modulator

via the PIOP module• Consider the LLRF control system as a whole:

– The XTCAV will be the first stand-alone RF station with EPICS-only controls– There are choices of platforms on which to implement EPICS

• Linac Phase I upgrade with EPICS driver for CAMAC• Replace CAMAC modules with VME modules and EPICS timing, similar to existing EPICS architecture.• Develop a new mTCA platform

– Need to be able to this in < 2 years– The choice we make here will set a precedent for the LCLS-2 injector project

Page 17: XTCAV X-Band Transverse Deflecting Cavity Project  Overview

Cost SummarySystem Estimated Cost

Including Indirects

Fabrication of second XTCAV structure $126,928 $188,671

Mechanical and vacuum installation $390,240 $390,240Waveguide system $365,200 $564,900Klystron and focusing magnet $492,227 $690,675Modulator and klystron tank $745,000 $855,000Electrical AC Service $115,000 $168,130Cooling systems $128,000 $157,564LLRF Drive system $271,500 $334,295LLRF controls $352,000 $505,027PPS, BCS and MPS $100,000 $150,000Profile Monitor $20,000 $30,000 Total $3,106,095 $4,034,502Including 25% Contingency $5,043,128