152
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable) 66 30-Sep-2016 See Section G N/A 6. ISSUED BY CODE N00164 7. ADMINISTERED BY (If other than Item 6) CODE S3605A NSWC, CRANE DIVISION 300 Highway 361 - Building 3373 Crane IN 47522-5001 @navy.mil 812-854-5028 DCMA DAYTON AREA A, BUILDING 30, 1725 VAN PATTON DRIVE WRIGHT-PATTERSON AFB OH 45433-5302 SCD: C 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and Zip Code) 9A. AMENDMENT OF SOLICITATION NO. Tri Star Engineering 3000 W. 16th Street Bedford IN 47421-3332 9B. DATED (SEE ITEM 11) 10A. MODIFICATION OF CONTRACT/ORDER NO. [X] N00178-04-D-4146-FC23 10B. DATED (SEE ITEM 13) CAGE CODE 03WZ3 FACILITY CODE 15-Aug-2013 11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS [ ]The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [ ] is extended, [ ] is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning one (1) copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified. 12. ACCOUNTING AND APPROPRIATION DATA (If required) SEE SECTION G 13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS, IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. (*) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A. [ ] [X] B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc )SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b). [ ] C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF: [ ] D. OTHER (Specify type of modification and authority) E. IMPORTANT: Contractor [ X ] is not, [ ] is required to sign this document and return copies to the issuing office. 14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible ) SEE PAGE 2 15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print) Officer 15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED BY / 30-Sep-2016 (Signature of person authorized to sign) (Signature of Contracting Officer) NSN 7540-01-152-8070 PREVIOUS EDITION UNUSABLE 30-105 STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA FAR (48 CFR) 53.243 1. CONTRACT ID CODE PAGE OF PAGES AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT U 1 3 XXXXXXXXXXXX XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX

Upload: others

Post on 23-Jan-2021

1.064 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

2.  AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

66 30-Sep-2016 See Section G N/A6. ISSUED BY CODE N00164 7. ADMINISTERED BY (If other than Item 6) CODE S3605A

NSWC, CRANE DIVISION

300 Highway 361 - Building 3373

Crane IN 47522-5001

@navy.mil 812-854-5028

DCMA DAYTON

AREA A, BUILDING 30, 1725 VAN PATTONDRIVE

WRIGHT-PATTERSON AFB OH 45433-5302

SCD: C

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and Zip Code) 9A.  AMENDMENT OF SOLICITATION NO.

Tri Star Engineering3000 W. 16th Street

Bedford IN 47421-3332 9B.  DATED (SEE ITEM 11)

10A.  MODIFICATION OF CONTRACT/ORDER NO.

[X]N00178-04-D-4146-FC23

10B.  DATED (SEE ITEM 13)

CAGECODE

03WZ3 FACILITY CODE 15-Aug-2013

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

[   ]The above numbered solicitation is amended as set forth in Item 14.  The hour and date specified for receipt of Offers  [   ]   is extended, [   ]  is not extended.Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning one (1) copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) Byseparate letter or telegram which includes a reference to the solicitation and amendment numbers.  FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THEPLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.  If by virtue of thisamendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitationand this amendment, and is received prior to the opening hour and date specified.12. ACCOUNTING AND APPROPRIATION DATA (If required)

SEE SECTION G

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(*) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:  (Specify authority)  THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. INITEM 10A.

[  ][X] B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation

date, etc )SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

[  ] C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

[  ] D. OTHER (Specify type of modification and authority)

E.  IMPORTANT:  Contractor [ X ] is not, [   ] is required to sign this document and return       copies to the issuing office.14.  DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible )

SEE PAGE 2

15A.  NAME AND TITLE OF SIGNER (Type or print) 16A.  NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Officer15B.  CONTRACTOR/OFFEROR 15C.  DATE SIGNED 16B.  UNITED STATES OF AMERICA 16C. DATE SIGNED

BY / 30-Sep-2016 (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070PREVIOUS EDITION UNUSABLE

30-105 STANDARD FORM 30 (Rev. 10-83)Prescribed by GSAFAR (48 CFR) 53.243

1. CONTRACT ID CODE PAGE OF PAGES

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT U 1 3

XXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXX

Page 2: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

GENERAL INFORMATION

The purpose of this modification is to add incremental labor funding for Visual Augmentation Systems' lab work forvarious program offices for the previous period of performance for work that charged to a different line ofaccounting.  In addition, the previous attempted ACRN corrections were not made on Mod 65, therefore thismodification corrects the ACRNs for 7301AK and 9301AJ from "BE" to "BK" and 7301AL and 9301AK from "BF"to "BL". ... Accordingly, said Task Order is modified as follows: A conformed copy of this Task Order is attachedto this modification for informational purposes only.

The Line of Accounting information is hereby changed as follows:

9301AJ:From: BE 1761810 84RA 310 V4X00 0 050120 2D 000000 A00003556979To:     BK 1761810 84RA 310 V4X00 0 050120 2D 000000 A00003556979

9301AK:From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932To:     BL 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932

7301AK:From: BE 1761810 84RA 310 V4X00 0 050120 2D 000000 A00003556979To:     BK 1761810 84RA 310 V4X00 0 050120 2D 000000 A00003556979

7301AL:From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932To:     BL 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932

The total amount of funds obligated to the task is hereby increased from by to

CLIN/SLIN Type Of Fund From ($) By ($) To ($)

7201EL FMS

7201EM MDA

7201EN FMS

FMS

7201EQ WCF

7201ER FMS

7201ES FMS

The total value of the order is hereby increased from by $ to

CLIN/SLIN From ($) By ($) To ($)

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 2 of 3 FINAL

 

XXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXX

XXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXX

XXXXXXXXXXXX

XXXXXXXXXXXX

XXXXXXXXXXXX

XXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXX

XXXXXXXX

XXXXXXXXXXXX

XXXXXXXXXXXX

XXXXXXXX

XXXXXXXX

XXXXXXXXXXXX

XXXXXXXXXXXX

Page 3: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

7200

7201EL

7201EM

7201EN

7201EP

7201EQ

7201ER

7201ES

The Period of Performance of the following line items is hereby changed as follows:

CLIN/SLIN From To

7201EL 8/15/2015 - 8/14/2016

7201EM 8/15/2015 - 8/14/2016

7201EN 8/15/2015 - 8/14/2016

7201EP 8/15/2015 - 8/14/2016

7201EQ 7/29/2016 - 8/14/2016

7201ER 8/14/2015 - 8/15/2016

7201ES 12/29/2015 - 8/14/2016

9201ER 8/14/2015 - 8/15/2016

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 3 of 3 FINAL

 

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXX

XXXXXXXXXXXXXXXX

XXXXXXXXXXXXXX

XXXXXXXXXXXX

XXXXXXXXXXXX

XXXXXXXXXXXX

XXXXXXXXXXXX

XXXXXXXX

XXXXXXXX

XXXXXXXX

XXXXXXXX

XXXXXXXXXXXX

XXXXXXXXXXXX

XXXXXXXX

XXXXXXXX

XXXXXXXXXXXX

XXXXXXXXXXXX

Page 4: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

SECTION B SUPPLIES OR SERVICES AND PRICES

CLIN - SUPPLIES OR SERVICES

For Cost Type Items:

Item PSC Supplies/Services Qty Unit Est. Cost Fixed Fee CPFF

4000 R425 Non-personal services to provide

technical documentation,

curriculum, technical drawings,

logistics, and technical support

of electro-optic technologies for

the Electro-Optics Technology

Division (Code JXQ). Labor Base

Year. (Fund Type - TBD)

52081.0 EA

400001 R425 Labor in support of CLIN 4000,

TI-0006, ACRN A1 in the amount of

(WCF)

400002 R425 Incremental funding in the amount

of in support of TI-11

(Funds provided for support of

USSOCOM LR-GMVAS). 2410(a)

Authority is hereby invoked. ACRN

A2. MOD 62: Deob from

leaving a balance of

(Fund Type - OTHER)

400003 R425 Incremental funding in the amount

of in support of TI-9

(Funds provided for Navy

Non-Lethal AT/FP support). ACRN

A3. De-OB Part of MOD 27;

New balance MOD 62: Deob

from leaving a

balance of (OPN)

400004 R425 Incremental funding in the amount

of in support of TI-8

(Funds provided for MARFLIR

program support). ACRN A4 (Fund

Type - OTHER)

400005 R425 Incremental funding in the amount

of in support of TI-6

(Funds provided for USASOC

SOPMOD/WPNAC program support).

2410(a) Authority is hereby

invoked. ACRN A5 (Fund Type -

OTHER)

400006 R425 Incremental funding in the amount

of in support of TI-3

(Funds provided for US Coast Guard

STAR SAFIRE-III Multi-Sensor

Systems program support). ACRN A6

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 1 of 149 FINAL

 

XXXXXXXXX XXXXXXXXX

XXXXXXXX

XXXXXXXXXXXXXXXXXXXX XXXXX

XXXXXX

XXXXXXX

XXXXXXX

XXXXXXX

XXXXXXX

XXXX

XXXXX

XXXXXXX

XXXXX

XXXXXXX

Page 5: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

Item PSC Supplies/Services Qty Unit Est. Cost Fixed Fee CPFF

(Fund Type - OTHER)

400007 R425 Incremental funding in the amount

of in support of TI-2

(Funds provided for NSWC Crane law

enforcement electro-optic loan

program). ACRN A7 (WCF)

400008 R425 Incremental funding in the amount

of in support of TI-4

(Funds provided for NECC

electro-optic VAS program).

2410(a) Authority is hereby

invoked. ACRN A8 (O&MN,N)

400009 R425 Incremental funding in the amount

of in support of TI-4

(Funds provided for NECC

electro-optic VAS program).

2410(a) Authority is hereby

invoked. ACRN A9 (O&MN,N)

400010 R425 Incremental funding in the amount

of in support of TI-1

(Funds provided for ISEA SPS

support). 2410(a) Authority is

hereby invoked. ACRN B1 (OPN)

400011 R425 Incremental funding in the amount

of in support of TI-4

(Funds provided for ISEA FLIR

equipment system support). 2410(a)

Authority is hereby invoked. ACRN

B2 (O&MN,N)

400012 R425 Incremental funding in the amount

of in support of TI-7

(Funds provided for repair and

testing of night vision

equipment). ACRN B3 (WCF)

400013 R425 Incremental funding in the amount

of in support of TI-7

(Funds provided for repair and

testing of night vision

equipment). ACRN B4 (WCF)

400014 R425 Incremental funding in the amount

of in support of TI-10

(Funds provided for WA/0 MTS-A

Payloads support). 2410(a)

Authority is hereby invoked. ACRN

B5 (Fund Type - OTHER)

400015 R425 Incremental funding in the amount

of in support of TI-05.

ACRN B6 Original Obligation=

DE- part of MOD

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 2 of 149 FINAL

 

XXXXXX

XXXXXXXX

XXXXXXX

XXXXXXX

XXXXXXX

XXXXXX

XXXXXXX

XXXXXXX

XXXXXX

XXXXXXX

XXXXXX

Page 6: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

Item PSC Supplies/Services Qty Unit Est. Cost Fixed Fee CPFF

4. (RDT&E)

400016 R425 Incremental funding in the amount

of in support of TI-05

(Funds provided for installation

of FLIR replacement on PC4 &

PC14). ACRN B7. Original

DE-

part of MOD 4. (MOD 16 DEOB

(OPN)

400017 R425 Funding in support of TI-07, ISEA

support for WARCOM for Visual

System Program testing and

maintenance. (O&MN,N)

400018 R425 Funding in support of TI-10,

UH1N/Y BRITE Star electro-optic

systems. (APN)

400019 R425 Funding in support of TI-07,

repair and testing of night vision

equipment. MOD 56: Deob

from leaving a balance of

(WCF)

400020 R425 Funding in support of TI-07,

repair and testing of night vision

equipment. MOD 62: Deob

from leaving a balance of

(Fund Type - OTHER)

400021 R425 Funding in support of TI-02,

logistic & sustainment services in

support of the NSWC Crane law

enforcement electro-optic loan

program. (Fund Type - OTHER)

400022 R425 Funding in support of TI-03,

SIRVSS & MARFLIR for US Coast

Guard. (Fund Type - OTHER)

400023 R425 Funding in support of TI-07, NECC

electro-optic VAS program.

(O&MN,N)

400024 R425 Funding in support of TI-07,

Fusion Goggle System. (WCF)

400025 R425 Funding in support of TI-07,

Repair and Testing of night vision

equipment. (O&MN,N)

400026 R425 Funding in support of TI-07,

visual augmentation repair for the

binocular/monocular program .

(Fund Type - OTHER)

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 3 of 149 FINAL

 

XXXXXXXX

XXXXXXXXXX

XXXXXXXXXXX

XXXXX

XXXXXX

XXXXXXX

XXXXXXXXXXXXXX

XXXX

Page 7: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

Item PSC Supplies/Services Qty Unit Est. Cost Fixed Fee CPFF

400027 R425 Funding in support of TI-08,

Information Technology & Graphical

documentation services for the

Electro Optics Technology

Division. (Fund Type - OTHER)

400028 R425 Funding in support of TI-04, ISEA,

logistic & sustainment services

supporting electro-optic VAS

systems fielded for NECC Riverine.

(O&MN,N)

400029 R425 Funding in support of TI-10,

Program management support,

technical data packages prep,

technical assistance, & other

contractor support for the UH1N/Y

BRITE star electro-optic systems.

MOD 30: DEOB from

leaving a balance of MOD

62: Deob from leaving

a balance of (APN)

400030 R425 Funding in support of TI-03,

Logistics support services to the

Multi-Sensor Program for US Coast

Guard. MOD 62: Deob from

leaving a balance of

(Fund Type - OTHER)

400031 R425 Funding in support of TI-03, PCGMS

project. DE-OB Part of

MOD 15, new balance = $

(O&MN,N)

400032 R425 Funding in support of TI-09, Navy

Non-Lethal Anti-Terrorism/Force-

Protection Afloat Support. (OPN)

400033 R425 Funding in support of TI-01,

Patrol Coastal Griffin Missile

System. (O&MN,N)

400034 R425 Funding in support of TI-02,

logistic and sustainment services

in support of NSWC Crane law

enforcement electro-optic program

(WCF)

400035 R425 Funding in support of TI-11.

Contractor may NOT perform against

this SLIN after 14 AUG 2014.

Contractor may continue to invoice

after this date, but only for work

performed through and including

the aforementioned date. (Fund

Type - OTHER)

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 4 of 149 FINAL

 

XXXXXXXX

XXXX

XXXX

XXXXXXXXXXX

XXXXXX

XXXXXX

XXXXXX

XXXXX

XXX

XXXX

XXX

Page 8: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

Item PSC Supplies/Services Qty Unit Est. Cost Fixed Fee CPFF

400036 R425 Funding in support of TI-04, ISEA,

logistic & sustainment services

supporting electro-optic VAS

systems fielded for NECC Riverine.

(MOD 16 DEOB MOD 62:

Deob from leaving a

balance of (O&MN,N)

400037 R425 Funding in support of TI-09,

Afloat support for NAVY

Anti-Terrorism/Force-Protection

projects. DE-OB part of

MOD 15, new balance =

(OPN)

400038 R425 Funding in support of TI-09, Navy

Anti-Terrorism/Force-Protection

programs: AEL, IDS, & NECC TOA.

DE-OB part of MOD 15,

new balance = $ (O&MN,N)

400039 R425 Funding in support of TI-05, FLIR

replacement on PC 6 and PC 10.(MOD

16 DEOB (OPN)

400040 R425 Funding in support of TI-001,

support of PC GMS Efforts. MOD 54:

Deob from

leaving a balance of

(OPN)

400041 R425 Funding in support of TI-12,

installation in support of US

Coast Guard. DE-OB part

of MOD 15, new balance

(WCF)

400042 R425 Funding in support of TI-08,

Technology Data Management, CSW

laser efforts. (O&MN,N)

400043 R425 Funding in support of TI-06,

SOPMOD program, including Blocks

II and III. MOD 62: Deob

from leaving a balance of

(Fund Type - OTHER)

400044 R425 Funding in support of TI-02 for

contractor logistic and

sustainment services in support of

Crane Law enforcement electro

optic loan program. MOD 62: Deob

from leaving a

balance of (WCF)

400045 R425 Funding in support of TI-13 for

Data management Support for Air

Force HC/MC-130J Program. DE-OB

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 5 of 149 FINAL

 

XXXXXXX

XXXXX XXXXXXX

XXXXX

XXXXXXXXXXX

XXXXXX

XXXXXXX

XXXXXXX

XXXXXXXXXXX

XXXXX

XXXXXXX

XXXXXXXX

XXXXXXXX

XXXX

XXXXX

XXXX

XXXXXXXXXX

XXX

Page 9: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

Item PSC Supplies/Services Qty Unit Est. Cost Fixed Fee CPFF

part of MOD 15, new

balance = MOD 29: DEOB

from leaving a

balance of (Fund Type -

OTHER)

4100 R425 Non-personal services to provide

technical documentation,

curriculum, technical drawings,

logistics, and technical support

of electro-optic technologies for

the Electro-Optics Technology

Division (Code JXQ). Labor Surge

Base Year. (Fund Type - TBD)

5208.0 EA

Option

4200 R425 Non-personal services to provide

technical documentation,

curriculum, technical drawings,

logistics, and technical support

of electro-optic technologies for

the Electro-Optics Technology

Division (Code JXQ). Labor Option

Year One. (Fund Type - TBD)

0.0 EA $ $ $

Option

4300 R425 Non-personal services to provide

technical documentation,

curriculum, technical drawings,

logistics, and technical support

of electro-optic technologies for

the Electro-Optics Technology

Division (Code JXQ). Labor Surge

Option Year One. (Fund Type - TBD)

0.0 EA $ $ $

Option

For Cost Type / NSP Items

4999 Labor CLIN(s) 4000 through 4300 and 7000 through 7700; in accordance with (IAW)

the Statement Of Work (SOW), and CDRL(s) A001 thru A009, and applicable DID(s).

The Government shall have unlimited rights to all Data/Tech Data generated

under this effort IAW DFARS 252.227-7013., unless an assertion is provided and

accepted by the Government with the offer IAW DFARS 252.227-7017. The

price/costs for all data/tech data generated by the contractor directly or

indirectly in its performance of this procurement effort is included in the

price/costs paid by the Government under CLIN(s) 4000 through 4300 and 7000

through 7700.

1.0 LO NSP

For ODC Items:

Item PSC Supplies/Services Qty Unit Est. Cost

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 6 of 149 FINAL

 

XXXXXXXXXXXXX

XXXXX

XXXXXXX

XXXXXXX

XXXX

XXXXXXXX XXXXXXXX

XXXX

XXX XXX XXX

XXX XXX XXX

Page 10: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

Item PSC Supplies/Services Qty Unit Est. Cost

6000 R425 Non-personal services to provide technical documentation,

curriculum, technical drawings, logistics, and technical support

of electro-optic technologies for the Electro-Optics Technology

Division (Code JXQ). ODC Base Year One. (Fund Type - TBD)

1.0 LO

600001 R425 Incremental funding in the amount of in support of TI-2

(Funds provided for support of NSWC Crane law enforcement

electro-optic loan program). ACRN A7 (increase). MOD 54 Deob

from leaving a balance of (WCF)

600002 R425 Funding in support of TI-09, Navy Non-Lethal Anti-Terrorism/Force-

Protection Afloat Support. De-OB Part of MOD 27. New

balance (OPN)

600003 R425 Funding in support of TI-05, SAWs installation trip to Norfolk VA.

(RDT&E)

600004 R425 Funding in support of TI-05, SAWs installation trip to Norfolk VA.

(RDT&E)

600005 R425 Funding in support of TI-05, Travel for installation support of

PCEO (OPN)

600006 R425 Funding in support of TI-01, funding for travel for PC GMS test

support. MOD 54 Deob from leaving a balance of

(OPN)

600007 R425 Funding in support of TI-05, FLIR replacement on PC 4 & PC 5. MOD

54 Deob from leaving a balance of (OPN)

600008 R425 Funding in support of TI-05, FLIR replacement on PC 6 & PC 10.

(MOD 16 DEOB (OPN)

600009 R425 Funding in support of TI-12, material of USCG program. MOD 54 Deob

from leaving a balance of (Fund Type -

OTHER)

600010 R425 Funding in support of TI-13, data management support for AIR Force

HC/MC-130J program. MOD 30: DEOB from leaving a

balance of MOD 54 Deob leaving a balance of

(Fund Type - OTHER)

6100 R425 Non-personal services to provide technical documentation,

curriculum, technical drawings, logistics, and technical support

of electro-optic technologies for the Electro-Optics Technology

Division (Code JXQ). ODC Surge Base Year One. (Fund Type - TBD)

1.0 LO

Option

6200 R425 Non-personal services to provide technical documentation,

curriculum, technical drawings, logistics, and technical support

of electro-optic technologies for the Electro-Optics Technology

Division (Code JXQ). ODC Option Year One. (Fund Type - TBD)

1.0 LO $

Option

6300 R425 Non-personal services to provide technical documentation,

curriculum, technical drawings, logistics, and technical support

of electro-optic technologies for the Electro-Optics Technology

Division (Code JXQ). ODC Surge Option Year One. (Fund Type - TBD)

1.0 LO $

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 7 of 149 FINAL

 

XXXXXXXX

XXXX

XXXXX

XXXXXX

XXXXXXXXX XXXXX

XXXXXX

XXXX

XXXXX

XXXXXX

XXXXX

XXXXX

XXXXX

XXXXXXXX

XXXXX XXXXXXXX

XXXXX

XXXXXXX

XXXXXX

XXXX

XXXX

XXXX

XXX

XXX

Page 11: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

Item PSC Supplies/Services Qty Unit Est. Cost

Option

For Cost Type Items:

Item PSC Supplies/Services Qty Unit Est. Cost Fixed Fee CPFF

7000 R425 Non-personal services to provide

technical documentation, curriculum,

technical drawings, logistics, and

technical support of electro-optic

technologies for the Electro-Optics

Technology Division (Code JXQ).

Labor Option Year One. (Fund Type -

TBD)

57096.0 EA

7001 Non-personal services to provide

technical documentation, curriculum,

technical drawings, logistics, and

technical support of electro-optic

technologies for the Electro-Optics

Technology Division (Code JXQ).

Labor Option Year One. Contractor

shall invoice the following priced

SLINs in accordance with invoicing

instructions in Section G.

7001AA R425 Funding in suuport of TI-04, ISEA,

logistic & sustainment services in

support of the electro-optic VAS

systems fielded for NECC Riverine.

(O&MN,N)

1.0 LO

7001AB R425 10 USC 2410(a) Authority is hereby

invoked. Funding in support of

TI-01, labor in support of PC

Griffin Missile System (GMS)

efforts. (O&MN,N)

1.0 LO

7001AC R425 10 USC 2410(a) Authority is hereby

invoked. Funding in support of

TI-06, US Army Special Operations

Command SOPMOD program. (Fund Type -

OTHER)

1.0 LO

7001AD R425 10 USC 2410(a) Authority is hereby

invoked. Funding in support of

TI-11, engineeing, design,

integration, technical and logistics

support of USSOCOM Long Range Ground

Mobility VAS (LR-GMVAS). MOD 62:

Deob from leaving a

balance of (Fund Type -

OTHER)

1.0 LO

7001AE R425 10 USC 2410(a) Authority is hereby

invoked. Funding in support of

1.0 LO

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 8 of 149 FINAL

 

XXXXXXXX XXXXXXXX

XXXXXX

XXXXXXX XXXXXXX

XXXXXXXXX

XXXXXXX

XXXX

XXXXXXX

XXXXX

XXXXXX

XXXXXX

XXXXXX

XXXXXX

XXXXXXX

XXXXXX

XXXXXXX

XXXXXXXXXXX

XXXXXXX XXXXXXX

XXXXX

Page 12: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

Item PSC Supplies/Services Qty Unit Est. Cost Fixed Fee CPFF

TI-03, US Coast Guard Program

Office. (Fund Type - OTHER)

7001AF R425 10 USC 2410(a) Authority is hereby

invoked. Funding in support of

TI-07, maintenance & repair services

in support of the NECC electro-optic

VAS program. (O&MN,N)

1.0 LO

7001AG R425 Funding in support of TI-05, Phase

III EO/IR SAWS Capability on CVN-71

USS Teddy Roosevelt. (RDT&E)

1.0 LO

7001AH R425 10 USC 2410(a) Authority is hereby

invoked. Funding in support of

TI-08, Information Technology Data

Management services in support of

CSW laser efforts. (O&MN,N)

1.0 LO

7001AJ R425 Funding in support of TI-09, Navy

Non-Lethal Anti-Terrorism/Force-

Protection Afloat Support. MOD 62:

Deob from leaving a

balance of (OPN)

1.0 LO

7001AK R425 Funding in support of TI-12,

installations for US Coast Guard

Program Office. MOD 62: Deob

from leaving a balance of

(Fund Type - OTHER)

1.0 LO

7001AL R425 Funding in support of TI-10, MH-60S

ILS Support. (APN)

1.0 LO

7001AM R425 Funding in support of TI-13, Data

Management Support for Air Force

DAS-1a Program. (Fund Type - OTHER)

1.0 LO

7001AN R425 Funding in support of TI-14, Patrol

Coastal Program Office, PC Class

MARFLIR support. (O&MN,N)

1.0 LO

7001AP R425 Funding in Support of TI-02,

logistic and sustainment services in

support of the NSWC Crane law

enforcement electro-optic loan

program. (WCF)

1.0 LO

7001AQ R425 Funding in support of TI-07, support

for Weapons Access sories (VAS)

Program for USSOCOM. (Fund Type -

OTHER)

1.0 LO

7001AR R425 10 USC 2410(a) Authority is hereby

invoked. Funding in support of

TI-0004, NAVSEA. (O&MN,N)

1.0 LO

7001AS R425 10 USC 2410(a) Authority is hereby

invoked. Funding in Support of

TI-07, USSOCOM repair and

1.0 LO

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 9 of 149 FINAL

 

XXXXXX

XXXX

XXXXXX

XXXXXXXXXXX

XXXXXXX

XXXXXX

XXXXXXXX XXXXXXXX

XXXXXXX XXXXXXX

XXXXXX

XXXXXXX XXXXXXX

XXXXXXXXXXX

XXXXXXX XXXXXXX

XXXXXXX

XXXXXX

XXXXXX

XXXXXXX

XXXXXXX

XXXXXXX XXXXXXX

XXXX

XXXXXX

XXXXX

XXXXXXX

XXXXXX

XXXXX

XXXXXXX XXXXXXX

XXXXXX

XXXXX

XXXXXXX

XXXXXX

XXXXXXX

XXXXXXX

XXXXXX

XXXXXXX

XXXXXX

Page 13: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

Item PSC Supplies/Services Qty Unit Est. Cost Fixed Fee CPFF

maintenance support. (Fund Type -

OTHER)

7001AT R425 10 USC 2410(a) Authority is hereby

invoked. Funding in support of

TI-07, NAVSEA PMS 340 repair and

maintenance support of electro-optic

visual augmentation systems.

(O&MN,N)

1.0 LO

7001AU R425 Funding in support of TI-03 for

Coast Gaurd program work. (WCF)

1.0 LO

7001AV R425 Funding in support of TT-12 for

Coast Guard Program work. (WCF)

1.0 LO

7001AW R425 Funding in support of TI-013 for

Data Management support for the

Integrated Product Data Management

(iPDM) tool and associated

information systems. (Fund Type -

OTHER)

1.0 LO

7001AX R425 10 USC 2410(a) Authority is hereby

invoked. Funding in support of TI 14

for lab work for the Patrol Coastal

Program office. (O&MN,N)

1.0 LO

7001AZ R425 10 USC 2410(a) Authority is hereby

invoked. Funding in support of

TI-01, Patrol Coastal Griffin System

efforts (OPN)

1.0 LO

7001BA R425 Funding in support of TI-13, Data

Management support for the Air Force

HC/MC-130J program (Fund Type -

OTHER)

1.0 LO

7001BB R425 Funding in support of TI-10,

logistics and program management

support for repair and overhaul of

Army Aviation and Missile Command

(AMCOM) assets. (WCF)

1.0 LO

7001BC R425 Funding in support of TI-01, support

of the PC Griffin Missile System

(PCGMS). (O&MN,N)

1.0 LO

7001BD R425 Funding in support of TI-08,

technical documentation updates

associated with US Army Common

Sensor (CSP) Program (Fund Type -

OTHER)

1.0 LO

7001BE R425 Funding in support of TI-15,

Installation of SA 79676K, FLIR

replacement on PC3 and PC4 (OPN)

1.0 LO

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 10 of 149 FINAL

 

XXXXXX

XXXXXXX XXXXXXX

XXXXXXX

XXXXXX

XXXXXX

XXXXXXX

XXXXXXX

XXXXXX

XXXXXXX XXXXXXX

XXXXXXX

XXXXXX

XXXXXXX XXXXXXX

XXXXXXX

XXXXXX

XXXXXX

XXXXXXX

XXXXXXX

XXXXXX

XXXXXXX

XXXXXXX

XXXXX

XXXXXXX

XXXXX

XXXXXXX XXXXXXX

XXXXXXX

XXXXXXX XXXXXXX

XXXXXX

Page 14: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

Item PSC Supplies/Services Qty Unit Est. Cost Fixed Fee CPFF

7001BF R425 Funding in support of TI-03,

In-service engineering support for

Star Safire-III and Sea Star

Safire-III, Coast Guard program work

(Fund Type - OTHER)

1.0 LO

7001BG R425 Funding in support of TI-02,

logistics and sustainment services

in support of the NSWC Crane law

enforcement electro-optic program.

(Fund Type - OTHER)

1.0 LO

7001BH R425 Funding in support of TI-04, ISEA,

logistics & sustainment services for

VAS systems fielded at SWFPAC

(O&MN,N)

1.0 LO

7001BJ R425 Funding in support of TI-04, ISEA,

logistics & sustainment services for

VAS systems fielded at SWFPAC

(O&MN,N)

1.0 LO

7001BK R425 Funding in support of TI-07, labor

in support for NAVSUP WSS for

intensifiers, including calibration,

repair, and repair testing (WCF)

1.0 LO

7001BL R425 Funding in support of TI-08,

EO/Infrared/Laser Designation

Payload for the US ARMY Warrior

Program. (Fund Type - OTHER)

1.0 LO

7001BM R425 Funding in support of TI-15, Patrol

Coastal-Electro Optic Program,

Maritime Forward Looking Infrared

(MARFLIR) for SEA21/PMS-470. MOD 62:

Deob from leaving a

balance of (O&MN,N)

1.0 LO

7001BN R425 Funding in support of TI-12, Coast

Guard Program work (Fund Type -

OTHER)

1.0 LO

7001BP R425 Funding in support of TI-03, Coast

Guard program work (Fund Type -

OTHER)

1.0 LO

7001BQ R425 Funding in support of TI-14, lab

work in support of Patrol Coastal

Program Office. MOD 62: Deob

from leaving a balance of

(Fund Type - OTHER)

1.0 LO

7001BR R425 Funding in support of TI-15,

Scoutmaster Program funding for

MARFLIR II ISEA tasking in support

of installation work. MOD 38: DEOB

from leaving a

balance of (RDT&E)

1.0 LO

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 11 of 149 FINAL

 

XXXXXXX XXXXXXX

XXXXXXX XXXXXXX

XXXXXXXXXXX

XXXXXXX

XXXXXXX

XXXXX

XXXXX

XXXXX

XXXXXXX

XXXXXX

XXXXXX

XXXX

XXXXXX

XXXXXX

XXXXXXX XXXXXXX

XXXXXX

XXXXXXX XXXXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXXXX

XXXXXXX

XXXXX

XXXXXXX

XXXXXXX

XXXXX

XXXXXX XXXXXX

XXXXX

XXXXX

XXXXXX XXXXXX

XXXXXX XXXXXX

XXXXXX

Page 15: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

Item PSC Supplies/Services Qty Unit Est. Cost Fixed Fee CPFF

7001BS R425 Funding in support of TI-10, WA/0

MTS-A payload support (Fund Type -

OTHER)

1.0 LO

7001BT R425 Funding in support of TI-07 (PMC) 1.0 LO

7001BU R425 Funding in Support of TI-12 Coast

Guard Program Work. (Fund Type -

OTHER)

1.0 LO

7001BV R425 Funding in support of TI-07 VAS

systems fielded maintenance and

repair. (WCF)

1.0 LO

7001BW R425 Funding in support of TI-07 VAS

Binocular/Monocular program

maintenance and repair. (Fund Type -

OTHER)

1.0 LO

7001BX R425 Funding in support of TI-04 VAS

systems fielded for NECC ISEA,

logistic and sustainment services.

(Fund Type - OTHER)

1.0 LO

7001BZ R425 Funding in support of TI-08

information technology and technical

documentation services for USCG VAS

Program 2. (Fund Type - OTHER)

1.0 LO

7001CA R425 Funding in support of TI-05

Installations on PC GMS. (OPN)

1.0 LO

7001CB R425 Funding in support of TI-01, Patrol

Coastal Griffin Missile System Brite

Star II installations. MOD 62: Deob

from leaving a

balance of (OPN)

1.0 LO

7001CC R425 Funding in support of TI-06, USSOCOM

PEO-SW Improved Night/Day Fire

Control/Observation Device program.

MOD 62: Deob from

leaving a balance of (Fund

Type - OTHER)

1.0 LO

7001CD R425 Funding in support of TI-08,

information technology and tech

documentation services for USSOCOM

HHI Program (Fund Type - OTHER)

1.0 LO

7001CE R425 Funding in support of TI-08,

Information technology and technical

documentation services for USSOCOM

Laser Maker Program (Fund Type -

OTHER)

1.0 LO

7001CF R425 Funding in support of TI-07, VAS

night vision lab, maintenance and

repair services in support of Naval

Special Warfare Visual Augmentation

1.0 LO

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 12 of 149 FINAL

 

XXXXXX

XXXXXXX

XXXXXXX

XXXXXX

XXXXXX

XXXXXXXX

XXXXXX

XXXXXXX

XXXXXXX XXXXXXX

XXXXXXX

XXXXXX

XXXXXXX

XXXXXXX XXXXXXX

XXXXXX

XXXXXX

XXXXXXX XXXXXXX

XXXXXXX

XXXXX

XXXXXXX

XXXXX

XXXXXXX XXXXXXX

XXXXX

XXXXXX

XXXXXXX

XXXX

XXXXX

XXXXX

XXXXX

XXXXXX

XXXXX

XXXXX

XXXXXX XXXXXX

XXXXXX XXXXXX

XXXXXX XXXXXX

XXXXXX

XXXXXXX

XXXXXX

Page 16: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

Item PSC Supplies/Services Qty Unit Est. Cost Fixed Fee CPFF

System Maintenance technical support

(Fund Type - OTHER)

7001CG R425 Funding in support of TI-17, for MSC

Situational Awareness System (SAwS)

preparation and installation onboard

USNS CESAR CHAVEZ. (WCF)

1.0 LO

7001CH R425 Funding in support of TI-02 for

contractor logistic and sustainment

services in support of NSWC Crane

Law Enforcement electro-optic loan

program. MOD 62: Deob from

leaving a balance of

(WCF)

1.0 LO

7001CJ R425 Funding in support of TI-10 for

MTS-A Support. MOD 62: Deob

from leaving a balance of

(Fund Type - OTHER)

1.0 LO

7001CK R425 Funding in support of TI-08 for

information technology and technical

documentation services for the

NAVSPECWARCOM Visual Augmentation

Systems. (Fund Type - OTHER)

1.0 LO

7001CL R425 Funding in support of TI-06 for

support services in support of

USSOCOM VAS - Weapon Accessories

program. MOD 62: Deob from

leaving a $0 balance. (Fund

Type - OTHER)

0.0 LO $ $ $

7001CM R425 Funding support of TI11 for support

services in support of the reset of

USSOCOM LR-GMVAS systems. MOD 62:

Deob from leaving a

$0 balance. (Fund Type - OTHER)

1.0 LO $ $ $

7001CN R425 Funding in support ofTI013 for Data

Management Support for the depot

facilitization support at FRCSE for

the CSP program. MOD 54: Deob

from leaving a

balance of (Fund Type -

OTHER)

1.0 LO

7001CP R425 Funding in support of Coast Guard

program work on TI-0012. MOD 62:

Deob from leaving a

balance of (Fund Type -

OTHER)

1.0 LO

7001CQ R425 Funding in support of TI-15 for

In-Service Engineering Agent

(ISEA)/Acquisition Engineering Agent

(AEA) support for the Scoutmaster

1.0 LO

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 13 of 149 FINAL

 

XXXXXX

XXXXXXXXXXX

XXXXXXX XXXXXXX

XXXXX XXXXX

XXXXXXX

XXXXX

XXXXXXX XXXXXXX

XXXXXXXX

XXXXXX

XXXXXXX

XXXXXX

XXXXXX

XXXXXX

XXXXXXX XXXXXXX

XXXXXX

XXXXXXX XXXXXXX

XXXXX

XXXX

XXXXX

XXXXXXX

XXXXX

XXXXX

XXXXXXX

XXXXX

XXXXX

XXXXX

XXXX

XXXXXX XXXXXX

XXX XXX XXX

XXX XXX XXX

Page 17: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

Item PSC Supplies/Services Qty Unit Est. Cost Fixed Fee CPFF

Program. MOD 33: DEOB from

leaving a balance of

(WCF)

7001CR R425 Funding in support of TI-15 for

In-Service Engineering Agent (ISEA)/

Acquisition Engineering Agent (AEA)

support for scoutmaster program. MOD

38: from leaving a

balance of (RDT&E)

1.0 LO $ $ $

7001CS R425 Funding in support of TI-14 for the

Patrol Coastal Program Office. MOD

38: from leaving a

balance of (O&MN,N)

1.0 LO $ $ $

7001CT R425 Funding in support of TI-15 for the

Patrol Coastal Program Office. MOD

62: Deob from leaving

a balance of (O&MN,N)

1.0 LO

7001CU R425 Funding in support of TI-08 for

information technology and technical

documentation services for the

USSOCOM Visual Augmentation Systems.

(O&MN,N)

1.0 LO

7001CV R425 Funding in support of TI-04 for

contractor ISEA, logistic &

sustainment services in support of

the electro-optic VAS systems

fielded for NECC. MOD 62: Deob

from leaving a

balance of (O&MN,N)

1.0 LO

7001CW R425 Funding in support of TI07 Visual

Augmentation Systems night vision

laboratory for contractor

maintenance & repair services in

support of the BNVS,AN/PVS-15

repair. MOD 62: Deob from

leaving a balance of

(PMC)

1.0 LO

7001CX R425 Funding in support of TI-07 Visual

Augmentation Systems night vision

laboratory for contractor

maintenance and repair services. MOD

62: Deob from leaving

a $0 balance. (PMC)

1.0 LO $ $ $

7001CY R425 Funding in support of TI-07 VAS

night vision laboratory for

contractor maintenance & repair

services in support of SOCOM Repair

effort. MOD 62: Deob from

leaving a balance. (Fund

Type - OTHER)

0.0 LO $ $ $

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 14 of 149 FINAL

 

XXXXXX

XXXXXX

XXXXXXX XXXXXXX

XXXXX

XXXXXXXXXXX

XXXXXXX

XXXXXX

XXXXXXX XXXXXXX

XXXXX

XXXXX

XXXXXX XXXXXX

XXXXX

XXXX

XXXX XXXX

XXXX

XXXXX

XXXX

XXXXXXXX

XXXX

XXXXX

XXXXXX

XXXXX

XXX XXX XXX

XXX XXX XXX

XXX XXX XXX

XXX XXX XXX

XXXXXX XXXX

XXXXXX XXXX

X

Page 18: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

Item PSC Supplies/Services Qty Unit Est. Cost Fixed Fee CPFF

7100 R425 Non-personal services to provide

technical documentation, curriculum,

technical drawings, logistics, and

technical support of electro-optic

technologies for the Electro-Optics

Technology Division (Code JXQ).

Labor Surge Option Year One. (Fund

Type - TBD)

5710.0 EA $ $ $

7101 Non-personal services to provide

technical documentation, curriculum,

technical drawings, logistics, and

technical support of electro-optic

technologies for the Electro-Optics

Technology Division (Code JXQ).

Labor Option Year One Surge.

Contractor shall invoice the

following priced SLINs in accordance

with invoicing instructions in

Section G.

7101AA R425 Funding in support of TI-05 in

support of installations on 8 PCGMS

ships OCONUS. MOD 35: DEOB

leaving a balance of

(OPN)

1.0 LO

7200 R425 Non-personal services to provide

technical documentation, curriculum,

technical drawings, logistics, and

technical support of electro-optic

technologies for the Electro-Optics

Technology Division (Code JXQ).

Labor Option Year Two. (Fund Type -

TBD)

57522.0 EA

7201 Non-personal services to provide

technical documentation, curriculum,

technical drawings, logistics, and

technical support of electro-optic

technologies for the Electro-Optics

Technology Division (Code JXQ).

Labor Option Year Two.

7201AA R425 Funding in support of TI-03 for

patrol Coastal (PCEO) program work.

(O&MN,N)

1.0 LO

7201AB R425 Incremental funding in support for

Option Year 2 Labor TI-06 for

support services in support of the

USSOCOM VAS- Weapon Accessories

program. (Fund Type - OTHER)

1.0 LO

7201AC R425 Funding in support TI 001 in support

of Patrol Coastal Griffin Missile

System (PC GMS) BRITE STAR II

In-Service Engineering Agent (ISEA)

1.0 LO

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 15 of 149 FINAL

 

XXXXXXX

XXXXXXXX XXXXXXXX

XXXXXXX XXXXXXX

XXXXXXX XXXXXXX

XXXXX

XXXXXXXXX

XXXXX

XXXXXX

XXXXXXX

XXXXXX XXXXXX

XXXXXX

XXXXX

XXXXXX

XXXXX

XXXXXX

XXX XXX XXX

Page 19: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

Item PSC Supplies/Services Qty Unit Est. Cost Fixed Fee CPFF

Efforts, Installations and retrofits

OCONUS. (O&MN,N)

7201AD R425 Funding in support of Coast Guard

program work on TI-03. (Fund Type -

OTHER)

1.0 LO

7201AE R425 Labor funding in support of Coast

Guard program work on TI-14. (Fund

Type - OTHER)

1.0 LO

7201AF R425 Funding provided for labor TI-10 for

program logistics management

support. (APN)

1.0 LO

7201AG R425 Labor and ODC funding in support of

Coast Guard program work on TI-12.

(Fund Type - OTHER)

1.0 LO

7201AH R425 10 USC 2410(a) Authority is hereby

invoked. Funding in support of TI-11

for support services in support of

the reset of USSOCOM LR-GMVAS

systems. (Fund Type - OTHER)

1.0 LO

7201AJ R425 Incremental funding provided for

Labor for FC23 TI-0002 for

contractor logistic and sustainment

services in support of the NSWC

Crane law enforcement electro-optic

loan program. (WCF)

1.0 LO

7201AK R425 Incremental funding provided for

Labor for FC23 TI-0007 Visual

Augmentation Systems (VAS) night

vision laboratory for contractor

services in support of the improved

night/day fire control device (INOD)

program. (Fund Type - OTHER)

1.0 LO

7201AL R425 Funding in support of TI18 for

LCS-EO. (O&MN,N)

1.0 LO

7201AM R425 Funding in support of TI-017 for

installation on board ship of a

Situational Awareness System. (WCF)

1.0 LO

7201AN R425 Funding in support of TI-10 program

logistics management support. (Fund

Type - OTHER)

1.0 LO

7201AP R425 10 USC 2410(a) Authority is hereby

invoked. Funding in support of TI-13

for Data Management Support in

support of ROR effort. (O&MN,N)

1.0 LO

7201AQ R425 10 USC 2410(a) Authority is hereby

invoked. Funding in support of

TI-014 for lab work for the Patrol

Coastal Program. (O&MN,N)

1.0 LO

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 16 of 149 FINAL

 

XXXXXX

XXXXXXX

XXXXXXX XXXXXXX

XXXXXXXX

XXXXXX

XXXXXX

XXXXXXX

XXXXXX

XXXXXX

XXXXXXX

XXXXXXX

XXXXXXX

XXXXXXX

XXXXXX

XXXXXX

XXXXXXX

XXXXXXX

XXXXXXX

XXXXXX

XXXXXXX

XXXXXXX XXXXXXX

XXXXXX

XXXXXXX XXXXXXX

XXXXXXX

XXXXXXX

XXXXX

XXXXXX

XXXXXXX

XXXXX

XXXXXXX XXXXXXX

XXXXXX

XXXXXXX

Page 20: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

Item PSC Supplies/Services Qty Unit Est. Cost Fixed Fee CPFF

7201AR R425 10 USC 2410(a) Authority is hereby

invoked. Funding in support of

TI-004 for contractor ISEA, logistic

& sustainment services in support of

the electro-optic VAS systems

fielded for SSP. (O&MN,N)

1.0 LO

7201AS R425 10 USC 2410(a) Authority is hereby

invoked. Funding in support of TI-04

for contractor ISEA, logistic &

sustainment services for VAS.

(O&MN,N)

1.0 LO

7201AT R425 10 USC 2410(a) Authority is hereby

invoked. Funding in support of TI 15

for lab work for the Patrol Coastal

Program Office. (O&MN,N)

1.0 LO

7201AU R425 Funding in support of TI-07 VAS

night vision lab for contractor

maintenance & repair services for

NAVICP assets ONLY. (WCF)

1.0 LO

7201AV R425 Funding in support of TI-05 for PC

GMS URGENT Shipboard installation

OCONUS. (OPN)

1.0 LO

7201AW R425 Funding in support of TI-017 for

installation on board ship of a

Situational Awareness System. (WCF)

1.0 LO

7201AX R425 Funding in support of TI-11 for

support services in support of the

USSOCOM VAS - Weapon Accessories

program. (Fund Type - OTHER)

1.0 LO

7201AY R425 Funding in support of TI-05 for BOM

for dry air compressor installations

on 8 Patrol Coastal Griffin Missile

System ships; and shipping material

OCONUS. (OPN)

1.0 LO

7201AZ R425 Funding in support of TI-12 for

Coast Guard program work. (Fund Type

- OTHER)

1.0 LO

7201BA R425 Funding in support of TI-017 for

installation on board ship of SAwS

for the SAwS program. (WCF)

1.0 LO

7201BB R425 10 USC 2410(a) Authority is hereby

invoked. Funding in support of TI-07

to provide sustaining the Visual

Augmentation System

binocular/Monocular Program. (MDA)

1.0 LO

7201BC R425 Funding in support of TI-15 for

In-Service Engineering

Agent/Acquisition Engineering Agent

1.0 LO

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 17 of 149 FINAL

 

XXXXXXX XXXXXXX

XXXXXXX XXXXXXX

XXXXXX

XXXXXXX

XXXXXXX

XXXXXXX

XXXXXX

XXXXXXX XXXXXXX

XXXXXXX

XXXXXXX XXXXXXX

XXXXXXX

XXXXXXX

XXXXXXX XXXXXXX

XXXXXXX

XXXXXXX

XXXXXX

XXXXXX

XXXXXXX XXXXXXX

XXXXX

XXXXX

XXXXXXX

XXXXX

XXXXXXX

XXXXXX

XXXXX

XXXXX

Page 21: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

Item PSC Supplies/Services Qty Unit Est. Cost Fixed Fee CPFF

support for the Scoutmaster program.

(RDT&E)

7201BD R425 Funding in support of TI-15 for

In-Service Engineering

Agent/Acquisition Engineering Agent

support for the Scoutmaster program.

(RDT&E)

1.0 LO

7201BE R425 10 USC 2410(a) Authority is hereby

invoked. Funding in support of

TI-004 for contractor ISEA, logistic

& sustainment services in support of

the electro-optic VAS systems

fielded for NECC. (O&MN,N)

1.0 LO

7201BF R425 Funding in support of TI-017 in

support of installation on board

ship of a SAwS for the MSC SAwS

program. (WCF)

1.0 LO

7201BG R425 10 USC 2410(a) Authority is hereby

invoked. Funding in support of TI-14

for lab work for the Patrol Coastal

Program Office. (Fund Type - OTHER)

1.0 LO

7201BH R425 Funding in support of TI-03 for

Coast Guard Program. (Fund Type -

OTHER)

1.0 LO

7201BJ R425 Funding in support of TI-12 for

Coast Guard Program work. MOD 62:

Deob from leaving a

balance of (Fund Type -

OTHER)

1.0 LO

7201BK R425 10 USC 2410(a) Authority is hereby

invoked. Funding in support of TI-01

for Patrol Coastal Griffin Missile

System efforts. (OPN)

1.0 LO

7201BL R425 Funding in support of TI001 for ISEA

Efforts in support of OCONUS

Installation on PCGMS Ships. (OPN)

1.0 LO

7201BM R425 Funding in support of TI-013 for

Data Management Support (Config and

TDP Data Upload) in support of the

Electro-Optics systems used on the

HC/MC-130J Aircraft effort. (Fund

Type - OTHER)

1.0 LO

7201BN R425 Funding in support of TI-17 for SAwS

Installations and SOVT for SAwS

system baseline configuration for

MSC SAwS program (Cesar Chavez).

(WCF)

1.0 LO

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 18 of 149 FINAL

 

XXXXX

XXXXXXX XXXXXXX

XXXXXXX

XXXXXXX

XXXX

XXXXXXX XXXXXXX

XXXXXX

XXXXXXX

XXXXXX

XXXXXX

XXXXX

XXXXX

XXXXXX

XXXXXXX

XXXXX

XXXXXXX XXXXXXX

XXXXXXX

XXXXXX XXXXXX

XXXXX

XXXXXX XXXXXX

XXXXX

XXXXX

XXXXX

XXXX

XXXXXX XXXXXX

XXXXXX

Page 22: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

Item PSC Supplies/Services Qty Unit Est. Cost Fixed Fee CPFF

7201BP R425 Funding in support of TI-017 for

SAwS Installations and SOVT for SAwS

system baseline configuration for

the MSC SAwS program (Richard Byrd).

MOD 59: Deob leaving a

balance of (WCF)

1.0 LO

7201BQ R425 Funding in support of TI-001 for

ISEA efforts for the PCGMS project,

to include engineering, technical,

logistical, administrative and

facility labor support to assist

in-service engineering and

engineering oversight of the BSII,

including performing required

inventory and material movement.

(O&MN,N)

1.0 LO

7201BR R425 Funding in support of TI-017 for

SAwS and SOVT for SAwS system

baseline configuration for the MSC

SAwS program (USNS PECOS). (WCF)

1.0 LO

7201BS R425 Funding in support of TI-017 for

SAwS and SOVT for SAwS system

baseline configuration for the MSC

SAwS program (USNS HUMPHREYS). (WCF)

1.0 LO

7201BT R425 Funding in support of TI-017 for

SAwS and SOVT for SAwS system

baseline configuration for the MSC

SAwS program (USNS ERICSSON). MOD 58

plussed up labor funding by

from to (WCF)

1.0 LO

7201BU R425 Funding in support of TI-005 in

support of Shipboard Protection

System (SPS) Efforts. (O&MN,N)

1.0 LO

7201BV R425 Funding in support of TI-17 for the

SAwS Installation and SOVT/Training

on the USNS Cesar Chavez (T-AKE 14).

(WCF)

1.0 LO

7201BW R425 Funding in support of TI-005 for

PCGMS efforts. (O&MN,N)

1.0 LO

7201BX R425 Funding in support of TI-001 for

PCGMS efforts. (O&MN,N)

1.0 LO

7201BY R425 Funding in support of TI-001 for

PCGMS efforts. (OPN)

1.0 LO

7201BZ R425 Funding in support of TI-19 for

Toplite Engineering, drawings and

prototype support. (WPN)

1.0 LO

7201CA R425 Funding in support of TI-005 for

PCGMS efforts. (OPN)

1.0 LO

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 19 of 149 FINAL

 

XXXXXX

XXXXXXX XXXXXXX

XXXXXX

XXXXXXX

XXXXX

XXXXXXX

XXXXXX

XXXXXXX

XXXXXXX

XXXXXXX

XXXXX

XXXXXX XXXXXX

XXXXXXX XXXXXXX

XXXXXX

XXXXXXX

XXXXX

XXXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXXX

XXXXXX

XXXXXX

XXXXXX

XXXXXXX XXXXXXX

XXXXXX

XXXXXX

XXXXXX

XXXXXX

XXXXX

XXXXXX

XXXXX

XXXXXX

Page 23: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

Item PSC Supplies/Services Qty Unit Est. Cost Fixed Fee CPFF

7201CB R425 Funding in support of TI-07 for VAS

Technician Support in support of the

Naval Special WARCOM VAS Program

support. (Fund Type - OTHER)

1.0 LO

7201CC R425 Funding in support of TI-017 for

SAwS and SOVT for SAwS system

baseline configuration for SAwS

program (USNS TIPPECANOE). (WCF)

1.0 LO

7201CD R425 Funding in support of TI-004 for

contractor ISEA, logistic and

sustainment services in support of

the electro-optic VAS systems

fielded for NECC. (O&MN,N)

1.0 LO

7201CE R425 Funding in support of TI-004 for

Contractor ISEA, logistic and

sustainment services in support of

the electro-optic VAS Systems

fielded for NECC. (O&MN,N)

1.0 LO

7201CF R425 Funding in support of TI-007 for

contractor ISEA, logistic &

sustainment services in support of

the electro optic VAS systems

fielded for USCG. (Fund Type -

OTHER)

1.0 LO

7201CG R425 Funding in support of TI-17 SAwS and

SOVT for SAwS system baseline

configuration for the MSC SAwS

program for USNS TIPPECONOE. (WCF)

1.0 LO

7201CH R425 Labor in support of TI-018 USSSOCOM

CCFLIR. (Fund Type - OTHER)

1.0 LO

7201CJ R425 Labor in support of TI-0007 for VAS

Lab Technician support in support of

VAS ISEA sustainment efforts. (Fund

Type - OTHER)

1.0 LO

7201CK R425 Labor funding for TI-002 for

contractor logistic and sustainment

services in support of the NSWC

Crane law enforcement electro-optic

loan program. (WCF)

1.0 LO

7201CL R425 Incremental funding for Labor for

TI-0007 to provide acceptance

verification only for weapons

accessories (Visual Augmentation

Systems) program in support of

USSOCOM. (Fund Type - OTHER)

1.0 LO

7201CM R425 Incremental funding for Labor for

TI-007 for Visual Augmentation

Systems Binocular/Monocular Program

Engineering and Logistics Depot

1.0 LO

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 20 of 149 FINAL

 

XXXXXX

XXXXXX

XXXXXXX

XXXXXXX

XXXXXXX XXXXXXX

XXXXXX

XXXXXXX XXXXXXX

XXXXXXX

XXXXXXX

XXXXXXX XXXXXXX

XXXXXXX

XXXXXXX

XXXXXXX

XXXXXXX

XXXXXXX

XXXXXX

XXXXXX

XXXXXXX XXXXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXXXX XXXXXXX

XXXXX

XXXXXX

XXXXXX

XXXXXX

Page 24: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

Item PSC Supplies/Services Qty Unit Est. Cost Fixed Fee CPFF

Support for USSOCOM. (Fund Type -

OTHER)

7201CN R425 Labor for TI-014 in support of PC-EO

Program. (O&MN,N)

1.0 LO

7201CP R425 Funding in support of labor support

TI-10, MH-60 support. (APN)

1.0 LO

7201CQ R425 Funding in support of TI-18 Labor

supporting the PC-EO Program.

(O&MN,N)

1.0 LO

7201CR R425 Funding for labor supporting TI-015

in support of PC-EO Program.

(O&MN,N)

1.0 LO

7201CS L010 Labor funding in support of TI-19,

Toplite/MK 38 MOD 2 technical

documentation writing and logistics

support. (WPN)

1.0 LO

7201CT R425 Labor funding in support of TI-004

for Configuration Management support

of the EO VAS systems fielded for

NECC. (O&MN,N)

1.0 LO

7201CU R425 Labor funding for TI-004

Configuration Management in support

of Visual Augmentation Systems

(VAS). (O&MN,N)

1.0 LO

7201CV R425 Incremental labor funding for TI-007

FY16 repairs. (WCF)

1.0 LO

7201CW R425 Incremental labor funding for TI-010

for product support and depot

activation support (FRCSE,

Jacksonville) for the EO system used

on the HC/MC-130J aircraft. (Fund

Type - OTHER)

1.0 LO

7201CX R425 Incremental labor funding for

product support and depot activation

support (FRCSE, Jacksonville) for

the EO system used on the HC/MC-130J

aircraft. TI-013. (Fund Type -

OTHER)

1.0 LO

7201CY R425 Incremental labor funding for TI-017

for SAwS installation for USNS

ERICSSON. (WCF)

1.0 LO

7201CZ R425 Incremental funding for Labor on

TI-017 for SAwS support for the USNS

Patuxent. (WCF)

1.0 LO

7201DA N020 Incremental funding for labor on

TI-017 for a re-install on the USS

Eisenhower. (O&MN,N)

1.0 LO

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 21 of 149 FINAL

 

XXXXXX

XXXXXXX

XXXXXXX

XXXXXX

XXXXXXX

XXXXXX

XXXXXX

XXXXXXX

XXXXXXX

XXXXXXX

XXXXXXX

XXXXXXX

XXXXXX

XXXXXX

XXXXXXX XXXXXXX

XXXXXXX

XXXXXXX

XXXXXXX

XXXXX

XXXXXX

XXXXXXX XXXXXXX

XXXXXX

XXXXXX

XXXXXX

XXXXXXX XXXXXXX

XXXXXXX

XXXXX

XXXXXX

XXXXXXX

XXXXXXX

XXXXXXX

XXXXXX

XXXXXXX

XXXXXXX

Page 25: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

Item PSC Supplies/Services Qty Unit Est. Cost Fixed Fee CPFF

7201DB R425 Incremental funding for Labor on

TI-007 for Engineering, Logistics,

Financial, Depot Support and Task

Lead Support for the Visual

Augmentation Binocular/Monocular

Program. (Fund Type - OTHER)

1.0 LO

7201DC R425 Incremental labor funding for TI-14

to provide support for the effective

and efficient U.S. Coast Guard

Multi-Sensor Program. (Fund Type -

OTHER)

1.0 LO

7201DD N020 Incremental labor funding for TI-017

for overhead/admin costs associated

with the reinstallation of the

Situational Awareness System (SAwS)

on board the USS Dwight D.

Eisenhower CVN-69. (O&MN,N)

1.0 LO

7201DE R425 Incremental labor funding for TI-019

for MK20 EOSS MOD X test and

evaluation, engineering, technical,

and logistical support. (SCN)

1.0 LO

7201DF N019 Incremental labor funding for TI-001

supporting Brite Star II (BS II)

installation on Patrol Coastal (PC)

Griffin Missile System (GMS). (OPN)

1.0 LO

7201DG L059 Incremental labor funding under

TI-003 to provide services

supporting the US Coast Guard Multi-

Sensor Program and the AN/SPS-40

radar system on the USCGC Alex

Haley. (Fund Type - OTHER)

1.0 LO

7201DH R425 Incremental labor funding under

TI-014 for In-Service Engineering

Agent (ISEA) Engineering/Logistics

and Maritime Forward Looking

Infrared (MARFLIR) support for

Patrol Coastal Ships. (O&MN,N)

1.0 LO

7201DJ N019 Incremental labor funding under

TI-017 for the re-installation of

the Situational Awareness System

(SAwS) onboard the USS Dwight D.

Eisenhower CVN-69. The labor

funds was originally authorized

under an ATP on 2 March 2016.

(O&MN,N)

1.0 LO

7201DK N019 Incremental labor funding under

TI-017 for the USNS Amelia Earhart

for PoP 1 Oct 15 - 30 Sep 16. MOD 59

increases labor funding provided via

PR 1300558714 by to a total

1.0 LO

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 22 of 149 FINAL

 

XXXXXXX

XXXXXX

XXXXXXX

XXXXXXX XXXXXXX

XXXXXXXX

XXXXXXXX

XXXXX

XXXXXXX XXXXXXX

XXXXXXX

XXXXXX

XXXXXX

XXXXXXX

XXXXXXX

XXXXXXX XXXXXXX

XXXXXXX

XXXXX

XXXXX

XXXXXX

XXXXXX

XXXXX

XXXX

XXXXXX

XXXXXX

XXXXX

XXXXXXX

XXXXXXX

Page 26: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

Item PSC Supplies/Services Qty Unit Est. Cost Fixed Fee CPFF

of (WCF)

7201DL R425 Incremental labor funding for Night

Vision Device (NVD) for Acquisition

Engineering Agent (AEA) efforts

under TI-004 associated with the

acquisition of NVD equipment. (OPN)

1.0 LO

7201DM R425 Incremental labor funding in support

of PCEO program under TI-018.

(O&MN,N)

1.0 LO

7201DN R425 Labor funding provided under TI-010

for Engineering/Management

capabilities in support of PdM EO/IR

- Intel (7.25 MY). (Fund Type -

OTHER)

1.0 LO

7201DP R425 Labor funding of under

TI-011 for GMVAS LCSM support to

MRAP vehicles. USSOCOM. (MDA)

1.0 LO

7201DQ R425 Labor funding in support of TI-013

for Engineering/Management

capabilities in support of PdM EO/IR

- Intel (3.15 MY). (APN)

1.0 LO

7201DR R425 Incremental funding for TI-002 labor

in support of contractor logistic

sustainment services for the NSWC

Crane Law Enforcement electro-optic

loan program. (WCF)

1.0 LO

7201DS R425 Labor funding for TI-020 to provide

the necessary resources and services

to support an effective and

efficient US Coast Guard Multi-

Sensor Program. (Fund Type - OTHER)

1.0 LO

7201DT J010 Incremental labor funding for TI-007

Visual Augmentation Systems (VAS)

night vision laboratory for

contractor maintenance and repair

services in support of the PMS-340

Naval Special Warfare Visual

Augmentation System (NSW VAS)

Program. (O&MN,N)

1.0 LO

7201DU R425 Incremental labor funding under

TI-012 to provide the necessary

resources and services to support an

effective and efficient US Coast

Guard Multi-Sensor Program. (Fund

Type - OTHER)

1.0 LO

7201DV R425 Incremental labor funding under

TI-007 for the sustainment of

systems returned for repair,

reutilization, disposal, and the

1.0 LO

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 23 of 149 FINAL

 

XXXXXX

XXXXXX

XXXXX XXXXXXX

XXXXXXX

XXXXXXX

XXXXXXX

XXXXXX

XXXXXXX XXXXXXX

XXXXXX

XXXXXXX

XXXXXXX

XXXXXX

XXXXXXX

XXXXXXX XXXXXXX

XXXXXX

XXXXXXX XXXXXXX

XXXXXXXXXXXXX

XXXXXXX XXXXXXX

XXXXXXX

XXXXXXXXXXX XXXXXX

Page 27: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

Item PSC Supplies/Services Qty Unit Est. Cost Fixed Fee CPFF

availability of repair parts for the

AN/PVS-15. (Fund Type - OTHER)

7201DW J010 Provide incremental labor funding

under TI-007 for PVS-15

refurbishment. (PMC)

1.0 LO

7201DX R425 Incremental labor funding under

TI-012 for the MARFLIR-II systems

installation on USCG Cutters, USCG

CHINOOK, RIDLEY, and FINBACK. (Fund

Type - OTHER)

1.0 LO

7201DY R425 Incremental labor funding in support

of TI-007 for Engineering,

Logistics, Financial, Depot Support

and Task Lead Support for the Visual

Augmentation System

Binocular/Monocular Program in

support of the USSOCOM sustainment

efforts. (WCF)

1.0 LO

7201DZ R425 Incremental labor funding under

TI-007 for the necessary services,

labor, material, travel, Equipment,

calibration, facilities, procurement

and testing to repair and properly

store/package/ship FY 16 repairs in

support of the NAVSUP sustainment

efforts. (WCF)

1.0 LO

7201EA R425 Incremental labor funding under

TI-012 to provide the necessary

resources and services to support an

effective and efficient program to

support the Star Safire III Electro-

Optical Sensor System. The equipment

support effort includes program

management, logistics, engineering

and acquisition of material and

related technical services required

to meet program objectives. (Fund

Type - OTHER)

1.0 LO

7201EB R425 Incremental Labor funding under

TI-018 for In-Service Engineering

Agent (ISEA) and Tactical Software

Support Center (TSSC) functions for

the Life Cycle of Electronic Warfare

(EW) and Electro Optic/Infrared

(EO/IR) systems installed aboard

Littoral Class Combat (LCS) ship

class including the WBR-2000 and

ES-3601 Electronic Support Measures,

Softkill Weapons System (SKWS) and

Automated Launching of Expendables

(ALEX) decoy launching systems and

1.0 LO $ $ $

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 24 of 149 FINAL

 

XXXXXXX

XXXXXX

XXXXXX

XXXXXX

XXXXXXX XXXXXXX

XXXXXXX XXXXXXX

XXXXXXX XXXXXXX

XXXXXX

XXXXX

XXXXXXX XXXXXXX

XXXXXX

XXX XXX XXX

Page 28: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

Item PSC Supplies/Services Qty Unit Est. Cost Fixed Fee CPFF

EO/IR systems installed aboard the

INDEPENDENCE Variant. MOD 65: DEOB

from leaving

(O&MN,N)

7201EC R425 Incremental labor funding under

TI-015 to provide In-Service

Engineering Agent (ISEA) and

Tactical Software Support Center

(TSSC) functions for the Life Cycle

of Electronic Warfare (EW) and

Electro Optic/Infrared (EO/IR)

systems installed aboard Littoral

Class Combat (LCS) ship class

including the WBR-2000 and ES-3601

Electronic Support Measures,

Softkill Weapons System (SKWS) and

Automated Launching of Expendables

(ALEX) decoy launching systems and

EO/IR systems installed aboard the

INDEPENDENCE Variant. (O&MN,N)

1.0 LO

7201ED N019 Incremental labor funding under

TI-017 USNS KANAWHA SAwS install

support with Period of Performance

of 4Apr2016 through 30Sep2016. (WCF)

1.0 LO

7201EF R425 Incremental labor funding under

TI-012 to provide the necessary

resources and services to support an

effective and efficient US Coast

Guard Multi-Sensor Program. (Fund

Type - OTHER)

1.0 LO

7201EG R425 Incremental labor funding under

TI-007 for the production

verification of the Visual

Augmentation System Hand-Held

Imagers Program in support of

USSOCOM. (Fund Type - OTHER)

1.0 LO

7201EH R425 Incremental labor funding for TI-007

for procurement of ancillary items,

engineering, logistics, acceptance

test labor, and travel support for

night vision goggles in support of

PMS NSW. (O&MN,N)

1.0 LO

7201EJ R425 Incremental labor funding under

TI-013 to maintain engineering and

logistical oversight for the depot

operations and perform depot level

repair of field-returned systems of

the Multi-spectral Targeting System

(MTS), maintain spares and system

configuration. UAS Project Office.

(Fund Type - OTHER)

1.0 LO

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 25 of 149 FINAL

 

XXXXXX

XXXXXX

XXXXX

XXXXX

XXXXXXX XXXXXXX

XXXXXXX XXXXXXX

XXXXXX

XXXXXX

XXXXXX

XXXXX XXXXX

XXXXXX

XXXXXX

XXXXXXX XXXXXXX

XXXXXXXXXXX XXXXXX

XX

Page 29: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

Item PSC Supplies/Services Qty Unit Est. Cost Fixed Fee CPFF

7201EK R425 Incremental labor funding under

TI-012 for the In-service

Engineering and Support for the CG

National Security Cutter Optical

Systems. (Fund Type - OTHER)

1.0 LO

7201EL J099 Incremental labor funding for TI-007

Visual Augmentation Systems (VAS)

Lab Technician Support in support of

the VAS FMS Case: Denmark DE-P-LBI

efforts. (FMS Case #DE-P-LBI)

1.0 LO

7201EM J099 Incremental labor funding under

TI-007 in support of Visual

Augmentation System (VAS) Lab

Technician Support for VAS ISEA

sustainment efforts. (MDA)

1.0 LO

7201EN J099 Incremental labor funding for TI-007

for Visual Augmentation Systems

(VAS) Lab Technician Support for the

VAS FMS Case: Slovakia LO-P-LAE

efforts. (FMS Case #LO-P-LAE)

1.0 LO

7201EP J099 Incremental labor funding for TI-007

Visual Augmentation Systems (VAS)

Lab Technician Support in support of

the VAS FMS Case: Jordan, JO-P-LBK

efforts. (FMS Case #JO-P-LBK)

1.0 LO

7201EQ R425 Incremental labor funding for TI-007

for Visual Augmentation Systems

(VAS) Lab Technician Support for the

Law Enforcement NVG Program. (WCF)

1.0 LO

7201ER J099 Incremental labor funding under TI-7

for Visual Augmentation Systems Lab

Technician Support in support of the

VAS FMS Case: Czech Republic,

EZ-O-LCI. (FMS Case #EZ-O-LCI)

1.0 LO

7201ES R425 Incremental labor funding under

TI-007 for Visual Augmentation

Systems (VAS) Lab Technician Support

in support of the VAS FMS Case:

England, UK-P-LUW.

(FMS Case #UK-P-LUW)

1.0 LO

7300 R425 Non-personal services to provide

technical documentation, curriculum,

technical drawings, logistics, and

technical support of electro-optic

technologies for the Electro-Optics

Technology Division (Code JXQ).

Labor Surge Option Year Two. (Fund

Type - TBD)

5754.0 EA

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 26 of 149 FINAL

 

XXXXXXX

XXXXXX

XXXX

XXXXX

XXXXXXX

XXXX

XXXXX XXXXX

XXXXXX

XXXXXXX

XXXXX

XXXXXX

XXXXXXXX XXXXXXXX

XXXXXX

XXXXX XXXXX

XXXXX

XXXXXX

XXXX

XXXXXX XXXXXX

XXXXX XXXXX

Page 30: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

Item PSC Supplies/Services Qty Unit Est. Cost Fixed Fee CPFF

7301 Non-personal services to provide

technical documentation, curriculum,

technical drawings, logistics, and

technical support of electro-optic

technologies for the Electro-Optics

Technology Division (Code JXQ).

Labor Option Year Two, Period of

Performance extension.

7301AA N019 Incremental Labor funding under

TI-022 for the SAwS installation

support for the USNS Kanawha. PoP =

4Apr2016 - 30Sep2016. (WCF)

1.0 LO

7301AB N019 Incremental labor funding under

TI-24 for the integration of Wide

Field of View (WFOV)/Narrow Field of

View (NFOV) EO/IR sensors with the

SAwS Government-owned software.

Office of Naval Research. (RDT&E)

1.0 LO

7301AC R425 Incremental labor funding under

TI-003 for the Acquisition and

installation support - MARFLIR II

System. (Fund Type - OTHER)

1.0 LO

7301AD R425 Incremental labor funding funder

TI-014 for the PC Class Maritime

Forward Looking Infrared (MARFLIR)

ISEA Support. (O&MN,N)

1.0 LO

7301AE N019 Incremental labor funding under

TI-023 to provide visual

identification and capture

capability to support AT/FP

requirements in the 5th FLT and 7th

FLT AORs and conduct System

Operational Verification Testing

(SOVT) SAwS system baseline

configuration to include procurement

of installation materials and labor

on USNS PECOS. MOD 65: Plus Up by

to the =

funded. (WCF)

1.0 LO

7301AF N019 Incremental labor funding under

TI-021 to provide visual

identification and capture

capability to support AT/FP

requirements in 5th FLT and 7th FLT

AORs and conduct System Verification

Testing (SOVT) SAwS system baseline

configuration to include procurement

of installation materials and labor

on USNS PATUXENT. MOD 65: Plus Up by

to the original for

current funding. (WCF)

1.0 LO

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 27 of 149 FINAL

 

XXXXXXX

XXXXXXXX XXXXXXXX

XXXXX XXXXX

XXXXXX

XXXXXXXXXX

XXXXXXX

XXXXXX

XXXXX

XXXXXXX XXXXXXX

XXXXXX

XXXXXXX XXXXXXX

XXXXXXXX

XXXX

XXXXXXX XXXXXXX

XXXXXX

Page 31: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

Item PSC Supplies/Services Qty Unit Est. Cost Fixed Fee CPFF

7301AG R425 Incremental labor funding under

TI-020 to provide the necessary

resources and services to support an

effective and efficient US Coast

Guard Multi-Sensor Program.

Acquisition and installation support

- MARFLIR II System. (Fund Type -

OTHER)

1.0 LO

7301AH R425 Incremental labor funding under

TI-018 for technical and engineering

support for LCS 6/20135/OWLD Oct 16.

NAVSEA. (SCN)

1.0 LO

7301AJ R425 Incremental labor funding under

TI-012 to provide acquisition and

installation support for the MARFLIR

II System. USCG. (MDA)

1.0 LO

7301AK N019 Incremental labor funding under

TI-001 in support of Brite Star II

Laser System (BS II) equipment on

Patrol Coastal (PC) Griffin Missile

Sytem (GMS) for the installation of

ten (10) BSII mounts. Two (2) person

teams on ten (10) trips. (OPN)

1.0 LO

7301AL K020 Incremental labor funding under

TI-024 for the SPS to SAwS

Conversion on DDG81 in support of

FIMS Initiative #12263. (US Forces

Fleet Command) (RDT&E)

1.0 LO

For ODC Items:

Item PSC Supplies/Services Qty Unit Est. Cost

9000 R425 Non-personal services to provide technical documentation,

curriculum, technical drawings, logistics, and technical support

of electro-optic technologies for the Electro-Optics Technology

Division (Code JXQ). ODC Option Year One. (Fund Type - TBD)

1.0 EA

9001 Non-personal services to provide technical documentation,

curriculum, technical drawings, logistics, and technical support

of electro-optic technologies for the Electro-Optics Technology

Division (Code JXQ). ODC Option Year One. Contractor shall invoice

the following priced SLINs in accordance with invoicing

instructions in Section G.

9001AA R425 10 USC 2410(a) Authority is hereby invoked. ODC funding in support

of TI-11, USSOCOM LR-GMVAS. MOD 54 Deob from leaving a

balance of (Fund Type - OTHER)

1.0 LO

9001AB R425 ODC Funding in support of TI-12, installations for the US Coast

Guard Program Office. MOD 54 Deob from leaving a

balance of (Fund Type - OTHER)

1.0 LO

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 28 of 149 FINAL

 

XXXXXX

XXXXX

XXXXXXXX

XXXX

XXXXX XXXXX

XXXXXXX XXXXXXX

XXXXXX

XXXXXX XXXXXX

XXXXXXXX

XXXXX

XXXXXX

XXXXXX

XXXXXX

XXXXXXX XXXXXXX

XXXXXXX XXXXXXX

XXXXXXX

XXX

XXXXX

XXXXXXX

XXX

Page 32: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

Item PSC Supplies/Services Qty Unit Est. Cost

9001AC R425 ODC Funding in support of TI-13, Data Management support for the

Air Force DAS-1a Program. MOD 54 Deob from

leaving a balance of (Fund Type - OTHER)

1.0 LO

9001AD R425 ODC Funding in support of TI-05, Phase III EO/IR SAWS Capability

on CVN-71 USS Teddy Roosevelt. (RDT&E)

1.0 LO

9001AE R425 10 USC 2410(a) Authority is hereby invoked. Funding in support of

TI-14 for lab work for the Patrol Coastal Program Office. (O&MN,N)

1.0 LO

9001AF R425 Funding in support of TI-01, in support of the PC Griffin Missile

System. MOD 56: Deob from leaving a balance of

(O&MN,N)

1.0 LO

9001AG R425 Funding in support of TI-15, Installation of SA 79676K, FLIR

replacement on PC3 and PC4. MOD 56: Deob from

leaving a balance of (OPN)

1.0 LO

9001AH R425 Funding in support of TI-07, Materials and ODC's in support for

NAVSUP WSS intensifier repairs (WCF)

1.0 LO

9001AJ R425 Funding in support of TI-05, in support of Phase III EO/IR

Situational Awareness (SAwS) Capability Experimentation. (RDT&E)

1.0 LO

9001AK R425 Funding in support of TI-15, Patrol Coastal-Electro Optic Program,

Maritime Forward Looking Infrared (MARFLIR) for SEA21/PMS-470. MOD

54 Deob from leaving a balance of (O&MN,N)

1.0 LO $

9001AL R425 Funding in support of TI-12, Coast Guard program work (Fund Type -

OTHER)

1.0 LO

9001AM R425 Funding in support of TI-15, Scoutmaster Program funding for

MARFLIR II ISEA tasking in support of installation work. (RDT&E)

1.0 LO

9001AN R425 Funding in support of TI-05, Phase III EO/IR Situational Awareness

(SAwS) Capability Experimentation in support of SAwS Installation

on CVN-71 Teddy Roosevelt (RDT&E)

1.0 LO

9001AP R425 ODC funding in support of TI-12 Coast Guard Program Work. MOD 54

Deob from leaving a balance of (Fund Type -

OTHER)

1.0 LO

9001AQ R425 ODC funding in support of TI-07 VAS systems fielded maintenance

and repair. (WCF)

1.0 LO

9001AR R425 ODC funding in support of TI-05 Situational Awareness System.

(RDT&E)

1.0 LO

9001AS R425 ODC funding in support of TI-05 (OPN) 1.0 LO

9001AT R425 Funding in support of TI-01, Patrol Coastal Griffin Missile System

Brite Star II installations. MOD 54: Deob from

leaving a balance of $0. (OPN)

1.0 LO $

9001AU R425 Funding in support of TI-05, Dry air compressor installations on

Patrol Coastal Griffin Missile Systems. MOD 35: DEOB from

leaving a balance of MOD 56: Deob from

leaving a balance of (OPN)

1.0 LO

9001AV R425 Funding in support of TI-17, for MSC Situational Awareness System

(SAwS) preparation and installation onboard USNS CESAR CHAVEZ

1.0 LO

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 29 of 149 FINAL

 

XXXXX

XXXXXXX

XXXXXXX

XXXXXXX

XXX XXXXX XXXXXXXXXXXXX

XXXXXXXXXXX

XXXXX

XXXXX XXXXXX

XXXXXXX

XXXXXX

XXXXXX

XXXXXXXXXXX

XXXXXX

XXXXX

XXXXXX

XXXXXXXXXXX

XXXXXXX

XXXXXX

XXXXXX

XXXXXX

XXX

XXXXX

XXXXXX

XXXX

XXXXXXXXXXX XXXXXX

XXXXXXX

XXXXXX

XXXX XXXX

XXXXXXX

XXX

XXX

XX

Page 33: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

Item PSC Supplies/Services Qty Unit Est. Cost

(WCF)

9001AW R425 Funding in support of TI-15 for In-Service Engineering Agent

(ISEA) Support for the Scoutmaster program. MOD 38: DEOB from

leaving a balance of (RDT&E)

1.0 LO

9001AX R425 Funding in support of Coast Guard program work on TI-0012. MOD 54

Deob from leaving a balance of (Fund Type

- OTHER)

1.0 LO

9001AY R425 Funding in support of TI-15 for In-Service Engineering Agent

(ISEA)/Acquisition Engineering Agent (AEA) support for the

Scoutmaster Program. MOD 38: DEOB from leaving a

balance of $0. (WCF)

1.0 LO $

9001AZ R425 Funding in support of TI-14 for the Patrol Coastal Program Office.

MOD 38: DEOB 5K from 5K leaving a balance of $0. (O&MN,N)

1.0 LO $

9001BA R425 Funding in support of TI-15 for support of lab work for the Patrol

Coastal Program Office. MOD 38: DEOB from leaving a

balance of (O&MN,N)

1.0 LO

9001BB R425 Funding in support of TI 15 for In-Service Engineering Agent

(ISEA)/Acquisition Engineering Agent support for the Scoutmaster

program. (RDT&E)

1.0 LO

9100 R425 Non-personal services to provide technical documentation,

curriculum, technical drawings, logistics, and technical support

of electro-optic technologies for the Electro-Optics Technology

Division (Code JXQ). ODC Surge Option Year One. (Fund Type - TBD)

1.0 LO

Option

9200 R425 Non-personal services to provide technical documentation,

curriculum, technical drawings, logistics, and technical support

of electro-optic technologies for the Electro-Optics Technology

Division (Code JXQ). ODC Option Year Two. (Fund Type - TBD)

1.0 LO

9201 Non-personal services to provide technical documentation,

curriculum, technical drawings, logistics, and technical support

of electro-optic technologies for the Electro-Optics Technology

Division (Code JXQ). ODC Option Year Two.

9201AA R425 Funding in support of Coast Guard program work on TI-12. (Fund

Type - OTHER)

1.0 LO

9201AB R425 Funding in support of TI-18. (WCF) 1.0 LO

9201AC R425 Funding in support of TI-17 for installation on board ship of a

Situational Awareness System. (WCF)

1.0 LO

9201AD R425 10 USC 2410(a) Authority is hereby invoked. Funding in support of

TI-14 for lab work for the Patrol Coastal Program. (O&MN,N)

1.0 LO

9201AE R425 10 USC 2410(a) Authority is hereby invoked. Funding in support of

TI-15. (O&MN,N)

1.0 LO

9201AF R425 Funding in support of TI-007 for VAS night vision laboratory for

contractor maintenance and repair services. (WCF)

1.0 LO

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 30 of 149 FINAL

 

XXXXX XXX

XXXXXXX

XXXXXXX

XXXXXXX

XXXXX

XXXXXX

XXXXX

XXXXXX

XXXXXXX

XX

XXXXXXX

XXXXXXX

XXXXXXXXXXXXX

XXXX

XXXXX

XXXXXXXX

XXXX

XXXX XXXX

XXXXXX

XXXXXX

XXXXXXX

XXX

XXX

Page 34: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

Item PSC Supplies/Services Qty Unit Est. Cost

9201AG R425 Funding in support of TI-05 for Bill of Materials (BOM) for dry

air compressor installations on 8 Patrol Coastal Griffin Missile

System ships and shipping material OCONUS. (OPN)

1.0 LO

9201AH R425 Funding in support of TI-05 for BOM for dry air compressor

installations on 8 PC GMS Ships and shipping materials OCONUS.

(OPN)

1.0 LO

9201AJ R425 Funding in support of TI-17 in support of installation on board

ship of a SAwS for the MSC SAwS program. (WCF)

1.0 LO

9201AK R425 Funding in support of TI-05 for BOM for dry air compressor

installations on 8 Patrol Coastal Griffin Missile System ships;

and shipping material OCONUS. (OPN)

1.0 LO

9201AL R425 Funding in support of TI-17 for installation on board ship of a

SAwS for the MSC SAwS program. (WCF)

1.0 LO

9201AM R425 Funding in support of TI-15 for In-Service Engineering

Agent/Acquisition Engineering Agent support for the Scoutmaster

program. (RDT&E)

1.0 LO

9201AN R425 Funding in support of TI-15 for In-Service Engineering

Agent/Acquisition Engineering Agent support for the Scoutmaster

program. (RDT&E)

1.0 LO

9201AP R425 Funding in support of TI-15 for In-Service Engineering

Agent/Acquisition Engineering Agent support for the Scoutmaster

program. (RDT&E)

1.0 LO

9201AQ R425 Funding in support of TI-12 for Coast Guard Program work. (Fund

Type - OTHER)

1.0 LO

9201AR R425 Funding in support of TI-013 for Data Management Support (Config &

TDP Data Upload) in support of the Electro Optics systems used on

the HC/MC-130J aircraft effort. (Fund Type - OTHER)

1.0 LO

9201AS R425 Funding in support of TI-17 for SAwS Installations and SOVT for

SAwS system baseline configuration for MSC SAwS program (Cesar

Chavez). (WCF)

1.0 LO

9201AT R425 Funding in support of TI-017 for SAwS Installations and SOVT for

SAwS system baseline configuration for the MSC SAwS Program

(Richard Byrd). MOD 59: Deob of leaving a balance of .

(WCF)

1.0 LO $

9201AU R425 Funding in support of TI-017 for SAwS and SOVT for SAwS system

baseline configuration for the MSC SAwS program (USNS PECOS).

(WCF)

1.0 LO

9201AV R425 Funding in support of TI-017 for SAwS and SOVT for SAwS system

baseline configuration for the MSC SAwS program (USNS HUMPHREYS).

(WCF)

1.0 LO

9201AW R425 Funding in support of TI-017 for SAwS and SOVT for SAwS system

baseline configuration for the MSC SAwS program (USNS ERICSSON).

MOD 58 plussed up ODC incremental funding by from

to MOD 60: plus up ODC funding by from to

(WCF)

1.0 LO

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 31 of 149 FINAL

 

XXXXXXX

XXXXXXX

XXXXXXX

XXXXXX

XXXXXXX

XXXXXX

XXXXXX

XXXXXX

XXXXXXX

XXXXXXX

XXXXXXXXXXX XXXXX

XXXXXX

XXXXXX

XXXXXX

XXXXXXX

XXXXXXXXXX

XXXXXX

XXXXXX

XXX

X

Page 35: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

Item PSC Supplies/Services Qty Unit Est. Cost

9201AX R425 Funding in support of TI-002 for contractor logistic & sustainment

services in support of the NSWC Crane law enforcement

electro-optic loan program. (WCF)

1.0 LO

9201AY R425 Funding in support of TI-005 in support of Shipboard Protection

System (SPS) Efforts. (O&MN,N)

1.0 LO

9201AZ R425 Funding in support of TI-017 for the SAwS Installation and SOVT

Training on the USNS Cesar Chavez. (WCF)

1.0 LO

9201BA R425 Funding in support of TI-005 for PCGMS efforts. (O&MN,N) 1.0 LO

9201BB R425 ODCs for TI-017 in support of SAwS Installations and SOVT for SAwS

system baseline configuration for the MSC SAwS program for USNS

TIPPECANOE. (WCF)

1.0 LO

9201BC R425 ODC in support of PC-EO under TI-014. (O&MN,N) 1.0 LO

9201BD R425 ODC Funding in support of TI-018, PC-EO Program. (O&MN,N) 1.0 LO

9201BE R425 ODC Funding for TI-015 in support of PC-EO Program. (O&MN,N) 1.0 LO

9201BF L010 ODC funding for TI-019 for Toplite/MK 38 technical documentation

writing and logistics support. (WPN)

1.0 LO

9201BG R425 Incremental ODC funding for TI-005 in support of Patrol Coastal

Griffin Missile System (PCGMS) efforts. (O&MN,N)

1.0 LO

9201BH R425 Incremental ODC funding for TI-017 for SAwS installations and SOVT

for SAwS system baseline configuration for the MSC SAwS program

for USNS Patuxent. (WCF)

1.0 LO

9201BJ R425 Incremental ODC funding under TI-017 for overhead/admin costs

associated with reinstallation of the Situational Awareness System

(SAwS) on board the USS DWIGHT D EISENHOWER CVN-69. (O&MN,N)

1.0 LO

9201BK R425 Incremental ODC funding under TI-017 for overhead/admin costs

associated with reinstallation of the Situational Awareness System

(SAwS) on board the USS DWIGHT D EISENHOWER CVN-69. (O&MN,N)

1.0 LO

9201BL R425 Incremental ODC funding for TI-019 for MK20 EOSS MOD X test and

evaluation, engineering technical and logistical support. (SCN)

1.0 LO

9201BM N019 Incremental ODC funding for TI-001 for installation team support

of Brite Star II mounts for Patrol Coastal (PC) Griffin Missile

System (GMS). (OPN)

1.0 LO

9201BN R425 Incremental ODC funding under TI-007 for USSSCOM Engineering,

Logistics, Financial, Depot Support, and Task Lead Support for the

Visual Augmentation System Binocular/Monocular Program. (MDA)

1.0 LO

9201BP N019 Incremental ODC funding under TI-017 for the USNS Amelia Earhart

(WCF)

1.0 LO

9201BQ R425 Incremental ODC funding in support of PCEO program under TI-018.

(O&MN,N)

1.0 LO

9201BR R425 Incremental ODC funding under TI-012 for the necessary resources

and services to support an effective and efficient US Coast Guard

Multi-Sensor Program. (Fund Type - OTHER)

1.0 LO

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 32 of 149 FINAL

 

XXXXXXX

XXXXXXX

XXXXXXX

XXXXXXX

XXXXXX

XXXXXXX

XXXXXXX

XXXXXXX

XXXXXXX

XXXXXXX

XXXXXXX

XXXXXXX

XXXXXXX

XXXXXX

XXXXX

XXXXXX

XXXXXX

XXXXXXX

XXXXXX

Page 36: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

Item PSC Supplies/Services Qty Unit Est. Cost

9201BS R425 Incremental ODC funding under TI-012 to provide necessary

resources and services to support an effective and efficient US

Coast Guard Multi-Sensor Program. Specifically for the

installation of MARFLIR-II systems currently in inventory on the

USCG CHINOOK, RIDLEY, and FINBACK. (Fund Type - OTHER)

1.0 LO

9201BT R425 Incremental ODC funding under TI-015 for In-Service Engineering

Agent (ISEA) and Tactical Software Support Center (TSSC) functions

for the Life Cycle of Electronic Warfare (EW) and Electro

Optic/Infrared (EO/IR) systems installed aboard Littoral Class

Combat (LCS) ship class including the WBR-2000 and ES-3601

Electronic Support Measures, Softkill Weapons System (SKWS) and

Automated Launching of Expendables (ALEX) decoy launching systems

and EO/IR systems installed aboard the INDEPENDENCE Variant. MOD

65: DEOB from %56,000 leaving $0. (O&MN,N)

1.0 LO $

9201BU R425 Incremental ODC funding under TI-012 to provide the necessary

resources and services to support an effective and efficient

program to support the Star Safire III Electro-Optical Sensor

System. The equipment support effort includes program management,

logistics, engineering and acquisition of material and related

technical services required to meet program objectives. (Fund Type

- OTHER)

1.0 LO

9201BV R425 Incremental ODC funding under TI-018 for In-Service Engineering

Agent (ISEA) and Tactical Software Support Center (TSSC) functions

for the Life Cycle of Electronic Warfare (EW) and Electro

Optic/Infrared (EO/IR) systems installed aboard Littoral Class

Combat (LCS) ship class including the WBR-2000 and ES-3601

Electronic Support Measures, Softkill Weapons System (SKWS) and

Automated Launching of Expendables (ALEX) decoy launching systems

and EO/IR systems installed aboard the INDEPENDENCE Variant. MOD

65: DEOB from leaving . (O&MN,N)

1.0 LO $

9201BW N019 Incremental ODC funding under TI-017 for USNS KANAWHA SAwS install

support for the period of performance of 4Apr2016 - 30Sep2016.

(WCF)

1.0 LO

9201BX J019 Incremental ODC funding under TI-019 for Toplite support necessary

for the MK38 MOD 2 EO/IR sensor. (WPN)

1.0 LO

9201BY R425 Incremental ODC funding under TI-012 to provide the necessary

resources and services to support an effective and efficient US

Coast Guard Multi-Sensor Program. (Fund Type - OTHER)

1.0 LO

9201BZ R425 Incremental ODC funding under TI-012 for the In-service

Engineering and Support for the CG National Security Cutter

Optical Systems. (Fund Type - OTHER)

1.0 LO

9201ER R425 ODC in support of CLIN 7201 (FMS Case #EZ-O-LCI) 1.0 LO $

9300 R425 Non-personal services to provide technical documentation,

curriculum, technical drawings, logistics, and technical support

of electro-optic technologies for the Electro-Optics Technology

Division (Code JXQ). ODC Surge Option Year Two. (Fund Type - TBD)

1.0 LO

9301 Non-personal services to provide technical documentation,

curriculum, technical drawings, logistics, and technical support

of electro-optic technologies for the Electro-Optics Technology

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 33 of 149 FINAL

 

XXXXXXX

XXXXXXXX

XXXXXXXX

XXXXXXX

XXXXX XXXXX

XXXXXXX

XXXXXXX

XXXXXXX

XXXXX

XXXXXX

XXX

XXX

XXX

X

Page 37: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

Item PSC Supplies/Services Qty Unit Est. Cost

Division (Code JXQ). ODC Surge Option Year Two.

9301AA R425 Funding in support of TI-019 for Toplight engineering, drawings

and prototype support. (WPN)

1.0 LO

9301AB R425 Funding in support of TI-005 in support of PCGMS efforts. (O&MN,N) 1.0 LO

9301AC R425 Funding in support of TI-017 for SAwS Installations and SOVT for

SAwS system baseline configuration (USNS TIPPECANOE). (WCF)

1.0 LO

9301AD N019 ODC funding under TI-22 for the SAwS installation support on the

USNS Kanawha. PoP = 4Apr2016 - 30Sep2016. (WCF)

1.0 LO

9301AE N019 Incremental ODC funding under TI-024 to integrate Wide Field of

View (WFOV)/Narrow Field of View (NFOV) EO/IR sensors with the

SAwS Government-owned software. (RDT&E)

1.0 LO

9301AF N019 Incremental labor funding under TI-023 to provide visual

identification and capture capability to support AT/FP

requirements in the 5th FLT and 7th FLT AORs and conduct System

Operational Verification Testing (SOVT) SAwS system baseline

configuration to include procurement of installation materials and

labor on USNS PECOS. MOD 65: Plus Up by to the for

current funding of (WCF)

1.0 LO

9301AG R425 Incremental ODC funding under TI-018 for technical and engineering

support for LCS 6/20135/OWLD Oct 16. NAVSEA. (SCN)

1.0 LO

9301AH R425 Incremental labor funding under TI-012 to provide acquisition and

installation support for the MARFLIR II System. USCG. (MDA)

1.0 LO

9301AJ N019 Incremental ODC funding under TI-001 in support of Brite Star II

Laser System (BSII) equipment on Patrol Coastal (PC) Griffin

Missile System (GMS) for installation of ten (10) BSII mounts. Two

(2) person teams on ten (10) trips. (OPN)

1.0 LO

9301AK K020 Incremental ODC funding in support of TI-024 for SPS to SAwS

Conversion on DDG81 in support of FIMS Initiative #12263. (US

Fleet Forces Command) (RDT&E)

1.0 LO

9301AL K020 Incremental ODC funding under TI-021 to provide visual

identification and capture capability to support AT/FP

requirements in 5th FLT and 7th FLT AORs and conduct System

Operational Verification Testing (SOVT) SAwS system baseline

configuration to include procurement of installation materials and

labor on USNS PATUXENT. PoP: 10/2/2015 - 9/30/2016. Military

Sealift Command Norfolk. (WCF)

1.0 LO

HQ B-2-0015  PAYMENTS OF FEE(S) (LEVEL OF EFFORT) (NAVSEA) (MAY 1993) 

(a) For purposes of this contract, "fee" means "target fee" in cost-plus-incentive-fee type contracts, "base fee" in cost-plus-award-feetype contracts, or "fixed fee" in cost-plus-fixed-fee type contracts for level of effort type contracts.

(b) The Government shall make payments to the Contractor, subject to and in accordance with the clause in this contract entitled"FIXED FEE" (FAR 52.216-8) or "INCENTIVE FEE", (FAR 52.216-10), as applicable. Such payments shall be submitted byand payable to the Contractor pursuant to the clause of this contract entitled "ALLOWABLE COST AND PAYMENT" (FAR52.216-7), subject to the withholding terms and conditions of the "FIXED FEE" or "INCENTIVE FEE" clause, as applicable(percentage of fee is based on fee dollars divided by estimated cost dollars, including facilities capital cost of money). Total fee(s)paid to the Contractor shall not exceed the fee amount(s) set forth in this contract.

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 34 of 149 FINAL

 

XXXXXXX

XXXXX XXXXX

XXXXXX

XXXXXXX

XXXXXX

XXXXXXX

XXXXXXX

XXXXXX

XXXXXXX

XXXXXXX

XXXXXX

XXXXXXX

XXXXXX

Page 38: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

(c) The fee(s) specified in SECTION B, and payment thereof, is subject to adjustment pursuant to paragraph (g) of the specialcontract requirement entitled "LEVEL OF EFFORT." If the fee(s) is reduced and the reduced fee(s) is less than the sum of all feepayments made to the Contractor under this contract, the Contractor shall repay the excess amount to the Government. If the finaladjusted fee exceeds all fee payments made to the contractor under this contract, the Contractor shall be paid the additionalamount, subject to the availability of funds. In no event shall the Government be required to pay the Contractor any amount inexcess of the funds obligated under this contract at the time of the discontinuance of work.

(d) Fee(s) withheld pursuant to the terms and conditions of this contract shall not be paid until the contract has been modified toreduce the fee(s) in accordance with the "LEVEL OF EFFORT" special contract requirement, or until the Procuring ContractingOfficer has advised the paying office in writing that no fee adjustment is required.

NOTE A:  LEVEL OF EFFORT

For labor items, Offerors shall propose man-hours recommended in Section B to perform requirements of the Statement of Work(SOW) provided for the period of performance specified in Section F.  The PAYMENT OF FEE(S) (LEVEL OF EFFORT) clauseapplies to these items.  The Government estimate is man-hours for year 1, man-hours for year 2, and man-hours for year 3, with the mix recommended in Attachment 10 in Section J.  The Government estimate is based on the totalanticipated Level of Effort (LOE) for all tasks combined per CLIN. 

NOTE B: OPTION

Option item to which the option clause in Section I applies and which is to be supplied only if and to the extent that said optionis exercised.

NOTE C:  SURGE

If the Government determines that an increased LOE  is required, the Government reserves the right to exercise "surge" optionCLINs for additional hours in accordance with the SOW.  In the event that the Government does elect to exercise the surge optionitem, the appropriate ceiling and LOE may be re-aligned under labor CLINs for each task identified in the SOW.  The Governmentestimate is  man-hours for year man-hours for year 2, and man-hours for year 3 (roughly 10% of yearly laborhours) for labor surge option items.  Offerors should propose surge options with the same labor mix and composite rate as thebasic effort.  All surge labor CLINs should be proposed as CPFF, and is not to exceed the prime Offeror's maximum fee percent intheir SeaPort Enhanced (Seaport-e) Multiple Award Contract (MAC). 

NOTE D:  OTHER DIRECT COSTS

The Government estimates total ODCs for this TO to be with a possible surge total of   ODCs shouldbe proposed as prescribed in Section L, paragraph 4.4.4.  

 

 

HQ B-2-0004  EXPEDITING CONTRACT CLOSEOUT (NAVSEA) (DEC 1995) (a)  As part of the negotiated fixed price or total estimated amount of this contract, both the Government and the Contractor haveagreed to waive any entitlement that otherwise might accrue to either party in any residual dollar amount of or less at thetime of final contract closeout.  The term "residual dollar amount" shall include all money that would otherwise be owed to eitherparty at the end of the contract except that, amounts connected in any way with taxation, allegations of fraud and/or antitrustviolations shall be excluded.  For purposes of determining residual dollar amounts, offsets of money owed by one party againstmoney that would otherwise be paid by that party may be considered to the extent permitted by law.

(b)  This agreement to waive entitlement to residual dollar amounts has been considered by both parties.  It is agreed that the

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 35 of 149 FINAL

 

XXX

XXXXX XXXXX

XXXX XXXX XXXX

XXX XXXX XXX

Page 39: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

administrative costs for either party associated with collecting such small dollar amounts could exceed the amount to be recovered.

HQ B-2-0007 LIMITATION OF COSTS OR LIMITATION OF FUNDS LANGUAGE

The clause entitled "LIMITATION OF COST" (FAR 52.232-20) or "LIMITATION OF FUNDS" (FAR 52.232-22), asappropriate, shall apply separately and independently to each separately identified estimated cost.

HQ B-2-0020  TRAVEL COSTS - ALTERNATE I (NAVSEA) (DEC 2005)  

(a)  Except as otherwise provided herein, the Contractor shall be reimbursed for its reasonable actual travel costs in accordance withFAR 31.205-46.  The costs to be reimbursed shall be those costs accepted by the cognizant DCAA.

(b)  Reimbursable travel costs include only that travel performed from the Contractor's facility to the worksite, in and around theworksite, and from the worksite to the Contractor's facility.

(c)  Relocation costs and travel costs incident to relocation are allowable to the extent provided in FAR 31.205-35; however,Contracting Officer approval shall be required prior to incurring relocation expenses and travel costs incident to relocation.

(d)  The Contractor shall not be reimbursed for the following daily local travel costs:

               (i)  travel at U.S. Military Installations where Government transportation is available,

              (ii)  travel performed for personal convenience/errands, including commuting to and from work, and

             (iii) travel costs incurred in the replacement of personnel when such replacement is accomplished for the Contractor's oremployee's convenience. 

HQ B-2-0021 CONTRACT SUMMARY FOR PAYMENT OFFICE (COST TYPE) (FEB 1997)

This entire contract is cost type.

 

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 36 of 149 FINAL

 

Page 40: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

SECTION C DESCRIPTIONS AND SPECIFICATIONS

STATEMENT OF WORKENGINEERING SUPPORT SERVICES FOR

ELECTRO-OPTIC TECHNOLOGY DIVISION (CODE JXQ) 

1.0            SCOPEThis objective of this Statement of Work (SOW) sets forth requirements for technical, non-personal services toprovide technical documentation, curriculum, technical drawings, logistics, and technical support of electro-optictechnologies for the Electro-Optics Technology Division (Code JXQ).  The SOW supports the U.S. Navy’sHandheld Visual Augmentation Systems (VAS) and Maritime Forward Looking Infrared (MARFLIR) Family ofElectro Optic Systems, United States Coast Guard (USCG) Handheld Visual Augmentation Systems (VAS) andMARFLIR Family Electro Optic Systems, Explosive Detection Systems, Acoustic Hailing Systems, and theSpecial Operations Command Combatant Craft Program Management Office (CCPMO), Combat Craft FLIR(CCFLIR) Electro Optic System, and Law Enforcement Program support.

1.1            BackgroundThe NSWC Crane Electro-Optics Technology Division provides full life-cycle support for military and nationalsecurity electro-optic and laser systems, including technical/program management, technology transition, design,engineering, logistics, test and evaluation, sustainment, maintenance, and repair services.  Services provided to theWarfighter (Navy, Air Force, Army, Marine Corps, Coast Guard, USSOCOM and other Department of Defense(DoD) and national security customers) in the areas of Airborne, Maritime and Special Operations/Ground Electro-Optics (EO) Systems, including Intelligence Surveillance Reconnaissance (ISR) Systems, Targeting Systems,Security Sensors, and Missile Optics.  (This effort does not include current tasking that is being executed under N00178-04-D-4119 / FC25.)

1.2            Applicable ParagraphsThis Task Order (TO) applies to the following SOW paragraphs of the basic SeaPort Enhanced(SeaPort-e) Multiple Award Contract (MAC): 3.1 Research and Development Support-N/A3.2 Engineering, System Engineering and Process Engineering Support3.3 Modeling, Simulation, Stimulation, and Analysis Support3.4 Prototyping, Pre-Production, Model-Making, and Fabrication Support3.5 System Design Documentation and Technical Data Support3.6 Software Engineering, Development, Programming, and Network Support- N/A3.7 Reliability, Maintainability, and Availability (RM&A) Support3.8 Human Factors, Performance, and Usability Engineering Support- N/A3.9 System Safety Engineering Support- N/A3.10 Configuration Management (CM) Support3.11 Quality Assurance (QA) Support3.12 Information Systems (IS) Development, Information Assurance (IA), and InformationTechnology (IT) Support3.13 Inactivation and Disposal Support- N/A3.14 Interoperability, Test and Evaluation, Trials Support3.15 Measurement Facilities, Range, and Instrumentation Support – N/A3.16 Logistics Support3.17 Supply and Provisioning Support – N/A3.18 Training Support- N/A3.19 In-Service Engineering, Fleet Introduction, Installation, and Checkout Support3.20 Program Support3.21 Functional and Administrative Support – N/A

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 37 of 149 FINAL

 

Page 41: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

3.22 Public Affairs and Multimedia Support- N/A

2.0            APPLICABLE DOCUMENTSThe Military Specifications, Standards, and Handbooks referenced within this SOW are provided as guidance onlyand are a basic framework for defining task areas.  This SOW will require the Contractor (as applicable) to providebest commercial standards and practices to meet the overall Performance Objectives.  Additional Specifications,Standards, and Handbooks might be referenced in individual Technical Instructions (TI).

2.1            Specifications, Standards, and HandbooksMIL-DTL-31000C Tech Data Packages MIL-HDBK-1812 Type Designation, Assignment and Method for Obtaining MIL-M-24100C (Notice 1) Manual, Technical: Functionally Oriented Maintenance Manuals for Electronic,Electromechanical, and Ordnance Equipment, Systems, and Platforms MIL-DTL-24784A, Detail Specification: Manuals, Technical: General Acquisition and Development Requirement,General Specification for MIL-DTL-24784/7B Technical Repair Standards (TRS) for Hull, Mechanical and Electrical (HM&E) Equipment,Electronic Equipment, and Ordnance Equipment MIL-PRF-28800F Test Equipment for use with Electrical and Electronic Equipment, General Specification for MIL-PRF-55110G (w/Amendment 3) Printed Wiring Boards, Rigid General Specification for (29 FEB 2008) [S/SBY MIL-PRF-31032] MIL-DTL-81927C Manuals, Technical: Work Package Style, Format, and Common Technical ContentRequirements; General Specification for (WORK PACKAGE CONCEPT) MIL-D-81992B Directives, Technical: Preparation of ASME Y14.100 Engineering Drawing Practices MIL-STD-129P Military Marking for Shipment and Storage MIL-STD-130N Identification Marking of US Military Property MIL-STD-461E Requirements for the Control of Electromagnetic Interference Characteristics of Subsystems andEquipment MIL-STD-469B Radar Engineering Interface Requirement, Electromagnetic Compatibility MIL-HDBK-470B Designing and Developing Maintainable Products and Systems MIL-HDBK-781A Reliability Test Methods; Plans, and Environments MIL-HDBK-881A Work Breakdown Structures for Defense Materiel Items MIL-STD-882D System Safety MIL-STD-883H Department of Defense Test Method Standard: Microcircuits MIL-STD-961E (w/Change 1) DoD Standard Practice: Defense and Program-Unique Specifications Format andContent MIL-STD-973 Configuration Management

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 38 of 149 FINAL

 

Page 42: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

 DI-CMAN-80400 Engineering Change Proposal MIL-PRF-29612B Training Data Products MIL-PRF-49506 (Notice 1) Performance Specification Logistics Management Information (LMI) MIL-STD-1389D (Notice 1) Design Requirements for Standard Electronic Modules MIL-HDBK-502 Department of Defense Handbook: Acquisition Logistics DOD-STD-2101 Classification of Characteristics DOD-D-4245.7-M Transition from Development to Production MIL-HDBK-2097 Acquisition of Support Equipment and Associated Logistics Support NAVSEAINST 4130.12A Con?guration Management Policy and Guidance MIL-Q-9858A Quality Program Requirements MIL-I-45208A Inspection System Requirements DOD-D-5000.1 The Defense Acquisition System MIL-DTL-81927C Work Package Style, Format, and Common Technical Content Requirements

3.0            Requirements InstructionsThe Contractor shall furnish all material, equipment, facilities, and labor to provide the following support services. Technical progress on all tasks and financial status of the task order shall be reported monthly.  Tasking shall beassigned via TI signed by the Contracting Officer (KO).  TIs will be utilized to delineate specific efforts whenapplicable.  Upon issuance of an approved TI the Contractor is authorized to perform the requirements of this SOWwithout further direction from the KO.  Everything created in support of this TO becomes the property of the USGovernment and will be delivered free of proprietary marking.  The following is a list of contract requirements: 3.1 Research and Development Support- N/A

3.2  Engineering, Systems Engineering and Process Engineering Support

3.2.1       Engineering Technical SupportThe Contractor shall provide engineering and technical support for the design, development, test, evaluation, andengineering related logistics to the procurement, production, maintenance, disposal (life cycle management) andrelated services only for electronic and mechanical systems, subsystems, equipments, and components noted in theSCOPE of this TO.  The Contractor shall analyze and evaluate proposed engineering changes or documentedequipment performance concerns.  The Contractor shall also assist in the investigation and resolution of othertechnical problems and issues pertaining to the system requirements, associated equipment, and associated supportequipment and peripherals.  The Contractor shall assist with the investigation analysis of the applicability of aparticular technology to satisfy requirements, review, and evaluation of current products available on the market andrecommended strategies for equipment upgrades or replacement.  These analyses and studies may entail conducting,arranging for, or monitoring environmental testing, performance testing or developing simulations.

3.2.2       Systems IntegrationThe Contractor shall identify and document data to ensure equipment and computer program compatibility;system/component interface; identify and provide recommended solutions to equipment interface problems; reviewand monitor system tolerances; participate with the Government in performing system tests to assess performance,safety, operability, reliability, and maintainability; and prepare/review Engineering Change Proposals (ECP) for

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 39 of 149 FINAL

 

Page 43: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

interface impacts in accordance with Government Furnished Information (GFI).  The Contractor shall annotate allrecommendations made to the Government with rationale and justification for all assumptions used to arrive at anyaforementioned recommendations.

3.2.3       Maintenance EngineeringThe Contractor shall develop and maintain maintenance concepts tasks and criteria for all levels of maintenance;perform design reviews and test evaluations to minimize maintenance support; assist with the definition of tasks tobe performed at all levels of maintenance; prepare or evaluate technical documentation such as repair standards,drawings, specifications, test procedures, and allowance parts lists; prepare or review maintenance facility designcriteria; develop or review personnel training criteria; assist in the development or review of provisioning of parts,establishing part replacement factors and Source Maintenance and Recoverability (SM&R) coding; reviewproduction engineering changes for impact on maintenance support; prepare/review installation design and physicallayout for reliability and ease of maintenance; develop or review installation standards and practices; develop orreview system Maintenance Requirements Cards (MRCs); and prepare or review computer programs and systems tosupport system or component maintenance.  The Contractor shall develop maintenance concepts and criteria inaccordance with applicable documents identified in individual Technical Instruction (TI) and provide to theGovernment all justification for any assumptions used.  The contractor shall utilize the existing production controlsystem to provide maintenance forecasts, capture maintenance data, repair costs and failure trends and provideperiodic data and reports on maintenance and acceptance testing activity.

3.2.4       Engineering InvestigationsThe Contractor shall perform engineering investigations to evaluate equipment operational reliability,maintainability, availability, logistics support, and configuration status in accordance with applicable drawingspecifications and appropriate Integrated Logistics Support Plans (ILSP) and Configuration Management (CM)Plans.  The Contractor shall report the results of such investigations along with recommendations and the basis forthose recommendations.  The Contractor shall assist the Government in planning, organizing, and attending on siteworking sessions in the Fleet to resolve problems and improve performance in the areas of equipment maintenanceand operation in order to satisfy the requirements in the TI.  The Contractor shall perform engineering investigationsto evaluate associated equipment systems, associated support equipment, and peripherals operational, logistical, andprogrammatic problems.  Such investigations could entail analyzing and making recommendations on performanceor supportability issues.

3.2.5       Reverse EngineeringThe Contractor shall assist in the performance of reverse engineering on electronic assemblies and assist in thedevelopment of the TDP meeting the requirements of DOD-STD-2101, MIL-DTL-31000C and ASME Y14.100 orother commercial standard as specified in the TI.  Details concerning the substitution of piece parts and requirementsconcerning logistic equivalency (exact reproductions) shall be provided by TI.  The Contractor shall assist in theproduction of prototypes of hardware resulting from reverse engineering and a Technical Report Study.  Allprototypes will be the property of the US Government and will be delivered free of proprietary marking. 

3.2.6       Manufacturing Engineering AnalysesThe Contractor shall review and analyze manufacturing technologies and/or processes and provide a report to theGovernment on their usability to Government equipment acquisitions, development, and application forGovernment uses.  The Contractor shall provide any assumptions made or rationale used in completing theanalysis.

3.2.6.1  Manufacturing TransitioningThe Contractor shall assist with documenting engineering and production studies and analyses concerning thetransition of electronic systems, subsystems, equipments, and components from development stage to production inaccordance with DOD-D-4245.7-M.

3.2.6.2  Manufacturing Engineering and Technology SupportThe Contractor shall prepare manufacturing procedures and/or processes for systems, subsystems, components,assemblies, subassemblies, and equipment.  The Contractor shall perform consulting, manufacturing engineering

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 40 of 149 FINAL

 

Page 44: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

and technology services, which may include the following delineated tasks:

     a)    Design (manual or by computer graphics) of electronic, electro-mechanical, or mechanical items.     b)    Equipment and facility requirement studies and planning.     c)    Production cost estimating.     d)    Assist with product "make or buy" analyses.     e)    Production capability assessment studies and surveys.     f)     Production equipment engineering.     g)    Production equipment/process evaluation.     h)    Manufacturing process development.     i)     Development of Computer Aided Design (CAD) and Computer Aided Manufacturing (CAM) media.

3.2.7       Production Engineering SupportThe Contractor shall assist in the development of procedures and acceptance criteria with supporting rationale toevaluate all disciplines (engineering, test and evaluation, maintenance, logistics requirements, manufacturingprocesses, methods, and technologies) incident to development, prototype, initial production, and production or teststatus for new systems or major modification or improvement programs for existing systems, subsystems, orcomponents.  The Contractor shall ensure that sufficient data has been generated for equipment reproducibility andshall evaluate system manufacturing proposals in accordance with specifications delineated in the TI.

3.2.7.1  Production Engineering AnalysisThe Contractor shall assist with the analysis of production costs and manufacturing problems; review productionchanges, waivers, and deviations; attend quality assurance audits and surveys; and assist in the identification ofproblems and progress concerning production, costs, and quality assurance.

3.2.7.2   Production Status and Control

The Contractor shall monitor, track, and report status of associated equipment or systems.  The contractor willprovide repair and acceptance testing through the use of the Code JXQ production control system (GFI).  Thismonitoring shall consist of maintenance and repair cost, failure trends, item process status, and numbers of itemsrepaired and tested per month and quarter.

3.2.8       Acquisition EngineeringThe Contractor shall assist with the review of technical specifications for accuracy in support of procurements inaccordance with GFI.  The Contractor shall analyze design data to determine defects detracting from equipment,system, or component capability to perform to its intended operational requirements and to satisfy all specificationrequirements.  The Contractor shall review production engineering changes, waivers, deviations, and/or alterationsfor their impact on performance, reliability, maintainability, availability, quality, safety, and life cycle cost.  TheContractor shall also perform production cost estimate analyses and provide the Government with justification forany recommendations made.  The Contractor shall assist in the review and preparation of technical specifications andother supporting documentation.  The Contractor shall assist with the evaluation of the design and performance datato make recommendations on strengths and weaknesses of potential equipment types in meeting applicableperformance requirements by the Government.

3.3  Modeling, Simulation, Stimulation and Analysis Support 

The Contractor shall perform engineering analyses and studies for equipment development and in service supportactivities.  The Contractor shall test and evaluate systems, computer programs, equipment, modules, andcomponents.  These tasks will include consulting, preparing inputs for test plans, reviewing test plans andprocedures, conducting or monitoring equipment testing, analyzing test results, determining valid recommendationsand conclusions based on test data, and the preparation of formal reports.  The Contractor shall submit evaluationsalong with the rationale for these evaluations to the Government.  Such analyses shall include:

a) Equipment finite element modeling and analysis for vibration, shock, and thermal impacts on design at thecabinet and module level.b) Electronic modeling and simulation.  Reports including assumptions made and rationale used shall be providedto the Government. 

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 41 of 149 FINAL

 

Page 45: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

3.4  Prototyping, Pre-Production, Model-Making, and Fabrication Support

The Contractor shall develop, design, and produce prototypes; initiate and complete original designs includingmodifications; identify and/or complete design validation testing; prepare technical data including product assuranceand system safety requirements to establish configuration product baselines; prepare maintenance supportdocumentation; prepare and review engineering change proposals, waivers, and deviations for impact on design,performance, safety, and producibility.  The Contractor shall design test equipment, tools, jigs, fixtures, andcomputer programs to support conformance testing, production acceptance, life cycle quality evaluation, andmaintenance of systems, equipments, and components.  The Contractor shall design systems interfaces, to includesoftware and executable test scenarios, to verify automated test equipment protocols and design of test equipment. All prototyping will become the property of the US Government and will be delivered free of any proprietarymarking. 

3.4.1       Design ReviewThe Contractor shall review electronic equipment, electronic components, and computer program design and designchanges provided as GFI to establish compliance with contract and mission requirements.  This includes analyses toidentify potential impacts on performance, reliability, maintainability, user interface, logistics, schedule, and cost. The Contractor shall participate with the Government in design review meetings.  The Contractor shall provide awritten evaluation of design or design changes along with the rationale for evaluations after completing the analysis.

3.4.1.1  Electronic Design and Design VerificationThe Contractor shall provide the labor and materials to design and verify design of electronic assemblies (modules,printed circuit boards, back planes, and wiring cables), subassemblies, and equipments.  The contractor shall alsodevelop, test, or modify Test Program Sets (TPSs).  The Contractor shall document the efforts and provide theGovernment with a complete technical data package free of proprietary marking covering this work.

3.4.1.2  Module Design and Design VerificationThe Contractor shall design modules to the requirements of MIL-STD-1389D, or as defined by TI.  The Contractorshall deliver design verification modules and design disclosure data to meet the requirements of the specs andstandards cited in paragraph 2.1 or as specified by TI.  The minimum deliverable set of data shall include assemblydrawings, parts lists, CAD files, and test procedures.  Test procedures shall meet the requirements of each TI.

3.4.1.3  Printed Circuit Board Design and Design VerificationThe Contractor shall design and provide design verification multi-layer printed circuit boards according to therequirements of MIL-PRF-55110G, or as specified in the TI.  The Government shall furnish the Contractor with aschematic, parts list, a board profile sketch, and any special instructions with respect to board format and routing. The Contractor shall deliver a complete design disclosure data package to meet the requirements of the specs andstandards listed in paragraph 2.1 or as specified in the TI.  This package shall include a printed circuit boardassembly drawing, artwork on stable base media, parts list, net lists on magnetic media describing point-to-pointconnections, and computer aided design files.  The Contractor shall utilize specific design and specifications asspecified by TI.  Data shall include an assembly drawing and a to-from list on magnetic media.

3.4.1.4  Cable Design and Design VerificationThe Contractor shall design and provide design verification cable assemblies in accordance with specifications setforth in the TI.  The Government will provide the Contractor with design information specified in the TI and theContractor shall design cable assemblies to include layout, routing diagrams, mechanical hardware (e.g., connectors,lacing), and determination of material requirements.  The Contractor shall provide the Government with designdisclosure data as defined and required by TI. 

3.5  System Design Documentation and Technical Data Support

The Contractor shall assist in the design of engineering technical data packages provided as GFI for technicalaccuracy, prepare subsequent changes for inclusion to the data package, provide senior level consulting to make

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 42 of 149 FINAL

 

Page 46: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

recommendations for changes with supporting rationale and, upon approval by the Government, incorporate thesechanges into the technical data package, and evaluate these changes for their immediate or potential impact upon thedata package.  Delivered data packages shall meet the specified requirements of the associated TI.  The technical datapackages will include, but not be limited to drawings, specifications, Technical Repair Standards (TRSs),Installation Operation and Checkout procedures (IOCs), and Engineering Change Proposals (ECPs).

3.6  Software Engineering, Development, Programming and Network Support- N/A

3.7  Reliability, Maintainability and Availability (RM&A) Support

3.7.1 Reliability

The contractor shall perform reliability predictions per Task 203 of MIL-HDBK-781A and submit properlycompleted Failure Mode, Effects, and Criticality Analysis Maintainability Information Worksheets.  TheGovernment will provide the Contractor design, configuration, and mission data and access to Governmentpersonnel to enable the Contractor to adequately perform these predictions.  The Contractor shall evaluate andannotate reliability predictions prepared by development contractors and submit them with any supportinginformation to the Government.  For fielded equipment, the Contractor shall collect, categorize, and summarize fielddata to verify previous reliability predictions and identify trends and design changes to improve reliability.

3.7.2       Failure Mode, Effects, and Criticality AnalysisThe Contractor shall perform an independent Failure Mode, Effects, and Criticality Analysis (FMECA) onequipment design in accordance with approved NAVSEA guidelines and (IEC) International Standard 60812.  TheContractor shall deliver to the Government completed Failure Mode, Effects, and Criticality AnalysisMaintainability Information Worksheets.  The Government will provide a complete description of the subject designand its performance requirements and access to the Government design staff.

3.7.3       Failure and Field performance AnalysisThe Contractor shall investigate failures of systems, subsystems, and components to isolate the causative defect andrecommend to the Government possible corrective actions.  Failure analysis may require disassembly eithershipboard or in a laboratory setting.  The Contractor shall conduct field performance analysis, of system, subsystem,and component performance through an assessment of data generated during fleet maintenance, testing, or trainingexercises.  The analysis to be performed by the Contractor may include system performance data, maintenance data,mishap reports, and false rejection data.

3.7.4       Maintainability

The Contractor shall perform maintainability analyses and prepare maintainability planning documentation inaccordance with MIL-HDBK-470B on equipment or systems.  The Contractor shall perform maintainabilityanalyses and prepare associated documentation.  These tasks shall include the following areas:     a)    Generation of maintainability program plans.     b)    Formulation of maintainability predictions.     c)    Maintainability analyses to include maintenance concepts, preventive maintenance studies, personnel andfacility constraints identification, and evaluations of equipment troubleshooting techniques and procedures.     d)    Maintainability design criteria studies.     e)    Maintainability demonstration testing.     f)    The Contractor shall also participate with the Government in maintainability program reviews on equipmentor systems, record and report any discrepancies/problems, and formulate recommendations to resolve thesediscrepancies/problems and submit these recommendations with supporting rationale to the Government.

3.8  Human Factors Performance and Usability Engineering Support- N/A

3.9  System Safety Engineering Support- N/A

3.10  Configuration Management (CM) Support

The Contractor shall develop specific elements of configuration management on selected equipment.  All detailed

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 43 of 149 FINAL

 

Page 47: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

requirements and configuration management tasks shall be performed in accordance with the requirements ofNAVSEAINST 4130.12A.  The Contractor shall analyze and evaluate the impact of engineering change proposalson materials, cost, schedule, and technical documentation.  The Contractor shall implement configuration changesin accordance with the configuration management plan for the system, subsystem, or component.  The Contractorshall use the Ship Configuration and Logistics Support Information System (SCLSIS) to maintain configurationmanagement information.  The Contractor shall provide CM support functions on the assigned systems.  TheContractor shall maintain the CM database by updating the established configuration baseline based on periodicreporting provided by the Original Equipment Manufacturer (OEM), ECP process and material transfers.  TheContractor shall also provide configuration assistance in the definition of CM products, review of CM deliverables,and review of proposed configuration baseline changes.  CM administrative support may also be provided duringconfiguration audits or in the development of ECPs.

3.11  Quality Assurance (QA) Support 

The Contractor shall perform quality assurance analyses and prepare quality assurance planning documentation onsystems, subsystems, equipment, and components and provide reports with recommendations and supporting datato the Government.  These tasks require the assimilation of quality assurance data, preparation of quality assuranceplans, evaluation of quality assurance data supplied by the Government, and other related tasks in accordanceMIL-Q-9858A and MIL-I-45208A.  The Contractor shall also attend quality assurance program reviews on specifiedsystems, subsystems, equipment, and components; record and report any discrepancies/problems, and formulaterecommendations, along with their respective justifications, to resolve these discrepancies/problems.

3.12  Information System (IS) Development, Information Assurance (IA) and Information Technology (IT)Support

 The Contractor shall provide data management related support in accordance with requirements set forth in TIsissued.  The contractor shall provide support for information technology and services including programmingsupport, web publishing, interactive software, systems administration, and other tasks as assigned in a TI, outsidethe cognizance of NMCI, and included in the scope of this TO.

3.13  Inactivation and Disposal Support- N/A

3.14  Interoperability, Test and Evaluation, Trials Support 

The Contractor shall provide system analysis, formal/informal testing, and analysis/application development, seniorlevel consulting for the aforementioned systems and programs.  This includes electro-optical and infrared sensors,explosive detection systems, acoustic hailing systems, and all other associated equipment, systems, andtechnologies only as included in the scope of the TO. 

3.15  Measurement Facilities, Range, and Instrumentation Support- N/A

3.16  Logistics Support

Integrated Logistics Support (ILS) management and technical support shall be performed by the Contractor for theequipment specified by TI for each of the logistic elements as defined in approved NAVSEA guidelines andspecifications.  The Contractor shall analyze, investigate, and/or produce ILS documentation to ensure that allprogram support requirements for ILS planning and implementation have been adequately addressed, and thatplanning adequately reflects known operational, design, and support requirements in accordance with currentdirectives.  The analysis shall include all areas of ILS needed for adequate assessment of Government ILS planning,implementation, contractual obligations, and performance.  ILS planning shall be in accordance with applicable LifeCycle Phase and Milestone Review requirements delineated in DOD-D-5000.1, subordinate instructions anddirectives, and approved NAVSEA guidelines.

3.16.1    Logistics Documentation SupportThe Contractor shall develop, analyze, investigate, and review logistic support documentation to ensure that allsupport requirements have been adequately addressed.  The Contractor shall attend planning meetings, workinggroups and Integrated Logistic Support Management Team meetings as directed by TI.  The Contractor shallpublish minutes and action items from the meetings.  All action items to be conducted by the Contractor shall be

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 44 of 149 FINAL

 

Page 48: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

within the scope of this SOW and shall be assigned by a TI.  The Contractor shall submit deliverables to theGovernment in accordance with TI requirements.

3.16.2   Training

The Contractor shall develop training plans.  Primarily, the courses shall be for Government instructors or othersupport agents, who will perpetuate the training in the Government.  All findings and recommendations shall bedocumented with supporting information.  The Contractor shall develop training materials and courses as specifiedin the TI, for specified equipment for these courses.  The Contractor shall participate in contractor trainingconferences to evaluate the effect of new system training data and make recommendations, along with the supportingrationale, to the Government.

3.16.3   Technical Documentation

The Contractor shall develop and review technical manuals, operations and maintenance procedures, and associatedelements in accordance with NAVSEAINST 4160.3A (Technical Manual Management Program (TMMP)),MIL-DTL-24784/7B, MIL-DTL-81927C, MIL-M-24100C, and GFI for compatibility with Logistic SupportAnalysis data.  The Contractor shall develop Technical Manual Contract Requirements in accordance with therequirements of the TI for incorporation into SOW for hardware acquisitions.  The Contractor shall support InProcess Reviews for technical manuals at prime contractor facilities and provide support for theverification/validation of technical manuals through on site reviews.  The Contractor shall provide support for thetransition of technical manuals and other technical data to Government support organizations.

3.17  Supply and Provisioning Support- N/A

3.18  Training Support- N/A

3.19  In-Service Engineering, Fleet Introduction, Installation and Checkout Support 3.19.1 Installation SupportThe Contractor shall perform site inspections in accordance with installation drawings and specifications inpreparation for installation of new equipment.  The Contractor shall perform pre-installation checks in accordancewith installation drawings and specifications in preparation for installation of new equipment.  The Contractor shallannotate land-based, ship, and aircraft class drawings accordingly; however, these annotations will not constitute achange to the drawing content.  The Contractor shall develop or evaluate the installation drawings and procedures asspecified by TI.  The tests are to assure operational integrity of the installed equipment.  The Contractor shallperform the installation of new equipment in accordance with the applicable installation drawings and procedures. The Contractor shall conduct associated operational verification tests to assure operational integrity of the installedequipment.  The Contractor shall review equipment installation requirements and documentation and providerecommendations with justifications to the Government.  The Contractor shall receive, inventory and verify GFMsuch as spares, support equipment, technical data, fleet introductory material and modification kits for ship or aircraftoutfitting at GFF.

3.19.2    Field EngineeringThe Contractor shall perform field-engineering tasks related to maintaining, installing, and enhancing deployedequipment in accordance with the equipment's operational specifications or improved specifications.

3.19.3    On-Site Alterations of Deployed EquipmentThe Contractor shall perform site inspections and annotate drawings accordingly in preparation for alteration,change, upgrade, or retrofit of equipment to ensure equipment compliance with its operational specifications.  TheContractor shall perform land-based, shipboard, or aircraft systems or equipment alterations in accordance with theapplicable installation specifications, guidelines, and alteration instructions.  The Contractor shall conduct theassociated operational verification tests to assure the operational integrity of the system or equipment.  After eachsuch alteration, the Contractor shall provide a report to the Government regarding the results of the alteration and thesubsequent operational verification tests, including recommendations with justification for improving alterationdocumentation and associated testing.

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 45 of 149 FINAL

 

Page 49: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

3.19.4    Field RepairThe Contractor shall perform repair and maintenance actions on deployed equipment, requiring repair beyond theskill of organizational maintenance personnel.  The Contractor shall analyze the problem, report the problem byelectronic communications, request approval to affect repairs, and perform the repair operation.  After each suchaction, the Contractor shall provide a report to the Government to include problem related information (repair actiontaken, time, date, place, equipment identification, and ship type and hull number).  GFM and GFE shall beprovided in instances where special equipments and materials are required.

3.20      Program SupportAs identified per TI, the Contractor shall provide multi-level technical program support services to assistNAVSURFWARCENDIV Crane in carrying out its mission to develop and maintain electronic weapons systems,subsystems, equipment, and components for programs in scope of the TO.  This support shall include tasks relatedto planning, preparing, organizing, and reporting.  The Contractor shall review, analyze, and produce requirementsand associated lists for test and support equipment in accordance with MIL-HDBK-2097 and MIL-PRF-28800F. The reviews and analyses shall include reviews of the Logistic Support Analysis Records to ensure all requirementsfor support and test equipment have been minimized (variety and quantity), that considerations for general or specialpurpose support equipments have been fully supported, that the selection process is based on cost effectiveness, andthat reliability and maintainability features of the support equipment is compatible with the prime equipment.

3.21  Functional and Administrative Support – N/A

3.22  Public Affairs and Multimedia Support – N/A

4              GOVERNMENT FURNISHED PROPERTY

4.1  Government Furnished Information (GFI)The Government will provide all applicable technical documentation and information to the contractor as GFI. Thisincludes technical manuals, training materials and information, drawings, specifications, procedures, processes, andquality system documents required for the performance of engineering, logistics, and technical support.  AdditionalGFI will be provided as required or at the request of the contractor.

4.2  Government Furnished Material (GFM)The GFM will be provided when the contractor has a requirement for special or specific Government material perspecific tasking. GFM will be identified in each specific TI.

4.3  Government Furnished Equipment (GFE)The GFE will be provided when the Contractor has a requirement for special or specific Government equipment perspecific tasking and as instructed by the TI. The Government will provide all equipment and computing resourcesincluding NMCI hardware, software programs, and access to required files and databases only for work performed onNSWC Crane.  Contractors will be required to perform work on site at NSWC, Crane due to accessibility of filesand other information required for the accomplishment of the tasks set forth in this SOW.  This is the only GFEidentified at this time. No other GFE has been identified.  Computer equipment will be supplied at NSWC Craneonly.

4.4  Government Furnished Facilities (GFF)Contractor personnel at NSWC Crane shall be authorized access to NMCI owned/Government owned equipment, whichshall be utilized during the performance of tasks stated in this TO.  This shall include a personal computer with accessto a printer with appropriate software (i.e., Microsoft Office), desk and use of telephone with long distance/voice mailcapability for official Government business (as required).  Contractor personnel at NSWC Crane may be required toperiodically relocate as office areas are moved to conform to re-organizations within the NSWC Crane Division orcontinuous improvement process changes to improve efficiency.  The nature of the work at times calls for the fulfillmentof surge requirements.  The Contractor shall have capability to access 800 square feet of electronic lab space to fulfillsurge capability.

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 46 of 149 FINAL

 

Page 50: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

4.5  Government Owned VehiclesThe Government shall provide contractor access and authorization to operate Government owned vehicles for thepurpose of transporting materials and documents to and from buildings within the NSWC Crane confines, asrequired by TI. Government provided vehicles shall be used solely for the purposes as described in this SOW.  Alldrivers must present proof of valid operator driver’s license prior to operating a government vehicle.   The contractorshall operate motor vehicles IAW NSWCCRANEINST 11240.1 or most recent instruction.  All contractorpersonnel operating Government vehicles, to include materials handling equipment, shall be licensed in IAWprovisions set forth IAW NSWCCRANEINST 11240.1 or most recent instruction, except when a valid state driverslicense shall be accepted as proper authority for operation of commercial/administrative (non-tactical) vehicles up toand including 10,000 pounds gross vehicle weight upon completion of training courses as called out inNSWCCRANEINST 11240.1 or most current instruction.  The contractor shall ensure contractor personnel have intheir possession a valid US Government Motor Vehicle Operator’s Identification Card (SF 46) or valid state driver’slicense, as applicable, when operating vehicles and equipment.  Employees possessing a valid Government licenseneed not be re-licensed.  The contractor shall report any accidents involving motor vehicles or any other equipmentIAW NSWCCRANEINST 11240.1 or most recent instruction.  

4.6  Return of Government Furnished Items All GFI, GFE, and GFM provided to or acquired by the contractor shall be returned to the responsible RequiringTechnical Activity (RTA) upon completion of assigned tasking.   5.0       DATA DELIVERABLES                                                                 All data deliverables shall be made as specified and in Contractor format unless otherwise directed.  All deliverablesshall be submitted as listed on the distribution of each Contract Data Requirements List (CDRL) DD 1423-1.

CDRL:  A001DID Number:  DI-MGMT-80227DID Title:  Contractor’s Progress, Status and Management ReportApplicable SOW Para.: 3.20   CDRL:  A002DID Number:  DI-FNCL-80331ADID Title:  Funds and Man-Hour Expenditure ReportApplicable SOW Para.:  3.20 CDRL:  A003DID Number:  DI-MGMT-81797DID Title:  Program Management PlanApplicable SOW Para.:  3.20 CDRL:  A004DID Number:  DI-ADMN-81373DID Title:  Presentation MaterialApplicable SOW Para.:   3.2, 3.3, 3.4, 3.5, 3.6, 3.7, 3.10, 3.11, 3.14, 3.16, 3.19 CDRL:  A005DID Number:  DI-ADMN-81505DID Title:  Report, Record of Meeting/MinutesApplicable SOW Para.:   3.2, 3.3, 3.4, 3.5, 3.6, 3.7, 3.10, 3.11, 3.14, 3.16, 3.19 CDRL:  A006DID Number:  DI-MGMT-81650DID Title:  Integrated Master Schedule (IMS)Applicable SOW Para.:  3.20 

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 47 of 149 FINAL

 

Page 51: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

CDRL:  A007DID Number:  DI-MGMT-81334DDID Title:  Contract Work Breakdown StructureApplicable SOW Para.:  3.20 CDRL:  A008DID Number:  DI-MISC-80508BDID Title:  Technical Report Study/ServicesApplicable SOW Para.:  3.2, 3.3, 3.4, 3.5, 3.6, 3.7, 3.10, 3.11, 3.14, 3.16, 3.19

CDRL:  A009DID Number:  DI-MISC-80508BDID Title:  Technical Report Study/ServicesApplicable SOW Para.:  3.2, 3.3, 3.4, 3.5, 3.6, 3.7, 3.10, 3.11, 3.14, 3.16, 3.19 CDRL:  A010DID Number:  DI-NDTI-80566ADID Title:  Test PlanApplicable SOW Para.:  3.2, 3.4, 3.7, 3.14 CDRL:  A011DID Number:  DI-QCIC-81794DID Title:  Quality Assurance Program PlanApplicable SOW Para.:  3.20 CDRL:  A012DID Number:  DI-FNCL-80331ADID Title:  Funds and Man-Hours Expenditure ReportApplicable SOW Para.:  3.20 CDRL:  A013DID Number:  DI-MGMT-81834DID Title:  Contractor’s Personnel RosterApplicable SOW Para.:  3.20 CDRL:  A014DID Number:  DI-DRPR-80651DID Title:  Engineering DrawingsApplicable SOW Para.:  3.7, 3.16, 3.19 CDRL:  A015DID Number:  DI-TMSS-81354DID Title:  Technical Manual Research and Analysis Source DataApplicable SOW Para.:  3.16.3  6.0       SPECIAL CONDITIONS

6.1       Security

The Contractor shall comply with Security procedures and instructions as specified by the local GovernmentSecurity Department.  Performance on this TO will require contractor employees to have access to classifiedinformation up to and including the SECRET level.  The Contractor shall appoint a Security Officer  who shall (1)be responsible for all security aspects of the work performed under this TO, (2) assure compliance with all DOD andService regulations regarding security and (3) assure compliance with any written instructions from the SecurityOfficers of each Government facility. In the event that any individual tasking requires a higher level of clearance, aseparate DD Form 254 will be prepared and issued. The Contractor may be required to have access to live dataduring the performance of this TO. Any records and data or information the Contractor may have access to may behighly sensitive and confidential. The Contractor must not divulge any information about files, data processing

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 48 of 149 FINAL

 

Page 52: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

activities or functions, user ids or passwords or any other knowledge that may be gained to anyone not authorized tohave access to such information. It is the Contractor’s responsibility to ensure that all required employees haveproper authority. All classified material shall be processed and protected in accordance with the provisions of thisSOW and all required instructions and directives in effect concerning the processing of classified material.  U.S.Citizenship is required for all positions. Contractor personnel in contact with classified documentation and/orequipment shall have the proper level of clearance on file with the local Government Security office.  A Departmentof Defense Form 254 shall be filed with the contract identifying the contractor’s facility and safeguarding level ofclearance requirements.

6.2  Travel 6.2.1    Travel RequirementsThe Contractor may be required to travel throughout the continental United States (CONUS) and to locationsoutside of CONUS.  Trip duration will be identified in a TI which will include the required transit time.  Whenrequired to obtain access to a Government facility, ship, aircraft, or other duty station, the Contractor shall initiaterequests for Need to Know Certification and submit these requests to the COR for appropriate action. 6.2.2    Travel AuthorizationAny travel undertaken by the Contractor for performance of TO must have prior authorization by the COR (as statedin each TI). 6.2.3    Need-to-Know CertificationWhen required to obtain access to a Government facility, ship, aircraft, or other duty station, the Contractor shallinitiate requests for need-to-know certification and submit these requests to/through the COR for appropriate action.

6.3  Contracting Officer’s Representative (COR) The COR is the point of contact for non-substantiative communications of a technical nature.  Only the ContractingOfficer has the authority to change the requirements of this order(s).  The COR is identified in Section G.

6.4  Requiring Technical Activity (RTA) 

The RTA contacts are Functional Managers, Task Managers, and project leads which will be identified in individualTI’s.   RTAs do not have the authority to direct Contractor personnel or change the requirements of this order(s) orchange the requirements of any TI(s). 

6.5  FundingThis task order will be funded incrementally as required.  Each project will be identified by a separate TI and/orCLIN/SLIN.

6.6  Safety and HealthThe requirements of this order may require contractor personnel to come in contact or be exposed to hazardousconditions.  The contractor shall abide by all applicable federal, local, and state occupational safety and healthrequirements.  The Government will provide Standard Operating Procedures (SOP) when applicable.  The contractormust have on record a corporate safety plan and shall provide a copy to the COR when instructed.  The contractorshall ensure all employees have appropriate Personal Protection Equipment (PPE).  The contractor shall ensureemployees have all required training and certifications related to Occupational Safety and Health Administration(OSHA) requirements.

6.7  Hazardous MaterialsThe contractor will provide someone responsible for the handling of the hazardous materials and the respectiveMaterial Safety Data Sheet (MSDS).  This responsibility includes proper training in the handling and disposal ofthe hazardous materials.

6.8  Control of Contractor Personnel

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 49 of 149 FINAL

 

Page 53: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

The Contractor shall comply with the requirements of NAVWPNSUPPCENINST 5510.1 andNAVWPNSUPPCENINST 5910.1.   All persons engaged in work while on Government property shall be subjectto search of their persons (no bodily search) and vehicles at any time by the Government, and shall report anyknown or suspected security violations to the Crane Division Security Department.  Assignment, transfer, andreassignment of Contractor personnel shall be at the discretion of the Contractor.  However, when the Governmentdirects, the Contractor shall remove from contract performance any person who endangers life, property, or nationalsecurity through improper conduct.  All Contractor personnel engaged in work while on Government property shallbe subject to the Standards of Conduct contained in SECNAVINST 5370.2J.  Prior to conducting work under thiscontract, the contractor shall provide a list of employees that will be working on site.  The employee list shallcontain full names, security clearance levels, social security numbers, job titles, and original birth certificates.  Thislist shall be updated within forty eight hours after changes occur.

6.9  Identification BadgesThe Contractor shall be required to obtain identification badges from the Government for Contractor personnel to belocated on Government property.  The identification badge shall be visible at all times while employees are onCrane Division property.  The Contractor shall furnish all requested information required to facilitate issuance ofidentification badges and shall conform to applicable regulations concerning the use and possession of the badges. The Contractor shall be responsible for ensuring that all identification badges issued to Contractor employees arereturned to the Crane Division Security Department within forty eight hours following the completion of thecontract, relocation or termination of an employee issued an identification badge, and upon request by theContracting Officer.

6.10         Accident ReportingThe Contractor shall maintain an accurate record of and shall report all accidents to the COR immediately afterincident occurs.

6.11         Smoking RegulationsSmoking on Crane Division, Crane, IN premises shall be in approved areas only in accordance with NAVFAC P1021.  Smoking in vehicles is prohibited.

6.12         Release of InformationAll technical data provided to the Contractor shall be protected from the public.  All other information relating tothe items to be delivered and services to be performed under this TO may not be disclosed by any means withoutprior approval of the authorized representative of the Contracting Officer.  Dissemination or public disclosureincludes but is not limited to permitting access to such information by foreign nationals by any other person orentity or publication of technical or scientific papers or advertising or any other proposed public release.  TheContractor shall provide adequate physical protection to such information so as to preclude access by any person orentity not authorized such access.

6.13         Privacy ActUnder US Code Title 5, Section 552, information accessed in completing this TO is subject to the Privacy Act.

6.14         Damage ReportingThe Contractor shall maintain an accurate record of and shall immediately report to the COR all damages toGovernment Furnished Equipment and Facilities as prescribed by OPNAVINST 5102.1.

6.15         Non-Personal ServicesThe Government will neither supervise contractor employees nor control the method by which the contractorperforms the required tasks.  Under no circumstances shall the Government assign tasks to, or prepare workschedules for, individual contractor employees.  It shall be the responsibility of the contractor to manage itsemployees and to guard against any actions that are of the nature of personal services, or give the perception ofpersonal services.  If the contractor feels that any actions constitute, or are perceived to constitute personal services,it shall be the contractor’s responsibility to notify the TO Procuring Contracting Officer (PCO) immediately.  Theseservices shall not be used to perform work of a policy/decision making or management nature, i.e., inherently

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 50 of 149 FINAL

 

Page 54: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

Governmental functions.  All decisions relative to programs supported by the contractor shall be the soleresponsibility of the Government. 6.16     InvestigationsContractor employees shall cooperate with Government investigative agencies conducting criminal or administrativeinvestigations. 

6.17     Government ObservationsGovernment personnel, such as Inspector General or higher headquarters staff, are authorized to observe Contractoroperations. Efforts will be made to minimize the degree of disturbance on Contractor performance. 6.18     Work Area CleanlinessThe Contractor shall be responsible for the orderliness and cleanliness of all Government controlled areas being usedby the contractor for office and storage.  The space shall be clean, neat and free from fire hazards, unsanitaryconditions and safety hazards.

6.19     Key ControlThe Contractor shall establish and implement methods of ensuring that all keys issued to the Contractor by thegovernment are not lost or misplaced and are not used by unauthorized persons.  No keys issued to the Contractorby the government shall be duplicated.  The Contractor shall develop procedures covering key control.  Key controland accountability shall be IAW the key control requirements set forth in applicable regulations.

6.20     Hours of OperationThe Contractor’s hours of operation will be provided on each individual TI.   If not so stated, then the normal dutyhours for Contractor on-site personnel and the Contractor’s liaison facility personnel assigned to this effort fallbetween 0630 and 1800 hours during normal government workdays, Monday through Friday.  The contractor maybe required to respond to an emergency and work outside of regular working hours to perform the work as required. If contractor desires to have personnel work compressed work schedule it shall be requested in writing and approvedby the COR.

6.20.1 Compressed Work ScheduleThe Contractor may be permitted to utilize a compressed work schedule for their employees working at NSWCCrane Division if specified on individual TI.  A compressed work schedule allows a starting time between the hoursof 0600 and 0830 for eight of the ten workdays (nine hours per day) with a stopping time between the hours of 1530and 1800, and between 0630 and 0900 for one of the ten workdays (eight-hour day) with a stopping time betweenthe hours of 1500 and 1730.  The contractor's full-time employees shall adhere to the same number of hours eachday for eight of the ten workdays (nine hours per day) during a biweekly pay period and for one eight-hour dayduring the same biweekly pay period.  The contractor's full-time employee is required to work 80 hours in abiweekly pay period and this work must be scheduled for fewer than 10 days in a biweekly pay period. In somecases, a contractor employee may be required to remain on a non-compressed work schedule or to adjust contractoremployee work hours (arrival and departure time) to accommodate the needs of the organization that they support. The contractor may be required to respond to an emergency requirement and work outside of regular working hoursto perform the work.  Exceptions to the compressed schedule may exist and the contractor will be notified by theCOR of any permanent or temporary exceptions. 6.20.2 FlextimeThe Contractor may be permitted to utilize a Flextime schedule for their employees working at NSWC CraneDivision if specified on individual TI.  A Flextime schedule allows a starting time between the hours of 0630 and0900, with a quitting time eight and one-half hours after the clock-in time (1500 to 1730).  The contractor may berequired to respond to an emergency requirement and work outside of regular working hours to perform the work. Exceptions to the Flextime schedule may exist, and the contractor will be notified by the COR of any permanent ortemporary exceptions.

6.20.3 Closed DaysAll closed days will be designated by the Commander, NSWC, Crane Division.  Closed days will be associatedwith holidays, National Security, and/or inclement weather/dangerous conditions.  The Contractor will not beallowed to work on NSWC, Crane Division during designated closed days, unless they are deemed to be essentialpersonnel.  Essential personnel will be identified by the Government, and communicated to the contractor prior to

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 51 of 149 FINAL

 

Page 55: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

the designated closed day, and will be authorized by COR/KO and specified on individual TI.  In the event theContractor is prevented from performance as the result of an Executive Order or an administrative leave determinationapplying to the using activity, such time may be charged to leave or indirect charges IAW the company policy.

6.20.3.1 Inclement WeatherWhen the Government Agency is closed by the Commander because of inclement weather conditions and/ordangerous conditions, notification of the closing will be broadcast over local radio and television stations.

6.20.3.2 HolidaysA list of Government Agency observed holidays and/or closed days in conjunction with holidays will be publishedat the beginning of each calendar year.  Contractor employees will not be allowed to work on Government propertyon a holiday and/or closed day unless they are deemed to be essential personnel.  The contractor is advised thataccess to the Government installation may be restricted on these holidays: 

New Year’s Day Birthday of Martin Luther King, Jr.President’s Day Memorial DayIndependence Day Labor DayColumbus Day Veteran’s DayThanksgiving Day Christmas Day

 In the event any of the above holidays occur on a Saturday or a Sunday, then such holiday shall be observed by theContractor IAW the practice as observed by the assigned Government employees at the using activity.  

6.20.4    OvertimeOvertime shall be performed as considered necessary by the contractor to meet the tasking and to the extentauthorized in 52.222-2 in Section I. The approved overtime shall not be exceeded without authorization from thecontracting officer. 6.21 Continuous ImprovementThe contractor shall support the NSWC Crane Continuous Improvement program. The contractor shall providesupport for the development and maintenance of lean performance execution processes and metrics. The contractorshall participate in lean events, meetings, and conferences, and execute lean tasks from initiation to closure whenauthorized. The contractor shall also provide data record entry, reproduction, distribution, and reporting of leandocumentation. 6.22 Information Non-DisclosureContractor personnel may be required, from time to time, to sign Non-Disclosure Agreements as applicable tospecific SOW tasking. The COR will notify the contractor of the number and type of personnel that will need tosign the Non-Disclosure agreements. The signed Non-Disclosure Agreements shall be executed prior to accessingdata or providing support for information that must be safeguarded and returned to the COR for endorsement andretention. Copies of all executed NDAs shall be provided to the COR. 6.23 Licenses, Certifications, and TrainingThe Contractor shall provide capable personnel with qualifications, experience levels, security clearances, andnecessary licenses, certifications, and training required by Federal, State, and Local laws and regulations.Information assurance functions require certifications specified in DFAR 252.239-7001 INFORMATIONASSURANCE CONTRACTOR TRAINING AND CERTIFICATION. Training necessary to ensure that personnelperforming under this contract maintain the knowledge and skills to successfully perform the required functions isthe responsibility of the Contractor. Training necessary to maintain professional certification is the responsibility ofthe Contractor. 6.24 Existing ConditionsIn the performance of work under this TO, the contractor is not responsible for any existing conditions (conditions thatexist prior to or as of the effective date of this TO) at the GFF, and the Government will reimburse the contractor for anycosts or liability the contractor might incur as a result of these existing conditions.  The Government and the contractorwill jointly conduct an inspection of the facilities to establish baseline conditions at the start of the performing period.

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 52 of 149 FINAL

 

Page 56: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

 

6.25Data RightsAll data/documentation delivered/created in support of this effort becomes the property of the US Government andwill be delivered without proprietary markings.  The Government shall have Government Purpose rights for all Dataassociated to this contract. The Government will have unlimited rights of all data delivered under this TO.  TheGovernment will have unlimited data and distribution rights to all processes, systems and equipment developedunder this SOW.  Data required from this contracting action shall be delivered in English with applicablenumbering in English or metric units.  The Government will have unlimited rights to reproduce and use allsubmitted CDRL(s).  All CDRLs will be submitted free of proprietary markings.  6.26     Use of Government Vehicles/Material Handling EquipmentContractor may be required to drive Government owned/leased vehicles and material handling equipment on-site atNSWC Crane in performance of their duties. Authorization to drive Government owned/leased vehicles and operateGovernment owned materials handling equipment, such as overhead cranes and forklifts, will be specificallyauthorized when applicable.   All contractor personnel operating Government vehicles/handling equipment shallpossess a valid state driver's license.   Contractor shall report any accidents involving motor vehicles or any otherGovernment equipment immediately to the cognizant Government manager and the Contracting Officer.  6.27     Contractor IdentificationThis TO is for non-personal services as defined by FAR Subpart 37.104.  As such, Contractor employees shallidentify themselves as contractor personnel by introducing themselves or being introduced as contractor personneland displaying distinguishing badges or other visible identification for meetings with Government personnel. Inaddition, contractor personnel shall appropriately identify themselves as contractor employees in telephoneconversations and in formal and informal written correspondence.

6.28 Skills and Training 

The Contractor shall provide capable personnel with qualifications, experience levels, securityclearances, and necessary licenses, certifications, and training required by Federal, State, andLocal laws and regulations. Information assurance functions require certifications specified in DFAR252.239-7001 INFORMATION ASSURANCE CONTRACTOR TRAINING AND CERTIFICATION.Training necessary to ensure that personnel performing under this contract maintain the knowledgeand skills to successfully perform the required functions is the responsibility of the Contractor.Training necessary to maintain professional certification is the responsibility of the Contractor.

6.29 Post Award Meetings

(a) A Post Award Meeting with the successful offeror will be conducted within 15 working days afteraward of the contract. The meeting will be held at (to be identified at Task Order award). (b) The contractor will be given at least five working days notice prior to the date of the meeting bythe Contracting Officer.(c) The requirement for a Post Award meeting shall, in no event, constitute grounds for excusabledelay by the Contractor in performance of any provisions of the Task Order.(d) A second post award meeting may, if necessary, be held after the receipt of the first invoice toassure that adequate documentation has been received to substantiate the validity of the invoicefor the stated period of performance, in accordance with HQ G-2-0007. The contractor will be givenat least five working days notice prior to the date of the meeting by the Contract Specialist.

6.30 Accounting System Adequacy

(a) FAR 16.301-3(a)(1) requires that a contractor’s accounting system be adequate for determiningcosts applicable to the contract in order to be eligible for a cost reimbursement type contract. This isunderstood to mean that the accounting system must have been reviewed and approved by the

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 53 of 149 FINAL

 

Page 57: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

Defense Contract Audit Agency (DCAA).(b) This requirement applies equally to the prime contractor as well as their subcontractors who areproposed for cost-reimbursement or time and materials (T&M) contracts. T&M contracts areconsidered to be a form of cost reimbursement contracting because of the manner in whichmaterials and ODCs are priced (actual cost plus indirect burdens). Subcontractors without approvedaccounting systems should be contracted using firm fixed price or labor hour contracts.(c) The prime contractor is solely responsible for verifying that subcontractors proposed for costreimbursement contracts (including T&M), have DCAA-approved accounting systems. They shallrequire subcontractors to include a copy of DCAA’s most recent review/approval letter as part of theirproposal detail. Proposal statements that the accounting system “has been approved” will not beaccepted; a copy of DCAA’s letter is required.(d) The prime contractor shall also provide a copy of DCAA’s most recent review/approval of theiraccounting system. The status of actions taken as a result of DCAA recommendations shall beaddressed. Any unresolved issues shall be identified and their impact on this requirement shall bediscussed.

7.  Place of Performance 

The primary work site will be Naval Surface Warfare Center Crane Division, Crane, IN.  Temporary duty sites mayinclude; Norfolk, San Diego, and others as required and defined by TI.

8.  Performance Standards

As a performance based acquisition for engineering, technical and management support services, the requirements arestructured around the results to be achieved as opposed to the manner by which the work is to be performed. Theeffort performed hereunder will be evaluated in accordance with the performance standards/acceptable quality levelssummarized in the Quality Assurance Surveillance Plan (QASP) identified as Attachment 1 to the RFP. Performancestandards are required to be met for each of the identified Task Requirements.

HQ C-2-0011 COMPUTER SOFTWARE AND/OR COMPUTER DATABASE(S) DELIVERED TO AND/ORRECEIVED FROM THE GOVERNMENT (NAVSEA) (APR 2004)

(a) The Contractor agrees to test for viruses all computer software and/or computer databases, as defined in the clauseentitled "RIGHTS IN NONCOMMERCIAL COMPUTER SOFTWARE AND NONCOMMERCIALCOMPUTER SOFTWARE DOCUMENTATION" (DFARS 252.227-7014), before delivery of that computersoftware or computer database in whatever media and on whatever system the software is delivered. The Contractorwarrants that any such computer software and/or computer database will be free of viruses when delivered.

(b) The Contractor agrees to test any computer software and/or computer database(s) received from the Governmentfor viruses prior to use under this contract.

(c) Unless otherwise agreed in writing, any license agreement governing the use of any computer software to bedelivered as a result of this contract must be paid-up and perpetual, or so nearly perpetual as to allow the use of thecomputer software or computer data base with the equipment for which it is obtained, or any replacement equipment,for so long as such equipment is used. Otherwise the computer software or computer database does not meet theminimum functional requirements of this contract. In the event that there is any routine to disable the computersoftware or computer database after the software is developed for or delivered to the Government, that routine shallnot disable the computer software or computer database until at least twenty-five calendar years after the delivery dateof the affected computer software or computer database to the Government.

(d) No copy protection devices or systems shall be used in any computer software or computer database deliveredunder this contract to restrict or limit the Government from making copies. This does not prohibit licenseagreements from specifying the maximum amount of copies that can be made.

(e) Delivery by the Contractor to the Government of certain technical data and other data is now frequently requiredin digital form rather than as hard copy. Such delivery may cause confusion between data rights and computer

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 54 of 149 FINAL

 

Page 58: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

software rights. It is agreed that, to the extent that any such data is computer software by virtue of its delivery indigital form, the Government will be licensed to use that digital-form data with exactly the same rights andlimitations as if the data had been delivered as hard copy.

(f) Any limited rights legends or other allowed legends placed by a Contractor on technical data or other datadelivered in digital form shall be digitally included on the same media as the digital-form data and must beassociated with the corresponding digital-form technical data to which the legends apply to the extent possible. Suchlegends shall also be placed in human-readable form on a visible surface of the media carrying the digital-form dataas delivered, to the extent possible.

                                                               (End of Text)

HQ C-2-0012 CONFIGURATION MANAGEMENT (NAVSEA) (APR 2004)

(a)  Baseline Definition  For configuration control purposes, all contractual documentation in effect at the time ofcontract award shall constitute the Contract Baseline which shall be considered incorporated in the baselinedocumentation.

(b)  General Requirement  (1)  The Contractor shall maintain a Configuration Control Program to assure that alldetal level work being performed under this contract is in compliance with appropriate baseline documentation.  TheContractor shall prepare a Configuration Management Plan in accordance with the requirements of the contract forapproval by the Government.  

    (2)  Whenever a situation arises wherein the contractor cannot comply with a baseline document, or wheneverintent of such documentation is significantly changed by detail level documentation, the Contractor shall submitchange documents to modify baseline documents to resolve the conflict or to allow noon compliance.  Whenever thecost of implementing a proposed change is less than th ethreshold requiring certified cost or pricing data, theContractor shall provide documentation explaining the nature of related costs as shown on the change document. Whenever the contract cost changes by an amount greater than the threshold requiring certified cost or pricing data,the Contractor shall complete such cost and pricing data as the Contracting Officer shall require detailing all relatedcosts, and attach it to the change document.  Requirements for cost and pricing data shall be determined by thegross amount of the change unless otherwise directed by the contracting officer.  Change documentation shall besubmitted to the Contracting Officer in accordance with the Contract Data Requirements List (CDRL), and asdescribed in paragraphs (c) through (f) below. 

(c) Engineering Change Proposals (ECPs) - ECPs shall be prepared in accordance with the approved configurationmanagement plan and the requirements of the contract. DI-CMAN-80639C approved 30 Sep 2000 andMIL-HDBK-61A of 7 Feb 2001 apply. An ECP should be submitted whenever the detail level physicalconfiguration, material quality, operational or functional performance of equipment or installed systems will not bein compliance with baseline design-related documents (Specifications, Contract Drawings, etc.), and a change to thebaseline document is considered an appropriate means of resolving a design-related issue. Documentation shall bedeveloped in sufficient detail to enable Government review and evaluation of the merits of the proposed change,including cost and scheduling impact, ship class impact, and consequences if disapproved. All existing drawingsand technical manuals impacted by the change shall be listed along with a brief narrative explanation of neededchanges to incorporate the ECP if approved. Weight and moment data incidental to the change shall be provided. The Contractor shall also prepare applicable baseline document insert sheets, with specific word changes or proposedrewrite, to facilitate baseline documentation changes.

(d) Non-Engineering Change Proposals (NECPs)– An NECP should be submitted whenever necessary to documentadministrative, procedural, scheduling, or documentation changes that do not directly impact the physicalconfiguration of the equipment. The NECP shall explain the nature of the problem, identify the applicable baselinedocument (i.e., Contract Data Requirement List (CDRL), Contract Clause, etc.) and provide a detailed explanationjustifying the proposed course of action desired to resolve the problem. Insert sheets for applicable documents shallalso be attached to facilitate change action in the event the Non-Engineering Change Proposal (NECP) is approved.

(e) Deviations and Waivers - In the event that a baseline design-related document requirement cannot be met, and achange to the baseline document is considered inappropriate, the Contractor shall submit a Request for Deviation

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 55 of 149 FINAL

 

Page 59: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

(RFD) or Request for Waiver (RFW), as applicable. DI-CMAN-80640C approved 30 Sep 2000 andMILHDBK-61A of 7 Feb 2001 apply. The explanation of "need for deviation" should provide detailed justificationand consequences of approval, to include technical details explaining the degree of non-compliance or effect on shipequipment or system operation constraints. In a similar manner, a waiver shall document an "as built" configurationthat departs from baseline documentation and should include any proposed corrections or modifications to bettermeet the intent of the baseline document.

(f) Equitable Adjustments for Change Documentation Preparations - For its effort expended in preparing ECPs,NECPs, Deviations and Waivers, the Contractor shall receive equitable adjustment under the followingcircumstances:  

    (1) In the event the Contractor, on its own initiative, and without written request from the Contracting Officer,develops a change document that is later disapproved by the Government, the Contractor shall bear the cost of thiseffort.

    (2) To avoid such loss, and at its option, the Contractor may submit a "preliminary" document that outlinesintent, but without detailed supporting documentation and request the Contracting Officer's approval for expenditureof effort to complete the detailed supporting documentation. In the event the Contracting Officer denies this request,the Contractor will bear the cost of development of the "preliminary" document, and shall make no further effort tocomplete detailed supporting documentation.

    (3) In the event the Contracting Officer approves the Contractor's request to develop supporting documentation,the Contractor shall be equitably compensated for its effort for both the "preliminary" and "final" documentation,regardless of whether or not the change document is later approved. 

    (4) In the event the Contracting Officer requests in writing that the Contractor develop change documentation, theeffort expended by the Contractor in developing such ocumentation shall be subject to equitable adjustment,regardless of whether or not the change document is later approved.

    (5) In the event the Contractor, on its own initiative, and without written request from the Government, developsa change document that is later approved by the Contracting Officer, the cost of developing such documentation shallbe incorporated in the contract modification that implements the change. (6) Failure to agree to such equitableadjustment in contract price shall constitute a dispute, and shall be adjudicated in accordance with the requirementsof the clause entitled "DISPUTES" (FAR 52.233-1).

(g) Any cost reduction proposal submitted pursuant to the clause entitled "VALUE ENGINEERING" (FAR52.248-1) shall be submitted as a Code V Engineering Change Proposal (VECP). DI-CMAN-80639C approved 30Sep 2000 and MIL-HDBK-61A of 7 Feb 2001 apply. Information required by the "VALUE ENGINEERING" clauseshall also be submitted as part of the change request.

HQ-C-2-0014 CONTRACTOR'S PROPOSAL (NAVSEA) (JAN 2008)

(a) Performance of this contract by the Contractor shall be conducted and performed in accordancewith detailed obligations to which the Contractor committed itself in Proposal _ N00024-12-R-3324___  dated __02 October 2012___ in response to NSWC Crane Solicitation No. N00024-12-R-3324.

(b) The technical volume(s) of the Contractor's proposal is incorporated by reference and hereby made subject to theprovisions of the "ORDER OF PRECEDENCE" (FAR 52.215-8) clause of this contract. Under the "ORDER OFPRECEDENCE" clause, the technical volume of the Contractor's proposal referenced herein is hereby designated asitem (f) of the clause, following "the specification" in the order of precedence.

HQ-C-2-0023 EXCLUSION OF MERCURY (NAVSEA) (JAN 2008)

Mercury or mercury containing compounds shall not be intentionally added or come in direct contact with hardwareor supplies furnished under this contract.

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 56 of 149 FINAL

 

Page 60: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

HQ-C-0037 ORGANIZATIONAL CONFLICT OF INTEREST (NAVSEA) (JUL 2000)

(a) "Organizational Conflict of Interest" means that because of other activities or relationships with other persons, aperson is unable or potentially unable to render impartial assistance or advice to the Government, or the person'sobjectivity in performing the contract work is or might be otherwise impaired, or a person has an unfair competitiveadvantage. "Person" as used herein includes Corporations, Partnerships, Joint Ventures, and other businessenterprises.

(b) The Contractor warrants that to the best of its knowledge and belief, and except as otherwise set forth in thecontract, the Contractor does not have any organizational conflict of interest(s) as defined in paragraph (a).

(c) It is recognized that the effort to be performed by the Contractor under this contract may create a potentialorganizational conflict of interest on the instant contract or on a future acquisition. In order to avoid this potentialconflict of interest, and at the same time to avoid prejudicing the best interest of the Government, the right of theContractor to participate in future procurement of equipment and/or services that are the subject of any work underthis contract shall be limited as described below in accordance with the requirements of FAR 9.5.

(d) (1) The Contractor agrees that it shall not release, disclose, or use in any way that would permit or result indisclosure to any party outside the Government any information provided to the Contractor by the Governmentduring or as a result of performance of this contract. Such information includes, but is not limited to, informationsubmitted to the Government on a confidential basis by other persons. Further, the prohibition against release ofGovernment provided information extends to cover such information whether or not in its original form, e.g., wherethe information has been included in Contractor generated work or where it is discernible from materialsincorporating or based upon such information. This prohibition shall not expire after a given period of time.

    (2) The Contractor agrees that it shall not release, disclose, or use in any way that would permit or result indisclosure to any party outside the Government any information generated or derived during or as a result ofperformance of this contract. This prohibition shall expire after a period of three years after completion of performanceof this contract.

    (3) The prohibitions contained in subparagraphs (d)(1) and (d)(2) shall apply with equal force to any affiliate ofthe Contractor, any subcontractor, consultant, or employee of the Contractor, any joint venture involving theContractor, any entity into or with which it may merge or affiliate, or any successor or assign of the Contractor.  Theterms of paragraph (f) of this Special Contract Requirement relating to notification shall apply to any release ofinformation in contravention of this paragraph (d).

(e) The Contractor further agrees that, during the performance of this contract and for a period of three years aftercompletion of performance of this contract, the Contractor, any affiliate of the Contractor, any subcontractor,consultant, or employee of the Contractor, any joint venture involving the Contractor, any entity into or with whichit may subsequently merge or affiliate, or any other successor or assign of the Contractor, shall not furnish to theUnited States Government, either as a prime contractor or as a subcontractor, or as a consultant to a prime contractoror subcontractor, any system, component or services which is the subject of the work to be performed under thiscontract. This exclusion does not apply to any recompetition for those systems, components or services furnishedpursuant to this contract. As provided in FAR 9.505-2, if the Government procures the system, component, orservices on the basis of work statements growing out of the effort performed under this contract, from a source otherthan the contractor, subcontractor, affiliate, or assign of either, during the course of performance of this contract orbefore the three year period following completion of this contract has lapsed, the Contractor may, with theauthorization of the cognizant Contracting Officer, participate in a subsequent procurement for the same system,component, or service. In other words, the Contractor may be authorized to compete for procurement(s) for systems,components or services subsequent to an intervening procurement.

(f) The Contractor agrees that, if after award, it discovers an actual or potential organizational conflict of interest, itshall make immediate and full disclosure in writing to the Contracting Officer. The notification shall include adescription of the actual or potential organizational conflict of interest, a description of the action which theContractor has taken or proposes to take to avoid, mitigate, or neutralize the conflict, and any other relevantinformation that would assist the Contracting Officer in making a determination on this matter. Notwithstanding

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 57 of 149 FINAL

 

Page 61: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

this notification, the Government may terminate the contract for the convenience of the Government if determined tobe in the best interest of the Government.

(g) Notwithstanding paragraph (f) above, if the Contractor was aware, or should have been aware, of an organizationalconflict of interest prior to the award of this contract or becomes, or should become, aware of an organizationalconflict of interest after award of this contract and does not make an immediate and full disclosure in writing to theContracting Officer, the Government may terminate this contract for default.

(h) If the Contractor takes any action prohibited by this requirement or fails to take action required by thisrequirement, the Government may terminate this contract for default.

(i) The Contracting Officer's decision as to the existence or nonexistence of an actual or potential organizationalconflict of interest shall be final.

(j) Nothing in this requirement is intended to prohibit or preclude the Contractor from marketing or selling to theUnited States Government its product lines in existence on the effective date of this contract; nor, shall thisrequirement preclude the Contractor from participating in any research and development or delivering any designdevelopment model or prototype of any such equipment. Additionally, sale of catalog or standard commercial itemsare exempt from this requirement.

(k) The Contractor shall promptly notify the Contracting Officer, in writing, if it has been tasked to evaluate oradvise the Government concerning its own products or activities or those of a competitor in order to ensure propersafeguards exist to guarantee objectivity and to protect the Government's interest.

(l) The Contractor shall include this requirement in subcontracts of any tier which involve access to information orsituations/conditions covered by the preceding paragraphs, substituting "subcontractor" for "contractor" whereappropriate.

(m) The rights and remedies described herein shall not be exclusive and are in addition to other rights and remediesprovided by law or elsewhere included in this contract.

(n) Compliance with this requirement is a material requirement of this contract.

CNIN-NOTICE-0003            CONTRACTOR MANPOWER REPORTING        (NOV 2013)

The contractor shall report contractor labor hours (including subcontractor labor hours) required for performance ofservices provided under this contract for the Naval Surface Warfare Center, Crane Division via a secure datacollection site.  Contracted services excluded from reporting are based on Product Service Codes (PSCs).  Theexcluded PSCs are:

 (1) W, Lease/Rental of Equipment;

(2) X, Lease/Rental of Facilities;

(3) Y, Construction of Structures and Facilities;

(4) S, Utilities ONLY;

(5) V, Freight and Shipping ONLY. 

 The contractor is required to completely fill in all required data fields using the following web addresshttps://doncmra.nmci navy mil.

 Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year(FY), which runs October 1 through September 30.  While inputs may be reported any time during the FY, all datashall be reported no later than October 31 of each calendar year.  Contractors may direct questions to the help desk,linked at https://doncmra.nmci navy mil.

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 58 of 149 FINAL

 

Page 62: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 59 of 149 FINAL

 

Page 63: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

SECTION D PACKAGING AND MARKING

All provisions and clauses in SECTION D of the basic contract apply to this task order, unlessotherwise specified in this task order.

HQ D-1-0001 DATA PACKAGING LANGUAGE

Data to be delivered by Integrated Digital Environment (IDE) or other electronic media shall be asspecified in the contract.

All unclassified data to be shipped shall be prepared for shipment in accordance with bestcommercial practice.

Classified reports, data, and documentation shall be prepared for shipment in accordance withNational Industrial Security Program Operating Manual (NISPOM), DOD 5220.22-M dated 28February 2006.

                                                    (End of Text)

HQ D-2-0008 MARKING OF REPORTS (NAVSEA) (SEP 1990)

All reports delivered by the Contractor to the Government under this contract shall prominentlyshow on the cover of the report:

(1) name and business address of the Contractor

(2) contract number/task order number

(3) task order dollar amount

(4) sponsor:       ____________________________________________                         (Name of Individual Sponsor)

                         ____________________________________________                         (Name of Requiring Activity)

                         ____________________________________________                         (City and State)

(5) Program Description/Program Manager

(6) Contractor’s point of contact name and phone number

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 60 of 149 FINAL

 

Page 64: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

SECTION E INSPECTION AND ACCEPTANCE

All provisions and clauses in SECTION E of the basic contract apply to this TO, unless otherwise specified inthis TO.

HQ E-1-0001  INSPECTION AND ACCEPTANCE LANGUAGE FOR DATA

Inspection and acceptance of all data shall be as specified on the attached Contract Data Requirements List(s), DDForm 1423.

HQ E-1-0007  INSPECTION AND ACCEPTANCE LANGUAGE FOR LOE SERVICES

Item(s) 4999 - Inspection and acceptance shall be made by the Contracting Officer’s Representative (COR) or adesignated representative of the Government. 

PERFORMANCE BASED CONTRACT REVIEW AND ACCEPTANCE PROCEDURE

(a) This is a performance-based contract as defined in FAR Part 37.6 (PERFORMANCE BASED ACQUISITION).Contractor performance will be reviewed in accordance with the Quality Assurance Surveillance Plan provided asAttachment 01 in Section J.

(b) The plan defines that this review and acceptance will become part of the annual Contractor PerformanceAssessment Reporting System (CPARS). The contractor may obtain more information regarding the CPARSprocess at the following internet site:  http://cpars.navy mil

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 61 of 149 FINAL

 

Page 65: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

SECTION F DELIVERABLES OR PERFORMANCE

The periods of performance for the following Items are as follows:

   

4000 8/15/2013 - 8/14/2014

6000 8/15/2013 - 8/14/2014

7000 8/15/2014 - 8/14/2015

7001AA 8/15/2014 - 9/30/2014

7001AB 8/15/2014 - 8/14/2015

7001AC 8/15/2014 - 8/14/2015

7001AD 8/15/2014 - 8/14/2015

7001AE 8/15/2014 - 8/14/2015

7001AF 8/15/2014 - 8/14/2015

7001AG 8/15/2014 - 8/14/2015

7001AH 8/15/2014 - 8/14/2015

7001AJ 8/15/2014 - 8/14/2015

7001AK 8/15/2014 - 9/30/2014

7001AL 8/15/2014 - 8/14/2015

7001AM 8/15/2014 - 8/14/2015

7001AN 8/15/2014 - 9/30/2014

7001AP 8/15/2014 - 8/14/2015

7001AQ 8/15/2014 - 9/30/2014

7001AR 8/28/2014 - 8/14/2015

7001AS 9/12/2014 - 8/14/2015

7001AT 9/12/2014 - 8/14/2015

7001AU 9/24/2014 - 2/24/2015

7001AV 9/24/2014 - 8/14/2015

7001AW 9/24/2014 - 8/14/2015

7001AX 9/24/2014 - 8/14/2015

7001AZ 9/26/2014 - 8/14/2015

7001BA 9/26/2014 - 8/14/2015

7001BB 11/7/2014 - 8/14/2015

7001BC 11/7/2014 - 8/14/2015

7001BD 11/7/2014 - 6/2/2015

7001BE 11/13/2014 - 8/14/2016

7001BF 12/2/2014 - 8/14/2015

7001BG 12/2/2014 - 8/14/2015

7001BH 12/2/2014 - 8/14/2015

7001BJ 12/2/2014 - 8/14/2015

7001BK 12/2/2014 - 8/14/2015

7001BL 12/12/2014 - 8/14/2015

7001BM 12/12/2014 - 8/14/2015

7001BN 12/23/2014 - 8/14/2015

7001BP 12/23/2014 - 8/14/2015

7001BQ 12/23/2014 - 8/14/2015

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 62 of 149 FINAL

 

Page 66: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

7001BR 1/3/2015 - 8/14/2015

7001BS 1/3/2015 - 8/14/2015

7001BT 3/12/2015 - 8/14/2015

7001BU 3/12/2015 - 8/14/2015

7001BV 3/12/2015 - 8/14/2015

7001BW 3/12/2015 - 8/14/2016

7001BX 3/12/2015 - 8/14/2015

7001BZ 3/12/2015 - 8/14/2015

7001CA 3/12/2015 - 8/14/2015

7001CB 3/25/2015 - 8/14/2015

7001CC 3/25/2015 - 8/14/2015

7001CD 3/25/2015 - 8/14/2015

7001CE 3/25/2015 - 8/14/2015

7001CF 3/25/2015 - 8/14/2015

7001CG 4/29/2015 - 8/14/2015

7001CH 5/18/2015 - 8/14/2015

7001CJ 5/18/2015 - 9/30/2015

7001CK 5/18/2015 - 8/14/2015

7001CL 6/18/2015 - 8/14/2015

7001CM 6/18/2015 - 8/14/2015

7001CN 6/18/2015 - 8/14/2015

7001CP 6/18/2015 - 8/14/2015

7001CQ 6/18/2015 - 8/14/2015

7001CR 6/18/2015 - 8/14/2015

7001CS 7/6/2015 - 8/14/2015

7001CT 7/6/2015 - 8/14/2015

7001CU 7/6/2015 - 8/14/2015

7001CV 7/6/2015 - 8/14/2015

7001CW 7/15/2015 - 8/14/2015

7001CX 7/15/2015 - 8/14/2015

7001CY 7/15/2015 - 8/14/2015

7100 8/15/2014 - 8/14/2015

7101AA 7/15/2015 - 8/14/2015

7200 8/15/2015 - 8/14/2016

7201AA 8/15/2015 - 9/30/2015

7201AB 8/15/2015 - 8/14/2016

7201AC 8/15/2015 - 8/14/2016

7201AD 8/15/2015 - 3/19/2016

7201AE 8/15/2015 - 3/19/2016

7201AF 8/15/2015 - 8/14/2016

7201AG 8/15/2015 - 3/19/2016

7201AH 8/15/2015 - 8/14/2016

7201AJ 8/15/2015 - 8/14/2016

7201AK 8/15/2015 - 9/30/2015

7201AL 8/15/2015 - 8/14/2016

7201AM 8/15/2015 - 9/30/2015

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 63 of 149 FINAL

 

Page 67: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

7201AN 8/15/2015 - 9/30/2015

7201AP 8/15/2015 - 8/14/2016

7201AQ 8/15/2015 - 8/14/2016

7201AR 8/15/2015 - 8/14/2016

7201AS 8/15/2015 - 8/14/2016

7201AT 8/15/2015 - 8/14/2016

7201AU 8/15/2015 - 8/14/2016

7201AV 8/15/2015 - 8/14/2016

7201AW 8/15/2015 - 9/30/2015

7201AX 8/28/2015 - 8/14/2016

7201AY 8/15/2015 - 8/14/2016

7201AZ 9/10/2015 - 3/19/2016

7201BA 9/8/2015 - 9/30/2015

7201BB 9/10/2015 - 8/14/2016

7201BC 9/14/2015 - 8/14/2016

7201BD 9/14/2015 - 8/14/2016

7201BE 9/17/2015 - 8/14/2016

7201BF 9/17/2015 - 9/30/2015

7201BG 9/17/2015 - 8/14/2016

7201BH 9/17/2015 - 3/19/2016

7201BJ 9/17/2015 - 3/19/2016

7201BK 9/29/2015 - 8/14/2016

7201BL 10/10/2015 - 8/14/2016

7201BM 8/15/2015 - 8/14/2016

7201BN 10/9/2015 - 8/14/2016

7201BP 10/16/2015 - 8/14/2016

7201BQ 10/16/2015 - 8/14/2016

7201BR 10/16/2015 - 8/14/2016

7201BS 10/16/2015 - 8/14/2016

7201BT 10/16/2015 - 8/14/2016

7201BU 11/2/2015 - 8/14/2016

7201BV 10/26/2015 - 8/14/2016

7201BW 11/18/2015 - 8/14/2016

7201BX 11/18/2015 - 8/14/2016

7201BY 11/18/2015 - 8/14/2016

7201BZ 11/24/2015 - 8/14/2016

7201CA 12/1/2015 - 8/14/2016

7201CB 12/2/2015 - 8/14/2016

7201CC 11/1/2015 - 8/14/2016

7201CD 12/2/2015 - 8/14/2016

7201CE 12/2/2015 - 8/14/2016

7201CF 12/4/2015 - 8/14/2016

7201CG 12/18/2015 - 8/14/2016

7201CH 12/2/2015 - 8/14/2016

7201CJ 12/18/2015 - 8/14/2016

7201CK 12/21/2015 - 8/14/2016

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 64 of 149 FINAL

 

Page 68: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

7201CL 1/15/2016 - 8/14/2016

7201CM 1/15/2016 - 8/14/2016

7201CN 1/15/2016 - 8/14/2016

7201CP 1/15/2016 - 8/14/2016

7201CQ 1/15/2015 - 8/14/2016

7201CR 1/15/2016 - 8/14/2016

7201CS 1/15/2016 - 8/14/2016

7201CT 2/2/2016 - 8/14/2016

7201CU 2/2/2016 - 8/14/2016

7201CV 2/2/2016 - 8/14/2016

7201CW 1/29/2016 - 8/14/2016

7201CX 2/2/2016 - 8/14/2016

7201CY 2/2/2016 - 8/14/2016

7201CZ 2/2/2016 - 8/14/2016

7201DA 2/8/2016 - 8/14/2016

7201DB 2/17/2016 - 8/14/2016

7201DC 2/17/2016 - 8/14/2016

7201DD 2/8/2016 - 8/14/2016

7201DE 2/17/2016 - 8/14/2016

7201DF 3/1/2016 - 8/14/2016

7201DG 3/17/2016 - 8/14/2016

7201DH 3/17/2016 - 8/14/2016

7201DJ 3/2/2016 - 8/14/2016

7201DK 3/17/2016 - 8/14/2016

7201DL 4/5/2016 - 8/14/2016

7201DM 4/5/2016 - 8/14/2016

7201DN 4/29/2016 - 8/14/2016

7201DP 4/29/2016 - 8/14/2016

7201DQ 4/29/2016 - 8/14/2016

7201DR 4/29/2016 - 8/14/2016

7201DS 4/29/2016 - 8/14/2016

7201DT 4/29/2016 - 8/14/2016

7201DU 4/29/2016 - 8/14/2016

7201DV 4/29/2016 - 8/14/2016

7201DW 4/29/2016 - 8/14/2016

7201DX 5/3/2016 - 8/14/2016

7201DY 5/20/2016 - 8/14/2016

7201DZ 5/20/2016 - 8/14/2016

7201EA 5/20/2016 - 8/14/2016

7201EB 5/20/2016 - 8/14/2016

7201EC 5/20/2016 - 8/14/2016

7201ED 5/23/2016 - 8/14/2016

7201EF 6/15/2016 - 8/14/2016

7201EG 6/29/2016 - 8/14/2016

7201EH 6/29/2016 - 8/14/2016

7201EJ 6/29/2016 - 8/14/2016

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 65 of 149 FINAL

 

Page 69: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

7201EK 6/29/2016 - 8/14/2016

7201EL 8/15/2015 - 8/14/2016

7201EM 8/15/2015 - 8/14/2016

7201EN 8/15/2015 - 8/14/2016

7201EP 8/15/2015 - 8/14/2016

7201EQ 7/29/2016 - 8/14/2016

7201ER 8/14/2015 - 8/15/2016

7201ES 12/29/2015 - 8/14/2016

7300 8/15/2016 - 2/14/2017

7301AA 8/15/2016 - 9/30/2016

7301AB 8/15/2016 - 2/14/2017

7301AC 8/15/2016 - 2/14/2017

7301AD 8/15/2016 - 2/14/2017

7301AE 8/15/2016 - 9/30/2016

7301AF 8/15/2016 - 9/30/2016

7301AG 8/15/2016 - 2/14/2017

7301AH 8/15/2016 - 10/31/2016

7301AJ 8/15/2016 - 2/14/2017

7301AK 8/15/2016 - 2/14/2017

7301AL 9/7/2016 - 12/31/2016

9000 8/15/2014 - 8/14/2015

9001AA 8/15/2014 - 8/14/2015

9001AB 8/15/2014 - 9/30/2014

9001AC 8/15/2014 - 8/14/2015

9001AD 8/15/2014 - 8/14/2015

9001AE 9/24/2014 - 8/14/2015

9001AF 11/7/2014 - 8/14/2015

9001AG 11/13/2014 - 8/14/2015

9001AH 12/2/2014 - 8/14/2015

9001AJ 12/12/2014 - 8/14/2015

9001AK 12/12/2014 - 8/14/2015

9001AL 12/23/2014 - 8/14/2015

9001AM 1/3/2015 - 8/14/2015

9001AN 1/3/2015 - 8/14/2015

9001AP 3/12/2015 - 8/14/2015

9001AQ 3/12/2015 - 8/14/2015

9001AR 3/12/2015 - 8/14/2015

9001AS 3/12/2015 - 8/14/2015

9001AT 3/25/2015 - 8/14/2015

9001AU 3/25/2015 - 8/14/2015

9001AV 4/29/2015 - 8/14/2015

9001AW 6/18/2015 - 8/14/2015

9001AX 6/18/2015 - 8/14/2015

9001AY 6/18/2015 - 8/14/2015

9001AZ 7/6/2015 - 9/30/2015

9001BA 7/6/2015 - 8/14/2015

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 66 of 149 FINAL

 

Page 70: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

9001BB 7/29/2015 - 8/14/2015

9200 8/15/2015 - 8/14/2016

9201AA 8/15/2015 - 3/19/2016

9201AB 8/15/2015 - 8/14/2016

9201AC 8/15/2015 - 9/30/2015

9201AD 8/15/2015 - 8/14/2016

9201AE 8/15/2015 - 8/14/2016

9201AF 8/15/2015 - 8/14/2016

9201AG 8/15/2015 - 8/14/2016

9201AH 8/15/2015 - 8/14/2016

9201AJ 8/15/2015 - 9/30/2015

9201AK 9/10/2015 - 8/14/2016

9201AL 9/8/2015 - 9/30/2015

9201AM 9/14/2015 - 8/14/2016

9201AN 9/14/2015 - 8/14/2016

9201AP 9/14/2015 - 8/14/2016

9201AQ 9/17/2015 - 3/19/2016

9201AR 8/15/2015 - 8/14/2016

9201AS 10/9/2015 - 8/14/2016

9201AT 10/16/2015 - 8/14/2016

9201AU 10/16/2015 - 8/14/2016

9201AV 10/16/2015 - 8/14/2016

9201AW 10/16/2015 - 8/14/2016

9201AX 10/23/2015 - 8/14/2016

9201AY 11/2/2015 - 8/14/2016

9201AZ 10/26/2015 - 8/14/2016

9201BA 11/18/2015 - 8/14/2016

9201BB 12/18/2015 - 8/14/2016

9201BC 1/15/2016 - 8/14/2016

9201BD 1/15/2016 - 8/14/2016

9201BE 1/15/2016 - 8/14/2016

9201BF 1/15/2016 - 8/14/2016

9201BG 2/2/2016 - 8/14/2016

9201BH 2/2/2016 - 8/14/2016

9201BJ 2/9/2016 - 8/14/2016

9201BK 2/8/2016 - 8/14/2016

9201BL 2/17/2016 - 8/14/2016

9201BM 3/1/2016 - 8/14/2016

9201BN 3/17/2016 - 8/14/2016

9201BP 3/17/2016 - 8/14/2016

9201BQ 4/5/2016 - 8/14/2016

9201BR 4/29/2016 - 8/14/2016

9201BS 5/3/2016 - 8/14/2016

9201BT 5/17/2016 - 8/14/2016

9201BU 5/20/2016 - 8/14/2016

9201BV 5/20/2016 - 8/14/2016

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 67 of 149 FINAL

 

Page 71: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

9201BW 5/23/2016 - 8/14/2016

9201BX 5/23/2016 - 8/14/2016

9201BY 6/15/2016 - 8/14/2016

9201BZ 6/29/2016 - 8/14/2016

9201ER 8/14/2015 - 8/15/2016

9300 8/15/2016 - 2/14/2017

9301AA 11/24/2015 - 8/14/2016

9301AB 12/1/2015 - 8/14/2016

9301AC 11/1/2015 - 8/14/2016

9301AD 8/15/2016 - 9/30/2016

9301AE 8/15/2016 - 2/14/2017

9301AF 8/15/2016 - 9/30/2016

9301AG 8/15/2016 - 10/31/2016

9301AH 8/15/2016 - 2/14/2017

9301AJ 8/15/2016 - 2/14/2017

9301AK 9/7/2016 - 12/31/2016

9301AL 9/7/2016 - 9/30/2016

All provisions and clauses in Section F of the basic contract apply to this TO unless otherwise specified.

HQ F-1-0003  PERFORMANCE LANGUAGE FOR LOE SERVICES

The Contractor shall perform the work described in SECTION C, at the level of effort specified in SECTION B, asfollows:  

            ITEM(S)                                                                           FROM    -     TO

 

The periods of performance for the following Items are as follows:

   

4000 8/15/2013 - 8/14/2014

6000 8/15/2013 - 8/14/2014

7000 8/15/2014 - 8/14/2015

7001AA 8/15/2014 - 9/30/2014

7001AB 8/15/2014 - 8/14/2015

7001AC 8/15/2014 - 8/14/2015

7001AD 8/15/2014 - 8/14/2015

7001AE 8/15/2014 - 8/14/2015

7001AF 8/15/2014 - 8/14/2015

7001AG 8/15/2014 - 8/14/2015

7001AH 8/15/2014 - 8/14/2015

7001AJ 8/15/2014 - 8/14/2015

7001AK 8/15/2014 - 9/30/2014

7001AL 8/15/2014 - 8/14/2015

7001AM 8/15/2014 - 8/14/2015

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 68 of 149 FINAL

 

Page 72: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

7001AN 8/15/2014 - 9/30/2014

7001AP 8/15/2014 - 8/14/2015

7001AQ 8/15/2014 - 9/30/2014

7001AR 8/28/2014 - 8/14/2015

7001AS 9/12/2014 - 8/14/2015

7001AT 9/12/2014 - 8/14/2015

7001AU 9/24/2014 - 2/24/2015

7001AV 9/24/2014 - 8/14/2015

7001AW 9/24/2014 - 8/14/2015

7001AX 9/24/2014 - 8/14/2015

7001AZ 9/26/2014 - 8/14/2015

7001BA 9/26/2014 - 8/14/2015

7001BB 11/7/2014 - 8/14/2015

7001BC 11/7/2014 - 8/14/2015

7001BD 11/7/2014 - 6/2/2015

7001BE 11/13/2014 - 8/14/2016

7001BF 12/2/2014 - 8/14/2015

7001BG 12/2/2014 - 8/14/2015

7001BH 12/2/2014 - 8/14/2015

7001BJ 12/2/2014 - 8/14/2015

7001BK 12/2/2014 - 8/14/2015

7001BL 12/12/2014 - 8/14/2015

7001BM 12/12/2014 - 8/14/2015

7001BN 12/23/2014 - 8/14/2015

7001BP 12/23/2014 - 8/14/2015

7001BQ 12/23/2014 - 8/14/2015

7001BR 1/3/2015 - 8/14/2015

7001BS 1/3/2015 - 8/14/2015

7001BT 3/12/2015 - 8/14/2015

7001BU 3/12/2015 - 8/14/2015

7001BV 3/12/2015 - 8/14/2015

7001BW 3/12/2015 - 8/14/2016

7001BX 3/12/2015 - 8/14/2015

7001BZ 3/12/2015 - 8/14/2015

7001CA 3/12/2015 - 8/14/2015

7001CB 3/25/2015 - 8/14/2015

7001CC 3/25/2015 - 8/14/2015

7001CD 3/25/2015 - 8/14/2015

7001CE 3/25/2015 - 8/14/2015

7001CF 3/25/2015 - 8/14/2015

7001CG 4/29/2015 - 8/14/2015

7001CH 5/18/2015 - 8/14/2015

7001CJ 5/18/2015 - 9/30/2015

7001CK 5/18/2015 - 8/14/2015

7001CL 6/18/2015 - 8/14/2015

7001CM 6/18/2015 - 8/14/2015

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 69 of 149 FINAL

 

Page 73: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

7001CN 6/18/2015 - 8/14/2015

7001CP 6/18/2015 - 8/14/2015

7001CQ 6/18/2015 - 8/14/2015

7001CR 6/18/2015 - 8/14/2015

7001CS 7/6/2015 - 8/14/2015

7001CT 7/6/2015 - 8/14/2015

7001CU 7/6/2015 - 8/14/2015

7001CV 7/6/2015 - 8/14/2015

7001CW 7/15/2015 - 8/14/2015

7001CX 7/15/2015 - 8/14/2015

7001CY 7/15/2015 - 8/14/2015

7100 8/15/2014 - 8/14/2015

7101AA 7/15/2015 - 8/14/2015

7200 8/15/2015 - 8/14/2016

7201AA 8/15/2015 - 9/30/2015

7201AB 8/15/2015 - 8/14/2016

7201AC 8/15/2015 - 8/14/2016

7201AD 8/15/2015 - 3/19/2016

7201AE 8/15/2015 - 3/19/2016

7201AF 8/15/2015 - 8/14/2016

7201AG 8/15/2015 - 3/19/2016

7201AH 8/15/2015 - 8/14/2016

7201AJ 8/15/2015 - 8/14/2016

7201AK 8/15/2015 - 9/30/2015

7201AL 8/15/2015 - 8/14/2016

7201AM 8/15/2015 - 9/30/2015

7201AN 8/15/2015 - 9/30/2015

7201AP 8/15/2015 - 8/14/2016

7201AQ 8/15/2015 - 8/14/2016

7201AR 8/15/2015 - 8/14/2016

7201AS 8/15/2015 - 8/14/2016

7201AT 8/15/2015 - 8/14/2016

7201AU 8/15/2015 - 8/14/2016

7201AV 8/15/2015 - 8/14/2016

7201AW 8/15/2015 - 9/30/2015

7201AX 8/28/2015 - 8/14/2016

7201AY 8/15/2015 - 8/14/2016

7201AZ 9/10/2015 - 3/19/2016

7201BA 9/8/2015 - 9/30/2015

7201BB 9/10/2015 - 8/14/2016

7201BC 9/14/2015 - 8/14/2016

7201BD 9/14/2015 - 8/14/2016

7201BE 9/17/2015 - 8/14/2016

7201BF 9/17/2015 - 9/30/2015

7201BG 9/17/2015 - 8/14/2016

7201BH 9/17/2015 - 3/19/2016

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 70 of 149 FINAL

 

Page 74: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

7201BJ 9/17/2015 - 3/19/2016

7201BK 9/29/2015 - 8/14/2016

7201BL 10/10/2015 - 8/14/2016

7201BM 8/15/2015 - 8/14/2016

7201BN 10/9/2015 - 8/14/2016

7201BP 10/16/2015 - 8/14/2016

7201BQ 10/16/2015 - 8/14/2016

7201BR 10/16/2015 - 8/14/2016

7201BS 10/16/2015 - 8/14/2016

7201BT 10/16/2015 - 8/14/2016

7201BU 11/2/2015 - 8/14/2016

7201BV 10/26/2015 - 8/14/2016

7201BW 11/18/2015 - 8/14/2016

7201BX 11/18/2015 - 8/14/2016

7201BY 11/18/2015 - 8/14/2016

7201BZ 11/24/2015 - 8/14/2016

7201CA 12/1/2015 - 8/14/2016

7201CB 12/2/2015 - 8/14/2016

7201CC 11/1/2015 - 8/14/2016

7201CD 12/2/2015 - 8/14/2016

7201CE 12/2/2015 - 8/14/2016

7201CF 12/4/2015 - 8/14/2016

7201CG 12/18/2015 - 8/14/2016

7201CH 12/2/2015 - 8/14/2016

7201CJ 12/18/2015 - 8/14/2016

7201CK 12/21/2015 - 8/14/2016

7201CL 1/15/2016 - 8/14/2016

7201CM 1/15/2016 - 8/14/2016

7201CN 1/15/2016 - 8/14/2016

7201CP 1/15/2016 - 8/14/2016

7201CQ 1/15/2015 - 8/14/2016

7201CR 1/15/2016 - 8/14/2016

7201CS 1/15/2016 - 8/14/2016

7201CT 2/2/2016 - 8/14/2016

7201CU 2/2/2016 - 8/14/2016

7201CV 2/2/2016 - 8/14/2016

7201CW 1/29/2016 - 8/14/2016

7201CX 2/2/2016 - 8/14/2016

7201CY 2/2/2016 - 8/14/2016

7201CZ 2/2/2016 - 8/14/2016

7201DA 2/8/2016 - 8/14/2016

7201DB 2/17/2016 - 8/14/2016

7201DC 2/17/2016 - 8/14/2016

7201DD 2/8/2016 - 8/14/2016

7201DE 2/17/2016 - 8/14/2016

7201DF 3/1/2016 - 8/14/2016

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 71 of 149 FINAL

 

Page 75: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

7201DG 3/17/2016 - 8/14/2016

7201DH 3/17/2016 - 8/14/2016

7201DJ 3/2/2016 - 8/14/2016

7201DK 3/17/2016 - 8/14/2016

7201DL 4/5/2016 - 8/14/2016

7201DM 4/5/2016 - 8/14/2016

7201DN 4/29/2016 - 8/14/2016

7201DP 4/29/2016 - 8/14/2016

7201DQ 4/29/2016 - 8/14/2016

7201DR 4/29/2016 - 8/14/2016

7201DS 4/29/2016 - 8/14/2016

7201DT 4/29/2016 - 8/14/2016

7201DU 4/29/2016 - 8/14/2016

7201DV 4/29/2016 - 8/14/2016

7201DW 4/29/2016 - 8/14/2016

7201DX 5/3/2016 - 8/14/2016

7201DY 5/20/2016 - 8/14/2016

7201DZ 5/20/2016 - 8/14/2016

7201EA 5/20/2016 - 8/14/2016

7201EB 5/20/2016 - 8/14/2016

7201EC 5/20/2016 - 8/14/2016

7201ED 5/23/2016 - 8/14/2016

7201EF 6/15/2016 - 8/14/2016

7201EG 6/29/2016 - 8/14/2016

7201EH 6/29/2016 - 8/14/2016

7201EJ 6/29/2016 - 8/14/2016

7201EK 6/29/2016 - 8/14/2016

7201EL 8/15/2015 - 8/14/2016

7201EM 8/15/2015 - 8/14/2016

7201EN 8/15/2015 - 8/14/2016

7201EP 8/15/2015 - 8/14/2016

7201EQ 7/29/2016 - 8/14/2016

7201ER 8/14/2015 - 8/15/2016

7201ES 12/29/2015 - 8/14/2016

7300 8/15/2016 - 2/14/2017

7301AA 8/15/2016 - 9/30/2016

7301AB 8/15/2016 - 2/14/2017

7301AC 8/15/2016 - 2/14/2017

7301AD 8/15/2016 - 2/14/2017

7301AE 8/15/2016 - 9/30/2016

7301AF 8/15/2016 - 9/30/2016

7301AG 8/15/2016 - 2/14/2017

7301AH 8/15/2016 - 10/31/2016

7301AJ 8/15/2016 - 2/14/2017

7301AK 8/15/2016 - 2/14/2017

7301AL 9/7/2016 - 12/31/2016

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 72 of 149 FINAL

 

Page 76: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

9000 8/15/2014 - 8/14/2015

9001AA 8/15/2014 - 8/14/2015

9001AB 8/15/2014 - 9/30/2014

9001AC 8/15/2014 - 8/14/2015

9001AD 8/15/2014 - 8/14/2015

9001AE 9/24/2014 - 8/14/2015

9001AF 11/7/2014 - 8/14/2015

9001AG 11/13/2014 - 8/14/2015

9001AH 12/2/2014 - 8/14/2015

9001AJ 12/12/2014 - 8/14/2015

9001AK 12/12/2014 - 8/14/2015

9001AL 12/23/2014 - 8/14/2015

9001AM 1/3/2015 - 8/14/2015

9001AN 1/3/2015 - 8/14/2015

9001AP 3/12/2015 - 8/14/2015

9001AQ 3/12/2015 - 8/14/2015

9001AR 3/12/2015 - 8/14/2015

9001AS 3/12/2015 - 8/14/2015

9001AT 3/25/2015 - 8/14/2015

9001AU 3/25/2015 - 8/14/2015

9001AV 4/29/2015 - 8/14/2015

9001AW 6/18/2015 - 8/14/2015

9001AX 6/18/2015 - 8/14/2015

9001AY 6/18/2015 - 8/14/2015

9001AZ 7/6/2015 - 9/30/2015

9001BA 7/6/2015 - 8/14/2015

9001BB 7/29/2015 - 8/14/2015

9200 8/15/2015 - 8/14/2016

9201AA 8/15/2015 - 3/19/2016

9201AB 8/15/2015 - 8/14/2016

9201AC 8/15/2015 - 9/30/2015

9201AD 8/15/2015 - 8/14/2016

9201AE 8/15/2015 - 8/14/2016

9201AF 8/15/2015 - 8/14/2016

9201AG 8/15/2015 - 8/14/2016

9201AH 8/15/2015 - 8/14/2016

9201AJ 8/15/2015 - 9/30/2015

9201AK 9/10/2015 - 8/14/2016

9201AL 9/8/2015 - 9/30/2015

9201AM 9/14/2015 - 8/14/2016

9201AN 9/14/2015 - 8/14/2016

9201AP 9/14/2015 - 8/14/2016

9201AQ 9/17/2015 - 3/19/2016

9201AR 8/15/2015 - 8/14/2016

9201AS 10/9/2015 - 8/14/2016

9201AT 10/16/2015 - 8/14/2016

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 73 of 149 FINAL

 

Page 77: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

9201AU 10/16/2015 - 8/14/2016

9201AV 10/16/2015 - 8/14/2016

9201AW 10/16/2015 - 8/14/2016

9201AX 10/23/2015 - 8/14/2016

9201AY 11/2/2015 - 8/14/2016

9201AZ 10/26/2015 - 8/14/2016

9201BA 11/18/2015 - 8/14/2016

9201BB 12/18/2015 - 8/14/2016

9201BC 1/15/2016 - 8/14/2016

9201BD 1/15/2016 - 8/14/2016

9201BE 1/15/2016 - 8/14/2016

9201BF 1/15/2016 - 8/14/2016

9201BG 2/2/2016 - 8/14/2016

9201BH 2/2/2016 - 8/14/2016

9201BJ 2/9/2016 - 8/14/2016

9201BK 2/8/2016 - 8/14/2016

9201BL 2/17/2016 - 8/14/2016

9201BM 3/1/2016 - 8/14/2016

9201BN 3/17/2016 - 8/14/2016

9201BP 3/17/2016 - 8/14/2016

9201BQ 4/5/2016 - 8/14/2016

9201BR 4/29/2016 - 8/14/2016

9201BS 5/3/2016 - 8/14/2016

9201BT 5/17/2016 - 8/14/2016

9201BU 5/20/2016 - 8/14/2016

9201BV 5/20/2016 - 8/14/2016

9201BW 5/23/2016 - 8/14/2016

9201BX 5/23/2016 - 8/14/2016

9201BY 6/15/2016 - 8/14/2016

9201BZ 6/29/2016 - 8/14/2016

9201ER 8/14/2015 - 8/15/2016

9300 8/15/2016 - 2/14/2017

9301AA 11/24/2015 - 8/14/2016

9301AB 12/1/2015 - 8/14/2016

9301AC 11/1/2015 - 8/14/2016

9301AD 8/15/2016 - 9/30/2016

9301AE 8/15/2016 - 2/14/2017

9301AF 8/15/2016 - 9/30/2016

9301AG 8/15/2016 - 10/31/2016

9301AH 8/15/2016 - 2/14/2017

9301AJ 8/15/2016 - 2/14/2017

9301AK 9/7/2016 - 12/31/2016

9301AL 9/7/2016 - 9/30/2016

The periods of performance for the following Option Items are as follows:

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 74 of 149 FINAL

 

Page 78: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

   

4100 8/15/2013 - 8/14/2014

4200 8/15/2014 - 8/14/2015

4300 8/15/2014 - 8/14/2015

6100 8/15/2013 - 8/14/2014

6200 8/15/2014 - 8/14/2015

6300 8/15/2014 - 8/14/2015

9100 8/15/2014 - 8/14/2015

HQ F-2-0003  DATA DELIVERY LANGUAGE FOR SERVICES ONLY PROCUREMENTS All data to be furnished under this contract shall be delivered prepaid to the destination(s) and at the time(s)specified on the Contract Data Requirements List(s), DD Form 1423.

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 75 of 149 FINAL

 

Page 79: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

SECTION G CONTRACT ADMINISTRATION DATA

All provisions and clauses in SECTION G of the basic contract apply to this TO, unless otherwise specified inthis TO. 

CLAUSES INCORPORATED BY REFERENCE:

252.232-7003 Electronic Submission of Payment Requests and Receiving Reports (MAR 2008)

252.201-7000 CONTRACTING OFFICER'S REPRESENTATIVE (DEC 1991)

252.204-7006 Billing Instructions (OCT 2005)

 

ACCOUNTING DATA

The award document will include Accounting Data at the end of Section G. All lines of accounting are listedsequentially under a heading that identifies the particular action (award or modification number) under which thefunding was obligated. Under SeaPort-e, all funding is identified / obligated at the Subline Item Number (SLIN)level. SLINs are established sequentially by the SeaPort-e software.

 

 

SECURITY ADMINISTRATION

The highest level of security required under this TO is SECRET as designated on DD Form 254 attached heretoand made a part hereof. The Commander, Defense Security Service, Director of Industrial Security, Southern Region,is designated Security Administrator for the purpose of administering all elements of military security hereunder.

HQ G-2-0002 CONTRACT ADMINISTRATION DATA

Enter below the address (street and number, city, county, state and zip code) of the Contractor's facility which willadminister the contract if such address is different from the address shown on the SF 26 or SF 33, as applicable.

________________________________________________________________________

________________________________________________________________________

HQ G-2-0003 CONTRACTING OFFICER’S REPRESENTATIVE

CONTRACTING OFFICER’S REPRESENTATIVE:  

Execution Operations Branch JXQWElectro-Optics Technology Division,300 Hwy. 361, Bldg. 3291Crane, IN 47522-5001Ph: 812-854-3503Email: @navy.mil  

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 76 of 149 FINAL

 

XXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXX

Page 80: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

The Contractor shall forward a copy of all invoices to the Contracting Officer's Representative.

HQ G-2-0004 PURCHASING OFFICE REPRESENTATIVE

PURCHASING OFFICE  REPRESENTATIVE:                                   

Contract Specialist Code 0231NSWC Crane300 HWY 361 BLG 3373Crane, IN 47552Ph: 812-854-5078Email: @navy.milHarnessing the Power of Technology for the Warfighter

The Contractor shall forward a copy of all invoices to the Purchasing Office Representative.

 

HQ G-2-0007 INVOICE INSTRUCTIONS (NAVSEA) (APR 2011)

(a) In accordance with the clause of this contract entitled “ELECTRONIC SUBMISSION OF PAYMENTREQUESTS” (DFARS 252.232-7003), the Naval Sea Systems Command (NAVSEA) will utilize the DoD WideArea Workflow Receipt and Acceptance (WAWF) system to accept supplies/services delivered under this contract. The web-based system located at https://wawf.eb.mil provides the technology for government contractors andauthorized Department of Defense (DoD) personnel to generate, capture and process receipt and payment-relateddocumentation in a paperless environment.  Invoices for supplies/services rendered under this contract shall besubmitted electronically through WAWF.  Submission of hard copy DD250/invoices may no longer be accepted forpayment.  

(b) It is recommended that the person in your company designated as the Central Contractor Registration (CCR)Electronic Business (EB) Point of Contact and anyone responsible for the submission of invoices, use the onlinetraining system for WAWF at https://wawftraining.eb.mil.  The Vendor, Group Administrator (GAM), and sectionsmarked with an asterisk in the training system should be reviewed.  Vendor documentation is available underResources at http://wawftraining.com. 

(c) The designated CCR EB point of contact is responsible for activating the company’s CAGE code on WAWF bycalling 1-866-618-5988.  Once the company is activated, the CCR EB point of contact will self-register under thecompany’s CAGE code on WAWF and follow the instructions for a group administrator.  After the company isset-up on WAWF, any additional persons responsible for submitting invoices must self-register under the company’sCAGE code at https://wawf.eb mil. 

(d)  The contractor shall use the following document types, DODAAC codes and inspection and acceptancelocations when submitting invoices in WAWF.

 

 

                Type of Document(s) (contracting officer check all that apply)

                 ___ Invoice (FFP Supply & Service)                ___ Invoice and Receiving Report Combo (FFP Supply)                   X  Cost Voucher (Cost Reimbursable, T&M, LH, or FPI)                ___ Receiving Report (FFP, DD250 Only)

                DODAAC Codes and Inspection & Acceptance Locations                (Contracting Officer complete appropriate information as applicable)

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 77 of 149 FINAL

 

XXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXX

Page 81: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

Issue DODAAC                                                   N00164Admin DODAAC                                                S101APay Office DODAAC                                          HQ0337             Inspector DODAAC                                            N/A  Service Acceptor DODAAC                                N00164Service Approver DODAAC                                N00164Ship To DODAAC                                               N/A DCAA Auditor DODAAC                                    N/A               LPO DODAAC                                                    N/AInspection Location                                               Destination                 Acceptance Location                                            Destination             

Attachments created in any Microsoft Office product may be attached to the WAWF invoice, e.g., backupdocumentation, timesheets, etc.  Maximum limit for size of each file is 2 megabytes.  Maximum limit for size offiles per invoice is 5 megabytes.   

(e) The Contractor agrees to segregate costs incurred under this task order at the lowest level of performance, eithertask or subtask, rather than on a total task order basis, and to submit invoices reflecting costs incurred at that level. Supporting documentation in WAWF for invoices shall include summaries of work charged during the periodcovered as well as overall cumulative summaries by individual labor categories, rates and hours (both straight timeand overtime) invoiced; as well as, a cost breakdown of ODCs (materials and travel), by line item task or subtask. Subcontractors are also required to provide labor categories, rates, and hours (both straight time and overtime)invoiced; as well as, a cost breakdown of ODCs, materials, and travel invoiced.  Supporting documentation may beencrypted before submission to the prime contractor for WAWF invoice submittal.  Subcontractors may emailencryption code information directly to the Contracting Officer and Contracting Officer Representative.  Should thesubcontractor lack encryption capability, the subcontractor may also email detailed supporting cost informationdirectly to the Contracting Officer and Contracting officer Representative; or other methods agreed to by theContracting Officer.   

(f) Before closing out of an invoice session in WAWF, but after submitting the document(s), you will be promptedto send additional email notifications.  Click on “Send More Email Notification” and add the acceptor/receiveremail addresses noted below in the first email address block, and add any other additional email addresses desired inthe following blocks.  This additional notification to the government is important to ensure that theacceptor/receiver is aware that the invoice documents have been submitted to WAWF.   

Send Additional Email Notification To:Contracting Officer Representative (COR)

Execution Operations Branch JXQWElectro-Optics Technology Division,300 Hwy. 361, Bldg. 3291Crane, IN 47522-5001Ph: 812-854-3503Email: @navy.mil  

  AND a copy to the PURCHASING OFFICE  REPRESENTATIVE:                                   

Contract Specialist Code 0231NSWC Crane300 HWY 361 BLG 3373Crane, IN 47552Ph: 812-854-5078

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 78 of 149 FINAL

 

XXXXXXXXXXX

XXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXX

Page 82: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

Email: @navy.milHarnessing the Power of Technology for the Warfighter

 

(g) The contractor shall submit invoices/cost vouchers for payment per contract terms and the government shallprocess invoices/cost vouchers for payment per contract terms.  Contractors approved by DCAA for direct billingwill submit cost vouchers directly to DFAS via WAWF.  Final voucher submission will be approved by the ACO.

(h) If you have any questions regarding WAWF, please contact the WAWF helpdesk at the above 1-866 number.

 

 

 

SPECIAL INVOICE INSTRUCTIONS- for informational SLINs

Each SLIN providing funding designates a specific project area/work area/Technical Instruction (TI)/WorkBreakdown Structure (WBS) item. Tracking and reporting shall be accomplished at the project/work area/TI/WBSitem level. Each indentified project/work area/TI/WBS shall be invoiced by its associated SLIN and ACRN asidentified on the TI.

SPECIAL INVOICE INSTRUCTIONS- for priced SLINs

Each SLIN that provides funding designates a specific project area/work area/Technical Instruction (TI)/WorkBreakdown Structure (WBS) item. Tracking and reporting shall be accomplished at the project/work area/TI/WBSitem level. Each identified project/work area/TI/WBS shall be invoiced by its associated SLINs and ACRNs asidentified in Sections B, F & G.

In accordance with (DFARS) PGI 204.7108 “Other”(d) (12) INVOICING AND PAYMENTINSTRUCTIONS FOR MULTIPLE ACCOUNTING CLASSIFICATION CITATIONS  the followingpayment instructions apply to this task order:

a) This requirement includes support for multiple programs with independent budgets and funding lines. Thesefunding lines are NOT interchangeable and it is critical that the Paying Office pay in accordance with the ACRNsand SLINs noted on the contractor's invoices. To do otherwise could result in a misappropriation of funds.

(b) The Payment Office shall ensure that each payment under this contract is made in accordance with the specificaccounting classification reference numbers (ACRNs) and SubCLIN (SLIN) numbers shown on each individualinvoice, including attached data.

CNIN-G-0001                      Invoicing Documentation for Cost Vouchers                                            (JULY 2015)       

Supporting cost voucher documentation in Wide Area Workflow (WAWF) shall be provided in contractor specifiedformat and shall include the following information.  This level of detail is required at both the job order (JO) or taskorder (TO) level and Technical Instruction (TI) level.  The supporting data should clearly reflect the JO/TO and TInumber for which it applies.  For other than firm fixed price subcontracts, subcontractors are also required to providethe same level of supporting detail as the prime contractor.  Supporting documentation may be encrypted beforesubmission to the prime contractor for WAWF cost voucher submittal.  Subcontractors may email encryption codeinformation directly to the Contracting Officer (CO) and Contracting Officer Representative (COR) as required. Failure to comply may result in an unfavorable CPARS rating in the area of regulation compliance. 

Cost Elements

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 79 of 149 FINAL

 

XXXXXXXXXXXXXXXXXXXXXXX

Page 83: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

Direct Labor Total direct labor costs billed for current billing period and cumulative. This includessub-contractor direct labor.   If there are different labor pools, they should be includedseparately (e.g., on-site, off-site, prime, subK, etc). 

Other Direct Costs Total ODC costs billed for current billing period and cumulativeIndirect Costs Total indirect costs billed for current billing period and cumulative.  If there are

different indirect pools, they should be included separately (e.g., Fringe, OH, G&A,etc.).  The indirect pool percentage shall be included.

Fee Total fee billed for current billing period and cumulative.Invoice Subtotal Sub-total costs billed for current billing period and cumulative.Adjustments Any adjustments to billed costs for current billing period and cumulative.Invoice Total Total costs billed for current billing period and cumulative.

Labor Detail (Prime and Subcontractor)

Employee nameLabor categoryDirect labor rate by employeeLoaded labor rate by employeeCurrent period hours (OT hours identified separately)Current period direct labor costsCumulative hours (OT hours identified separately)Cumulative direct labor costs

Non-Labor Detail – detail provided for current billing period only

Travel Destination, dates, traveler name, total trip costs (includes subK travel)Material* Detailed description of item and total item costs (includes subK material)ODCs* Covers items that are not material or travel (e.g., training, conference costs, etc).  Detailed

description of item and total item costs (includes subK ODC)*Copies of invoices and/or receipts for Material/ODC purchases shall be included.

CLIN/SLIN Detail – Information should be a cumulative total invoiced against each CLIN/SLIN

CLIN/SLIN SLIN being billedACRN ACRN being billedTO/TI TO and/or TI numberAmount Funded Amount funded on each SLINCurrent Amount billed in current billing periodCumulative Cumulative amount billed against SLINBalance Remaining balance on SLIN

PAYMENT INSTRUCTIONS (PGI 204.7108(d)(1)

252.204-0001 Line Item Specific: Single Funding. (SEP 2009)The payment office shall make payment using the ACRN funding of the line item being billed. 

CONTRACTOR PERFORMANCE ASSESSMENT RATING SYSTEM (CPARS) (JAN 2001)

(a) Pursuant to FAR 42.1502, this task order is subject to DoD's Contractor Performance Assessment RatingSystem (CPARS). CPARS is an automated centralized information system accessible via the Internet that maintainsreports of contractor performance for each contract/task order. CPARS is located at http://www.cpars.navy.mil/.Further information on CPARS is available at that web-site.

(b) Under CPARS, the Government will conduct annual evaluations of the contractor's performance. The contractorhas thirty (30) days after the Government's evaluation is completed to comment on the evaluation. The opportunityto review and comment is limited to this time period and will not be extended. Failure to review the report at thistime will not prevent the Government from using the report.

(c) The contractor may request a meeting to discuss the CPAR. The meeting is to be requested via e-mail to the

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 80 of 149 FINAL

 

Page 84: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

CPARS Program Manager no later than seven days following receipt of the CPAR. A meeting will then be heldduring the contractor’s 30-day review period.

(d) The CPARS system requires the Government to assign the contractor a User ID and password in order to viewand comment on the evaluation. Provide the name(s) of at least one individual (not more than three) that will beassigned as your Defense Contractor Representative for CPARS. Name, Phone, E-mail Addres.

GOVERNMENT CONTRACT ADMINISTRATION POINTS-OF-CONTACT AND RESPONSIBILITIES

Procuring Contracting Officer (PCO):

(a) 

Contrac ng OfficerExpedi onary Sensors Contrac ng BranchCrane Division, Naval Surface Warfare Center (NSWC Crane)Building 3373, 300 Highway 361Crane, IN 47522-5001Phone: (812) 854-6102Email: @navy.mil

(b) PCO responsibilities are outlined in FAR 1.602-2. The PCO is the only person authorized to approve changesin any of the requirements of this TO, notwithstanding provisions contained elsewhere in this contract, the saidauthority remains solely the PCO’s. The contractor shall not comply with any order, direction or request ofGovernment personnel unless it is issued in writing and signed by the Contracting Officer or is pursuant to specificauthority otherwise included as part of this contract. In the event the contractor effects any change at the direction ofany person other than the PCO, the change will be considered to be unauthorized.

Contract Specialist:

(a) 

Contract Specialist Code 0231NSWC Crane300 HWY 361 BLG 3373Crane, IN 47552Ph: 812-854-5078Email: @navy.milHarnessing the Power of Technology for the Warfighter

(b) The Contract Specialist is the representative of the Contracting Officer for all contractual matters.

Contracting Officers Representative (COR):

(a)  

Branch JXQWElectro-Optics Technology Division,300 Hwy. 361, Bldg. 3291Crane, IN 47522-5001Ph: 812-854-3503Email: @navy.mil  

(b) The COR is the PCO’s appointed representative for technical matters. The COR is not a contracting officer anddoes not have the authority to direct the accomplishment of effort which is beyond the scope of the TO or to

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 81 of 149 FINAL

 

XXXXXXXXXX

XXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXX

Page 85: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

otherwise change any TO requirements. A copy of the COR appointment letter which provides a delineation of CORauthority and responsibilities is provided at contract award.

CONSENT TO SUBCONTRACT

For subcontracts and consulting agreements for services, where the prime contractor anticipates that hours deliveredwill be counted against the hours in the proposed Level of Effort, Consent to Subcontract authority is retained by theProcuring Contracting Officer.

The following subcontractors are approved on this TO:

            Black Bird Group, llc            CACI Technologies Inc            Raydar and Associates                Sabre Systems, Inc                SCIENCE APPLICATIONS INTERNATIONAL CORP            Valkyrie Enterprises LLC            AD&G Welding                Gary's Welding and Machine                

Accounting Data

SLINID PR Number Amount -------- -------------------------------------------------- ---------------------400001 1300374398  LLA : A1 97X4930 NH1J 251 77777 0 050120 2F 000000 A00001878030 TI 0006 LABOR Note: 10 U.S.C. 2410a Authority does NOT apply. Funds expire 30 September 2013, or through the end date of the period of performance for CLIN 4000, whichever occurs first. Contractor may continue to invoice after this date, but only for work performed up through and including 30 September 2013.   BASE Funding  Cumulative Funding   MOD 01  400002 1300379731  LLA : A2 9730100 56SF SC3 52SP FLMRAP 0 10000 57815 017417 667100 F67100  Standard Number: F2VUF03067G001 Funding in support of TI-11. Note: 10 U.S.C. 2410a Authority is applicable. Contractor may incur costs for work performed against this SLIN for 365 days from effective date of above modification, or through the end date of the period of performance for CLIN 4000, whichever occurs first. Contractor may continue to invoice after the ending date, but only for work performed during the applicable period.  400003 1300378938  LLA : A3 97X4930 NH1J 251 77777 0 050120 2F 000000 A00001913566 Standard Number: N0002413WX07682 Funding in support of TI-9. Note: 10 U.S.C. 2410a Authority does NOT apply. Funds expire 30 September 2015, or through the end date of the period of performance for CLIN 4000, whichever occurs first. Contractor may continue to invoice after this date, but only for work performed up through and including 30 September 2015, or up through and including the last day of the period of performance for CLIN 4000.  400004 1300374806  LLA : 

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 82 of 149 FINAL

 

XXXXX

XXXXXXXXXX

XXXXX

XXXXX

XXXXX

Page 86: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

A4 97X4930 NH1J 251 77777 0 050120 2F 000000 A00001880281 Standard Number: HSCG7913XPC8005 Funding in support of TI-8. Note: 10 U.S.C. 2410a Authority does NOT apply. Contractor may incur costs for work performed against this SLIN for 12 months from effective date of above modification, or through the end date of the period of performance for CLIN 4000, whichever occurs first. Contractor may continue to invoice after the ending date, but only for work performed during the applicable period.  400005 1300379095  LLA : A5 9730100 56SA 0 5 0 501 7 01217 4K L000 3 1ED 58GBMD M IPR3EDAVGB015 GBMD58 031007  Standard Number: MIPR3EDAVGB015 Funding in support of TI-6. Note: 10 U.S.C. 2410a Authority is applicable. Contractor may incur costs for work performed against this SLIN for 365 days from effective date of above modification, or through the end date of the period of performance for CLIN 4000, whichever occurs first. Contractor may continue to invoice after the ending date, but only for work performed during the applicable period.  400006 1300378439  LLA : A6 97X4930 NH1J 251 77777 0 050120 2F 000000 A00001909643 Standard Number: HSCG7913XPBN012 Funding in support of TI-3. Note: 10 U.S.C. 2410a Authority does NOT apply. Contractor may incur costs for work performed against this SLIN for 12 months from effective date of above modification, or through the end date of the period of performance for CLIN 4000, whichever occurs first. Contractor may continue to invoice after the ending date, but only for work performed during the applicable period.  400007 1300378893  LLA : A7 97X4930 NH1J 251 77777 0 050120 2F 000000 A00001912547 Standard Number: N0016413SD03001 Funding in support of TI-2. Note: 10 U.S.C. 2410a Authority does NOT apply. Contractor may incur costs for work performed against this SLIN through the end date of the period of performance for CLIN 4000. Contractor may continue to invoice after the ending date, but only for work performed during the period of performance for CLIN 4000.  400008 1300378385  LLA : A8 1731804 70CC 260 57046 C 068688 2D XNWW02 57046335129T Standard Number: R5704613WXNWW02 Funding in support of TI-4. Note: 10 U.S.C. 2410a Authority is applicable. Contractor may incur costs for work performed against this SLIN for 365 days from effective date of above modification, or through the end date of the period of performance for CLIN 4000, whichever occurs first. Contractor may continue to invoice after the ending date, but only for work performed during the applicable period.  400009 1300379028  LLA : A9 1731804 8D3D 251 V0000 0 050120 2D 000000 A00001913337 Standard Number: N0002413WX07783 Funding in support of TI-4. Note: 10 U.S.C. 2410a Authority is applicable. Contractor may incur costs for work performed against this SLIN for 365 days from effective date of above modification, or through the end date of the period of performance for CLIN 4000, whichever occurs first. Contractor may continue to invoice after the ending date, but only for work performed during the applicable period.  400010 1300378895  LLA : B1 97X4930 NH1J 251 77777 0 050120 2F 000000 A00001912549 Standard Number: N0002412WX02633 Funding in support of TI-1. Note: 10 U.S.C. 2410a Authority is applicable. Contractor may incur costs for work performed against this SLIN for 365 days from effective date of above modification, or through the end date of the period of performance for CLIN 4000, whichever occurs first. Contractor may continue to invoice after the ending date, but only for work performed during the applicable 

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 83 of 149 FINAL

 

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXXX

Page 87: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

period.  600001 1300378893  LLA : A7 97X4930 NH1J 251 77777 0 050120 2F 000000 A00001912547 Standard Number: N0016413SD03001 Funding in support of TI-2. Note: 10 U.S.C. 2410a Authority does NOT apply. Contractor may incur costs for work performed against this SLIN through the end date of the period of performance for CLIN 6000. Contractor may continue to invoice after the ending date, but only for work performed during the period of performance for CLIN 6000.   MOD 01 Funding  Cumulative Funding   MOD 02  400011 1300378386  LLA : B2 1731804 3D2D 251 00030 0 050120 2D 000000 A00001908976 Standard Number: N0003013WX00321 Funding in support of TI-004. Note: 10 U.S.C. 2410a Authority is applicable. Contractor may incur costs for work performed against this SLIN for 365 days from effective date of above modification, or through the end date of the period of performance for CLIN 4000, whichever occurs first. Contractor may continue to invoice after the ending date, but only for work performed during the applicable period.  400012 1300382152  LLA : B3 97X4930 NH1J 251 77777 0 050120 2F 000000 A00001951521 Standard Number: N0010413WX01114 (AA) Funding in support of TI-007. Note: 10 U.S.C. 2410a Authority does NOT apply. Funds expire by the end date of the period of performance for CLIN 4000, Contractor may continue to invoice after this date, but only for work performed up through and including the end date of the period of performance for CLIN 4000.  400013 1300382050  LLA : B4 97X4930 NH1J 251 77777 0 050120 2F 000000 A10001951441 Standard Number: N0010413WX01114 (AA) Funding in support of TI-007. Note: 10 U.S.C. 2410a Authority does NOT apply. Funds expire by the end date of the period of performance for CLIN 4000, Contractor may continue to invoice after this date, but only for work performed up through and including the end date of the period of performance for CLIN 4000.  400014 1300378570  LLA : B5 97X4930 NH1J 251 77777 0 050120 2F 000000 A00001910491 Standard Number: MIPR10288462 Funding in support of TI-010. Note: 10 U.S.C. 2410a Authority is applicable. Contractor may incur costs for work performed against this SLIN up through 31 December 2013, or through the end date of the period of performance for CLIN 4000, whichever occurs first. Contractor may continue to invoice after the ending date, but only for work performed during the applicable period.   MOD 02 Funding  Cumulative Funding   MOD 03  400015 1300365403  LLA : B6 1731319 W3DT 251 RAD5D 0 050120 2D 000000 A00001821792 Funding in support of TI-05. Note: 10 U.S.C. 2410a Authority does NOT apply. Funds expire 30 September 2014, or through the end date of the period of performance for CLIN 4000, whichever occurs first. Contractor may continue to invoice after this date, but only for work performed up through and including 30 September 2014, or up through and including the last day of the period of performance for CLIN 4000. 

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 84 of 149 FINAL

 

XXXXX

XXXXXXXXXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXXXXXXXXX

XXXXX

Page 88: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

 400016 1300381050  LLA : B7 1721810 81LT 251 VU021 0 050120 2D 000000 A00001945129 Standard Number: N0002413WX08634 Funding in support of TI-05. Note: 10 U.S.C. 2410a Authority does NOT apply. Funds expire 30 September 2014, or through the end date of the period of performance for CLIN 4000, whichever occurs first. Contractor may continue to invoice after this date, but only for work performed up through and including 30 September 2014, or up through and including the last day of the period of performance for CLIN 4000.   MOD 03 Funding  Cumulative Funding   MOD 04  400015 130036540300001 (  LLA : B6 1731319 W3DT 251 RAD5D 0 050120 2D 000000 A00001821792 Funding in support of TI-05. Note: 10 U.S.C. 2410a Authority does NOT apply. Funds expire 30 September 2014, or through the end date of the period of performance for CLIN 4000, whichever occurs first. Contractor may continue to invoice after this date, but only for work performed up through and including 30 September 2014, or up through and including the last day of the period of performance for CLIN 4000.  400016 130038105000001 (  LLA : B7 1721810 81LT 251 VU021 0 050120 2D 000000 A00001945129 Standard Number: N0002413WX08634 Funding in support of TI-05. Note: 10 U.S.C. 2410a Authority does NOT apply. Funds expire 30 September 2014, or through the end date of the period of performance for CLIN 4000, whichever occurs first. Contractor may continue to invoice after this date, but only for work performed up through and including 30 September 2014, or up through and including the last day of the period of performance for CLIN 4000.  400017 130039129900001  LLA : B8 1741804 8D3D 251 V0000 0 050120 2D 000000 A00002033814 Standard Number: N0002414WX00738 Funding in support of TI-07. Contractor may NOT perform against this SLIN after 30 SEP 2014. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  400018 130038994000001  LLA : B9 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002023621 Standard Number: N0001914WX01505 Funding in support of TI-10. Contractor may NOT perform against this SLIN after 30 September 2016. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  400019 130038816600001  LLA : C1 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002009212 Standard Number: N0010413WX01114 Funding in support of TI-07. Contractor may NOT perform against this SLIN after 30 SEP 2014. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  400020 130038844800002  LLA : C2 9740100 74D7 252 00074 0 068688 2D CCW002 000744DSG03Q Standard Number: N0007414RCCW002 Funding in support of TI-07. Contractor may NOT perform against this SLIN after 30 SEP 2014. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  600002 130039038600001  

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 85 of 149 FINAL

 

XXXXX

XXXXXXXXXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

Page 89: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

LLA : C3 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002026217 Standard Number: N0002413WX07682 Funding in support of TI-09. Contractor may NOT perform against this SLIN after 30 SEP 2015. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.   MOD 04 Funding  Cumulative Funding   MOD 05  400021 130039450000001  LLA : C4 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002056766 Standard Number: N0016413SD03001 Funding in support of TI-02. Contractor may NOT perform against this SLIN after 14 AUG 2014. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  400022 130039463100001  LLA : C5 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002056769 Standard Number: HSCG79-14-X-PC8000 Funding in support of TI-03. Contractor may NOT perform against this SLIN after 14 AUG 2014. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  400023 130039463500001  LLA : C6 1741804 60CC 257 4582A H 060951 2D X0019C 40273435AUAD Standard Number: N4027314WX0019C Funding in support of TI-07. Contractor may NOT perform against this SLIN after 14 AUG 2014. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  400024 130039456900001  LLA : C7 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002057269 Standard Number: MIPR3HDAV3A165 Funding in support of TI-07. Contractor may NOT perform against this SLIN after 14 AUG 2014. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  400025 130039463600001  LLA : C8 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002056965 Standard Number: N0002413WX00497 Funding in support of TI-07. Contractor may NOT perform against this SLIN after 31 DEC 2013. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  400026 130039463700001  LLA : C9 9740100 56SF SC4 52SQ 3GQVOH 010000 7 565Z 0 17417 667100 F2VUF03326G006 F67100  Standard Number: F2VUF03326G006 (AB) Funding in support of TI-07. Contractor may NOT perform against this SLIN after 15 JAN 2014. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  600003 130039575700001  LLA : D1 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002064535 Standard Number: N0001413WX21334 Funding in support of TI-05. Contractor may NOT perform against this SLIN after 31 MAR 2014. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.   MOD 05 Funding  Cumulative Funding  

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 86 of 149 FINAL

 

XXXXXXXXXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXXXXXXXXXX

Page 90: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

 MOD 06  400027 130039559200001  LLA : D2 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002063596 Standard Number: HSCG7914XPC8000 Funding in support of TI-08. Contractor may NOT perform against this SLIN after 14 AUG 2014. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.   MOD 06 Funding  Cumulative Funding   MOD 07  400028 130039463300001  LLA : D3 1741804 8D3D 251 V0000 0 050120 2D 000000 A00002056961 Standard Number: N0002414WX01906 Funding in support of TI-04. Contractor may NOT perform against this SLIN after 14 AUG 2014. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  600004 130039906600001  LLA : D4 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002088555 Standard Number: N0001413WX21334 Funding in support of TI-05. Contractor may NOT perform against this SLIN after 31 MAR 2014. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.   MOD 07 Funding  Cumulative Funding   MOD 08  400029 130040075100001  LLA : D5 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002101986 Standard Number: N0001914WX01505 Funding in support of TI-10. Contractor may NOT perform against this SLIN after 14 AUG 2014. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  400030 130040697200001  LLA : D7 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002154187 Standard Number: HSCG79-14-X-PC8000 Funding in support of TI-03. Contractor may NOT perform against this SLIN after 14 AUG 2014. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  600005 130040450900001  LLA : D6 1721810 81LT 251 VU021 0 050120 2D 000000 A00002137434 Standard Number: N0002413WX08634 Funding in support of TI-05. Contractor may NOT perform against this SLIN after 14 AUG 2014. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  600006 130040450700001  LLA : D8 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002137220 Standard Number: N0002414WX02491 Funding in support of TI-01. Contractor may NOT perform against this SLIN after 14 AUG 2014. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.   

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 87 of 149 FINAL

 

XXXXX

XXXXXXXXXXXX

XXXXX

XXXXX

XXXXXXXXXXXX

XXXXX

XXXXX

XXXXX

XXXXX

Page 91: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

MOD 08 Funding  Cumulative Funding   MOD 09  400031 130041107400001  LLA : D9 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002186084 Standard Number: N0002414WX01490 Funding in support of TI-03. Contractor may NOT perform against this SLIN after 14 AUG 2014. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  400032 130040493200001  LLA : E1 1741810 87X7 251 V0000 0 050120 2D 000000 A00002139478 Standard Number: N0002414WX03667 Funding in support of TI-09. Contractor may NOT perform against this SLIN after 14 AUG 2014. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  400033 130040855100001  LLA : E4 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002168005 Standard Number: N0002414WX00908 Funding in support of TI-01. Contractor may NOT perform against this SLIN after 14 AUG 2014. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  400034 130041183800001  LLA : E2 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002191177 Standard Number: N0016414SD04001 Funding in support of TI-02. Contractor may NOT perform against this SLIN after 14 AUG 2014. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  400035 130041111800001  LLA : E3 9740100 56SF SC4 52SPF L MRAP01 00 005781 501741766710 0F2VUF03309G002 F67100 ESP:  ST FSR: 023979 PSR: I01921 DSR: 232295 Standard Number: F2VUF03309G002 (AA) Funding in support of TI-11. Contractor may NOT perform against this SLIN after 14 AUG 2014. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  600007 130041183200001  LLA : E5 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002190999 Standard Number: N0002413WX08634 Funding in support of TI-05. Contractor may NOT perform against this SLIN after 14 AUG 2014. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.   MOD 09 Funding  Cumulative Funding   MOD 10 Funding  Cumulative Funding   MOD 11  400036 130041426300001  LLA : E6 1741804 8D3D 251 V0000 0 050120 2D 000000 A00002207194 Standard Number: N0002414WX01906 Funding in support of TI-4. Contractor may NOT perform against this SLIN after 14 AUG 2014. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  400037 130041731800001  

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 88 of 149 FINAL

 

XXXXXXXXXXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXXXXXXXXXX

XXXXXXXXX

XXXXX

XXXXX

Page 92: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

LLA : E7 97X4930 NH1J 252 77777 0 050120 2F 000000 A00002233067 Standard Number: N0002412WX06465 Funding in support of TI-09. Contractor may NOT perform against this SLIN after 14 AUG 2014. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  400038 130041731900001  LLA : E8 97X4930 NH1J 252 77777 0 050120 2F 000000 A00002233070 Standard Number: N0002414WX02137 Funding in support of TI-09. Contractor may NOT perform against this SLIN after 14 AUG 2014. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.   MOD 11 Funding  Cumulative Funding   MOD 12  400039 130042298400001  LLA : E9 97X4930 NH1J 252 77777 0 050120 2F 000000 A00002275939 Standard Number: N0002414WX05795 Funding in support of TI-05. Contractor may NOT perform against this SLIN after 14 AUG 2014. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  600008 130042298400002  LLA : E9 97X4930 NH1J 252 77777 0 050120 2F 000000 A00002275939 Standard Number: N0002414WX05795 Funding in support of TI-05. Contractor may NOT perform against this SLIN after 14 AUG 2014. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.   MOD 12 Funding  Cumulative Funding   MOD 13  400040 130043113200001  

 F1 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002328971 Funding in support of TI-01. Contractor may NOT perform against this SLIN after 14 AUG 2014. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  400041 130043022100001  LLA : F2 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002323745 Funding in support of TI-12. Contractor may NOT perform against this SLIN after 14 AUG 2014. Contractor may continue to invoice after this date, but only for workperformed through and including the aforementioned date.  400042 130042961000001  LLA : F3 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002320941 Funding in support of TI-08. Contractor may NOT perform against this SLIN after 14 AUG 2014. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  400043 130042656500001  LLA : F4 9740100 56SA 0 5 0 501 7 01217 4K L000 3 1CA 58GBMD M IPR4DDAVGB021 GBMD58 031007  Standard Number: MIPR4DDAVGB021(AA) Funding in support of TI-06. Contractor may NOT perform against this SLIN after 14 AUG 2014. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 89 of 149 FINAL

 

XXXXX

XXXXXXXXXXXX

XXXXX

XXXXX

XXXXXXXXXXXX

XXXXX

XXXXX

XXXXX

XXXXXXXXXX

Page 93: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

600009 130043010000001  LLA : F5 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002323744 Funding in support of TI-12. Contractor may NOT perform against this SLIN after 14 AUG 2014. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.   MOD 13 Funding  Cumulative Funding   MOD 14  400044 130043342700001  LLA : F6 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002348049 Standard Number: Noo16414SD04001 (AA) Funding in support of TI-02. Contractor may NOT perform against this SLIN after 14 AUG 2014. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  400045 130042971400001  LLA : F7 5733010 113 47WT 10400N 4 G9731 80118 27230F 503000FF4FDBV411G008 F03000  Standard Number: F4FDBV4114G008 (AA) Funding in support of TI-13. Contractor may NOT perform against this SLIN after 14 AUG 2014. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  600010 130042971400002  LLA : F7 5733010 113 47WT 10400N 4 G9731 80118 27230F 503000FF4FDBV411G008 F03000  Standard Number: F4FDBV4114G008 (AA) Funding in support of TI-13. Contractor may NOT perform against this SLIN after 14 AUG 2014. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.   MOD 14 Funding  Cumulative Funding   MOD 15  400031 130041107400001 (  LLA : D9 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002186084 Standard Number: N0002414WX01490 Funding in support of TI-03. Contractor may NOT perform against this SLIN after 14 AUG 2014. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  400037 130041731800001  LLA : E7 97X4930 NH1J 252 77777 0 050120 2F 000000 A00002233067 Standard Number: N0002412WX06465 Funding in support of TI-09. Contractor may NOT perform against this SLIN after 14 AUG 2014. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  400038 130041731900001 (  LLA : E8 97X4930 NH1J 252 77777 0 050120 2F 000000 A00002233070 Standard Number: N0002414WX02137 Funding in support of TI-09. Contractor may NOT perform against this SLIN after 14 AUG 2014. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  400041 130043022100001 (  LLA : F2 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002323745 Funding in support of TI-12. Contractor may NOT perform against this SLIN after 14 AUG 2014. Contractor may continue to invoice after this date, but only for 

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 90 of 149 FINAL

 

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXXX

XXXXXX

XXXXXX

XXXXXXXXXXXXX

XXXXXXX

XXXXXXX

Page 94: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

workperformed through and including the aforementioned date.  400045 130042971400001 (  LLA : F7 5733010 113 47WT 10400N 4 G9731 80118 27230F 503000FF4FDBV411G008 F03000  Standard Number: F4FDBV4114G008 (AA) Funding in support of TI-13. Contractor may NOT perform against this SLIN after 14 AUG 2014. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7001AA 130044476900001  LLA : F8 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002426320 Standard Number: N0002414WX01906 Funding in support of TI-04. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7001AB 130044362900001  LLA : F9 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002419950 Standard Number: N0002414WX00908 Funding in support of TI-01. 10 USC 2410(a) Authority is hereby invoked. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7001AC 130044415600001  LLA : F4 9740100 56SA 0 5 0 501 7 01217 4K L000 3 1CA 58GBMD M IPR4DDAVGB021 GBMD58 031007  Standard Number: MIPR4DDAVGB021(AA) Funding in support of TI-06. 10 USC 2410(a) Authority is hereby invoked. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7001AD 130044415900001  LLA : E3 9740100 56SF SC4 52SPF L MRAP01 00 005781 501741766710 0F2VUF03309G002 F67100 ESP:  ST FSR: 023979 PSR: I01921 DSR: 232295 Standard Number: F2VUF03309G002 (AA) Funding in support of TI-11. 10 USC 2410(a) Authority is hereby invoked. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7001AE 130044601700001  LLA : G1 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002434975 Standard Number: HSCG79-14-X-PC8000 Funding in support of TI-03. 10 USC 2410(a) Authority is hereby invoked. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7001AF 130044439500001  LLA : C6 1741804 60CC 257 4582A H 060951 2D X0019C 40273435AUAD Standard Number: N4027314WX0019C Funding in support of TI-07. 10 USC 2410(a) Authority is hereby invoked. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7001AG 130044024800001  LLA : G2 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002396754 Standard Number: N0001414WX01082 Funding in support of TI-05. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 91 of 149 FINAL

 

XXXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

Page 95: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

7001AH 130044121100001  LLA : G3 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002402138 Standard Number: N0001914WX01289 Funding in support of TI-08. 10 USC 2410(a) Authority is hereby invoked. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7001AJ 130043794200001  LLA : G4 1741810 87X7 251 V0000 0 050120 2D 000000 A00002380426 Standard Number: N0002414WX05740 Funding in support of TI-09. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7001AK 130044476700001  LLA : G5 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002426315 Standard Number: HSCGFT-14-X-PBN007 Funding in support of TI-12. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7001AL 130044218900001  LLA : G6 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002410651 Standard Number: N0001914WX05788 (AA) Funding in support of TI-10. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7001AM 130044701900001  LLA : G7 5743010 114 47WT 19REPR 4 G952E 81402 25219F 503000F4FDAG4195G003 F03000  Standard Number: F4FDAG4195G003 Funding in support of TI-13. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7001AN 130044683100001  LLA : G8 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002439895 Standard Number: N0002414WX01490 Funding in support of TI-14. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7001AP 130044729300001  LLA : G9 97X4930 NH1J 253 77777 0 050120 2F 000000 A00002442741 Standard Number: N0016414SD04001 Funding in support of TI-02. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7001AQ 130044620600001  LLA : H2 97X4930 NH1J 253 77777 0 050120 2F 000000 A00002436667 Standard Number: F2VUF03283G004 Funding in support of TI-07. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9001AA 130044415900002  LLA : E3 9740100 56SF SC4 52SPF L MRAP01 00 005781 501741766710 0F2VUF03309G002 F67100 ESP:  ST FSR: 023979 PSR: I01921 DSR: 232295 Standard Number: F2VUF03309G002 (AA) Funding in support of TI-11. 10 USC 2410(a) Authority is hereby invoked. Contractor may NOT perform against this SLIN after POP date identified in Section 

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 92 of 149 FINAL

 

XXXXX

XXXXX

XXXXX

XXXXX

XXXXXX

XXXXX

XXXXX

XXXXX

XXXXX

Page 96: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9001AB 130044476700002  LLA : G5 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002426315 Standard Number: HSCGFT-14-X-PBN007 Funding in support of TI-12. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9001AC 130044701900002  LLA : G7 5743010 114 47WT 19REPR 4 G952E 81402 25219F 503000F4FDAG4195G003 F03000  Standard Number: F4FDAG4195G003 Funding in support of TI-13. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9001AD 130044024800002  LLA : G2 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002396754 Standard Number: N0001414WX01082 Funding in support of TI-05. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.   MOD 15 Funding  Cumulative Funding   MOD 16  400016 130038105000001  LLA : B7 1721810 81LT 251 VU021 0 050120 2D 000000 A00001945129 Standard Number: N0002413WX08634 Funding in support of TI-05. Note: 10 U.S.C. 2410a Authority does NOT apply. Funds expire 30 September 2014, or through the end date of the period of performance for CLIN 4000, whichever occurs first. Contractor may continue to invoice after this date, but only for work performed up through and including 30 September 2014, or up through and including the last day of the period of performance for CLIN 4000.  400036 130041426300001 (  LLA : E6 1741804 8D3D 251 V0000 0 050120 2D 000000 A00002207194 Standard Number: N0002414WX01906 Funding in support of TI-4. Contractor may NOT perform against this SLIN after 14 AUG 2014. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  400039 130042298400001 (  LLA : E9 97X4930 NH1J 252 77777 0 050120 2F 000000 A00002275939 Standard Number: N0002414WX05795 Funding in support of TI-05. Contractor may NOT perform against this SLIN after 14 AUG 2014. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  600008 130042298400002 (  LLA : E9 97X4930 NH1J 252 77777 0 050120 2F 000000 A00002275939 Standard Number: N0002414WX05795 Funding in support of TI-05. Contractor may NOT perform against this SLIN after 14 AUG 2014. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7001AR 130045045900001  LLA : H3 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002465891 Standard Number: N0002414WX01906 (AA) 

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 93 of 149 FINAL

 

XXXXX

XXXXX

XXXXX

XXXXXX

XXXXXX

XXXXX

XXXXX

XXXXXXXXXXXXX

XXXXXXX

Page 97: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

2410(a) funds expire for this SLIN 365 days from effective date of above modification, or through 8/14/2015, whichever occurs first. Contractor may continue to invoice after this date, but only for work performed during the applicable period.   MOD 16 Funding  Cumulative Funding   MOD 17  7001AS 130044617900001  LLA : H4 9740100 56SF SC4 52SQ M5QSOH 0 10000 7565Z 017417 667100F2VUF04070G001 F67100  Standard Number: F2VUF04070G001 Funding in support of TI-07. 10 USC 2410(a) Authority is hereby invoked. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7001AT 130044653400001  LLA : H5 1741804 8D3D 251 V0000 0 050120 2D 000000 A00002437969 Funding in support of TI-07. 10 USC 2410(a) Authority is hereby invoked. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.   MOD 17 Funding  Cumulative Funding   MOD 18  7001AU 130045453800001  LLA : H6 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002506850 Standard Number: HSCGFT-14-X-PBN007 Funding in support of TI-03. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7001AV 130045499700001  LLA : H7 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002511401 Standard Number: HSCG7914XPC8134 Funding in support of TI-12. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7001AW 130045514100001  LLA : H8 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002511914 Standard Number: MIPR4KDAV14E12 Funding in support of TI-13. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7001AX 130045401800001  LLA : H9 1741804 8B5B 251 VU021 0 050120 2D 000000 A00002502914 Standard Number: N0002414WX01490 (AA) Funding in support of TI-14. 10 USC 2410(a) Authority is hereby invoked. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9001AE 130045401800002  LLA : H9 1741804 8B5B 251 VU021 0 050120 2D 000000 A00002502914 Standard Number: N0002414WX01490 (AA) Funding in support of TI-14. 10 USC 2410(a) Authority is hereby invoked. 

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 94 of 149 FINAL

 

XXXXX

XXXXX

XXXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXXXXXXXXXX

XXXXXXX

Page 98: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.   MOD 18 Funding  Cumulative Funding   MOD 19  7001AF 130044439500002  LLA : C6 1741804 60CC 257 4582A H 060951 2D X0019C 40273435AUAD Standard Number: N4027314WX0019C Funding in support of TI-07. 10 USC 2410(a) Authority is hereby invoked. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7001AZ 130045472800001  LLA : J1 1721810 84RA 251 V4X00 0 050120 2D 000000 A00002508766 Standard Number: N0002413WX01858 Funding in support of TI-01. 10 USC 2410(a) Authority is hereby invoked. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7001BA 130042971400004  LLA : F7 5733010 113 47WT 10400N 4 G9731 80118 27230F 503000FF4FDBV411G008 F03000  Standard Number: F4FDBV4114G008 (AA) Funding in support of TI-13. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.   MOD 19 Funding  Cumulative Funding   MOD 20  7001BB 130045806800001  LLA : J2 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002546717 Standard Number: N0016415PR00026 Funding in support of TI-10. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7001BC 130046191200001  LLA : J3 1751804 8D4D 251 WS030 0 050120 2D 000000 A00002589503 Standard Number: N0002415PR00714 Funding in support of TI-01. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7001BD 130046053200001  LLA : J4 97X4930 NH1J 253 77777 0 050120 2F 000000 A00002575165 Standard Number: MIPR4DDAV14E02 Funding in support of TI-08. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9001AF 130046191200002  LLA : J3 1751804 8D4D 251 WS030 0 050120 2D 000000 A00002589503 Standard Number: N0002415PR00714 Funding in support of TI-01. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this 

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 95 of 149 FINAL

 

XXXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXXXX

XXXXXXX

Page 99: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

date, but only for work performed through and including the aforementioned date.   MOD 20 Funding  Cumulative Funding   MOD 21  7001BE 130046181900001  LLA : J5 1741810 81LT 251 VU021 0 050120 2D 000000 A00002589532 Standard Number: N0002414WX05795 Funding in support of TI-15. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9001AG 130046181900002  LLA : J5 1741810 81LT 251 VU021 0 050120 2D 000000 A00002589532 Standard Number: N0002414WX05795 Funding in support of TI-15. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.   MOD 21 Funding  Cumulative Funding   MOD 22  7001BF 130046402000001  LLA : J6 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002609788 Standard Number: HSCGFT15XPC8003 Funding in support of TI-03. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7001BG 130046518000001  LLA : J7 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002618748 Funding in support of TI-02. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7001BH 130046517600001  LLA : J8 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002618476 Standard Number: N0003015WX00118 (AA) Funding in support of TI-04. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7001BJ 130046517600002  LLA : J9 97X4930 NH1J 251 77777 0 050120 2F 000000 A10002618476 Standard Number: N0003015WX00118 (AB) Funding in support of TI-04. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7001BK 130046609100001  LLA : K1 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002626026 Standard Number: N0010415WX50211 Funding in support of TI-07. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9001AH 130046609100002  LLA : K1 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002626026 

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 96 of 149 FINAL

 

XXXXXX

XXXXX

XXXXX

XXXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXXXX

XXXXXXX

XXXXX

Page 100: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

Standard Number: N0010415WX50211 Funding in support of TI-07. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.   MOD 22 Funding  

  MOD 23  7001BL 130046539300001  LLA : K2 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002619901 Contractor may NOT perform against this SLIN after PoP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7001BM 130046927000001  LLA : K4 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002653120 Contractor may NOT perform against this SLIN after PoP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9001AJ 130046927900001  LLA : K3 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002651985 Contractor may NOT perform against this SLIN after PoP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9001AK 130046927000002  LLA : K4 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002653120 Contractor may NOT perform against this SLIN after PoP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.   MOD 23 Funding  Cumulative Funding   MOD 24  7001BN 130047085700001  LLA : K5 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002666267 Standard Number: HSCG7915XPC8020 Funding in support of TI-12. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7001BP 130047085800001  LLA : K6 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002666294 Standard Number: HSCG7915XPC8020 Funding in support of TI-03. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7001BQ 130047085500001  LLA : K7 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002666174 Standard Number: HSCG7915XPC8020 Funding in support of TI-14. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9001AL 130047085700002  LLA : K5 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002666267 

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 97 of 149 FINAL

 

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXXXXXXXXX

XXXXXXX

Page 101: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

Standard Number: HSCG7915XPC8020 Funding in support of TI-12. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.   MOD 24 Funding  Cumulative Funding   MOD 25  7001BR 130047635800002  LLA : K8 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002712554 Standard Number: N4175615WX50106 Funding in support of TI-15. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7001BS 130047627700001  LLA : K9 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002711438 Standard Number: MIPR10608479 Funding in support of TI-10. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9001AM 130047635800001  LLA : K8 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002712554 Standard Number: N4175615WX50106 Funding in support of TI-15. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9001AN 130047620700001  LLA : L1 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002711000 Standard Number: N0001414WX01082 Funding in support of TI-05. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.   MOD 25 Funding  Cumulative Funding   MOD 26  7001BT 130048235800001  LLA : L2 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002758459 Standard Number: M9545015WR34K69 Funding in support of TI-07. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7001BU 130048398100001  LLA : L3 97X4930 NH1J 253 77777 0 050120 2F 000000 A00002769109 Standard Number: HSCGFT15XPC8003 Funding in support of TI-12. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7001BV 130048191500001  LLA : L4 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002754630 Standard Number: N0010415WX50701 Funding in support of TI-07. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date. 

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 98 of 149 FINAL

 

XXXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXXXX

XXXXX

XXXXXXXXXXXX

Page 102: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

 7001BW 130048207300001  LLA : L5 97X4930 NH1J 251 77777 0 050120 2F 000000 A10002755800 Standard Number: F2VUF04316GW01 (01) Funding in support of TI-07. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7001BX 130048476200001  LLA : L9 97X4930 NH1J 253 77777 0 050120 2F 000000 A00002774437 Standard Number: R5704615WRNW003 Funding in support of TI-04. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7001BZ 130047823300001  LLA : L7 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002726197 Funding in support of TI-08. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7001CA 130048476300001  LLA : L8 97X4930 NH1J 253 77777 0 050120 2F 000000 A00002774439 Standard Number: N0002415WX02288 Funding in support of TI-05. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9001AP 130048398100002  LLA : L3 97X4930 NH1J 253 77777 0 050120 2F 000000 A00002769109 Standard Number: HSCGFT15XPC8003 Funding in support of TI-12. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9001AQ 130048191500002  LLA : L4 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002754630 Standard Number: N0010415WX50701 ODC funding in support of TI-07. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9001AR 130048480200001  LLA : L6 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002774647 Standard Number: N0001414WX01082 Funding in support of TI-05. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9001AS 130048476300002  LLA : L8 97X4930 NH1J 253 77777 0 050120 2F 000000 A00002774439 Standard Number: N0002415WX02288 Funding in support of TI-05. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.   MOD 26 Funding  Cumulative Funding   MOD 27  400003 130037893800001 (  

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 99 of 149 FINAL

 

XXXXX

XXXXX

XXXXX

XXXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXXX

XXXXXX

XXXXXXX

Page 103: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

LLA : A3 97X4930 NH1J 251 77777 0 050120 2F 000000 A00001913566 Standard Number: N0002413WX07682 Funding in support of TI-9. Note: 10 U.S.C. 2410a Authority does NOT apply. Funds expire 30 September 2015, or through the end date of the period of performance for CLIN 4000, whichever occurs first. Contractor may continue to invoice after this date, but only for work performed up through and including 30 September 2015, or up through and including the last day of the period of performance for CLIN 4000.  600002 130039038600001 (  LLA : C3 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002026217 Standard Number: N0002413WX07682 Funding in support of TI-09. Contractor may NOT perform against this SLIN after 30 SEP 2015. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7001AJ 130043794200001 (  LLA : G4 1741810 87X7 251 V0000 0 050120 2D 000000 A00002380426 Standard Number: N0002414WX05740 Funding in support of TI-09. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7001CB 130048607200001  LLA : U1 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002783375 Standard Number: N0002415WX02288 Funding in support of TI-01. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7001CC 130048616400001  LLA : M3 97X4930 NH1J 253 77777 0 050120 2F 000000 A00002784723 Standard Number: F2VUF04304GW02 Funding in support of TI-06. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7001CD 130048334400001  LLA : M4 97X4930 NH1J 253 77777 0 050120 2F 000000 A00002764988 Standard Number: F2VUF04316GW03 Funding in support of TI-08. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7001CE 130048334200001  LLA : M5 97X4930 NH1J 253 77777 0 050120 2F 000000 41273535GNGP Standard Number: F2VUF04294GW04 Funding in support of TI-08. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7001CF 130048733300001  LLA : M6 9750100 74D7 252 00074 0 068688 2D CVS001 000745LSXHQQ Standard Number: N0007415RCVS001 Funding in support of TI-07. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9001AT 130048607200002  LLA : M1 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002783375 Standard Number: N0002415WX02288 Funding in support of TI-01. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date. 

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 100 of 149 FINAL

 

XXXXX

XXXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

Page 104: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

 9001AU 130048459800001  LLA : M2 1751810 84RA 251 V4X00 0 050120 2D 000000 A00002773588 Standard Number: N0002415WX02288 Funding in support of TI-05. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.   MOD 27 Funding  Cumulative Funding   MOD 28  7001CG 130049483200001  LLA : M7 97X4930 ND2A 252 32205 0 000033 2F 118105 100200025235 Standard Number: N2900315RCP1003 Funding in support of TI-17. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9001AV 130049483200002  LLA : M7 97X4930 ND2A 252 32205 0 000033 2F 118105 100200025235 Standard Number: N2900315RCP1003 Funding in support of TI-17. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.   MOD 28 Funding  Cumulative Funding   MOD 29  400045 130042971400001 (  LLA : F7 5733010 113 47WT 10400N 4 G9731 80118 27230F 503000FF4FDBV411G008 F03000  Standard Number: F4FDBV4114G008 (AA) Funding in support of TI-13. Contractor may NOT perform against this SLIN after 14 AUG 2014. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7001CH 130049566300001  LLA : M8 97X4930 NH1J 253 77777 0 050120 2F 000000 A00002853683 Standard Number: N0016415SD05001 (AA) Funding in support of TI-02. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7001CJ 130049744300001  LLA : M9 2152020 000 A5XC I 12201 1V FRE 25 71 001063758 7 A.0021705.4.2.1 021001  Standard Number: 10637587 Funding in support of TI-10. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7001CK 130049794800001  LLA : N1 97X4930 NH1J 252 77777 0 050120 2F 000000 A00002870509 Standard Number: N0007415WRVS009 (AA) Funding in support of TI-08. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.   MOD 29 Funding  Cumulative Funding  

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 101 of 149 FINAL

 

XXXXXX

XXXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXXXX

XXXXXXX

XXXXXXX

Page 105: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

 MOD 30  400029 130040075100001 (  LLA : D5 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002101986 Standard Number: N0001914WX01505 Funding in support of TI-10. Contractor may NOT perform against this SLIN after 14 AUG 2014. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  600010 130042971400002 (  LLA : F7 5733010 113 47WT 10400N 4 G9731 80118 27230F 503000FF4FDBV411G008 F03000  Standard Number: F4FDBV4114G008 (AA) Funding in support of TI-13. Contractor may NOT perform against this SLIN after 14 AUG 2014. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7001CL 130050489900001  LLA : N2 9750300 56SF SD5 52SQ 24K04B N 80160 00000F 3877 00 F2VUF05120GW04 F87700  Standard Number: F2VUF05120GW04 (AA) Funding in support of TI-06. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7001CM 130050239400001  LLA : N3 9750100 56SF SC5 52SP FLMRAP 0 1 5781 5 017417 387 700 F2VUF05096GW02 F87700  Standard Number: F2VUF05096GW02 (AA) Funding in support of TI-11. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7001CN 130050105100001  LLA : N4 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002893046 Standard Number: MIPR5EDAV15E04 (AA) Funding in support of TI-013. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7001CP 130050157000001  LLA : N5 97X4930 NH1J 252 77777 0 050120 2F 000000 A00002896529 Standard Number: HSCG7915XPC8044 Funding in support of TI-0012. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7001CQ 130050487100001  LLA : N7 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002917406 Standard Number: N0017815EX00209 (AA) Funding in support of TI-15. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7001CR 130050650900002  LLA : N8 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002928210 Standard Number: N417561WX50106 (AA) Funding in support of TI-15. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9001AW 130050487200001  LLA : N6 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002917408 Standard Number: N4175615WX50106 (AA) Funding in support of TI-15. Contractor may NOT perform against this SLIN after POP 

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 102 of 149 FINAL

 

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

Page 106: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9001AX 130050157000002  LLA : N5 97X4930 NH1J 252 77777 0 050120 2F 000000 A00002896529 Standard Number: HSCG7915XPC8044 Funding in support of TI-0012. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9001AY 130050650900001  LLA : N8 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002928210 Standard Number: N4175615WX50106 (AA) Funding in support of TI-15. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.   MOD 30 Funding  Cumulative Funding   MOD 31  7001CS 130050750900001  LLA : P4 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002935394 Standard Number: N0002415WX0255 (A) Funding in support of TI-14. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7001CT 130050750800001  LLA : N9 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002935179 Standard Number: N0002415WX0255 (AA) Funding in support of TI-15. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7001CU 130050763800001  LLA : P2 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002936285 Standard Number: F2VUF04304GW03 (AA) Funding in support of TI-08. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7001CV 130050866200001  LLA : P3 97X4930 NH1J 252 77777 0 050120 2F 000000 A00002942679 Standard Number: N4027315WX0039C (AA) Funding in support of TI-04. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9001AZ 130050750900002  LLA : P4 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002935394 Standard Number: N0002415WX02555 (AA) Funding in support of TI-14. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9001BA 130050750800002  LLA : N9 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002935179 Standard Number: N0002415WX0255 (AA) Funding in support of TI-15. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date. 

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 103 of 149 FINAL

 

XXXXX

XXXXX

XXXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXXXX

Page 107: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

  MOD 31 Funding  Cumulative Funding   MOD 32  7001CW 130051203200001  LLA : P5 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002964667 Standard Number: M9545015WR34K69 (AA) Funding in support of TI-07. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7001CX 130051203500001  LLA : P6 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002964804 Standard Number: M9545015WR34K69 (AA) Funding in support of TI-07. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7001CY 130051203100001  LLA : P7 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002964662 Standard Number: V4789815WXB0079 (AA) Funding in support of TI-07. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date,but only for work performed through and including the aforementioned date.  7101AA 130051213700001  

 P8 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002966624 Standard Number: N0002415WX02288 (AA) Funding in support of TI-05. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.   MOD 32 Funding  Cumulative Funding   MOD 33  7001CQ 130050487100001 (  LLA : N7 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002917406 Standard Number: N0017815EX00209 (AA) Funding in support of TI-15. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9001BB 130051395800001  LLA : P9 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002976968 Standard Number: N0017815WX00209 (AA) Funding in support of TI-15. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.   MOD 33 Funding  Cumulative Funding   MOD 34  7201AA 130052001100001  LLA : P1 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003017248 Standard Number: N0002415WX02555 (AA) Funding in support of TI-03. Contractor may NOT perform against this SLIN after PoP 

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 104 of 149 FINAL

 

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XX

XXXXX

XXXXXXX

XXXXXXXXXX

XXXXXXXXXXXX

XXXXXXXX

Page 108: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201AB 130050503100001  LLA : N2 9750300 56SF SD5 52SQ 24K04B N 80160 00000F 3877 00 F2VUF05120GW04 F87700  Standard Number: F2VUF05120GW04(AA) Contractor may NOT perform against this SLIN after PoP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201AC 130051722000001  LLA : S6 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002999036 Standard Number: N0002415WX01190(AA) Contractor may NOT perform against this SLIN after PoP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201AD 130051623700001  LLA : S7 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002992572 Standard Number: HSCG7915XPC8020 Contractor may NOT perform against this SLIN after PoP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201AE 130051686200001  LLA : P4 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002996974 Standard Number: HSCG7915XPC8020 Contractor may NOT perform against this SLIN after PoP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201AF 130051699400001  LLA : S8 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002997561 Standard Number: N0001915WX04270(AA) Contractor may NOT perform against this SLIN after PoP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201AG 130051448200001  LLA : Q6 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002979660 Standard Number: HSCG7915XPC8020 Contractor may NOT perform against this SLIN after PoP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201AH 130050498000001  LLA : N3 9750100 56SF SC5 52SP FLMRAP 0 1 5781 5 017417 387 700 F2VUF05096GW02 F87700  Standard Number: F2VUF05096GW02 Funding in support of TI-11. 10 USC 2410(a) Authority is hereby invoked. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201AJ 130051796000001  LLA : S9 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003004184 Standard Number: N0016415SD05001 Contractor may NOT perform against this SLIN after PoP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201AK 130051888500001  LLA : T1 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003009926 Standard Number: F2VUF04199GW01(AA) 

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 105 of 149 FINAL

 

XXXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

Page 109: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

Contractor may NOT perform against this SLIN after PoP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9201AA 130051448200002  LLA : Q6 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002979660 Standard Number: HSCG7915XPC8020 Contractor may NOT perform against this SLIN after PoP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.   MOD 34 Funding  Cumulative Funding   MOD 35  7101AA 130051213700001 (  LLA : P8 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002966624 Standard Number: N0002415WX02288 (AA) Funding in support of TI-05. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9001AU 130048459800001 (  LLA : M2 1751810 84RA 251 V4X00 0 050120 2D 000000 A00002773588 Standard Number: N0002415WX02288 Funding in support of TI-05. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.   MOD 35 Funding -  Cumulative Funding   MOD 36  7201AL 130052062100001  LLA : T2 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003021437 Standard Number: N6339415WX00378 (AA) Funding in support of TI-18. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201AM 130052104300001  LLA : Q1 97X4930 NH1J 252 77777 0 050120 2F 000000 A00003024683 Standard Number: N2900315WRP1009 (AA) Funding in support of TI-17. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201AN 130051441000001  LLA : Q2 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002979656 Standard Number: MIPR10608479 Funding in support of TI-10. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9201AB 130052062100002  LLA : Q3 97X4930 NH1J 251 77777 0 050120 2F 000000 A10003021437 Standard Number: N6339415WX00378 (AA) Funding in support of TI-18. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 106 of 149 FINAL

 

XXXXX

XXXXXX

XXXXXX

XXXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXXXX

XXXXXXX

Page 110: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

9201AC 130052104300002  LLA : Q1 97X4930 NH1J 252 77777 0 050120 2F 000000 A00003024683 Standard Number: N2900315WRP1009 (AA) Funding in support of TI-17. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.   MOD 36 Funding  Cumulative Funding   MOD 37  7201AP 130051800200001  LLA : Q4 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003004188 Standard Number: N0001915WX02984 (AA) Funding in support of TI-13. 10 USC 2410(a) Authority is hereby invoked. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201AQ 130051758000001  LLA : Q5 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003001966 Standard Number: N0002415WX02555 (AA) Funding in support of TI-14. 10 USC 2410(a) Authority is hereby invoked. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201AR 130051808800001  LLA : T8 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003005655 Standard Number: N0003015WX00118 (AA) 10 USC 2410(a) Authority is hereby invoked. Funding in support of TI-04. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201AS 130051808800002  LLA : Q7 97X4930 NH1J 251 77777 0 050120 2F 000000 A10003005655 Standard Number: N0003015WX0018 (AB) Funding in support of TI-004. 10 USC 2410(a) Authority is hereby invoked. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201AT 130051795900001  LLA : Q8 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003004120 Standard Number: N0002415WX02555 (AA) Funding in support of TI-015. 10 USC 2410(a) Authority is hereby invoked. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201AU 130051795600001  LLA : Q9 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003004087 Standard Number: N0010415WX50701 (AA) Funding in support of TI-007. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201AV 130052201800001  LLA : R1 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003029890 Standard Number: N0002415WX02288 (AA) Funding in support of TI-05. Contractor may NOT perform against this SLIN after POP 

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 107 of 149 FINAL

 

XXXXX

XXXXXX

XXXXX

XXXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXXXX

Page 111: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201AW 130052318500001  LLA : R2 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003037638 Standard Number: N2900315WRP1009 (AA) Funding in support of TI-17. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9201AD 130051758000002  LLA : Q5 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003001966 Standard Number: N0002415WX02555 (AA) Funding in support of TI-14. 10 USC 2410(a) Authority is hereby invoked. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9201AE 130051795900002  LLA : Q8 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003004120 Standard Number: N0002415WX0255 (AA) Funding in support of TI-015. 10 USC 2410(a) Authority is hereby invoked. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9201AF 130051795600002  LLA : Q9 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003004087 Standard Number: N0010415WX50701 (AA) Funding in support of TI-007. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.   MOD 37 Funding  Cumulative Funding   MOD 38  7001BR 130047635800002 (  LLA : K8 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002712554 Standard Number: N4175615WX50106 Funding in support of TI-15. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7001CR 130050650900002 (  LLA : N8 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002928210 Standard Number: N417561WX50106 (AA) Funding in support of TI-15. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7001CS 130050750900001 (  LLA : P4 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002935394 Standard Number: N0002415WX0255 (A) Funding in support of TI-14. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201AX 130050489500001  LLA : R3 9750300 56SF SD5 52SQ 24K04B N 80160 00000F 3877 00 F2VUF05120GW04 F87700  Standard Number: F2VUF05120GW04 Funding in support of TI-11. Contractor may NOT perform against this SLIN after 

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 108 of 149 FINAL

 

XXXXX

XXXXX

XXXXX

XXXXX

XXXXXX

XXXXX

XXXXXX

XXXXXX

XXXXX

XXXXXXX

Page 112: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201AY 130052198900002  LLA : R4 1751810 84RA 251 V4X00 0 050120 2D 000000 A00003029747 Standard Number: N0002415WX02288 (AA) Funding in support of TI-05. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9001AW 130050487200001 (  LLA : N6 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002917408 Standard Number: N4175615WX50106 (AA) Funding in support of TI-15. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9001AY 130050650900001 (  LLA : N8 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002928210 Standard Number: N4175615WX50106 (AA) Funding in support of TI-15. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9001AZ 130050750900002 (  LLA : P4 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002935394 Standard Number: N0002415WX02555 (AA) Funding in support of TI-14. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9001BA 130050750800002 (  LLA : N9 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002935179 Standard Number: N0002415WX0255 (AA) Funding in support of TI-15. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9201AG 130052082400001  LLA : T9 1751810 84RA 251 V4X00 0 050120 2D 000000 A00003022761 Standard Number: N0002415WX02288 Funding in support of TI-05. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9201AH 130052198900001  LLA : R5 1751810 84RA 251 V4X00 0 050120 2D 000000 A00003029747 Standard Number: N0002415WX02288 (AA) Funding in support of TI-005. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9201AJ 130052629800001  LLA : R6 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003061718 Standard Number: N2187015WRP1005 (AA) Funding in support of TI-17. Contractor may NOT perform against this SLIN after PoP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.   MOD 38 Funding  Cumulative Funding   MOD 39 

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 109 of 149 FINAL

 

XXXXX

XXXXX

XXXXX

XXXXX

XXXXXX

XXXXX

XXXXX

XXXXX

XXXXXXXXXXXX

Page 113: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

 7201AZ 130052689200001  LLA : R7 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003067217 Standard Number: HSCG7915XPC8044 Funding in support of TI-12. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201BA 130052696500001  LLA : R8 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003068027 Standard Number: N2187015WRP1005 (AA) Funding in support of TI-17. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201BB 130052373500001  LLA : S1 9750100 56SF SC5 52SQ 3GQVOH 0 1 8016 0 017417 387 700 F2VUF04316GW01 F87700  Standard Number: F2VUF04316GW01 Funding in support of TI-07. 10 USC 2410(a) Authority is hereby invoked. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9201AK 130052674400001  LLA : R9 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003066212 Standard Number: N0002415WX02288 (AA) Funding in support of TI-005. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9201AL 130052748000001  

 S2 97X4930 ND2A 252 32205 0 000033 2F 118045 060200025235 Standard Number: N2187015RCP1005 (AA) Funding in support of TI-17. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.   MOD 39 Funding  Cumulative Funding   MOD 40  7201BC 130052777700002  LLA : S3 97X4930 NH1J 251 77777 0 050120 2F 000000 330027659000 Standard Number: N4175615WX50106 (AA) Funding in support of TI-15. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201BD 130052777700005  LLA : S4 1751319 F4TD 000 41756 0 068941 2D 000000 320027659000 Standard Number: N4175615WX50106 (AA) Funding in support of TI-15. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9201AM 130052777700001  LLA : S4 1751319 F4TD 000 41756 0 068941 2D 000000 320027659000 Standard Number: N4175615WX50106 (AA) Funding in support of TI-15. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 110 of 149 FINAL

 

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXXXXXXX

XXXXXXXXXXXXX

Page 114: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

9201AN 130052777700003  LLA : S3 97X4930 NH1J 251 77777 0 050120 2F 000000 330027659000 Standard Number: N4175615WX50106 (AA) Funding in support of TI-15. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9201AP 130052777700004  LLA : S5 97X4930 NH1J 251 77777 0 050120 2F 000000 340027659000 Standard Number: N4175615WX50106 (AA) Funding in support of TI-15. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.   MOD 40 Funding  Cumulative Funding   MOD 41  7201BE 130052776900001  LLA : T3 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003076799 Standard Number: N4027315WX0039C (AA) Funding in support of TI-004. 10 USC 2410(a) Authority is hereby invoked. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201BF 130052810100001  LLA : T4 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003078606 Standard Number: N2187015WRP1005 (AA) Funding in support of TI-017. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201BG 130052859700001  LLA : T5 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003084242 Standard Number: N0002415WX0255 (AA) Funding in support of TI-014. 10 USC 2410(a) Authority is hereby invoked. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201BH 130052859600001  LLA : T6 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003084020 Standard Number: HSCG7915XPC8044 Funding in support of TI-03. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201BJ 130052860000001  LLA : T7 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003084249 Standard Number: HSCG7915XPC8044 Funding in support of TI-012. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9201AQ 130052860000002  LLA : T7 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003084249 Standard Number: HSCG7915XPC8044 Funding in support of TI-12. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 111 of 149 FINAL

 

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXXXX

Page 115: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

 MOD 41 Funding  Cumulative Funding   MOD 42 Funding  Cumulative Funding   MOD 43 Funding  Cumulative Funding   MOD 44  7201BK 130053094900001  LLA : U2 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003105241 Standard Number: N0002415WX01190 (AA) Funding in support of TI-01. 10 USC 2410(a) Authority is hereby invoked. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.   MOD 44 Funding  Cumulative Funding   MOD 45  7201BL 130053034800001  LLA : U3 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003099872 Standard Number: N0002415WX02288 (AA) Funding in support of TI-01. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201BM 130053130700001  LLA : U4 5743010 114 47WT 10400M 4 G9731 80118 27224F 503000F4FDBV4336G001 F03000  Standard Number: F4FDBV4336G001 Funding in support of TI-13. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9201AR 130053130700002  LLA : U5 5743010 114 47WT 10400M 4 G9731 80118 27224F 503000F4FDBV4336G001 F03000  Standard Number: F4FDBV4336G001 Funding in support of TI-13. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.   MOD 45 Funding  Cumulative Funding   MOD 46  7201BN 130053212400001  LLA : U6 97X4930 ND2A 252 32205 0 000033 2F 118106 100200025235 Standard Number: N2900316RCP1001 (AA) Funding in support of TI-017. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201BP 130053202700001  LLA : U7 97X4930 ND2A 252 32205 0 000033 2F 118106 110200025235 Standard Number: N2319416RCP1002 (AA) Funding in support of TI-017. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date. 

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 112 of 149 FINAL

 

XXXXX

XX

XX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXXXX

XXXXXXX

XXXXXXX

XXXXXXX

XXXXXXX

Page 116: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

 7201BQ 130053240700001  LLA : U8 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003125897 Standard Number: N0002416WX00325 (AA) Funding in support of TI-001. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201BR 130053264800001  LLA : U9 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003129605 Standard Number: N2158216WRP1004 (AA) Funding in support of TI-017. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201BS 130053265900001  LLA : V1 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003128622 Standard Number: N2141916WRP1004 (AA) Funding in support of TI-017. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201BT 130053282400001  LLA : V2 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003129046 Standard Number: N2152416WRP1003 (AA) Funding in support of TI-017. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9201AS 130053212400002  LLA : U6 97X4930 ND2A 252 32205 0 000033 2F 118106 100200025235 Standard Number: N2900316RCP1001 (AA) Funding in support of TI-017. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9201AT 130053202700002  LLA : U7 97X4930 ND2A 252 32205 0 000033 2F 118106 110200025235 Standard Number: N2319416RCP1002 (AA) Funding in support of TI-017. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9201AU 130053264800002  LLA : U9 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003129605 Standard Number: N2158216WRP1004 (AA) Funding in support of TI-017. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9201AV 130053265900002  LLA : V1 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003128622 Standard Number: N2141916WRP1004 (AA) Funding in support of TI-017. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9201AW 130053282400002  LLA : V2 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003129046 Standard Number: N2152416WRP1003 (AA) Funding in support of TI-017. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date. 

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 113 of 149 FINAL

 

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

Page 117: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

  MOD 46 Funding  Cumulative Funding   MOD 47  9201AX 130053105500001  LLA : V3 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003107260 Standard Number: N0016415SD05001 Funding in support of TI-002. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.   MOD 47 Funding  Cumulative Funding   MOD 48  7201BU 130053442200001  LLA : V4 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003145747 Standard Number: N0002416WX00341 (AA) Funding in support of TI-005. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201BV 130053386000001  LLA : V5 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003142478 Standard Number: N2900316WRP1001 (AA) Funding in support of TI-017. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9201AY 130053442200002  LLA : V4 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003145747 Standard Number: N0002416WX00341 (AA) Funding in support of TI-005. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9201AZ 130053386000002  LLA : V5 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003142478 Standard Number: N2900316WRP1001 (AA) Funding in support of TI-017. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.   MOD 48 Funding  Cumulative Funding   MOD 49 Funding  Cumulative Funding   MOD 50  7201BW 130053625100001  LLA : V6 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003162843 Standard Number: N0002416WX00325 (AA) Funding in support of TI-005. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201BX 130053649300001  LLA : 

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 114 of 149 FINAL

 

XXXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXX

XXXXX

XXXXX

XX

XXXXX

XXXXX

XXXXXXX

XXXXXXX

XXXXXXX

XXXXXXX

Page 118: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

V7 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003165191 Standard Number: N0002416WX00325 (AA) Funding in support of TI-001. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201BY 130053671700001  LLA : V8 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003167162 Standard Number: N0002416WX01574 (AA) Funding in support of TI-001. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9201BA 130053625100002  LLA : V6 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003162843 Standard Number: N0002416WX00325 (AA) Funding in support of TI-005. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.   MOD 50 Funding  Cumulative Funding   

  7201BZ 130053450900001  LLA : V9 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003146831 Standard Number: N0002415WX04008 (AA) Funding in support of TI-019. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201CA 130053849100001  LLA : W1 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003183450 Standard Number: N0002416WX01574 (AA) Funding in support of TI-05. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9301AA 130053450900002  LLA : V9 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003146831 Standard Number: N0002415WX04008 (AA) Funding in support of TI-019. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9301AB 130053849100002  LLA : W1 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003183450 Standard Number: N0002416WX01574 (AA) Funding in support of TI-005. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.   MOD 51 Funding  Cumulative Funding   MOD 52  7201CB 130053974100001  LLA : W2 9760100 74D7 252 00074 0 068688 2D CVS005 000746LSXHQQ Standard Number: N0007416RCVS005 (AA) Funding in support of TI-007. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this 

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 115 of 149 FINAL

 

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXXXXXXXXXXXXXXXXXX

XXXXXXX

Page 119: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

date, but only for work performed through and including the aforementioned date.  7201CC 130053279400001  LLA : W3 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003128828 Standard Number: N2162216WRP1003 (AA) Funding in support of TI-017. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201CD 130054044600001  LLA : W4 97X4930 NH1J 253 77777 0 050120 2F 000000 A00003199143 Standard Number: N4027316WX0059C (AA) Funding in support of TI-004. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201CE 130054044800001  LLA : W5 97X4930 NH1J 260 77777 0 050120 2F 000000 A00003199204 Standard Number: R5704616WRNQWD1 (AA) Funding in support of TI-004. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201CF 130054051100001  LLA : W6 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003199207 Standard Number: HSCG7916XPC8001 Funding in support of TI-007. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9301AC 130053279400002  LLA : W3 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003128828 Standard Number: N2162216WRP1003 (AA) Funding in support of TI-017. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.   MOD 52 Funding  Cumulative Funding   MOD 53  7201CG 130054228400001  LLA : W7 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003214863 Standard Number: N2162216WRP1003 (AA) Funding in support of TI-017. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201CH 130054089600001  LLA : W8 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003202971 Standard Number: F2VUE25287GW01 Funding in support of TI-018. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201CJ 130054105400001  LLA : W9 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003203898 Standard Number: V4789816WXH0084 Funding in support of TI-007. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 116 of 149 FINAL

 

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXXX

XXXXX

XXXXX

XXXXX

XXXXXXX

Page 120: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

7201CK 130054192500001  LLA : X1 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003211916 Standard Number: N0016415SD05001 Funding in support of TI-002. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9201BB 130054228400002  LLA : W7 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003214863 Standard Number: N2162216WRP1003 Funding in support of TI-017. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.   MOD 53 Funding  Cumulative Funding   MOD 54  400040 130043113200001 (  LLA : F1 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002328971 Funding in support of TI-01. Contractor may NOT perform against this SLIN after 14 AUG 2014. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  600001 130037889300002 (  LLA : A7 97X4930 NH1J 251 77777 0 050120 2F 000000 A00001912547 Standard Number: N0016413SD03001 Funding in support of TI-2. Note: 10 U.S.C. 2410a Authority does NOT apply. Contractor may incur costs for work performed against this SLIN through the end date of the period of performance for CLIN 6000. Contractor may continue to invoice after the ending date, but only for work performed during the period of performance for CLIN 6000.  600006 130040450700001 (  LLA : D8 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002137220 Standard Number: N0002414WX02491 Funding in support of TI-01. Contractor may NOT perform against this SLIN after 14 AUG 2014. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  600007 130041183200001 (  LLA : E5 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002190999 Standard Number: N0002413WX08634 Funding in support of TI-05. Contractor may NOT perform against this SLIN after 14 AUG 2014. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  600009 130043010000001  LLA : F5 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002323744 Funding in support of TI-12. Contractor may NOT perform against this SLIN after 14 AUG 2014. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  600010 130042971400002 (  LLA : F7 5733010 113 47WT 10400N 4 G9731 80118 27230F 503000FF4FDBV411G008 F03000  Standard Number: F4FDBV4114G008 (AA) Funding in support of TI-13. Contractor may NOT perform against this SLIN after 14 AUG 2014. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7001CN 130050105100001 (  LLA : 

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 117 of 149 FINAL

 

XXXXX

XXXXX

XXXXXX

XXXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXXX

XXXXXXX

XXXXX

Page 121: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

N4 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002893046 Standard Number: MIPR5EDAV15E04 (AA) Funding in support of TI-013. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201CL 130054283500001  LLA : X2 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003218994 Standard Number: F2VUF0511GW02 (AA) Funding in support of TI-007. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201CM 130054183500001  LLA : X3 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003210758  7201CN 130054306600001  LLA : X4 1761804 8B5B 251 VU021 0 050120 2D 000000 A10003221114 Funding in support of TI-014. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201CP 130051699400002  LLA : S8 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002997561 Funding in support of TI-010. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201CQ 130054229000003  LLA : X4 1761804 8B5B 251 VU021 0 050120 2D 000000 A10003215275 Funding in support of TI-018. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201CR 130054311400003  LLA : X4 1761804 8B5B 251 VU021 0 050120 2D 000000 A10003221518 Funding in support of TI-015. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201CS 130054459700001  LLA : X7 97X4930 NH1J 257 77777 0 050120 2F 000000 A00003233905 Standard Number: N0002414WX05326 (AA) Funding in support of TI-019. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9001AA 130044415900002 (  LLA : E3 9740100 56SF SC4 52SPF L MRAP01 00 005781 501741766710 0F2VUF03309G002 F67100 ESP:  ST FSR: 023979 PSR: I01921 DSR: 232295 Standard Number: F2VUF03309G002 (AA) Funding in support of TI-11. 10 USC 2410(a) Authority is hereby invoked. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9001AB 130044476700002 (  LLA : G5 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002426315 Standard Number: HSCGFT-14-X-PBN007 Funding in support of TI-12. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 118 of 149 FINAL

 

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXXX

Page 122: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

9001AC 130044701900002 (  LLA : G7 5743010 114 47WT 19REPR 4 G952E 81402 25219F 503000F4FDAG4195G003 F03000  Standard Number: F4FDAG4195G003 Funding in support of TI-13. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9001AK 130046927000002 (  LLA : K4 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002653120 Contractor may NOT perform against this SLIN after PoP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9001AP 130048398100002 (  LLA : L3 97X4930 NH1J 253 77777 0 050120 2F 000000 A00002769109 Standard Number: HSCGFT15XPC8003 Funding in support of TI-12. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9001AT 130048607200002 (  LLA : M1 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002783375 Standard Number: N0002415WX02288 Funding in support of TI-01. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9001AX 130050157000002 (  LLA : N5 97X4930 NH1J 252 77777 0 050120 2F 000000 A00002896529 Standard Number: HSCG7915XPC8044 Funding in support of TI-0012. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9201BC 130054306600002  LLA : X4 1761804 8B5B 251 VU021 0 050120 2D 000000 A10003221114 Funding in support of TI-014. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9201BD 130054229000004  LLA : X4 1761804 8B5B 251 VU021 0 050120 2D 000000 A10003215275 Funding in support of TI-018. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9201BE 130054311400004  LLA : X6 1761804 8B5B 251 VU021 0 050120 2D 000000 A10003221518 Funding in support of TI-015. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9201BF 130054459700002  LLA : X7 97X4930 NH1J 257 77777 0 050120 2F 000000 A00003233905 Standard Number: N0002414WX05326 (AA) Funding in support of TI-019. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.   MOD 54 Funding  Cumulative Funding   

 

  

  

  

  FINAL

 

XXXXX

XXXXX

XXXXX

XXXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXXX

XXXXXXXXXXXXXXXXXXXXXXX

Page 123: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

MOD 55  7201CT 130054737200001  LLA : X8 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003256507 Standard Number: N4027316WX0059C (AA) Funding in support of TI-004. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201CU 130054753200001  LLA : X9 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003258006 Standard Number: R5704616WRNQWD1 (AA) Funding in support of TI-004. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201CV 130054306000001  LLA : Y2 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003221929 Standard Number: N0010416WX41748 Funding in support of TI-007. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201CW 130054819200001  LLA : Y3 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003262706 Standard Number: F4FDBV5338G101 (AF) Funding in support of TI-010. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201CX 130054624800001  LLA : Y4 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003247845 Standard Number: F4FDBV5338G101 (AF) Funding in support of TI-013. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201CY 130054843100001  LLA : Y5 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003264169 Standard Number: N2152416WRP1003 Funding in support of TI-017. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201CZ 130053264900001  LLA : Y6 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003129606 Standard Number: N2185716WRP1003 (AA) Funding in support of TI-017. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9201BG 130054725000001  LLA : Y1 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003255941 Standard Number: N0002416WX00325 Funding in support of TI-005. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9201BH 130053264900002  LLA : Y6 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003129606 Standard Number: N2185716WRP1003 Funding in support of TI-017. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this 

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 120 of 149 FINAL

 

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

Page 124: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

date, but only for work performed through and including the aforementioned date.   MOD 55 Funding  Cumulative Funding   MOD 56  400019 130038816600001 (  LLA : C1 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002009212 Standard Number: N0010413WX01114 Funding in support of TI-07. Contractor may NOT perform against this SLIN after 30 SEP 2014. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201DA 130054886900001  LLA : Y7 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003268760 Standard Number: N5701216WR001PN Funding in support of TI-017. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201DB 130054183500002  LLA : X3 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003210758 Standard Number: F2VUF05302GW01 (AA) Funding in support of TI-007. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201DC 130055039700001  LLA : Y8 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003280786 Standard Number: HSCG7916XPC8002 (AA) Funding in support of TI-014. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201DD 130055217500001  LLA : Y9 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003295133 Standard Number: N5701216WR001PN (AA) Funding in support of TI-017. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201DE 130055140600001  LLA : Z1 97X4930 NH1J 257 77777 0 050120 2F 000000 A00003289292 Standard Number: N0002416WX04497 (AA) Funding in support of TI-019. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9001AF 130046191200002 (  LLA : J3 1751804 8D4D 251 WS030 0 050120 2D 000000 A00002589503 Standard Number: N0002415PR00714 Funding in support of TI-01. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9001AG 130046181900002 (  LLA : J5 1741810 81LT 251 VU021 0 050120 2D 000000 A00002589532 Standard Number: N0002414WX05795 Funding in support of TI-15. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 121 of 149 FINAL

 

XXXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXXX

XXXXX

XXXXXXX

Page 125: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

9001AU 130048459800001 (  LLA : M2 1751810 84RA 251 V4X00 0 050120 2D 000000 A00002773588 Standard Number: N0002415WX02288 Funding in support of TI-05. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9201BJ 130054886900002  LLA : Y7 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003268760 Standard Number: N5701216WR001PN Funding in support of TI-017. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9201BK 130055217500002  LLA : Y9 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003295133 Standard Number: N5701216WR001PN (AA) Funding in support of TI-017. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9201BL 130055140600002  LLA : Z1 97X4930 NH1J 257 77777 0 050120 2F 000000 A00003289292 Standard Number: N0002416WX04497 (AA) Funding in support of TI-019. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.   MOD 56 Funding  Cumulative Funding   MOD 57  7201DF 130055277700001  LLA : Z2 1761810 84RA 310 V4X00 0 050120 2D 000000 A00003300490 Funding in support of TI-001. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9201BM 130055277700002  LLA : Z2 1761810 84RA 310 V4X00 0 050120 2D 000000 A00003300490 Funding in support of TI-001. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.   MOD 57 Funding  Cumulative Funding   MOD 58  7201BT 130053282400003  LLA : V2 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003129046 Standard Number: N2152416WRP1003 (AA) Funding in support of TI-017. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201DG 130055486500001  LLA : Z3 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003316046 Standard Number: HSCG7916XPC8002 (AA) Funding in support of TI-003. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this 

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 122 of 149 FINAL

 

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXXX

XXXXX

XXXXXX

XXXXX

XXXXX

XXXXXXX

XXXXXXX

Page 126: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

date, but only for work performed through and including the aforementioned date.  7201DH 130055870700001  LLA : Z5 1761804 8B5B 251 VU021 0 050120 2D 000000 A00003344990 Funding in support of TI-014. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201DJ 130055522600001  LLA : Z6 1761804 60BE 310 57012 Y 060951 2D C002PN 5701261BSOWW Standard Number: N5701216RC002PN Funding in support of TI-017. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201DK 130055871400001  LLA : Z7 97X4930 ND2A 310 32205 0 000033 2F 118106 040200025235 Standard Number: N2319616RCP1002 (AB) Funding in support of TI-017. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9201AW 130053282400004  LLA : V2 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003129046 Standard Number: N2152416WRP1003 (AA) Funding in support of TI-017. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9201BN 130055911200001  LLA : Z4 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003347493 Standard Number: F2VUF05302GW01 (AA) Funding in support of TI-007. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9201BP 130055871400002  LLA : Z7 97X4930 ND2A 310 32205 0 000033 2F 118106 040200025235 Standard Number: N2319616RCP1002 (AB) Funding in support of TI-017. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.   MOD 58 Funding  Cumulative Funding   MOD 59  7201BP 130053202700001 (  LLA : U7 97X4930 ND2A 252 32205 0 000033 2F 118106 110200025235 Standard Number: N2319416RCP1002 (AA) Funding in support of TI-017. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201DK 130055871400003  LLA : Z7 97X4930 ND2A 310 32205 0 000033 2F 118106 040200025235 Funding in support of TI-017. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201DL 130056078800001  LLA : 

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 123 of 149 FINAL

 

XXXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXXX

XXXXXX

XXXXX

XXXXX

XXXXXXX

Page 127: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

Z8 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003359890 Standard Number: N0002414WX07485 (AA) Funding in support of TI-004. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201DM 130055838700001  LLA : Z9 1761804 8B5B 251 VU021 0 050120 2D 000000 A00003342764 Funding in support of TI-018. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9201AT 130053202700002 (  LLA : U7 97X4930 ND2A 252 32205 0 000033 2F 118106 110200025235 Standard Number: N2319416RCP1002 (AA) Funding in support of TI-017. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9201BQ 130055838700002  LLA : Z9 1761804 8B5B 251 VU021 0 050120 2D 000000 A00003342764 Funding in support of TI-018. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.   MOD 59 Funding  Cumulative Funding   

  7201DN 130056378700001  LLA : AA 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003380798 Standard Number: MIPR6FDAT16E08 (AA) Funding in support of TI-010. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201DP 130056378800001  LLA : AB 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003380801 Standard Number: F2VUF06055GW03 (02) Funding in support of TI-011. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201DQ 130056268800001  LLA : AC 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003372275 Standard Number: MIPR6FDAT16E08 (AA) Funding in support of TI-013. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201DR 130056474200001  LLA : AD 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003389039 Funding in support of TI-002. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201DS 130056030200001  LLA : AE 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003355559 Standard Number: HSCG7916XPC8002 (AA) Funding in support of TI-020. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date. 

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 124 of 149 FINAL

 

XXXXX

XXXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXXXXXXXXXXXXXXXXXX

Page 128: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

 7201DT 130056704600001  LLA : AF 1761804 8D3D 257 240V0 0 050120 2D 000000 A00003408485 Funding in support of TI-007. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201DU 130056708300001  LLA : AJ 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003408813 Standard Number: HSCG7916XPC8002 (AA) Funding in support of TI-012. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201DV 130056704300001  LLA : AG 97X4930 NH1J 257 77777 0 050120 2F 000000 A00003408378 Standard Number: M9545016WRCW410 (AA) Funding in support of TI-007. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201DW 130056704200001  LLA : AH 97X4930 NH1J 257 77777 0 050120 2F 000000 A00003408375 Standard Number: M9545016WR66136 (AA) Funding in support of TI-007. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201DX 130056821000001  LLA : AK 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003418472 Standard Number: HSCG7916XPC8090 (AA) Funding in support of TI-012. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9201AW 130053282400006  LLA : V2 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003129046 Standard Number: N2152416WRP1003 (AA) Funding in support of TI-017. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9201BR 130056708300002  LLA : AJ 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003408813 Standard Number: HSCG7916XPC8002 (AA) Funding in support of TI-012. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9201BS 130056821000002  LLA : AK 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003418472 Standard Number: HSCG7916XPC8090 (AA) Funding in support of TI-012. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.   MOD 60 Funding  Cumulative Funding   MOD 61  7201DY 130056857000001  LLA : 

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 125 of 149 FINAL

 

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXXX

XXXXX

XXXXXXX

Page 129: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

AL 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003421218 Standard Number: F2VUF05302GW01 (AA) Funding in support of TI-007. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201DZ 130056905300001  LLA : AN 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003425091 Standard Number: N0010416WX41748 (AA) Funding in support of TI-007. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201EA 130056774100001  LLA : AP 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003413607 Standard Number: HSCG7916XPC8004 (AA) Funding in support of TI-012. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201EB 130056963100001  LLA : AQ 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003429522 Standard Number: N0002416WX00998 (AA) Funding in support of TI-018. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201EC 130056972000001  LLA : AR 1761804 8B5B 251 24VCS 0 050120 2D 000000 A00003431814 Funding in support of TI-015. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201ED 130057243500001  LLA : AS 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003451676 Standard Number: N2158116WRP1003 (AA) Funding in support of TI-017. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9201BT 130056973900001  LLA : AM 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003430727 Standard Number: N0002416WX00998 (AA) Funding in support of TI-015. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9201BU 130056774100002  LLA : AP 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003413607 Standard Number: HSCG7916XPC8004 (AA) Funding in support of TI-012. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9201BV 130056963100002  LLA : AQ 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003429522 Standard Number: N0002416WX00998 (AA) Funding in support of TI-018. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9201BW 130057243500002  LLA : AS 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003451676 

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 126 of 149 FINAL

 

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

Page 130: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

Standard Number: N2158116WRP1003 (AA) Funding in support of TI-017. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9201BX 130057112400001  LLA : AT 97X4930 NH1J 257 77777 0 050120 2F 000000 A00003441846 Standard Number: N0002416WX03339 (AA) Funding in support of TI-019. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.   MOD 61 Funding  Cumulative Funding   MOD 62  400002 130037973100001 (  LLA : A2 9730100 56SF SC3 52SP FLMRAP 0 10000 57815 017417 667100 F67100  Standard Number: F2VUF03067G001 Funding in support of TI-11. Note: 10 U.S.C. 2410a Authority is applicable. Contractor may incur costs for work performed against this SLIN for 365 days from effective date of above modification, or through the end date of the period of performance for CLIN 4000, whichever occurs first. Contractor may continue to invoice after the ending date, but only for work performed during the applicable period.  400003 130037893800001 (  LLA : A3 97X4930 NH1J 251 77777 0 050120 2F 000000 A00001913566 Standard Number: N0002413WX07682 Funding in support of TI-9. Note: 10 U.S.C. 2410a Authority does NOT apply. Funds expire 30 September 2015, or through the end date of the period of performance for CLIN 4000, whichever occurs first. Contractor may continue to invoice after this date, but only for work performed up through and including 30 September 2015, or up through and including the last day of the period of performance for CLIN 4000.  400020 130038844800002 (  LLA : C2 9740100 74D7 252 00074 0 068688 2D CCW002 000744DSG03Q Standard Number: N0007414RCCW002 Funding in support of TI-07. Contractor may NOT perform against this SLIN after 30 SEP 2014. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  400029 130040075100001 (  LLA : D5 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002101986 Standard Number: N0001914WX01505 Funding in support of TI-10. Contractor may NOT perform against this SLIN after 14 AUG 2014. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  400030 130040697200001 (  LLA : D7 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002154187 Standard Number: HSCG79-14-X-PC8000 Funding in support of TI-03. Contractor may NOT perform against this SLIN after 14 AUG 2014. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  400036 130041426300001 (  LLA : E6 1741804 8D3D 251 V0000 0 050120 2D 000000 A00002207194 Standard Number: N0002414WX01906 Funding in support of TI-4. Contractor may NOT perform against this SLIN after 14 AUG 2014. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 127 of 149 FINAL

 

XXXXX

XXXXXX

XXXXX

XXXXX

XXXXXX

XXXXX

XXXXX

XXXXX

XXXXXXX

Page 131: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

400043 130042656500001 (  LLA : F4 9740100 56SA 0 5 0 501 7 01217 4K L000 3 1CA 58GBMD M IPR4DDAVGB021 GBMD58 031007  Standard Number: MIPR4DDAVGB021(AA) Funding in support of TI-06. Contractor may NOT perform against this SLIN after 14 AUG 2014. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  400044 130043342700001 (  LLA : F6 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002348049 Standard Number: Noo16414SD04001 (AA) Funding in support of TI-02. Contractor may NOT perform against this SLIN after 14 AUG 2014. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7001AD 130044415900001 (  LLA : E3 9740100 56SF SC4 52SPF L MRAP01 00 005781 501741766710 0F2VUF03309G002 F67100 ESP:  ST FSR: 023979 PSR: I01921 DSR: 232295 Standard Number: F2VUF03309G002 (AA) Funding in support of TI-11. 10 USC 2410(a) Authority is hereby invoked. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7001AJ 130043794200001 (  LLA : G4 1741810 87X7 251 V0000 0 050120 2D 000000 A00002380426 Standard Number: N0002414WX05740 Funding in support of TI-09. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7001AK 130044476700001 (  LLA : G5 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002426315 Standard Number: HSCGFT-14-X-PBN007 Funding in support of TI-12. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7001BM 130046927000001 (  LLA : K4 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002653120 Contractor may NOT perform against this SLIN after PoP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7001BQ 130047085500001 (  LLA : K7 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002666174 Standard Number: HSCG7915XPC8020 Funding in support of TI-14. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7001CB 130048607200001 (  LLA : U1 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002783375 Standard Number: N0002415WX02288 Funding in support of TI-01. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7001CC 130048616400001 (  LLA : M3 97X4930 NH1J 253 77777 0 050120 2F 000000 A00002784723 Standard Number: F2VUF04304GW02 Funding in support of TI-06. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date. 

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 128 of 149 FINAL

 

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXXX

XXXXXX

XXXXXX

XXXXX

Page 132: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

 7001CH 130049566300001 (  LLA : M8 97X4930 NH1J 253 77777 0 050120 2F 000000 A00002853683 Standard Number: N0016415SD05001 (AA) Funding in support of TI-02. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7001CJ 130049744300001 (  LLA : M9 2152020 000 A5XC I 12201 1V FRE 25 71 001063758 7 A.0021705.4.2.1 021001  Standard Number: 10637587 Funding in support of TI-10. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7001CL 130050489900001 (  LLA : N2 9750300 56SF SD5 52SQ 24K04B N 80160 00000F 3877 00 F2VUF05120GW04 F87700  Standard Number: F2VUF05120GW04 (AA) Funding in support of TI-06. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7001CM 130050239400001 (  LLA : N3 9750100 56SF SC5 52SP FLMRAP 0 1 5781 5 017417 387 700 F2VUF05096GW02 F87700  Standard Number: F2VUF05096GW02 (AA) Funding in support of TI-11. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7001CP 130050157000001 (  LLA : N5 97X4930 NH1J 252 77777 0 050120 2F 000000 A00002896529 Standard Number: HSCG7915XPC8044 Funding in support of TI-0012. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7001CT 130050750800001 (  LLA : N9 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002935179 Standard Number: N0002415WX0255 (AA) Funding in support of TI-15. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7001CV 130050866200001 (  LLA : P3 97X4930 NH1J 252 77777 0 050120 2F 000000 A00002942679 Standard Number: N4027315WX0039C (AA) Funding in support of TI-04. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7001CW 130051203200001 (  LLA : P5 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002964667 Standard Number: M9545015WR34K69 (AA) Funding in support of TI-07. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7001CX 130051203500001 (  LLA : P6 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002964804 Standard Number: M9545015WR34K69 (AA) Funding in support of TI-07. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date. 

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 129 of 149 FINAL

 

XXXXX

XXXXX

XXXXX

XXXXXX

XXXXXX

XXXXX

XXXXX

XXXXX

XXXXX

Page 133: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

 7001CY 130051203100001 (  LLA : P7 97X4930 NH1J 251 77777 0 050120 2F 000000 A00002964662 Standard Number: V4789815WXB0079 (AA) Funding in support of TI-07. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date,but only for work performed through and including the aforementioned date.  7201BJ 130052860000001 (  LLA : T7 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003084249 Standard Number: HSCG7915XPC8044 Funding in support of TI-012. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201EF 130057319300001  LLA : AU 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003457836 Standard Number: HSCG7916XPC8002 (AA) Funding in support of TI-012. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9201BY 130057319300002  LLA : AU 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003457836 Standard Number: HSCG7916XPC8002 (AA) Funding in support of TI-012. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.   MOD 62 Funding -  Cumulative Funding   MOD 63  7201EG 130057793200001  LLA : AV 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003488671 Standard Number: F2VUF04202GW03(AA) Funding in support of TI-007. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201EH 130057786700001  LLA : AW 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003488666 Standard Number: N4175616WX50197 (AA) Funding in support of TI-007. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201EJ 130057984500001  LLA : AX 2162020 0000 5E 5E22 P 411328 0 000 25 1C MIPR6TUWA R05D9 S01021  Standard Number: MIPR6TUWAR05D9 (AA) MRRN: 9U61411628TUWAR05D9 MDEP: VFRE JONO: 69U411 COST CENTER: 9U0000 ACCT STA DODAAD: S01021  Funding in support of TI-013. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may con  7201EK 130057811100001  LLA : AY 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003489450 Standard Number: HSCG7916XPC8004 (AA) Funding in support of TI-012. Contractor may NOT perform against this SLIN after 

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 130 of 149 FINAL

 

XXXXX

XXXXX

XXXXX

XXXXX

XXXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXXXX

Page 134: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9201BZ 130057811100002  LLA : AY 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003489450 Standard Number: HSCG7916XPC8004 (AA) Funding in support of TI-012. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.   MOD 63 Funding  Cumulative Funding   MOD 64  7301AA 130057791300001  LLA : AZ 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003488500 Standard Number: N2158116WRP1003 (AA) Funding in support of TI-022. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7301AB 130058740600001  LLA : BA 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003552963 Standard Number: N0001416WX01502 (AA) Funding in support of TI-024. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7301AC 130058639200001  LLA : BB 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003546626 Standard Number: HSCG7916XPC8045 (AA) Funding in support of TI-003. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7301AD 130058644900001  LLA : BC 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003546984 Standard Number: N0002416W03255 (AA) Funding in support of TI-014. 10 USC 2410(a) Authority is hereby invoked. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7301AE 130058328200001  LLA : BE 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003524615 Standard Number: N2158216WRP1004 (AA) Funding in support of TI-023. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7301AF 130057791400001  LLA : BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003488501 Standard Number: N2185716WRP1003 (AA) Funding in support of TI-021. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7301AG 130058707100001  LLA : BH 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003550562 Standard Number: HSCG7916XPC8045 (AA) Funding in support of TI-020. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this 

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 131 of 149 FINAL

 

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXXX

XXXXX

XXXXX

XXXXX

XXXXXXX

Page 135: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

date, but only for work performed through and including the aforementioned date.  7301AH 130058796200001  LLA : BJ 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003556021 Standard Number: N0002416WX04525 (AB) Funding in support of TI-018. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7301AJ 130058932700001  LLA : BD 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003564919 Standard Number: HSCG7916XPC8045 (AA) Funding in support of TI-012. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7301AK 130058814200001  LLA : BK 1761810 84RA 310 V4X00 0 050120 2D 000000 A00003556979 Standard Number: N0002416WX01574 Funding in support of TI-001. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9301AD 130057791300002  LLA : AZ 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003488500 Standard Number: N2158116WRP1003 (AA) Funding in support of TI-022. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9301AE 130058740600002  LLA : BA 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003552963 Standard Number: N0001416WX01502 (AA) Funding in support of TI-024. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9301AF 130058328200002  LLA : BE 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003524615 Standard Number: N2158216WRP1004 (AA) Funding in support of TI-023. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9301AG 130058796200002  LLA : BJ 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003556021 Standard Number: N0002416WX04525 (AB) Funding in support of TI-018. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9301AH 130058932700002  LLA : BD 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003564919 Standard Number: HSCG7916XPC8045 (AA) Funding in support of TI-012. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9301AJ 130058814200002  LLA : BK 1761810 84RA 310 V4X00 0 050120 2D 000000 A00003556979 Standard Number: N0002416WX01574 Funding in support of TI-001. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this 

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 132 of 149 FINAL

 

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

XXXXX

Page 136: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

date, but only for work performed through and including the aforementioned date.   MOD 64 Funding  Cumulative Funding   MOD 65  7201EB 130056963100001 (  LLA : AQ 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003429522 Standard Number: N0002416WX00998 (AA) Funding in support of TI-018. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7301AE 130058328200003  LLA : BE 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003524615 Standard Number: N2158216WRP1004 (AA) Funding in support of TI-023. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7301AF 130057791400002  LLA : BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003488501 Standard Number: N2185716WRP1003 (AA) Funding in support of TI-021. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7301AL 130059256800001  

 BL 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 Standard Number: N4657916WR001CE (AA) Funding in support of TI-024. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9201BT 130056973900001 (  LLA : AM 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003430727 Standard Number: N0002416WX00998 (AA) Funding in support of TI-015. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9201BV 130056963100002 (  LLA : AQ 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003429522 Standard Number: N0002416WX00998 (AA) Funding in support of TI-018. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9301AF 130058328200004  LLA : BE 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003524615 Standard Number: N2158216WRP1004 (AA) Funding in support of TI-023. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  9301AK 130059256800002  LLA : BL 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 Standard Number: N4657916WR001CE (AA) Funding in support of TI-024. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 133 of 149 FINAL

 

XXXXXX

XXXXX

XXXXX

XXXXXX

XXXXXX

XXXXX

XXXXXXXXXXXXX

XXXXXXXXXX

XXXXX

Page 137: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

9301AL 130059341300001  LLA : BG 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003589013 Standard Number: N2185716WRP1003 (AA) Funding in support of TI-021 Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.   MOD 65 Funding  Cumulative Funding   MOD 66  7201EL 130060147500001  LLA : BM 97X4930 NH1J 257 77777 0 050120 2F 000000 A00003646398 Standard Number: N0002415WX07804 (AA) Funding in support of TI-007. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201EM 130060128200001  LLA : BN 97X4930 NH1J 257 77777 0 050120 2F 000000 A00003645248 Standard Number: V4789816WXH0084 (AA) Funding in support of TI-007. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201EN 130060147800001  LLA : BN 97X4930 NH1J 257 77777 0 050120 2F 000000 A00003646555 Standard Number: N0002415WX08771 (AA) Funding in support of TI-007. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201EP 130060149100001  LLA : BQ 97X4930 NH1J 257 77777 0 050120 2F 000000 A00003646654 Standard Number: N0002415WX06466 (AA) Funding in support of TI-007. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201EQ 130060238900001  LLA : BR 97X4930 NH1J 251 77777 0 050120 2F 000000 A00003657428 Standard Number: N0016416SD06001 Funding in support of TI-007. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201ER 130060147600001  LLA : BS 97X4930 NH1J 257 77777 0 050120 2F 000000 A00003646552 Standard Number: N0002415WX07423 (AA) Funding in support of TI-007. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.  7201ES 130060249200001  LLA : BT 97-11X8242 2880 000 74802 0 065916 2D PUKW44 335360020LUW Standard Number: N0002414RX00328 Funding in support of TI-007. Contractor may NOT perform against this SLIN after POP date identified in Section F. Contractor may continue to invoice after this date, but only for work performed through and including the aforementioned date.   MOD 66 Funding  

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 134 of 149 FINAL

 

XXXXX

XXXXXXXXXXXXX

XXXXX

XXXXX

XXXX

XXXX

XXXXX

XXXX

XXXXX

XXXXX

Page 138: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

Cumulative Funding  

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 135 of 149 FINAL

 

XXXXXXX

Page 139: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

SECTION H SPECIAL CONTRACT REQUIREMENTS

All provisions and clauses in SECTION H of the basic contract apply to this TO, unless otherwisespecified in this TO.

NAVSEA 5252.216-9122  LEVEL OF EFFORT – ALTERNATE 1 (MAY 2010)

(a)  The Contractor agrees to provide the total level of effort specified in the next sentence in performance of the workdescribed in Sections B and C of this contract.  The total level of effort for the performance of this contract shall be 166,699 total man-hours of direct labor, including subcontractor direct labor for those subcontractors specificallyidentified in the Contractor's proposal as having hours included in the proposed level of effort (does not includesurge CLINS).

(b)  Of the total man-hours of direct labor set forth above, it is estimated that zero (0) man-hours are uncompensatedeffort.

Uncompensated effort is defined as hours provided by personnel in excess of 40 hours per week without additionalcompensation for such excess work.  All other effort is defined as compensated effort.  If no effort is indicated in thefirst sentence of this paragraph, uncompensated effort performed by the Contractor shall not be counted in fulfillmentof the level of effort obligations under this contract.

(c)  Effort performed in fulfilling the total level of effort obligations specified above shall only include effort performedin direct support of this contract and shall not include time and effort expended on such things as (local travel to andfrom an employee's usual work location), uncompensated effort while on travel status, truncated lunch periods, work(actual or inferred) at an employee's residence or other non-work locations (except as provided in paragraph (i)below), or other time and effort which does not have a specific and direct contribution to the tasks described inSections B and C.

(d)  The level of effort for this contract shall be expended at an average rate of approximately  hours per week.  Itis understood and agreed that the rate of man-hours per month may fluctuate in pursuit of the technical objective,provided such fluctuation does not result in the use of the total man-hours of effort prior to the expiration of the termhereof, except as provided in the following paragraph.

(e)  If, during the term hereof, the Contractor finds it necessary to accelerate the expenditure of direct labor to such anextent that the total man hours of effort specified above would be used prior to the expiration of the term, theContractor shall notify the Contracting Officer in writing setting forth the acceleration required, the probable benefitswhich would result, and an offer to undertake the acceleration at no increase in the estimated cost or fee together withan offer, setting forth a proposed level of effort, cost breakdown, and proposed fee, for continuation of the work untilexpiration of the term hereof.  The offer shall provide that the work proposed will be subject to the terms andconditions of this contract and any additions or changes required by then current law, regulations, or directives, andthat the offer, with a written notice of acceptance by the Contracting Officer, shall constitute a binding contract.  TheContractor shall not accelerate any effort until receipt of such written approval by the Contracting Officer.  Anyagreement to accelerate will be formalized by contract modification.

(f)  The Contracting Officer may, by written order, direct the Contractor to accelerate the expenditure of direct laborsuch that the total man-hours of effort specified in paragraph (a) above would be used prior to the expiration of theterm.  This order shall specify the acceleration required and the resulting revised term.  The Contractor shallacknowledge this order within five days of receipt.

(g)  The Contractor shall provide and maintain an accounting system, acceptable to the Administrative ContractingOfficer and the Defense Contract Audit Agency (DCAA), which collects costs incurred and effort (compensated anduncompensated, if any) provided in fulfillment of the level of effort obligations of this contract.  The Contractor shallindicate on each invoice the total level of effort claimed during the period covered by the invoice, separatelyidentifying compensated effort and uncompensated effort, if any.

(h)  Within 45 days after completion of the work under each separately identified period of performance hereunder,the Contractor shall submit the following information in writing to the Contracting Officer with copies to thecognizant Contract Administration Office and to the DCAA office to which vouchers are submitted:  (1) the total

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 136 of 149 FINAL

 

XXX

Page 140: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

number of man-hours of direct labor expended during the applicable period; (2) a breakdown of this total showingthe number of man-hours expended in each direct labor classification and associated direct and indirect costs; (3) abreakdown of other costs incurred; and (4) the Contractor's estimate of the total allowable cost incurred under thecontract for the period.  Within 45 days after completion of the work under the contract, the Contractor shall submit,in addition, in the case of a cost underrun; (5) the amount by which the estimated cost of this contract may bereduced to recover excess funds.  All submissions shall include subcontractor information.

(i) Unless the Contracting Officer determines that alternative worksite arrangements are detrimental to contractperformance, the Contractor may perform up to 10% of the hours at an alternative worksite, provided the Contractorhas a company-approved alternative worksite plan.  The primary worksite is the traditional “main office” worksite.An alternative worksite means an employee’s residence or a telecommuting center.  A telecommuting center is ageographically convenient office setting as an alternative to an employee’s main office. The Government reserves theright to review the Contractor’s alternative worksite plan. In the event performance becomes unacceptable, theContractor will be prohibited from counting the hours performed at the alternative worksite in fulfilling the totallevel of effort obligations of the contract. Regardless of work location, all contract terms and conditions, includingsecurity requirements and labor laws, remain in effect.  The Government shall not incur any additional cost norprovide additional equipment for contract performance as a result of the Contractor’s election to implement analternative worksite plan.

(j) Notwithstanding any of the provisions in the above paragraphs and subject to the LIMITATION OF FUNDS orLIMITATION OF COST clauses, as applicable, the period of performance may be extended and the estimated costmay be increased in order to permit the Contractor to provide all of the man-hours listed in paragraph (a) above. The contractor shall continue to be paid fee for each man-hour performed in accordance with the terms of the contract.

TO ORDER RATES

The following rates have been approved for this TO.

Annual Labor Escalation:  1% per year

Maximum Pass-Thru Rate:  5% Fixed Fee on Subcontractor Costs, Total Pass-Thru amount not to exceed 8%.

Maximum Fee:  5% on Prime Costs

The above maximum rates are applicable to the prime contractor. If subcontracting is proposed, the prime contractor isstrongly encouraged to restrict subcontractor fixed fee to the lower of (a) the prime contractor’s fee under this order or(b) the subcontractor’s SeaPort-e fixed fee rate where the subcontractor is also a prime contractor under SeaPort-e. Thepurpose of this is the Government’s desire to avoid having it be more financially lucrative for a firm to be asubcontractor rather than a prime contractor under SeaPort-e. The Government strongly encourages the prime contractorto also implement this under Time and Materials subcontracts. Subcontractors may not earn fee on ODC’s.

The Government also strongly encourages the prime contractor to eliminate “double pass-thru” costs by (1) avoidingsecond tier subcontractors/consultants during performance and (2) where this situation is unavoidable, limitingsubcontractor pass-thru costs to the lower of (i) the prime contractor’s pass-thru rate under this order or (ii) thesubcontractor’s SeaPort-e pass-thru rate where the subcontractor is also a prime contractor under SeaPort-e. 

NAVSEA 5252.242-9115 TECHNICAL INSTRUCTIONS (APRIL 1999)

(a)  Performance of the work hereunder may be subject to written technical instructions signed by the ContractingOfficer's Representative specified in Section G of this contract.  As used herein, technical instructions are defined toinclude the following:

       (1)  Directions to the Contractor which suggest pursuit of certain lines of inquiry, shift work emphasis, fill indetails or otherwise serve to accomplish the contractual statement of work.

       (2)  Guidelines to the Contractor which assist in the interpretation of drawings, specifications or technicalportions of work description.

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 137 of 149 FINAL

 

Page 141: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

(b)  Technical instructions must be within the general scope of work stated in the contract.  Technical instructionsmay not be used to:  (1) assign additional work under the contract; (2) direct a change as defined in the"CHANGES" clause of this contract; (3) increase or decrease the contract price or estimated contract amount(including fee), as applicable, the level of effort, or the time required for contract performance; or (4) change any of theterms, conditions or specifications of the contract.

(c)  If, in the opinion of the Contractor, any technical instruction calls for effort outside the scope of the contract or isinconsistent with this requirement, the Contractor shall notify the Contracting Officer in writing within ten (10)working days after the receipt of any such instruction.  The Contractor shall not proceed with the work affected bythe technical instruction unless and until the Contractor is notified by the Contracting Officer that the technicalinstruction is within the scope of this contract.

(d)  Nothing in the foregoing paragraph shall be construed to excuse the Contractor from performing that portion ofthe contractual work statement which is not affected by the disputed technical instruction.

NAVSEA 5252.202-9101  ADDITIONAL DEFINITIONS (MAY 1993) As used throughout this contract, the following terms shall have the meanings set forth below:

(a) DEPARTMENT means the Department of the Navy.

(b) REFERENCES TO THE FEDERAL ACQUISITION REGULATION (FAR)   All references to the FAR in thiscontract shall be deemed to also reference the appropriate sections of the Defense FAR Supplement (DFARS), unlessclearly indicated otherwise.

(c) REFERENCES TO ARMED SERVICES PROCUREMENT REGULATION OR DEFENSE ACQUISITIONREGULATION   All references in this document to either the Armed Services Procurement Regulation (ASPR) orthe Defense Acquisition Regulation (DAR) shall be deemed to be references to the appropriate sections of theFAR/DFARS.

(d) NATIONAL STOCK NUMBERS   Whenever the term Federal Item Identification Number and its acronymFIIN or the term Federal Stock Number and its acronym FSN appear in the contract, order or their citedspecifications and standards, the terms and acronyms shall be interpreted as National Item Identification Number(NIIN) and National Stock Number (NSN) respectively which shall be defined as follows:

 (1)  National Item Identification Number (NIIN).  The number assigned to each approved Item Identification underthe Federal Cataloging Program.  It consists of nine numeric characters, the first two of which are the NationalCodification Bureau (NCB) Code.  The remaining positions consist of a seven digit non significant number.

 (2)  National Stock Number (NSN).  The National Stock Number (NSN) for an item of supply consists of theapplicable four position Federal Supply Class (FSC) plus the applicable nine position NIIN assigned to the item ofsupply.

 NAVSEA 5252.232-9104  ALLOTMENT OF FUNDS (JAN 2008)

(a)  This contract is incrementally funded with respect to both cost and fee.  The amount(s) presently available andallotted to this contract for payment of fee for incrementally funded contract line item number/contract subline itemnumber (CLIN/SLIN), subject to the clause entitled "FIXED FEE" (FAR 52.216-8) or "INCENTIVE FEE" (FAR52.216-10), as appropriate, is specified below.  The amount(s) presently available and allotted to this contract forpayment of cost for incrementally funded CLINs/SLINs is set forth below.  As provided in the clause of this contractentitled "LIMITATION OF FUNDS" (FAR 52.232-22), the CLINs/SLINs covered thereby, and the period ofperformance for which it is estimated the allotted amount(s) will cover are as follows:

                                                                                                      ESTIMATEDITEM(S)         ALLOTTED TO COST          ALLOTTED TO FEE      PERIOD OF PERFORMANCE   *                          $                                                  $ 

(b)  The parties contemplate that the Government will allot additional amounts to this contract from time to time forthe incrementally funded CLINs/SLINs by unilateral contract modification, and any such modification shall state

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 138 of 149 FINAL

 

Page 142: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

separately the amount(s) allotted for cost, the amount(s) allotted for fee, the CLINs/SLINs covered thereby, and theperiod of performance which the amount(s) are expected to cover.

(c)  CLINs/SLINs        N/A                               are fully funded and performance under these CLINs/SLINs issubject to the clause of this contract entitled "LIMITATION OF COST" (FAR 52.232-20).

(d)  The Contractor shall segregate costs for the performance of incrementally funded CLINs/SLINs from the costs ofperformance of fully funded CLINs/SLINs.

NAVSEA 5252.245-9108  GOVERNMENT FURNISHED PROPERTY (SEP 1990)The Government will provide only that property set forth below, notwithstanding any term or condition of this taskorder to the contrary. Upon Contractor's written request to the cognizant COR, via the cognizant Procuring ContractOffice (NSWC Crane), the Government will furnish the following for use in the performance of this task

order:            

Attachment 2 - Historical GFX List

Also identified upon issuance of each Technical Instruction (TI).  

H20S INSURANCE - WORK ON A GOVERNMENT INSTALLATIONThe following types of insurance are required in accordance with the clause entitled. Insurance - Work On AGovernment Installation (FAR 52.228-5), and shall be maintained in the minimum amounts shown: 

1.       Bodily injury liability insurance coverage shall be written on the comprehensive form of policy of at least per occurrence.

2.       Automobile Insurance: per person and per accident for bodily injury and peraccident for property damage.

3.       Standard Workmen's Compensation and Employer's Liability Insurance (or, where maritime employment isinvolved, Longshoremen's and Harbor Worker's Compensation Insurance) in the minimum of  

H83S SERVICE CONTRACT ACT WAGE DETERMINATION (JUN 2004)The applicable Service Contract Wage Determinations by the Secretary of Labor are provided as Attachment 03 -Wage Determination in Section J. 

HG10S CONTRACTUAL AUTHORITY AND COMMUNICATIONS (JUN 2004)

(a) Except as specified in subparagraph (b) below, no order, statement, or conduct of any Government personnel whovisit the contractor's facilities or in any other manner communicates with contractor personnel during theperformance of this task order shall constitute a change under the Changes clause of this task order.  

(b) The contractor shall not comply with any order, direction or request of Government personnel unless it is issuedin writing and signed by the Contracting Officer, or is pursuant to specific authority otherwise included as a part ofthis task order.  

(c) The Contracting Officer is the only person authorized to approve changes in any of the requirements of this taskorder and, notwithstanding provisions contained elsewhere in this task order, the said authority remains solely theContracting Officer's. In the event the contract effects any change at the direction of any person other than theContracting Officer, the change will be considered to have been made without authority and no adjustment will bemade in the task order price to cover any increase in charges incurred as a result thereof. 

CONFORMANCE WITH THE ENVIRONMENTAL MANAGEMENT SYSTEM

The Contractor shall perform work under this contract, at the installation or at the Contractor site, consistent with

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 139 of 149 FINAL

 

XXXXXX

XXXXX XXXX

XXXXX

XXXXX

Page 143: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

the policy and objectives identified in the installation's Environmental Management System (EMS) and applicablerules and regulations provided to the contractor as Government Furnished Information (GFI).  The Contractor shallperform work in a manner that conforms to objectives and targets, environmental programs and operational controlsidentified by the EMS.  The Contractor shall provide monitoring and measurement information as required by theEMS coordinator (Environmental Protection Manager) to address environmental performance relative toenvironmental, energy, and transportation management goals. 

In the event an EMS nonconformance or environmental noncompliance associated with the contracted services,tasks, or actions occurs, the Contractor shall be responsible for coordinating with the installation's EnvironmentalProtection office on proposed corrective and/or preventive actions and for completing all corrective/preventive actionsas required by the EMS coordinator or the Environmental Protection Office.  In addition, the Contractor shall ensureits employees are aware of their roles and responsibilities under the EMS and Environmental laws and regulations,and how these EMS roles and responsibilities affect work performed under the contract. 

The Contractor shall be responsible for ensuring their employees receive applicable environmental and occupationalhealth and safety training, and maintain regulatory-required specific training for the type of work to be conducted. All Contractor personnel, and their subcontractor personnel, performing tasks that have the potential to cause anenvironmental impact shall be competent on the basis of appropriate education, training or experience.    Uponcontract award, the Government will provide EMS Awareness and Environmental Awareness training on CD to theContractor.  The Contractor shall provide the EMS coordinator with all training records required by the EMScoordinator or the Environmental Protection Office (including but not limited to EMS training, waste watertreatment certifications, asbestos certifications, etc.) for all contractor personnel and subcontractor personnel within30 days prior to performance or at time of contract award whichever comes first and annually thereafter. Theinstallation EMS Coordinator will retain associated records.

RAPIDGate       NSA/NSWC CRANE INSTALLATION ACCESS .(May 2012) 

If this contract includes the clause "FAR 52.204-9 Personal Identity Verification of Contractor Personnel" or willotherwise require frequent access to NSA/NSWC Crane site, the Contractor shall consider taking advantage of thebenefits available from the following RAPIDGate program: 

NSA/NSWC Crane is implementing the Navy Commercial Access Control System (NCACS) projects. TheNCACS is the standard identity management and perimeter installation access control solution for the accessmanagement of vendors, contractors, suppliers and service providers who are not authorized a Common Access Card(CAC). The rationale for implementation of this system is to increase security while reducing impacts to thecontractor community by improving efficiencies for base entry.  

The new protocol being implemented to fulfill this NCACS requirement is the RAPIDGate system. The systemmeets Presidential Directive (HSPD-12) requirements by providing background checks of contractor personnel. Apersonal badge that affords base access (and/or multiple base access) for one year will be issued to each Contractoremployee that meets background check criteria. While Contractors are not required to participate in this program,those Contractors who choose not to participate will be required to obtain daily passes for base access.  

There are costs for contractors to participate in the RAPIDGate program which include a fee for the Contractor’s formand a fee per Contractor employee. Costs to participating Contractor’s are recaptured through increased productivityof their employees due to the reduction in waiting times at the Pass and Identification Office and Entry ControlPoint (ECP).  Costs shall not be directly billed to the Government. The costs to participate in the RAPIDGateprogram are identified in the table below.  

A Government Sponsor is required to validate a Contractor’s request for RAPIDGate access, and shall be theContracting Officer’s Representative (COR).  If there is no COR, then the Government Sponsor is the ContractingOfficer (KO). 

The Government does not guarantee the contractor’s successful enrollment or the successful enrollment of anycontractor employees in the RAPIDGate program. Significant delays may result from choosing to access theinstallation by obtaining a one day pass. The Government will not be held responsible for any access delays

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 140 of 149 FINAL

 

Page 144: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

associated with using the daily pass process.  Please address any questions or concerns regarding RAPIDGate to theCOR or the local Base Security Office personnel listed below.   

NSA/NSWC Crane RAPIDGate Primary Program Point of Contact is Jon Thomas, and can be reached atJon.M.Thomas@Navy mil or at 812-854-5624.  NSA/NSWC Crane RAPIDGate Secondary Program Point ofContact is Larry Patterson, and can be reached at [email protected] or 812-854-5642.  

Additional information is available at http://www.rapidgate.com/rapidgate 

RAPIDGate Pricing—(Subject to change without notice): 

Program Enrollment Price

Single Installation Company annuallySingle Installation Employee annuallyEnterprise                        (Multiple installations)

Company annually - 2 or more

installationsEnterprise                        (Multiple installations)

Employee annually  2 or more

installations90 day Option Employee per 90 daysReplacement Credential Employee per credential

 

(end of clause)

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 141 of 149 FINAL

 

XXXXXXXXXX

XXXXX

XXXXX

XXXXXXXX

Page 145: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

SECTION I CONTRACT CLAUSES

All provisions and clauses in SECTION I of the basic contract apply to this TO, unless otherwise specified in thisTO.

CLAUSES INCORPORATED BY REFERENCE (FEB 1998) (FAR 52.252-2) 

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given infull text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause maybe accessed electronically at this/these address (es): http://www.farsite.hill.af.mil/

52.203-16         Preventing Personal Conflicts of Interest (Dec 2011)52.204-10         Reporting Subcontract Awards (Sep 2007)52.204-09         Personal identity Verification of Contractor Personnel (Jan 2011)52.222-29         Notification of Visa Denial (Jun 2003) IF OCONUS travel52.222-41         Service Contract Act of 1965 (Nov 2007)52.223-5           Pollution Prevention and Right-to-Know Information (May 2011)52.223-10         Waste Reduction Program (May 2011)52.227-1           Authorization and Consent (Dec 2007)52.232-22         Limitation of Funds (Apr 1984)52.237-2           Protection of Government Buildings, Equipment, and Vegetation (Apr 1984)52.237-3           Continuity of Services (Jan 1991)52.245-1           Government Property (Apr 2012)252.227-7013   Rights in Technical Data - Noncommercial Items (FEB 2012)252.227-7014   Rights in Noncommercial Computer Software and Noncommercial Computer SoftwareDocumenation (FEB 2012)252.227-7028   Technical Data or Computer Software Previously Delivered to the Government (Jun 1995)252.227-7030   Technical Data--Withholding of Payment (Mar 2000)252.242-7004   Material Management and Accounting System (May 2011)252.242-7006   Accounting System Administration (Feb 2012)252.244-7001   Contractor Purchasing System Administration (May 2011)252.245-7001   Tagging, Labeling, and Marking of Government-Furnished Property (Feb 2011)252.245-7002   Reporting Loss of Government Property (Feb 2011)252.245-7003   Contractor Property Management System Administration (Feb 2012

252.204-7012 Safeguarding of Unclassified Controlled Technical Information (NOV 2013

 

52.217-8 - OPTION TO EXTEND SERVICE (NOV 1999)

The Government may require continued performance of any services within the limits and at the rates specified in thecontract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretaryof Labor. The option provision may be exercised more than once, but the total extension of performance hereundershall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractorwithin 60 days. 

FAR 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000) (NAVSEAVARIATION) (SEP 2009)

(a) The Government may extend the term of this contract by written notice(s) to the Contractor within the periodsspecified below. If more than one option exists the Government has the right to unilaterally exercise any such optionwhether or not it has exercised other options.

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 142 of 149 FINAL

 

Page 146: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

ITEM(S) LATEST OPTION EXERCISE DATE

CLIN 4100 No later than 11 months after the TO Award date.CLIN 7000 No later than 11 months after the TO Award date.CLIN 7100 No later than 23 months after the TO Award date.CLIN 7200 No later than 23 months after the TO Award date.CLIN 7300 No later than 35 months after the TO Award date.CLIN 6100 No later than 11 months after the TO Award dateCLIN 9000 No later than 11 months after the TO Award date.CLIN 9100 No later than 23 months after the TO Award date.CLIN 9200 No later than 23 months after the TO Award date.CLIN 9300 No later than 35 months after the TO Award date.

(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.

(c) The total duration of this contract, including the exercise of any option(s) under this clause, shall notexceed three (3) years, however, in accordance with paragraph (g) of the requirement of this contract entitled "LEVELOF EFFORT" (NAVSEA 5252.216-9122), if the total manhours delineated in paragraph (a) of the LEVEL OFEFFORT requirement, have not been expended within the period specified above, the Government may require theContractor to continue to perform the work until the total number of manhours specified in paragraph (a) of theaforementioned requirement have been expended.

 

52.219-6 -- Notice of Total Small Business Set-Aside.

(a) Definition. “Small business concern,” as used in this clause, means a concern, including its affiliates, that isindependently owned and operated, not dominant in the field of operation in which it is bidding on Governmentcontracts, and qualified as a small business under the size standards in this solicitation.

(b) Applicability. This clause applies only to--

            (1) Contracts that have been totally set aside or reserved for small business concerns; and            (2) Orders set aside for small business concerns under multiple-award contracts as described in 8.405-5                  and 16.505(b)(2)(i)(F).*

(c) General.

(1) Offers are solicited only from small business concerns. Offers received from concerns that are not smallbusiness concerns shall be considered nonresponsive and will be rejected.(2) Any award resulting from this solicitation will be made to a small business concern.

(d) Agreement. A small business concern submitting an offer in its own name shall furnish, in performing thecontract, only end items manufactured or produced by small business concerns in the United States or its outlyingareas. If this procurement is processed under simplified acquisition procedures and the total amount of this contractdoes not exceed a small business concern may furnish the product of any domestic firm. This paragraphdoes not apply to construction or service contracts.

52.222-2 PAYMENT FOR OVERTIME PREMIUMS (JUL 1990)

(a) The use of overtime is authorized under this contract if the overtime premium does not exceed  or theovertime premium is paid for work --

(1) Necessary to cope with emergencies such as those resulting from accidents, natural disasters, breakdowns of

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 143 of 149 FINAL

 

XXXXXX

XXXXX

Page 147: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

production equipment, or occasional production bottlenecks of a sporadic nature;

(2) By indirect-labor employees such as those performing duties in connection with administration, protection,transportation, maintenance, standby plant protection, operation of utilities, or accounting;

(3) To perform tests, industrial processes, laboratory procedures, loading or unloading of transportation conveyances,and operations in flight or afloat that are continuous in nature and cannot reasonably be interrupted or completedotherwise; or

(4) That will result in lower overall costs to the Government.

(b) Any request for estimated overtime premiums that exceeds the amount specified above shall include all estimatedovertime for contract completion and shall --

(1) Identify the work unit; e.g., department or section in which the requested overtime will be used, together withpresent workload, staffing, and other data of the affected unit sufficient to permit the Contracting Officer to evaluatethe necessity for the overtime;

(2) Demonstrate the effect that denial of the request will have on the contract delivery or performance schedule;

(3) Identify the extent to which approval of overtime would affect the performance or payments in connection withother Government contracts, together with identification of each affected contract; and

(4) Provide reasons why the required work cannot be performed by using multishift operations or by employingadditional personnel.

52.223-18 – Encouraging Contractor Policies to Ban Text Messaging While Driving.

(a) Definitions. As used in this clause--

“Driving”—

(1) Means operating a motor vehicle on an active roadway with the motor running, including whiletemporarily stationary because of traffic, a traffic light, stop sign, or otherwise.

(2) Does not include operating a motor vehicle with or without the motor running when one has pulled overto the side of, or off, an active roadway and has halted in a location where one can safely remain stationary.

“Text messaging” means reading from or entering data into any handheld or other electronic device, including forthe purpose of short message service texting, e-mailing, instant messaging, obtaining navigational information, orengaging in any other form of electronic data retrieval or electronic data communication. The term does not includeglancing at or listening to a navigational device that is secured in a commercially designed holder affixed to thevehicle, provided that the destination and route are programmed into the device either before driving or whilestopped in a location off the roadway where it is safe and legal to park.

(b) This clause implements Executive Order 13513, Federal Leadership on Reducing Text Messaging whileDriving, dated October 1, 2009.

(c) The Contractor is encouraged to—

(1) Adopt and enforce policies that ban text messaging while driving—

(i) Company-owned or -rented vehicles or Government-owned vehicles; or

(ii) Privately-owned vehicles when on official Government business or when performing any work foror on behalf of the Government.

(2) Conduct initiatives in a manner commensurate with the size of the business, such as—

(i) Establishment of new rules and programs or re-evaluation of existing programs to prohibit text

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 144 of 149 FINAL

 

Page 148: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

messaging while driving; and

(ii) Education, awareness, and other outreach to employees about the safety risks associated withtexting while driving.

(d) Subcontracts. The Contractor shall insert the substance of this clause, including this paragraph (d), in allsubcontracts that exceed the micro-purchase threshold.

(End of clause)

FAR 52.228-3, Workers’ Compensation Insurance (Defense Base Act) (Apr 1984)

The Contractor shall

(a) provide, before commencing performance under this contract, such workers’ compensation insurance or securityas the Defense Base Act (42 U.S.C. 1651, et seq.) requires and

(b) continue to maintain it until performance is completed. The Contractor shall insert, in all subcontracts under thiscontract to which the Defense Base Act applies, a clause similar to this clause (including this sentence) imposingupon those subcontractors this requirement to comply with the Defense Base Act.

52.244-2 SUBCONTRACTS (OCT 2010)

(a) Definitions. As used in this clause—

“Approved purchasing system” means a Contractor’s purchasing system that has been reviewed and approved inaccordance with Part 44 of the Federal Acquisition Regulation (FAR)

“Consent to subcontract” means the Contracting Officer’s written consent for the Contractor to enter into a particularsubcontract.

“Subcontract” means any contract, as defined in FAR Subpart 2.1, entered into by a subcontractor to furnishsupplies or services for performance of the prime contract or a subcontract. It includes, but is not limited to, purchaseorders, and changes and modifications to purchase orders.

(b) When this clause is included in a fixed-price type contract, consent to subcontract is required only on unpricedcontract actions (including unpriced modifications or unpriced delivery orders), and only if required in accordancewith paragraph (c) or (d) of this clause.

(c) If the Contractor does not have an approved purchasing system, consent to subcontract is required for anysubcontract that-

(1) Is of the cost-reimbursement, time-and-materials, or labor-hour type; or

(2) Is fixed-price and exceeds—

(i) For a contract awarded by the Department of Defense, the Coast Guard, or the National Aeronautics and SpaceAdministration, the greater of the simplified acquisition threshold or 5 percent of the total estimated cost of thecontract; or

(ii) For a contract awarded by a civilian agency other than the Coast Guard and the National Aeronautics and SpaceAdministration, either the simplified acquisition threshold or 5 percent of the total estimated cost of the contract.

(d) If the Contractor has an approved purchasing system, the Contractor nevertheless shall obtain the ContractingOfficer’s written consent before placing the following subcontracts:

CONTRACTS WITH ANY FIRM NOT INCLUDED WITH THE BASIC CONTRACT PROPOSAL. FORADDING TEAM MEMBERS TO THE TASK ORDER AFTER AWARD, THE TASK ORDERCONTRACTING OFFICER‘S APPROVAL IS REQUIRED. THE TASK ORDER CONTRACTING OFFICER

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 145 of 149 FINAL

 

Page 149: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

WILL DETERMINE THE DOCUMENTATION TO BE SUBMITTED BY THE CONTRACTOR FORAPPROVAL.

(e)(1) The Contractor shall notify the Contracting Officer reasonably in advance of placing any subcontract ormodification thereof for which consent is required under paragraph (b), (c), or (d) of this clause, including thefollowing information:

(i) A description of the supplies or services to be subcontracted.

(ii) Identification of the type of subcontract to be used.

(iii) Identification of the proposed subcontractor.

(iv) The proposed subcontract price.

(v) The subcontractor’s current, complete, and accurate certified cost or pricing data and Certificate of Current Costor Pricing Data, if required by other contract provisions.

(vi) The subcontractor’s Disclosure Statement or Certificate relating to Cost Accounting Standards when such dataare required by other provisions of this contract.

(vii) A negotiation memorandum reflecting -

(A) The principal elements of the subcontract price negotiations;

(B) The most significant considerations controlling establishment of initial or revised prices;

(C) The reason certified cost or pricing data were or were not required;

(D) The extent, if any, to which the Contractor did not rely on the subcontractor’s certified cost or pricing data indetermining the price objective and in negotiating the final price;

(E) The extent to which it was recognized in the negotiation that the subcontractor’s certified cost or pricing datawere not accurate, complete, or current; the action taken by the Contractor and the subcontractor; and the effect of anysuch defective data on the total price negotiated;

(F) The reasons for any significant difference between the Contractor’s price objective and the price negotiated; and

(G) A complete explanation of the incentive fee or profit plan when incentives are used. The explanation shallidentify each critical performance element, management decisions used to quantify each incentive element, reasons forthe incentives, and a summary of all trade-off possibilities considered.

(2) The Contractor is not required to notify the Contracting Officer in advance of entering into any subcontract forwhich consent is not required under paragraph (b), (c), or (d) of this clause.

(f) Unless the consent or approval specifically provides otherwise, neither consent by the Contracting Officer to anysubcontract nor approval of the Contractor’s purchasing system shall constitute a determination -

(1) Of the acceptability of any subcontract terms or conditions;(2) Of the allowability of any cost under this contract; or(3) To relieve the Contractor of any responsibility for performing this contract.

(g) No subcontract or modification thereof placed under this contract shall provide for payment on a cost-plus-a-percentage-of-cost basis, and any fee payable under cost-reimbursement type subcontracts shall not exceed the feelimitations in FAR 15.404-4(c)(4)(i).

(h) The Contractor shall give the Contracting Officer immediate written notice of any action or suit filed and promptnotice of any claim made against the Contractor by any subcontractor or vendor that, in the opinion of theContractor, may result in litigation related in any way to this contract, with respect to which the Contractor may beentitled to reimbursement from the Government.

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 146 of 149 FINAL

 

Page 150: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

(i) The Government reserves the right to review the Contractor’s purchasing system as set forth in FAR Subpart44.3.

(j) Paragraphs (c) and (e) of this clause do not apply to the following subcontracts, which were evaluated duringnegotiations: 

252.227-7017 Identification and Assertion of Use, Release, or Disclosure Restrictions  (JAN 2011)

(a) The terms used in this provision are defined in following clause or clauses contained in this solicitation—

(1) If a successful offeror will be required to deliver technical data, the Rights in Technical Data--NoncommercialItems clause, or, if this solicitation contemplates a contract under the Small Business Innovation Research Program,the Rights in Noncommercial Technical Data and Computer Software--Small Business Innovation Research (SBIR)Program clause.

(2) If a successful offeror will not be required to deliver technical data, the Rights in Noncommercial ComputerSoftware and Noncommercial Computer Software Documentation clause, or, if this solicitation contemplates acontract under the Small Business Innovation Research Program, the Rights in Noncommercial Technical Data andComputer Software--Small Business Innovation Research (SBIR) Program clause.

(b) The identification and assertion requirements in this provision apply only to technical data, including computersoftware documentation, or computer software to be delivered with other than unlimited rights. For contracts to beawarded under the Small Business Innovation Research Program, the notification and identification requirements donot apply to technical data or computer software that will be generated under the resulting contract. Notification andidentification is not required for restrictions based solely on copyright.

(c) Offers submitted in response to this solicitation shall identify, to the extent known at the time an offer issubmitted to the Government, the technical data or computer software that the Offeror, its subcontractors orsuppliers, or potential subcontractors or suppliers, assert should be furnished to the Government with restrictions onuse, release, or disclosure.

(d) The Offeror's assertions, including the assertions of its subcontractors or suppliers or potential subcontractors orsuppliers, shall be submitted as an attachment to its offer in the following format, dated and signed by an officialauthorized to contractually obligate the Offeror:

Identification and Assertion of Restrictions on the Government's Use, Release, or Disclosure of Technical Data orComputer Software.

The Offeror asserts for itself, or the persons identified below, that the Government's rights to use, release, or disclosethe following technical data or computer software should be restricted:

Technical Data or Computer So ware Name of Person

to be Furnished Basis for Asserted Rights Asser ngWith Restric ons* Asser on** Category*** Restric ons****

None***** None None None *For technical data (other than computer software documentation) pertaining to items, components, or processesdeveloped at private expense, identify both the deliverable technical data and each such item, component, or process.For computer software or computer software documentation identify the software or documentation.

**Generally, development at private expense, either exclusively or partially, is the only basis for assertingrestrictions. For technical data, other than computer software documentation, development refers to development ofthe item, component, or process to which the data pertain. The Government's rights in computer softwaredocumentation generally may not be restricted. For computer software, development refers to the software. Indicatewhether development was accomplished exclusively or partially at private expense. If development was not

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 147 of 149 FINAL

 

Page 151: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

accomplished at private expense, or for computer software documentation, enter the specific basis for assertingrestrictions.

***Enter asserted rights category (e.g., government purpose license rights from a prior contract, rights in SBIR datagenerated under another contract, limited, restricted, or government purpose rights under this or a prior contract, orspecially negotiated licenses).

****Corporation, individual, or other person, as appropriate.

*****Enter “none” when all data or software will be submitted without restrictions.

Date _________________________________ Printed Name and Title _________________________________    _________________________________ Signature _________________________________ (End of identification and assertion)

(e) An offeror's failure to submit, complete, or sign the notification and identification required by paragraph (d) ofthis provision with its offer may render the offer ineligible for award.

(f) If the Offeror is awarded a contract, the assertions identified in paragraph (d) of this provision shall be listed in anattachment to that contract. Upon request by the Contracting Officer, the Offeror shall provide sufficient informationto enable the Contracting Officer to evaluate any listed assertion.

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 148 of 149 FINAL

 

Page 152: XXXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX · XXXXXXXXXXX. GENERAL INFORMATION ... From: BF 97X4930 NH1J 310 77777 0 050120 2F 000000 A00003583932 To: BL 97X4930 NH1J 310 77777

SECTION J LIST OF ATTACHMENTS

Attachment 01 - Quality Assurance Surveillance Plan (QASP)

Attachment 02 - Historical GFX List

Attachment 04 - Contract Security Classification Specification, DD Form 254

Attachment 05 - Staffing Plan

Attachment 06 - Sample Technical Instruction TI-001

Attachment 07 - Sample Technical Instruction TI-002

Attachment 08 - Prime Cost Summary Format Example

Attachment 09 - ROM Template

Attachment 10 - Government LOE Estimate

Attachment 11 - DCAA Rate Check Template

Attachment 12a: CDRL A001: Contractor's Progress Status and Management Report - DD Form 1423

Attachment 12b: CDRLS A002 - A015 - DD Form 1423

Attachment 13 - Wage Determination

 CONTRACT NO.

 N00178-04-D-4146 DELIVERY ORDER NO.

 FC23 AMENDMENT/MODIFICATION NO.

 66 PAGE

 149 of 149 FINAL