Mark Roebert KDC West Ya Rona (4) Shaft Fire Update - status of fire and fire fighting strategy 25 July 2012

Upload: others

Post on 24-Mar-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Ya Rona (4) Shaft Fire Update - status of fire and fire ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/120725update.pdf · •Install water sprays as to contain the fire •Seal

Mark Roebert

KDC West – Ya Rona (4) Shaft Fire

Update - status of fire and fire fighting

strategy

25 July 2012

Page 2: Ya Rona (4) Shaft Fire Update - status of fire and fire ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/120725update.pdf · •Install water sprays as to contain the fire •Seal

• Fire Fighting Strategy

• Fire Fighting - Sequence of Events

• Fire Fighting – MRS Feedback

• Ya Rona (4) Shaft – 31 Line Plans

• 36/31 Photos

Index

Ya Rona (4) Shaft Fire Update

2

Page 3: Ya Rona (4) Shaft Fire Update - status of fire and fire ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/120725update.pdf · •Install water sprays as to contain the fire •Seal

• Risk Assessment

• Remove all persons from any area that could be contaminated (Seal damage and leakage,

fan failures)

• Close off and seal any workings on adjacent shafts that could be affected

• Establish a dedicated chimney

• Reconnoitre the area to see if you can locate the fire for direct fire fighting

• Install water sprays as to contain the fire

• Seal off appropriate areas to limit feed of O2 to the fire

• A seismic ring of 1km in radius has been established around the fire area

• No mining will take place within this ring

Fire Fighting Strategy

Ya Rona (4) Shaft Fire Update

3

Page 4: Ya Rona (4) Shaft Fire Update - status of fire and fire ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/120725update.pdf · •Install water sprays as to contain the fire •Seal

• Fire Control Room established on surface

• Manned 24 hours per day by Senior Managers and Engineers, Environmental Engineering

Superintendents and Safety Officers and persons from Mines Rescue Services (MRS)

• A scribe is appointed to record the sequence of all events

• Abbreviated sequence of events

• A reverse chimney was established to downcast air down to 39 level through the stope and to

discharge up to 34 level. This then fed directly into stoped out areas to main fans on 24 level

• While chimney was being established, reconnaissance was done on 38 level to gain access in stope.

Access could not be gained due to high temperatures and convergence

• Point of attack moved to 36 level

• Limited access into stope, but fire located and direct fire fighting attempted

• Unable to extinguish

• A number of seals installed on various levels to limit air flow into fire area

• Preparations and reconnaissance done on 34 level to install a water barrier

• Double bank water sprays installed in 34/31 1W and 1E gully

• Reconnaissance done on 30 level to establish a second line of defence (bad ground conditions

encountered and no access into reef horizon)

Fire Fighting – Sequence of Events

Ya Rona (4) Shaft Fire Update

4

Page 5: Ya Rona (4) Shaft Fire Update - status of fire and fire ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/120725update.pdf · •Install water sprays as to contain the fire •Seal

• Abbreviated sequence of events (continued)

• Water sprays are monitored continuously

• Rock falls are taking place in 1W and 1E gully

• Further lines of sprays are being installed in gully below 1W and 1E to ensure that fire will be

contained

• The chimney and other critical areas are monitored 24 hours per day with hourly reports on

airflow, temperatures, visibility and gas readings

• The essential services manning the pump chambers on 38, 42 and 43 levels under the

personal supervision of MRS team

Fire Fighting – Sequence of Events

Ya Rona (4) Shaft Fire Update

5

Page 6: Ya Rona (4) Shaft Fire Update - status of fire and fire ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/120725update.pdf · •Install water sprays as to contain the fire •Seal

• To date (20 July 2012 at 08:00) 170 MRS teams have been used

• Teams from as far away as Welkom and Thabazimbi have been called in to assist

• All MRS teams are fully briefed and de-briefed by fire control

• A full risk assessment is done by each team before any work commences

• One injury has been reported by a MRS team member

• Contused arm with slight abrasions (caught between man carriage and ventilation door)

• Some of the work completed to date

• 2,000m of 200mm pipe and 2,000m of 150mm pipe installed

• 3,000m of electrical cable installed

• Mobile compressor installed as back-up

• Booster pump station installed for water pressure

• 30 Tunnel seals installed

• 6 Fans and sets of ventilation doors installed

• 1,000m of spray pipes installed

• 2,500m of fire hoses installed

Mines Rescue Services

Ya Rona (4) Shaft Fire Update

6

Page 7: Ya Rona (4) Shaft Fire Update - status of fire and fire ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/120725update.pdf · •Install water sprays as to contain the fire •Seal

• The majority of this work has been completed in an environment with low visibility (0-

5,0m), with high toxicity (CO – up to 20,000ppm; CO2 – up to 60,000ppm), and

temperatures of up to 47oC

• All the MRS teams are fully trained and equipped to deal with the conditions referred

to above

• The fire control room continuously making decisions on further tactics to contain and

extinguish the fire based on reports by the MRS teams

Mines Rescue Services

Ya Rona (4) Shaft Fire Update

7

Page 8: Ya Rona (4) Shaft Fire Update - status of fire and fire ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/120725update.pdf · •Install water sprays as to contain the fire •Seal

Ya Rona – 31 Line Area Plan

8

Old worked out area

between 38 Level and

28 Level – no mining

operations

(Average depth below

surface 2,800m; last

mining activities in

2000)

38 Level

34 Level

Page 9: Ya Rona (4) Shaft Fire Update - status of fire and fire ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/120725update.pdf · •Install water sprays as to contain the fire •Seal

Ya Rona – 31 Line on 36 Level

9

Page 10: Ya Rona (4) Shaft Fire Update - status of fire and fire ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/120725update.pdf · •Install water sprays as to contain the fire •Seal

Ya Rona – 31 Line on 34 Level

10

Water Sprays

Page 11: Ya Rona (4) Shaft Fire Update - status of fire and fire ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/120725update.pdf · •Install water sprays as to contain the fire •Seal

Ya Rona – section view through 31 Line

11

38 Level

39 Level

37 Level

35 Level

36 Level

34 Level

32 Level

30 Level

28 Level

Bank of water sprays

RBH chimney

38L to 34 L

Page 12: Ya Rona (4) Shaft Fire Update - status of fire and fire ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/120725update.pdf · •Install water sprays as to contain the fire •Seal

Ya Rona – Fire in 36/31 Stope

12