1 RE in China: the Status Quo and Prospect
2 Promoting RE in China: Investment Policy and Experience
3 Vision of Future: Enhancing International Cooperation in RE
Content
-
I. RE in China: the Status Quo and Prospect
1. RE: Expanding Scale in Utilization and Proportion in Consumption Market
By 2015, China possessed 319.37GW, 129.34 GW, and 43.18 GW hydropower (22.71 GW from pumped), wind power and
solar PV installed capacity with the accumulated power output reaching 1100 billion kWh, 186.3 billion kWh, and 39.2
billion kWh respectively. China boasts the largest Hydro, wind and PV power installed capacity in the world.
By 2015, the total energy consumption of China reached 4.3 billion standard coal, 0.9% up compared to 2014. The non-
fossil fuel took up 12%, 08% up compared to 2014 and 3.4% to 2010, providing strong support to the transformation of
energy portfolio and the carbon reduction in China.
10 M
W10
,000
kW
h
Hydro Installed
Wind Installed
PV Installed
Hydro Production
Wind Production
PV Production
Chart1
200820082008200820082008
200920092009200920092009
201020102010201020102010
201120112011201120112011
201220122012201220122012
201320132013201320132013
201420142014201420142014
201520152015201520152015
水电装机容量
风电装机容量
光伏装机容量
水电发电量
风电发电量
光伏发电量
万千瓦万千瓦时
17260.3919
1217
5655.479895538
237
19629.0188
1767
5716.8166664602
344.5
21605.7181
3131
86
6867.364617
490
5
23297.8808
4784
293
6681.118758
715
18
24947.0476
6266
650
8555.51772
1028
41
28044.0715
7758
1745
8920.695176
1393
85
30485.68
9732
2805
10600.89
1534
250
31937
12934
4318
11000
1863
392
Sheet1
水电装机容量风电装机容量光伏装机容量水电发电量风电发电量光伏发电量
20081726012175655237
20091962917675717344.5
20102160631318668674905
2011232984784293668171518
20122494762666508556102841
201328044775817458921139385
20143048697322805106011534250
201531937129344318110001863392
-
2. Full-fledged RE Technology and Industrial Chain
“Frontrunner”PV Demo Base in the Subsidence Area in Datong, China
Jinping I, 305m high
Upgrading Large Capacity Wind Turbine
Hydro Wind
SolarIntegrated
Completion of Jinping I hydropower station, the world highest Concrete Double Arch Dam above 300mProgress of the key technologies, such as the Safety and Risk Control of Large Scale Hydropower ProjectsR&D of the Equipment Set for Super High Dams above 200m HighMastering the key technologies of large size impulse turbine units of 200~400 MWDomestic production of turbine units for pumped storage stations with 400MW installed capacity and 500m water head and above
Equipment Manufacture:1. 1.5MW~5MW: Production and Commercialization; rolling off of the large scale offshore wind turbine units2. 13121 sets of new wind turbines installed by 2015; Goldwind Technology, United Power, and Ming Yang Wind Power taking up 52% of the market in totalKey Technology:1.Wind turbine units resisting complicated natural environment, such as low temperature, typhoon, and high-altitude2. R&D of mega wind turbine
Equipment Manufacture:1. Advancing the properties of PV products, based on the “Frontrunner“ demo base2. Enhancing the conversion efficiencies: polysilicon 16.5%, monocrystalline silicon 17%, and the system 81%3. 6 of the 10 largest PV module supplies in the world come from China; Trina Solar boasts the largest production in the world.Key Technologies:1.Innovation in the technology of high percentage connection of distributed PV stations. 2.Promoting demo application of Photo thermal
Innovation of energy storage technologies,
such as all VRB and air compression, and
application in real projects
Exploration in the integration of multi-type
energies, and the construction of demo
projects
Diversifying the application of RE
China Boasts World leading Equipment Manufacturing Capacity in Hydropower, Wind Power and Solar Power
I. RE in China: the Status Quo and Prospect
-
Desigin
Construc-tion
Accept-ance
Opera-tion
I. RE in China: the Status Quo and Prospect
3. Developing Complete RE Industry SystemPolicy System:Based on the Renewable Energy Law, China has developed a complete RE subsidizing and monitoring policy system.
Standardization and Certification System:China possesses a full-fledged standardization policy system to guide the development of
the industry. There are dedicated standardization institutions for hydro, wind, solar power respectively, covering the whole life cycle of
projects.
Capacity Building:Investment from Chinese enterprises, such as the five power generation companies, China Guangdong Nuclear,
Guohua Group, and the Three Gorges Group, have boosted RE construction in China and the world. Engineering corporations from
POWERCHINA, such as PowerChina Chengdu, PowerChina Huadong, PowerChina Shanghai, PowerChina Xibei, PowerChina Zhongnan,
and PowerChina Guangdong, carried out extensive preliminary and planning studies and design work of large-scale hydropower projects
and onshore and offshore wind power projects in China. They possess strong investigation, design, and EPC capacity.
-
4. Overall Prospect of RE Development in China
The percentage of Non-fossil Fuel in Primary Power Consumption
2014 2015 2020 2030
11.1%
15%
20%
12%
I. RE in China: the Status Quo and Prospect
RE is the direction of world energy development. Chinese government pays significant attention
to RE development and has announced the ambitious goal to raise the proportion of non-fossil fuel
in energy consumption to 15% by 2020, and 20% by 2030.
-
340GW
Hydro
250GW
Wind
150GW
Solar
15000MW
Biomass
5. RE in the Thirteenth Five Year Plan of China
Marine
Hydro
Geo-thermal
Solar Biomass
WindOverall Coordination of
Wind Power Development
Accelerating Biomass
Development
Promoting Demo Application of Energy
Reserve Tech
Acceleration Geothermal Development
Diversified Application of Solar Power
Actively Promoting Hydropower Development
I. RE in China: the Status Quo and Prospect
-
II. Promoting RE in China: Investment Policy and Experience
1. Enacting RE Law and the related regulations, guiding the industry development
Feb 2005
Jan 2006
2007RE Law
Took Force
Middle and Long Term RE Development Plan
Mar 2016Amendment of the RE Law of China
Issuance of RE Law
Dec 2009
Regulation on the Full Price Subsidy Takeover of RE Power GenerationGuidance Opinion on the Establishment of Target Guiding System in RE Development and Utilization
Based on the Target Guiding System, RE (excluding hydropower) should take up 5%~13% in the social power consumption of all provinces in China by 2020.
-
RE (excluding hydropower) in China adopts benchmark prices. Onshore wind power and Solar PV follow certain benchmark prices in different regions, while agriculture and forest biomass, offshore wind, and Photo thermal power use the same benchmark price nationwide.
2、Mature pricing policies, creating a stable market for investment(1)Founding of RE Development Fund
(2)The Subsidy Policy of Benchmark Power Price
The first, second and the third lists of the subsidized items was issued in 2012
The forth list of the subsidized items was issued
in 2013
The fifth list of the subsidized items was issued
in 2014
The sixth list of the subsidized items was issued
in 2016
•2016 Benchmark Price:0.47~0.60 Yuan RMB/kWhWind
•2016 Benchmark Price:0.80~0.98 Yuan RMB/kWhPV
•Intertidal Zone 0.75 Yuan RMB/kWh,Coastline Zone 0.85 Yuan RMB/kWhOffshore Wind
•1.15Yuan RMB/kWh for demo projectsPhoto thermal
II. Promoting RE in China: Investment Policy and Experience
The Added Fees intend to support:
Some of the fund is allocated by the Ministry of Finance from the yearly public budget, while the rest comes from the
added fees to power payment.
•The scientific and technological studies, standard compilation, and demo projects in RE
development and utilization
•RE project supplying energy to rural and pasturing area
•Development of isolated RE power system in remote area and islands
•RE resources investigation, evaluation, and information system development
The special fund will go to:
-
3 、 Enhancing Planning; Guiding the Industry; Promoting Investmentfrom Enterprises; Upgrading the Manufacturing Capacity
•The Thirteenth Five Year Plan for RE development
•The planning of regional energy reform demo projects, such as Zhangjiakou RE demo zone
•The planning of hydro, wind, and solar power complementary demo base
RE Integrated Utilization
•The Thirteenth Five Year Plan for Hydropower development
•Nationwide water resources investigation and river planning of 40 rivers, including Jinsha
River, Yalong River, and Dadu
•Pumped storage planning in more than 20 provinces of China
Hydro
•The Thirteenth Five Year Plan for Wind Power development
•The planning of large-scale wind power bases, such as in Jiuquan of Gansu Province, Inner
Mongolia, Shanxi, and Huaidong in Xinjiang autonomous region
•The planning of offshore wind farms in provinces, such as Jiangsu, Fujian, Guangdong, and
Hainan
Wind
•The Thirteenth Five Year Plan for Solar Power development
•The planning of “frontrunner” demo bases in Datong, Yangquan, Baotou, Jining, Xintai, and etc.
•The planning of photo thermal demo projects
Solar
II. Promoting RE in China: Investment Policy and Experience
-
4. Ideas on the Incentive Policies for RE Investment during the “13th Five Year Plan
Developing the RE industry in market environment, allocating the projects through competition, and pulling down the cost of the industry
Exploring mechanisms such as RE quota, carbon reduction, and green certificate to develop full-fledged RE market mechanism
Imposing Non-RE power generation quota and assessment mechanism on coal-fired thermal power projects to ensure room for RE power consumption
Accelerating the development of micro-grid and distributed PV stations and cultivating strategic new markets, based on the Power System Reform
II. Promoting RE in China: Investment Policy and Experience
-
III. Vision of Future: Enhancing International Cooperation in RE
Vision of Cooperation:
It is estimated that there should be about 2.5 trillion RMB investment in RE during the “13th
Five Year Plan”. There will be a huge market for RE investment in China. On the other hand,
China is willing to participate in RE development and construction in the world market,
leveraging our strengths in technology and cost and capacity from manufacturing, investment
and development, construction to operation.
As we go further in countering climate change and pushing forward energy reform, RE has
become a key area for“green”economic development. China is willing to carry out coorpation
with all nations by capacity building, technical exchanges, project construction, and talent
training. We hope to join hands with all nations to promote the development of RE industry.
-
the only appointed institution in Charge of RE technology management of China
Industry Planning
Technology management
Project check and acceptance
Quality monitoring
Standard compilation
Policy studies
RE budget administration
Safety facility check and acceptance
National RE power generation monitoring institution
National RE information management center
International and inter-governmental Cooperation
One of the 16 energy study and consulting bases of China
Standardization Commission and 8 Sub-commissions
Industry Planning
Industry Report Compilation
Information System
Development
Quality Monitoring
Compilation of Policies and Standards
Technical Review and Approval
Project Budget and Technology Management
Safety Check and Acceptance
III. Vision of Future: Enhancing International Cooperation in RE
The Core Business of CREEI
CREEI is the RE technology administrative institution of China and boasts strengths in technology, information, resources, and talents. CREEI is willing to provide full-ranged technical exchanges, cooperation and service in planning and studies, policy consulting, project design, project assessment consulting, and project construction. CREEI is willing to join the world to explore the prospect of RE cooperation and contribute to the sustained and sound development of RE industry in the world.
-
Slide Number 1Slide Number 2Slide Number 3Slide Number 4Slide Number 5Slide Number 6Slide Number 7Slide Number 8Slide Number 9Slide Number 10Slide Number 11Slide Number 12Slide Number 13Slide Number 14