your built form and · 2017-01-26 · our capabilities. your advantage. complete project and...

4
YOUR BUILT FORM AND STRATA TITLING PARTNERS. TEAMWORK. INNOVATION. KNOWLEDGE. 3 3.34 3.71 10.39 22.53 20.34 9.24 3.45 9.98 4.84 6.56 30.2 3.7 12.74 7.3 24.91 5.43 12 134°55'15" 134°55'15" 90°9'30" 135°3' 135°3' 134°57' 134°57' 134°57' 90° 270° 6' 90°6' 89°54' 89°50'30" 1 293m² 2 80m² 0.2 90°6' 1.5 30.2 1.5 89°54' 270° 90° 1 90°9'30" 10.98 (15.1) 1.41 134°55'15" CP 3 336m² 3 P (35.3) 33b SEE ENLG 'A1' 261 2 28 DP 400939 P 420 P (SP 11706) P 420 0.65 0.75 .07 90°6' 0.1 14H 14H 2 EAST OF CORNER PEG 0.1 SOUTH 6.68 8 ERRACE

Upload: others

Post on 02-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: YOUR BUILT FORM AND · 2017-01-26 · OUR CAPABILITIES. YOUR ADVANTAGE. Complete project and approvals management In addition to preliminary, contour/feature, boundary, environment

YOUR BUILT FORM AND STRATA TITLING PARTNERS.

TEAMWORK. INNOVATION. KNOWLEDGE.

3

3.34

3.71

10.39

22.53

20.34

9.24

3.45

9.98

4.84

6.56

30.2

3.712.74

7.3

24.91

5.43

5.12

134°55'15"

134°55'15"

90°9

'30"

135°

3'13

5°3'

134°57'

134°57'134°57'

90° 27

0°90

°6'

90°6

'

89°54'

89°50'30"

1293m² 2

80m²

33b (Sewerage)EASEMENT

REG 33 (b)SEC 167 OF THE P.& D. ACT THIS PLAN LOT 2 WATER CORPORATION

(Intrusion)EASEMENT THIS PLAN LOT 1

SEC 136C OF THE T.L.A. LOT 1

0.2

SURVEYOR'S CERTIFICATE - REG 54

ADDRESS OF PARCEL

NAME OF SCHEME

PLAN OF

CERTIFICATE OF TITLE

LOCAL GOVERNMENT

FIELD RECORD

MANAGEMENT STATEMENT NO

which it is lodged.complies with the relevant written law(s) in relation toundertaken for the purposes of this plan and that it [* delete if inapplicable] records,(b) *calculations from measurements recorded in the field(a) *survey; and/or representation of the - hereby certify that this plan is accurate and is a correctI,

LICENSED SURVEYOR DATE

LODGED

DATE FEE PAID ASSESS No.

EXAMINED

DATE

WESTERN AUSTRALIAN PLANNING COMMISSION

Delegated under S.16 P&D Act 2005 DATE

W.A.P.C. REF:Certificate of Approval of W.A.P.C. under Section 25B(2) of

PLAN APPROVED

(S. 18 Licensed Surveyors Act 1909)INSPECTOR OF PLANS AND SURVEYS DATE

IN ORDER FOR DEALINGSSUBJECT TO

REGISTERED

DATE REGISTRAR OF TITLES SEAL

APPLICATION

FOR REGISTRAR OF TITLES DATE

AMENDMENT AUTHORISED BY DATEVERSIONHELD BY LANDGATE IN DIGITAL FORMAT ONLYSURVEY-STRATA PLAN

DP 400939ON

LOT 262

Volume 2892 Folio 352

CITY OF FREMANTLE

127409

FREMANTLE56 BELLEVUE TERRACE

FREMANTLE, W.A., 616056 BELLEVUE TERRACE

Matthew DUNN

895-13

GOVERNMENT OFWESTERN AUSTRALIA

Strata Titles Act 1985

90°6

' 1.5

30.2

1.589°54'

270°

90°1 90°9

'30"

10.98

(15.1)

1.41

134°55'15"

CP 3

336m²

20.34

1.32

1.32

0.150.15

90°

90°

CP 3

3.45

135°

3'

1

270°

270°

1.34

1.34

0.220.22

90°

90°

270°

270°

3

3

P

(35.3)

33b

THIS PLAN LOT 2

SEE ENLG 'A1'

Not to ScaleENLARGEMENT 'A1'

261

25

28

30

DP 400939

P 420

P 420

(SP 11706)P 420

4

(SP 8234)D 40314

3D 14581

29

0.65

0.75

0.07

90°6

'

0.1

NOT TO SCALE A - A

CROSS SECTION

1

CP 3

14H

0.15

0.1520.34m AHD

20.84m AHD

1

CP 3

14H

0.22

0.2220.34m AHD

20.84m AHD

NOT TO SCALE B - B

CROSS SECTION

A

2

14H14H 2

14H

14H 2

A

B

B

REG 14H OF THE STGR 1996

Pby Underground Cable)

(Transmission of ElectricityEASEMENT

14H,

14H 220.34m - 20.84m AHD

LIMITED IN HEIGHT

N

YEVRUS

GNM

EAST OF CORNERPEG 0.1 SOUTH

FLOOR LEVEL = 18.77m AHD

FLOOR LEVEL = 18.77m AHD

0.5

0.5

0.5

0.5

1.57

1.57

(SP 16133)P 420

6.68

6.68

8

8

LOT CP 3

FINAL

0

ALL DISTANCES ARE IN METRES

255 SCALE 1 : 300 @ A3

SUBJECT PURPOSE STATUTORY REFERENCE COMMENTS

INTERESTS AND NOTIFICATIONS

ORIGIN LAND BURDENED BENEFIT TO

.CSD68221 - SP300613sp-001bMNG Ref : OF 01 SHEETSSHEET 01

68221

TERRACE

BELLEVUE

E m ail: in fo @ m n gsu rve y.co m .auFax: (0 8) 6 43 6 15 00Te l: (0 8) 6 43 6 15 99P O B o x 3 526 , Su cce ss W .A . 6 96 4M C M U LLEN N O LA N G R O U P

Page 2: YOUR BUILT FORM AND · 2017-01-26 · OUR CAPABILITIES. YOUR ADVANTAGE. Complete project and approvals management In addition to preliminary, contour/feature, boundary, environment

MINIMISE YOUR RISK. MAXIMISE YOUR RETURNS.

Time is money, especially in the land and property

development sector, which is why we’ve developed

a specialised strata titling solution for developers. A

solution that combines leading-edge technologies with

our built form expertise to expedite the entire titling

process, so you can realise the potential and profit in

your development as quickly as possible.

From strata title registrations to final strata plans

Whether you have a 2 or 20 lot residential or commercial

development, or even a 200-lot mixed use project in

the pipeline, we have the market leading built form

and strata titling capabilities you need to make your

development a success.

Here at MNG, you and your development will

benefit from our:

• Teamwork.

Harness our project management, licensing,

land tenure and mapping expertise, as well as

our project administration team – with strong

relationships with local authorities and government

bodies, they focus solely on driving your approvals

to fruition.

• Innovation.

Gain an advantage with our advanced terrestrial,

mobile and aerial laser scanning solutions and 3D

visualisation, modelling and sub-surface mapping

technologies, including our hologram studio.

• Knowledge.

Access a greater breadth and depth of information,

insights and intelligence than ever before and stay up

to date with our online portal and proprietary MNG

Access tracking system, which enables you to monitor

the progress of your approvals in real time.

• Improve planning decisions• Minimise approval timeframes• Expedite valuations and sales

AWARD-WINNING EXCELLENCEOur surveying and spatial information expertise has earned over 60 industry awards for excellence.

Page 3: YOUR BUILT FORM AND · 2017-01-26 · OUR CAPABILITIES. YOUR ADVANTAGE. Complete project and approvals management In addition to preliminary, contour/feature, boundary, environment

OUR CAPABILITIES. YOUR ADVANTAGE.

Complete project and approvals management In addition to preliminary, contour/feature, boundary, environment and monitoring surveys, we also provide specialist guidance on strata titles, and registration advice.

With a dedicated project manager and project assistant assigned to your development – two points of contact instead of one – you’ll benefit from a team focussed on achieving titles.

Early Intervention We can work with your Architect and Town Planning consultant team to alleviate any potential tenure complications before they arise.

Fully Integrated ServiceBenefit from efficiencies and cost savings only a fully integrated service can provide, from sourcing unit entitlements and management statements, to draft strata plans, to construction setout to preparation of final strata plans and titles.

Title registration administration and clearance tracking Your dedicated project assistant will submit and track your development’s title applications, utilising our working relationships with government bodies and local authorities to expedite approvals.

What’s more, you’ll be able to track the progress of your registration through our MNG Access title registration and clearance tracking system. Simply log in to our secure online portal to track and access in real time:

• communications with authorities• progress of approvals• a copy of relevant Approvals• a copy of the Strata Plan• a copy of legal documents• when the Strata Plan was placed ‘In Order For Dealings’• when the Strata Plan was titled• send an email enquiry to your project manager

Innovative solutions for built formMake better informed decisions with our leading edge technologies during planning, marketing and build needs.

• Laser scanning• BIM, Revit modelling• 3D visualisations• Sub-surface mapping

Make better informed decisions with our leading edge technologies during planning, marketing and building needs.

mngsurvey.com.au | 1800 MNG SURVEY

UNLODGED VERSION

UN

LOD

GED

VER

SIO

N

UNLODGED VERSION

UN

LOD

GED

VER

SION

ARE SUBJECT TO FINAL SURVEYALL AREAS AND DIMENSIONSDRAFT

SEE "HASSELL" - DRAWINGS "A_1004.DWG" - DATE 13/01/2016DRAFT STRATA PLAN - SUBJECT TO CONSTRUCTION

STRATA PLAN

HELD BY LANDGATE IN DIGITAL FORMAT ONLY

STRATA TITLES ACT 1985.SECTION 3(2)(a) OF THE SURFACE OF THE CEILING, AS PROVIDED BYWALLS, THE UPPER SURFACE OF THE FLOOR AND THE UNDERSHOWN ON THE STRATA PLAN ARE THE INNER SURFACES OF THETHE BOUNDARIES OF THE LOTS OR PARTS OF THE LOTS WHICH ARE BUILDINGS

0 205

ALL DISTANCES ARE IN METRES

SCALE 1 : 250 @ A2

N

Y E V R U S

G N M

OF THE BUILDING TO THE INNER SURFACE OF THE BALUSTRADING.THE BOUNDARIES OF THE BALCONIES ARE FROM THE EXTERNAL SURFACE

OF THE BALCONY FLOOR TO THE UNDER SURFACE OF THE BALCONY CEILING.THE STRATUM OF THE BALCONIES EXTENDS FROM THE UPPER SURFACE

= PILLAR (COMMON PROPERTY)

B = BALCONY

ARE COMMON PROPERTY.ALL STRUCTURAL CUBIC SPACE AND WALLS EXTERNAL TO THE BUILDING

should be obtained for such purposes.a LANDGATE APPROVED copy

- Not intended for design use,- Subject to change without notice- Current as atThis version is

LANDGATE AUDITSUBJECT TO

UNLODGED VERSIONPRELIMINARY ONLY

15/09/2016

OF SHEETS

315715sp-001eMNG Ref:

SHEET 13

Lift

Stairs

Lift

Stairs

Lift

Stairs

Pt 4265m²

Duct

Duct Duct Duct Duct

DuctDuct

Pt 42B 10m²

Pt 4377m²

(118m²)

Pt 43B 11m²

Pt 44B 11m²

Pt 4477m²

(118m²)

Pt 45B 10m²

Pt 4565m²

Pt 47B 10m²

Pt 4777m²

(117m²)

Pt 4077m²

(116m²)Pt 40B 10m²

Pt 13555m²

Pt 13410m²B

Duct Duct

DuctDuctDuct

Pt 136

(120m²)77m²

10m²B

Pt 129

Pt 129

(119m²)77m²

9m²B

Pt 130

Pt 13055m²

Pt 13110m²B

Pt 13165m²

Pt 13211m²B

Pt 132

(118m²)77m²

Pt 13311m²B

Pt 133

(118m²)77m²

Pt 13466m²

9m²B

Pt 89

Pt 8956m²

Pt 9010m²B

Pt 90

(117m²)77m²

Pt 8310m²B

Pt 83

(117m²)77m²

Pt 86B 11m²

Pt 86

(118m²)77m²

Pt 8711m²B

Pt 87

(124m²)77m²

Pt 8810m²B

Pt 8865m²

Pt 4155m²

Pt 419m²B

Pt 469m²B

Pt 4656m²

Pt 8456m²

Pt 849m²B

Pt 136

10m²B

Pt 13510m²

B

Pt 85B 10m²

Pt 8565m²

FIFTH FLOOR PLAN

7300015

(91m²)

(78m²)

(93m²)

(79m²) (79m²)

(96m²)(93m²)

(79m²) (78m²)

(93m²) (94m²)

(79m²)

Page 4: YOUR BUILT FORM AND · 2017-01-26 · OUR CAPABILITIES. YOUR ADVANTAGE. Complete project and approvals management In addition to preliminary, contour/feature, boundary, environment

TEAMWORK. INNOVATION. KNOWLEDGE.

MNG SERVICESMNG offer a full suite of surveying services

• Land Surveying

• Land Tenure

• Subdivisions and Land Development

• Builtform and Survey Strata

• 3D Terrestrial, Mobile, and Aerial Laser Scanning

• Mapping Services

• Hydrographic Surveys

• Cartographic Services

• 3D Visualisation

• Geographic Information Systems (GIS)

• Sub-surface Mapping and Investigations

Head Office Level 1, 2 Sabre Crescent, Jandakot WA 6164

P 1800 MNG SURVEY

E [email protected]

W mngsurvey.com.au