your dream comes true with daeshin aerospace...daeshin aerospace daeshin aerospace 15 kt-1 fuselage...
TRANSCRIPT
-
Daeshin Aerospace
Your Dream comes true with
http://www.dsaero.com
-
Company Profile03 • Message from the President04 • History05 • Certification & Awards06 • Capabilities
Equipment07 • Major Equipment
• Assembly / welding08 • Machining
• Sheet Metal`• Painting Booth
Business Status 09 • B767 Fixed Trailing Edge10 • B767 ATB Rib / S48 Frame11 • Bell M412 Fuselage12 • C-130 Engine Nacelle13 • G-V Leading Edge14 • P-8A Raked Wing Tip
• DASH-8 Empennage15 • KUH Subassemblies
• KT-1 Fuselage
Contents
-
Daeshin Aerospace ● 03
I deeply appreciate your continuing love and support for DaeshinAerospace, and would like to sincerely welcome you.
Starting from the production of the Floor Panel assembly for Boeing’sCH-47D Helicopter in 1990.Daeshin Aerospace is a specialist in the assembly and modification ofcommercial and military aircrafts.
We have taken parts in various businesses, including commercial / militaryhelicopter BELL M412 fuselage, DASH-8 empennage, C-130 Engine Nacelle,KT-1 fuselage and Korean Utility Helicopter, KUH sub assemblies.
In addition, we have received continuing compliments from customer inthe modification program of the wing of maritime patrol aircraft P-3C andfuselage of U.S Air Force fighter F-16.
Daeshin Aerospace is doing its best to provide the best possible servicethrough the quality desired by customers and accurate delivery with our20 years of experience in the industry.We promise to become your reliable partner that realizes customersatisfaction management through continuous R&D and secure competitiveness.
Message from the President
CEO Lee Gyeong-geun
Com
pany Profile
-
04 ● Daeshin Aerospace
History
Mar 1990 Daeshin Aerospace established.
May 1998 KAI contract for Bombardier DASH-8 Empennage assembly
May 2000 KAI contract for Lockheed Martin C-130 Engine Nacelle assembly
Oct 2004 KAI contract for Bell Helicopter M412 major assembly
Jan 2010 KAI contract for Triumph(Vought) B767 Fixed Trailing Edge assembly
Jan 2010 KAI contract for Triumph(Vought) GV Leading Edge assembly
Feb 2011 International Quality Approval: AS 9100 Rev C
Mar 2013 KAI contract for KT-1P FWD Fuselage sub assemblies
Aug 2013 KAI contract for Boeing P-8A Raked Wing Tip assembly
Oct 2013 KAI contract for Korean Utility Helicopter sub assemblies
Aug 2016 KAI contract for Triumph B767 Sec.48 Rib & Frame assembly
-
Daeshin Aerospace ● 05
Certification & Awards
Quality certificate
Patent acquisition
Other certificate
-
06 ● Daeshin Aerospace
Capabilities
Management & People
Trained, stable work force.
Aerospace management experience.
A core competence.
Design, Fabrication and Calibration of Tooling.
UG NX and CATIA V5 CAD systems available.
Able to work with PDF, IGES, and STEP file formats.
Aero ERP to plan and manage materials.
Assembly
Manufacturing Engineering
ERP System and Inventory Warehouse
-
Daeshin Aerospace ● 07
Major Equipment
Drivematic Machine (Auto Riveter) KR-2400 #1 1 Auto Riveting
ZP-450EA-36-HOT 3
US-150EA-36 1
FT200 Power
Pak/LB-20 SN:1285
Resistance Spot Welder Type : PMCO. 2STM 1 Spot welding
Tig Welder Syncro wave 300 1 Welding
Paint Spray Booth (W)16.4ft X (D)39.3ft X (H)16.4ft 1 Painting
Curing Oven (W)16.4ft X (D)39.3ft X (H)16.4ft 1 Curing
5 AXIS Machining center 800 X900 X 600 MM, 16,000 RPM 1
3 AXIS High Speed Machining Center 1,100 X650 X 550 MM, 20,000 RPM 1
3 AXIS High Machining Center 1,550 X750 X 729 MM, 10,000 RPM 1
Co-ordinate Measuring Machine 1,300 X 1,000 X 800MM 1
CNC Router (L)4.5M X (W)1.4M, 30,000 RPM 1
Press Brake (L)6M, (T)16MM 1
CNC Roll Bender (W)11M Max 1
Hydraulic Press (L)3.2M X (W)1.2M, 1,500 Ton 1
RivetingHot Dimpling M/C Dimple/Riveting
Detail PartsFabrication
Cold Working2Cold Expanding
Welding
Painting andCuring
Machining
Sheet Metal
Description Nomenclature Specification Q’ty(ea) Usage
Major Equipment
Assembly / welding
Drivematic Machine Spot Welding Machine
Equipment
-
08 ● Daeshin Aerospace
Major Equipment
Machining
Painting Booth
5 AXIS Machining CenterX,Y,Z : 800×900×600 mm, RPM : 16,000 rpm
3 AXIS High Speed Machining CenterX,Y,Z : 1,100×650×550 mm, RPM : 20,000 rpm
Sheet Metal
CNC Router / RPM 30,000Length 4.5m / Width 1.4m
Press BrakeLength 6m / Thickness 16mm
CNC Roll BenderWidth 1.1m Max
Hydraulic PressLength 3m / Width 1.2m / 1,500Ton
Spray BoothSize : (L)5m x (W)15m x (H)5m - Type : Dry Process Type
Curing Oven Size : (L)5m x (W)15m x (H)5m - Temperature : MAX 176℉
3 AXIS Machining CenterX,Y,Z : 1,550×750×720 mm, RPM : 10,000 rpm
Co-ordinate Measuring MachineX,Y,Z : 1,300×1,000×800 mm
-
Daeshin Aerospace ● 09
B767 Fixed Trailing Edge
D a e s h i n A e r o s p a c e
Customer Triumph (KAI)
Products Fixed Trailing Edge Assy
AL Machined Rib / Spar / Composite Bonded Panel
Production Rate 2-3 Ship Set per month
Business Status
Characteristics
-
10 ● Daeshin Aerospace
B767 ATB Rib / S48 Frame
Business Status
Customer Triumph (KAI)
Products After Torque Box Rib & Sec.48 Frame Assy
AL Machined Rib / Spar /Stretch Formed Frame
Production Rate 2-3 Ship Set per month
Characteristics
-
Daeshin Aerospace ● 11
Bell M412 Fuselage
D a e s h i n A e r o s p a c e
Customer Bell Helicopter (KAI)
Products Outer Beam, Roof, Nose, Tail Boom
Characteristics Al Sheet / Composite Skin
Production Rate 1 Ship Set per month
-
12 ● Daeshin Aerospace
C-130 Engine Nacelle
실적
Business Status
Customer Lockheed Martin (KAI)
Products Upper & Lower Engine Nacelle
Characteristics Titanium Skin & Bulkhead / Spot Welding
Production Rate 3 Ship Set per month
-
Daeshin Aerospace ● 13
G-V Leading Edge
D a e s h i n A e r o s p a c e
Customer Triumph (KAI)
Products Leading Edge / Landing & Navigation Light
Characteristics AL Formed & Chemmilled / Rib Skin Quality
Production Rate 2 Ship Set per month
-
Business Status 14 ● Daeshin Aerospace
P-8A Raked Wing Tip
DASH-8 Empennage
Customer Boeing (KAI)
Products Raked Wing Tip
Characteristics Composite Skin / Skin Quality
Production Rate 2 Ship Set per month
Customer Bombardier (KAI)
Products Rudder, Elevator, Horizontal Stabilizer
Characteristics Al Sheet / Metal Bonded Skin
Production Rate Spare parts
-
D a e s h i n A e r o s p a c eDaeshin Aerospace ● 15
KT-1 Fuselage
Korea Utility Helicopter Subassemblies
Customer Korean Army (KAI)
Products 200 sub assemblies
Characteristics AL Sheet Metal / Machined Parts / Cold working
Production Rate 3-4 Ship Set per month
Customer Peru Air Force (KAI)
FWD Fuselage, Aileron / Flap, Canopy, Rudder, Elevator, Horizontal Stabilizer
Characteristics Composite Bonded Structure, Al Sheet Metal Parts
Production Rate 1–2 Ship Set per month
Products
-
57, Gongdan 5-ro, Sanam-myeon, Sacheon-si, Gyeongsangnam-do, Korea (52535)Tel (82)55-854-2877 Fax (82)55-854-2876 E-mail [email protected]
URL http://www.dsaero.com
South Korea
Sacheon
SEOUL