Page 1: YourHome Team for the Long Haul - Broward County, Florida · Marwan Mufleh, P.E. Project Manager 30 years of Experience in Broward County Wiles Rd Widening (Phases 1, 2, 3) Hiatus
Page 2: YourHome Team for the Long Haul - Broward County, Florida · Marwan Mufleh, P.E. Project Manager 30 years of Experience in Broward County Wiles Rd Widening (Phases 1, 2, 3) Hiatus
Page 3: YourHome Team for the Long Haul - Broward County, Florida · Marwan Mufleh, P.E. Project Manager 30 years of Experience in Broward County Wiles Rd Widening (Phases 1, 2, 3) Hiatus

35years with an office in

Broward County

55full-time staffin Plantation

40yearsserving FDOT

15yearsaverage tenureof KH staff

51continual years

in business

85offices worldwide

#10 in 2018Fortune Magazine’sBest Places to Work

100%Commitment to the County

Your HomeTeamfortheLongHaul

Page 4: YourHome Team for the Long Haul - Broward County, Florida · Marwan Mufleh, P.E. Project Manager 30 years of Experience in Broward County Wiles Rd Widening (Phases 1, 2, 3) Hiatus

MarwanMufleh,P.E.ProjectManager30 years of Experience in Broward County Wiles Rd Widening (Phases 1, 2, 3) Hiatus Rd (Phases 1, 2) Riverside Drive Design‐Build Riverside Drive Widening FDOT On‐Call Minor Design P.B. County On‐Call Intersection Improvements Municipal On‐Call General Engineering

Page 5: YourHome Team for the Long Haul - Broward County, Florida · Marwan Mufleh, P.E. Project Manager 30 years of Experience in Broward County Wiles Rd Widening (Phases 1, 2, 3) Hiatus

Thompson & Associates

Craven Thompson& Associates

Keith and Associates

Page 6: YourHome Team for the Long Haul - Broward County, Florida · Marwan Mufleh, P.E. Project Manager 30 years of Experience in Broward County Wiles Rd Widening (Phases 1, 2, 3) Hiatus

OurHistoryofInnovativeDesign

Diverging Diamond Interchange at Coral Ridge Drive/Sawgrass Expressway Under design now. 6

Page 7: YourHome Team for the Long Haul - Broward County, Florida · Marwan Mufleh, P.E. Project Manager 30 years of Experience in Broward County Wiles Rd Widening (Phases 1, 2, 3) Hiatus

HistoryofInnovativeDesign

CustomizedTrafficControlAppforBicyclists

Page 8: YourHome Team for the Long Haul - Broward County, Florida · Marwan Mufleh, P.E. Project Manager 30 years of Experience in Broward County Wiles Rd Widening (Phases 1, 2, 3) Hiatus

8

ITS Design Services in Broward County: FDOT TSM&O Contract; South US 1 Bus Rapid Transit Lane Design

Page 9: YourHome Team for the Long Haul - Broward County, Florida · Marwan Mufleh, P.E. Project Manager 30 years of Experience in Broward County Wiles Rd Widening (Phases 1, 2, 3) Hiatus

9

South US 1 Bus Rapid Transit (BRT) Improvements, Broward County 

Page 10: YourHome Team for the Long Haul - Broward County, Florida · Marwan Mufleh, P.E. Project Manager 30 years of Experience in Broward County Wiles Rd Widening (Phases 1, 2, 3) Hiatus

YourSampleProject

Page 11: YourHome Team for the Long Haul - Broward County, Florida · Marwan Mufleh, P.E. Project Manager 30 years of Experience in Broward County Wiles Rd Widening (Phases 1, 2, 3) Hiatus

Multi‐disciplined approachOffice review Field review Traffic volume counts Speed studyDrone video

ConditionAssessment

Page 12: YourHome Team for the Long Haul - Broward County, Florida · Marwan Mufleh, P.E. Project Manager 30 years of Experience in Broward County Wiles Rd Widening (Phases 1, 2, 3) Hiatus

ConditionAssessment SafetyOperating conditionsComplete StreetsDesign criteria

• FDOT ‐ New Context Classification

• Broward County• Pembroke Pines• City of Miramar

Page 13: YourHome Team for the Long Haul - Broward County, Florida · Marwan Mufleh, P.E. Project Manager 30 years of Experience in Broward County Wiles Rd Widening (Phases 1, 2, 3) Hiatus

Existing Traffic Patterns

Miramar Pkwy

Pembroke Rd

Page 14: YourHome Team for the Long Haul - Broward County, Florida · Marwan Mufleh, P.E. Project Manager 30 years of Experience in Broward County Wiles Rd Widening (Phases 1, 2, 3) Hiatus

After

NewRamp

Pembroke Rd

Miramar Pkwy

Page 15: YourHome Team for the Long Haul - Broward County, Florida · Marwan Mufleh, P.E. Project Manager 30 years of Experience in Broward County Wiles Rd Widening (Phases 1, 2, 3) Hiatus

SafetyAnalysisandRecommendations Intersection dark crashes = 30% Pembroke Road dark crashes = 40%

SolutionImprove low lightinglevels on Pembroke RoadImprove signal visibility

Results of Kimley‐Horn’s lighting analysis at Pembroke/Flamingo intersection

Page 16: YourHome Team for the Long Haul - Broward County, Florida · Marwan Mufleh, P.E. Project Manager 30 years of Experience in Broward County Wiles Rd Widening (Phases 1, 2, 3) Hiatus

SafetyAnalysisRear‐end crashes = 60% Rear‐end PM peak crashes = 25%Average speed 55 MPH

Page 17: YourHome Team for the Long Haul - Broward County, Florida · Marwan Mufleh, P.E. Project Manager 30 years of Experience in Broward County Wiles Rd Widening (Phases 1, 2, 3) Hiatus

Rear‐End Crashes

17

10

20

3

2

SafetyRecommendations

21 SolutionsReduce congestion/queuesImprove signal head visibilitySpeed feedback signCentury Village gate backup

Pembroke Rd

Flamingo Rd

Century Village

Page 18: YourHome Team for the Long Haul - Broward County, Florida · Marwan Mufleh, P.E. Project Manager 30 years of Experience in Broward County Wiles Rd Widening (Phases 1, 2, 3) Hiatus

OurTrafficCountsConducted new counts in April 2018

• Included all 3 intersections in study limits

Page 19: YourHome Team for the Long Haul - Broward County, Florida · Marwan Mufleh, P.E. Project Manager 30 years of Experience in Broward County Wiles Rd Widening (Phases 1, 2, 3) Hiatus

Existing LOS E• Capacity acceptable• Long delay due to cycle length

Potential ImprovementsReduce cycle lengthAdd through lanes (traditional)New FDOT ICE method

LevelofServiceAnalysisResults

Page 20: YourHome Team for the Long Haul - Broward County, Florida · Marwan Mufleh, P.E. Project Manager 30 years of Experience in Broward County Wiles Rd Widening (Phases 1, 2, 3) Hiatus

Add through lanes Reduced queue length LOS E

Flamingo Rd

Pembroke Rd

OperationalAnalysisOption1

Page 21: YourHome Team for the Long Haul - Broward County, Florida · Marwan Mufleh, P.E. Project Manager 30 years of Experience in Broward County Wiles Rd Widening (Phases 1, 2, 3) Hiatus

Add through lanesReduced queue length LOS E

Flamingo Rd

Pembroke Rd

OperationalAnalysisOption2

Page 22: YourHome Team for the Long Haul - Broward County, Florida · Marwan Mufleh, P.E. Project Manager 30 years of Experience in Broward County Wiles Rd Widening (Phases 1, 2, 3) Hiatus

OperationalAnalysisOption3

FDOT method for analyzing intersection improvementsReduce or eliminate left‐turns from intersections

IntersectionControlEvaluation(ICE)

Page 23: YourHome Team for the Long Haul - Broward County, Florida · Marwan Mufleh, P.E. Project Manager 30 years of Experience in Broward County Wiles Rd Widening (Phases 1, 2, 3) Hiatus

IntersectionControlEvaluation(ICE)Median U‐Turn (MUT)No left turns allowed at main signalized intersection

Pembroke Rd

Flamingo Rd

Page 24: YourHome Team for the Long Haul - Broward County, Florida · Marwan Mufleh, P.E. Project Manager 30 years of Experience in Broward County Wiles Rd Widening (Phases 1, 2, 3) Hiatus

LOS C

OperationalAnalysisOption3

Flamingo Rd

Pembroke Rd

Page 25: YourHome Team for the Long Haul - Broward County, Florida · Marwan Mufleh, P.E. Project Manager 30 years of Experience in Broward County Wiles Rd Widening (Phases 1, 2, 3) Hiatus

IntersectionMedianU‐Turn

Flamingo Rd

Pembroke Rd

LOS C

Page 26: YourHome Team for the Long Haul - Broward County, Florida · Marwan Mufleh, P.E. Project Manager 30 years of Experience in Broward County Wiles Rd Widening (Phases 1, 2, 3) Hiatus

CompleteStreetsPrinciples Stewart Robertson, P.E. Expert advisor on Complete StreetsBroward MPO Complete Streets Master Plan Frequent presenter at statewide and national conferences

Member of national MUTCD CommitteeBased in our Broward County Office

Page 27: YourHome Team for the Long Haul - Broward County, Florida · Marwan Mufleh, P.E. Project Manager 30 years of Experience in Broward County Wiles Rd Widening (Phases 1, 2, 3) Hiatus

GreenwaysMasterPlan Flamingo Road Trail Greenway (Corridor #9)

Add shared use path along canalCentral Trail FPL crosses Red Road at Hiatus

27

Page 28: YourHome Team for the Long Haul - Broward County, Florida · Marwan Mufleh, P.E. Project Manager 30 years of Experience in Broward County Wiles Rd Widening (Phases 1, 2, 3) Hiatus

GreenColorBikeLanes Use throughout traffic conflict zones 

on the State Highway System• Per FDM (Chapter 223) and local FDOT District Four directive

28

Page 29: YourHome Team for the Long Haul - Broward County, Florida · Marwan Mufleh, P.E. Project Manager 30 years of Experience in Broward County Wiles Rd Widening (Phases 1, 2, 3) Hiatus

ContextClassificationNew process for State Highway System Influences design criteriaC‐4 Urban General

29

Page 30: YourHome Team for the Long Haul - Broward County, Florida · Marwan Mufleh, P.E. Project Manager 30 years of Experience in Broward County Wiles Rd Widening (Phases 1, 2, 3) Hiatus

RedRoad

Page 31: YourHome Team for the Long Haul - Broward County, Florida · Marwan Mufleh, P.E. Project Manager 30 years of Experience in Broward County Wiles Rd Widening (Phases 1, 2, 3) Hiatus

Kimley‐Horn’sProposedSafeBikeCrossing

Proposed shared‐use path

Page 32: YourHome Team for the Long Haul - Broward County, Florida · Marwan Mufleh, P.E. Project Manager 30 years of Experience in Broward County Wiles Rd Widening (Phases 1, 2, 3) Hiatus

BrowardCountyTransit(BCT)

32

BCT Routes 5 and 28• No planned service improvements per the Transit Development Plan (TDP)

Miramar Town Center• Existing bus terminal inside parking garage serves Routes 5 and 28

Route 28 uses Red Road between Miramar Town Center and Miramar Parkway

• Currently no bus stops, but may be stop(s) if development occurs

95 Express Bus uses Red Road between Hiatus and the Turnpike but does not stop

Page 33: YourHome Team for the Long Haul - Broward County, Florida · Marwan Mufleh, P.E. Project Manager 30 years of Experience in Broward County Wiles Rd Widening (Phases 1, 2, 3) Hiatus

ADADeficienciesandSolutionsADA Access Cross slope > 4%

Cross slope > 3% Drop‐off Hazard

Trip Hazard

Missing S/W landing

Page 34: YourHome Team for the Long Haul - Broward County, Florida · Marwan Mufleh, P.E. Project Manager 30 years of Experience in Broward County Wiles Rd Widening (Phases 1, 2, 3) Hiatus

ClearZone De icienciesandSolutions

Tree in clear zone

Trees in clear zonePole & guardrail  hazard

Page 35: YourHome Team for the Long Haul - Broward County, Florida · Marwan Mufleh, P.E. Project Manager 30 years of Experience in Broward County Wiles Rd Widening (Phases 1, 2, 3) Hiatus

SignalizationDeficienciesandSolutions

Missing back plates

One camera for 4+ lanes Wrong crossing sign

2 push buttons on same post   

Push button more than 10’ from curb

Page 36: YourHome Team for the Long Haul - Broward County, Florida · Marwan Mufleh, P.E. Project Manager 30 years of Experience in Broward County Wiles Rd Widening (Phases 1, 2, 3) Hiatus

Signing/Marking De icienciesandSolutionsFaded crosswalk markings

Missing curve warning signs Wrong direction 

Broken sign post

Page 37: YourHome Team for the Long Haul - Broward County, Florida · Marwan Mufleh, P.E. Project Manager 30 years of Experience in Broward County Wiles Rd Widening (Phases 1, 2, 3) Hiatus

GeometricDeficienciesandSolutionsProposed shared‐use path

Substandard median width

Add aux. signal

Horizontal and vertical geometry deficiencies

Remove island andrelocate signal pole

Add advance signal signage

BEPREPARED

TO STOP

Page 38: YourHome Team for the Long Haul - Broward County, Florida · Marwan Mufleh, P.E. Project Manager 30 years of Experience in Broward County Wiles Rd Widening (Phases 1, 2, 3) Hiatus

GeometricDeficienciesandSolutions

Remove island andrelocate signal pole

Add pedestrian crossing

Page 39: YourHome Team for the Long Haul - Broward County, Florida · Marwan Mufleh, P.E. Project Manager 30 years of Experience in Broward County Wiles Rd Widening (Phases 1, 2, 3) Hiatus

OtherGeometric De icienciesandSolutions

Turn‐lane taperMissing high‐emphasis crosswalk Guardrail height

4‐foot paved shoulder vs. buffered bike lane on Red Road 

Substandard signal spacing for access class

Page 40: YourHome Team for the Long Haul - Broward County, Florida · Marwan Mufleh, P.E. Project Manager 30 years of Experience in Broward County Wiles Rd Widening (Phases 1, 2, 3) Hiatus

OurRecommendations Immediate/Short‐Term

• Revisit traffic counts after I‐75 ramp opens• Correct ADA ramps• Relocate/add pedestrian push buttons• Signing and marking improvements• Analyze signal cycle length

Interim/Mid‐Term• Additional lanes• Remove free‐flow right turn at Red Road• Bike lane improvements/add bike signal• Shared‐use path

Long‐Term (ICE)• Intersection reconfiguration at Flamingo/Red Road and Flamingo/Pembroke

Page 41: YourHome Team for the Long Haul - Broward County, Florida · Marwan Mufleh, P.E. Project Manager 30 years of Experience in Broward County Wiles Rd Widening (Phases 1, 2, 3) Hiatus

Successful track record in Broward County

Quick response to every request

Low turnover & long‐term stability 

We will exceed your expectations

We’re less than a mile away

We’re here for the long haul

ReasonstoSelect

AtruepartnerwiththeCounty

Page 42: YourHome Team for the Long Haul - Broward County, Florida · Marwan Mufleh, P.E. Project Manager 30 years of Experience in Broward County Wiles Rd Widening (Phases 1, 2, 3) Hiatus