SELECTED WORK SAMPLES

Page 2: YU MIN LIU _ 2017 PORTFOLIO_FULL 11_17
Page 3: YU MIN LIU _ 2017 PORTFOLIO_FULL 11_17

“ARCHITECTURE A LIFE-LONG MARATHON. I CAN STOP TO TAKE A BREAK, BUT I CAN’T QUIT.

EACH MILESTONE HAS ITS OWN UNIQUENESS. EVERY ACCOMPLISHED MILSTONE IS A LESSON LEARNED.

I WILL GO WHEREVER THIS ARCHITECTURAL PATH TAKES ME!

MY GOAL IS ONLY TO RUN AN UNFORGETTABLE MARATHON.”

YuMin Liu

Page 4: YU MIN LIU _ 2017 PORTFOLIO_FULL 11_17

YOUNG WOMEN COLLEGE PREPATORY ACADEMY / 2015PROJECT MANAGER

This project is located downtown Houston. It’s an all-girls secondary school is slated to receive a $27.1 million makeover that will preserve its historic past while creating modern learning spaces to help prepare students for college and careers. The school is upgrading their classroom space to current Houston Independent school district standards as well as additional spaces for their STEM program, robotics and CTE classroom.

The design includes adding a circular drive to the front of the building with a covered pick-up/drop-off area complimenting its classical brick facade. The administrative offices, now on the second floor, will be relocated near the building’s main entrance, where a secure vestibule will be added. Much of the interior renovation will focus on modernizing the classroom spaces into larger learning centers with better natural light, integrated technology and flexible furniture. An addition is slated to be built adjacent to the current auditorium, and will feature an atrium and flexible spaces to create a college-like, collaborative atmosphere for the students to expand their creativities.

The challenge for this project is the site restriction due to project location and the need to preserve existing trees to achieve LEED status.

Page 5: YU MIN LIU _ 2017 PORTFOLIO_FULL 11_17

EXTERIOR FRONT VIEW

EXTERIOR EAST ADDTION

Page 6: YU MIN LIU _ 2017 PORTFOLIO_FULL 11_17

CLEBURNE ST.

CH

ENEV

ERT

ST.

CH

AR

TRES

ST.

WHEELER ST.

NEW ADDTION

FUTURE EXPANSION

DETENTION POND

TENNIS COURT

NEW PARKING

BUS DROP-OFF

SITE PLAN

N

34' - 0 1/2"

1' - 6" 22' - 4 1/2" 1' - 6" 7' - 2"

ENTRY GATE78' - 0"

36' -

0"

27' -

0"

39' - 0"

2" (TYP.)

4" (TYP.)21' - 0"

CENTRE SERVICELINE 2" (TYP.)

2" (T

YP.)

CEN

TRE

MA

RK

SER

VIC

E LI

NE

2" (T

YP.)

SINGLES SIDELINE 2" (TYP.)

BA

SE L

INE

2" (T

YP.)

NET

TENNIS COURT PLAN

18" DIAMETER

2'-6" SQUARE

MIN

.3'

- 6"

3' -

6"

NET POST SET IN SLEEVE

CONCRETE FOOTING BASEPOUR TO STABLE UNDISTURBED SOIL

COURT PAVEMENT

NET POST(LACING ROD OPTIONAL)NET

TIGHTENER

TENNIS NET POST FOOTING

CONCRETE LEVEL

BRICK PILASTER

7' -

4"2 1

/2"2"

4 1/2"

6"63

"12

1/2

"

1"

1 1/2"

1 1/2"

CASTONE BASE

FOUNDATION RE: STRUCTURE

CASTONE CAP

ELEVATION

6' -

3"

1 1/2" 23 1/2" 1 1/2"

26 1/2"

1 1/2"

23 1

/2"

1 1/2"

26 1

/2"

PLAN

REINFORCE CONCRETERE: STRUCTURE04 20 008" CMU04 20 00ECONO KING BRICK

CASTONE CAP

04 20 00BRICK TIES EVERY 6 ROWSALIGN WITH CMU ROWS

Page 7: YU MIN LIU _ 2017 PORTFOLIO_FULL 11_17

LEARNINGCENTER

LEARNINGCENTER

LEARNINGCENTER

LEARNINGCENTER

MECH RM

UNIFORM / GEN STG

FINE ARTS LEARNING CENTER / BLACK BOX

TEACHING THEATER STG

POOL FITNESS AREASHOWERS

GYMELEC

SCIENCE 6SCIENCE 7

LEARNINGCENTER

LEARNINGCENTER

LEARNINGCENTER

TEACHER WORK RM

EXTENDEDLEARNING AREA

EXTENDEDLEARNING AREA

FLEX LAB

ROBOTICS LAB

LEARNINGCOMMONS

AUDITORIUMUPPER LEVEL

AUDITORIUMUPPER LEVEL

AUDITORIUMLOWER LEVEL PREP RMSCIENCE 1

SCIENCE 3

GRAPHIC DESIGN

SCIENCE 2

CORRIDOR

CORRIDOR

CORRIDOR

PREP RMSCHLUMBERGERENGINEERINGLAB

CORRIDOR

CORRIDOR

CORRIDOR

MECH RM

SECTION A - A

SECTION B - B

Page 8: YU MIN LIU _ 2017 PORTFOLIO_FULL 11_17

MSSHOWERS

WOMEN

EXTENDEDLEARNING AREA

STGEXPLORINGCAREERS

GRAPHIC DESIGN

SCIENCE 3

SCIENCE 1

DEAN'S OFFICE

CONF. RM

TEACHER WORK RM

CONF. RM

CONF. RM

LEARNINGCENTER

DEAN OFINSTRUCTION

MAG. COORD.

RECEP.BOOK ROOMCORRIDOR

CORRIDOR

ADVANCEDCONCEPTS OF ENGINEERING

GYMMS LOCKERS

SCIENCE 5

SCIENCE 6

LEARNINGCENTER

LEARNINGCENTER

LEARNINGCENTER

CONF. RM

CORRIDOR

CORRIDOR

CORRIDOR

RECEP.LEARNINGCOMMONS

ROBOTICS LAB

EXTENDEDLEARNINGAREA

CORRIDOR

CORRIDOR

STAIR

STAIR

MECH RM

CUST. STG

FITNESSAREA

ATTENDANCE

CORRIDOR MECH RM

SECTION C - C

SECTION D - D

Page 9: YU MIN LIU _ 2017 PORTFOLIO_FULL 11_17

EXTENDED LEARNING AREA

CAFETERIA

LEVEL 3 CORRIDOR

LEVEL 2 CORRIDOR

Page 10: YU MIN LIU _ 2017 PORTFOLIO_FULL 11_17

ATRIUM

Page 11: YU MIN LIU _ 2017 PORTFOLIO_FULL 11_17

PEOPLES STATE BANK / 2013INTERN ARCHITECT

This is a complete interior renovation project for a Texas Bank. The existing bank was built in 1975 and an addition was added to the back of the building in 1983. The bank has a total of 9,232 s and is a type VB construction.

The vestibule is a transition space in between exterior and interior space. The Texas Star was used to give the bank that “Texan” welcome. The lobby is the hierarchical space of the building. In order to keep an open plan concept for the lobby, Tremain Planel System was used for the space. It’s different from the traditional cubicles, it has a nice black metal panel with window vision panel in between allowing people to feel less enclosed but yet they still have privacy from the public.

In this project, my focus was to ensure the phasing plan has clear graphics to convey to the contractors, ensure demolition plan has correctly noted with correct graphics, dimensioning all aspect of the project, coordinating with MEP on lighting and structural engineer on details for large span of above teller and waiting area, designed finish floor pattern for vestibule and lobby, designed and detailed teller and check stand millwork base on custom specifications, detailed interior elevations, layout furniture plan and generated 3D image for clients.

Page 12: YU MIN LIU _ 2017 PORTFOLIO_FULL 11_17

LOBBY VIEW FROM WATING AREA

LOBBY VIEW FROM ENTRANCE

BOOKKEEPINGTELLER AREA

Page 13: YU MIN LIU _ 2017 PORTFOLIO_FULL 11_17

OFFICE OFFICE OFFICEOFFICEOFFICEOFFICE

OFFICEOFFICE

TELLER

WAITINGROOM

SECURITYVAULT

SAFEDEPOSITVAULT

MOTOR BANKLOBBYBOOKKEEPING

TELLERS

RECORDS EMPLOYEES LOUNGE

HALL

HALL

STAIRSMACHINERM.

ELEVATOR

JANITORIAL

VESTIBULE

PHASE 5

PHASE 5

PHASE 2

PHASE 3

PHASE 4

VESTIBULE

SAFE DEPOSIT VAULT

LOBBY TELLERS

ELECTRICAL

RECORDS

OFFICE OFFICE OFFICE

ELEVATOR

MACHINE ROOMSTAIR 2

STORAGE

OFFICE OFFICE OFFICE OFFICE OFFICE ADMINISTRATOR

PRESIDENT

OFFICE

CORRIDOR 2

JANITORIAL

STAIR 1

CORRIDOR 1

EMPLOYEEPUBLIC

AREA N.I.C

NEW CONSTRUCTION PHASE 1

NEW CONSTRUCTION PHASE 2

NEW CONSTRUCTION PHASE 3

NEW CONSTRUCTION PHASE 4

NEW CONSTRUCTION PHASE 5

COUPON BOOTH

LOBBY

BOOKKEEPING

MOTOR BANK TELLERS

OFFICE

OFFICE

OFFICE

OFFICE

PHASE 5

PHASE 5

PHASE 2

PHASE 3

PHASE 4

1 FIRST FLOOR DEMOLITION - PHASE 2, 3, 4, 5 2 FIRST FLOOR NEW CONSTRUCTION - PHASE 2, 3, 4, 5

PROJECTNORTH

TRUE NORTH

AREA N.I.C

DEMOLITION PHASE 1

DEMOLITION PHASE 2

DEMOLITION PHASE 3

DEMOLITION PHASE 4

DEMOLITION PHASE 5

Page 14: YU MIN LIU _ 2017 PORTFOLIO_FULL 11_17

BOARD ROOM

COMPUTER ROOM

STORAGEMECHANICAL

ROOM

FURRED SPACE

FURRED SPACE

GENERAL STORAGE SPACE

CORRIDOR 1

COFFEE

AREA N.I.C

DEMOLITION PHASE 1

DEMOLITION PHASE 2

DEMOLITION PHASE 3

DEMOLITION PHASE 4

DEMOLITION PHASE 5

MEN WOMENELEVATOR

LOBBY

PHASE 1

PHASE 5BELOW

PHASE 5BELOW

FURRED SPACE

AREA N.I.C

NEW CONSTRUCTION PHASE 1

NEW CONSTRUCTION PHASE 2

NEW CONSTRUCTION PHASE 3

NEW CONSTRUCTION PHASE 4

NEW CONSTRUCTION PHASE 5

MECHANICAL ROOMCOMPUTER ROOM

GENERAL STORAGESPACE

CORRIDOR 1

STORAGE

MEN WOMENELEVATOR LOBBY

BOARDROOMPHASE 1

PHASE 5BELOW

PHASE 5BELOW

1 SECOND FLOOR DEMOLITION - PHASE 1, 5 2 SECOND FLOOR NEW CONSTRUCTION - PHASE 1, 5

PROJECTNORTH

TRUE NORTH

Page 15: YU MIN LIU _ 2017 PORTFOLIO_FULL 11_17

C

D

E

F

G

6

6

5

5

4

43

1

2

2

2.1

A

B

2A08.01

VESTIBULE100

LOBBY101

SAFE DEPOSIT

VAULT103

LOBBY TELLERS

105BOOKKEEPING106

111

RECORDS117

OFFICE114

OFFICE113

OFFICE112

ELEVATOR119

MECH. RM120

STAIR 2121

STG122

OFFICE123

OFFICE124

OFFICE125

OFFICE126

OFFICE127

ADMIN.128

PRESIDENT129

JANITORIAL108

110

CORRIDOR 1109

EMPLOYEE115

PUBLIC116

COUPON BOOTH

102

OFFICE130

OFFICE131

OFFICE132

OFFICE133

OFFICE134

1 -1

1.1

1-2

1.1

7

MOTOR BANK TELLERS

107

SECURITY VAULT104

FIRST FLOOR DRAWING CONVENTIONS

LEGEND

GENERAL NOTESA. ALL INTERIOR DIMENSIONS ARE MEASURED FROM FACE WALL. U.N.O.B. DIMENSIONS AT EXTERIOR ARE FROM EDGE OF SLAB.C. ALL INTERIOR LOAD BEARING PARTITIONS. RE: STRUCTURALD. VERIFY FINAL CLEARANCE DIMENSIONS FOR EQUIPMENT AND DEVICES PRIOR TO SETTING WALLS. E. NOTIFY HALTNER H.A.I. OF ANY DISCREPANCIES IN THE DIMENSIONS FOR RESOLUTION.

SEE A09.01 FORPARTITION TYPE

GLASS PARTITION,RE: 06.02

MILLWORK UPPERCABINETS

PROVIDE MINIMUM DISTANCETO ADJACENT CONSTRUCTIONON STRIKE PULL SIDE OFDOOR TO FACILITATEACCESSIBILITY, U.N.O.

5'-0" ACCESSIBLETURNINGRADIUS.

30" X 48"ACCESSIBLE CLEARFLOOR SPACE.ACCESSIBLE APPROACHZONE, SLOPE NOT TOEXCEED 1:50

HALF RECESSEDFIRE EXTINGUISHER

EXTERIOR WINDOWDESIGNATION RE: AO6.02

DOOR DESIGNATIONRE: AO6.01

INTERIOR WINDOWDESIGNATION RE: AO6.02

SURFACE MOUNTEDFIRE EXTINGUISHER

PROJECTNORTH

TRUE NORTH

Page 16: YU MIN LIU _ 2017 PORTFOLIO_FULL 11_17

Level 1

0' - 0"

Level 212' - 0"

Level 322' - 8"

Lobby Ceiling18' - 0"

L3 X 3 X 1/4 Wall Support @ 32” O.C.

Bar Joist

EXISTING W14Wide Flange

EXISTING W16 WideFlange

EXISTING W16Wide Flange

5/8” GYP. BD. ON 3/4” APA RATE EXP.

1 PLYWOOD SHEATING

3 5/8"x 18 GAMTL STUDS @

32" O.C

3 5/8"x 18 GAMTL STUDS @

32" O.C

3 5/8"x 18 GACONT.

EXISTING 2x4

LIGHT COVE BEYOND

3 5/8"x 18 GAMTL STUDS @

16" O.C

10"

6"8'

- 6"

18' -

0"

11 3/4" 2' - 10 1/4" 5 1/2"

1' - 7 3/8"

9' -

0"

3"

4' - 0" 1' - 11" 1' - 0"

Level 10' - 0"

Level 212' - 0"

Level 322' - 8"

Lobby Ceiling18' - 0"

Bar JoistEXISTING W14Wide Flange

EXISTING W16Wide Flange

5/8" GYP. BD. ON3/4" APA RATE EXP. 1 PYWOOD SHEATHING

3 5/8"x 18 GA MTLSTUD BRACING

@ 32" O.C

3 5/8"x 18 GA MTL STUDS@ 32" O.C

3 5/8"x 18 GACONT.

EXISTING 2x4

LIGHT COVEBEYOND

3 5/8"x 18 GA MTL STUDS@ 16" O.C

8' -

0"3"

9' -

0"

VERIFY W/ ARCH9"

5' - 0" 2' - 0"

10"

1' -

0"8'

- 0"

C6X8.2 CONT.

AT DOOR 37 PROVIDE 4 6" X 18GAMETAL JOIST @ 16" O.C WITH3 1/4" X 4' X 6' PLYWOOD DECK

A/C DUCT VERIFY LOCATIONW/ ARCHITECT

1-2 SECTION - CORRIDOR 2 AND LOBBY FURRDOWN1-1 SECTION - TELLER FURRDOWN

LOBBYLOBBYTELLER COORIDOR 2

1' -

11"

7"4"

1' -

11"

11 1/4" 3' - 1 1/2" 1' - 10 1/2" 3' - 1 1/2" 5' - 0" 1' - 10 1/2" 3' - 1 1/2"

GR - 2

GR - 1

DEAL PLATE ANDPURSE RAIL, GR - 1

TYP.

PL - 2TYP.

GYPSUM BOARD FURR-DOWN PAINTED

PL - 2TYP.

4' -

9"2'

- 10

"

10"

2' - 11"

7"

GR - 2

1/2" RAISEDPANEL WITH

POLISHED EDGES,GR - 1

PL-2

DEALPLATE ANDPURSE RAIL, GR - 1

WIREMANAGEMENTCHASE

PL - 2

2' -

10"

1.1 LOBBY TELLER ENLARGED PLAN

LOBBY TELLER FRONT ELEVATION

SECTION @DEAL PLATE

6"4"

11 7/8"

3/4" TYP.

1 1/

2" T

YP.

10"1/4"

1/4"

1"

TOP OF THE HOOD,PL - 2

VERTICAL SURFACES,PL - 2 PL - 2

1/4" REVEAL,PL - 1

DEALPLATE, GR - 1

PURSE RAIL,GR - 1

HOOD SECTION

PL - 2

PL - 2

3' - 2"

2' - 10"ACCESS.

TELLERLINE STONE DETAILS

1' - 8" 1' - 8" 3' - 4" 1' - 8" 3' - 4" 1' - 8" 3' - 4" 1' - 8" 1' - 8"

2' -

11"

3' -

4"6"

2"2'

- 0"

10"

6"

2' -

0"

DEAL PLATE ANDPURSE RAIL, GR - 1 TYP.

COUNTERTOPANDBACKSPLASH,PL - 1

PL-1HORIZONTALSURFACES.TYPICAL.

LOBBY TELLERS7 5/8"15' - 0"2' - 7 7/8"3' - 1 3/4"

PERUSE RAIL

DEAL PLATE

Page 17: YU MIN LIU _ 2017 PORTFOLIO_FULL 11_17

C

D

E

F

G

543

1 2

2.1

A

B

2A08.01

1A08.01

A.H

.U. #

2

A.H.U. #1H.W.H.

EXISTINGROOF HATCH

MECHANICAL ROOM206

BREAK ROOM209

COMPUTER ROOM205

GENERAL STORAGESPACE200

STORAGE208

MEN203

WOMEN204STORAGE

201

CORRIDOR 1207

30

2

2

BOARDROOM210

LOBBY101

ELEVATOR LOBBY202

A13.021

F.E.

28 27

3

7 7

3

3

29

31 33

EXISTINGKEY PADACCESS

EXISTINGKEY PADACCESS

CASED OPENING

1.1

7

SECOND FLOOR DRAWING CONVENTIONS

LEGEND

SEE A09.01 FORPARTITION TYPE

GLASS PARTITION,RE: 06.02

MILLWORK UPPERCABINETS

PROVIDE MINIMUM DISTANCETO ADJACENT CONSTRUCTIONON STRIKE PULL SIDE OFDOOR TO FACILITATEACCESSIBILITY, U.N.O.

5'-0" ACCESSIBLETURNINGRADIUS.

30" X 48"ACCESSIBLE CLEARFLOOR SPACE.ACCESSIBLE APPROACHZONE, SLOPE NOT TOEXCEED 1:50

HALF RECESSEDFIRE EXTINGUISHER

EXTERIOR WINDOWDESIGNATION RE: AO6.02

DOOR DESIGNATIONRE: AO6.01

INTERIOR WINDOWDESIGNATION RE: AO6.02

SURFACE MOUNTEDFIRE EXTINGUISHER

PROJECTNORTH

TRUE NORTH

Page 18: YU MIN LIU _ 2017 PORTFOLIO_FULL 11_17

D.W.

REF.

12 X 12 CERAMIC TILE

COUNTERTOP ANDBACKSPLASH, PL - 1

3' - 5 7/8" 20' - 11 5/8"

M.W.

COUNTERTOP ANDBACKSPLASH, PL - 1

4 1/4" 2' - 6" 11' - 6" 4 1/4"

BREAK ROOM209

BREAKROOM ENLARGE PLAN

3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0"

1' -

8"3'

- 6"

1' -

0"

GWB PAINT

6 X 12CERAMIC TILE

VERTICAL SURFACESPL - 3

COUNTERTOP ANDBACKSPLASH, PL - 1

M.W.

D.W.ACCESSIBLE

PANEL

1' -

5 3/

4"5"

3' - 0"2' - 11 7/8"1' - 0 1/8"2' - 0"3' - 0"3' - 0"3' - 0"3' - 0"

VERTICAL SURFACESPL - 3

EXSITINGCMU WALL

BREAKROOM - SOUTH

6 X 12 COVEBASE TILE

GWB PAINT

COUNTERTOP ANDBACKSPLASH, PL - 1

4 1/2"11' - 6"2' - 6"4 1/2"

4"2'

- 10

"4"

3' -

5 1/

2"

BREAKROOM - NORTH

BREAKROOM - EAST

6 X 12 COVEBASE TILE

GWB PAINTGWB PAINT

M.W.

3' -

4"1

1/2"

3' -

6"1'

- 8"

2' -

10"

COUNTERTOPANDBACKSPLASH,PL - 1

VERTICALSURFACES

PL - 3

COUNTERTOPAND

BACKSPLASH,PL - 1

VERTICALSURFACES,

PL - 3

8' -

0"

Page 19: YU MIN LIU _ 2017 PORTFOLIO_FULL 11_17

C

D

E

F

G

654

3

B

BOOKKEEPING106

RECORDS117

JANITORIAL108

PUBLIC116

EMPLOYEE115

CORRIDOR 2118

ELEVATOR119

MACH.ROOM

120

STAIR 2121

STG122

OFFICE123

OFFICE124

OFFICE125

OFFICE126

OFFICE127

ADMINISTRATOR128

PRESIDENT129

OFFICE114

OFFICE113

OFFICE112

LOBBY TELLERS105

ELECTRICAL111

STAIR 1110

SAFE DEPOSIT

VAULT103 VESTIBULE

100

LOBBY101

CORRIDOR 1109

COUPON BOOTH

102

OPEN ABOVE

1.1

7

SECURITY VAULT

104

MOTOR BANK TELLERS107

FIRST FLOOR REFLECTED CEILING PLAN

LEGEND

GYPSUM BOARD W/ PAINTED FINISH

2' X 2' GRID AND ACOUSTICAL TILE

EXHAUST FAN

2' X 2' RECESSED FLUORESCENT LIGHT FIXTURE,24 HR CIRCUIT UNSWITCHED WITH BATTERY BACK UP

SINGLE POLE SWITCH

EMERGENCY EXIT LIGHT

ACCESS PANEL

PENDANT LIGHTING

MOTOR BANK LANE LIGHT.RE: ELECTRICAL

RECESSED DOWN LIGHT

RETURN AIR

SUPPLY AIR

CEILING HEIGHT ABOVE FINISHED FLOOR (A.F.F.)AS NOTED

2' X 2' RECESSED FLUORESCENT LIGHT FIXTURE.

2 X 2 RECESSED FLUORESCENT LIGHT FIXTURE.NIGHT LIGHT

SINGLE POLE OCCUPANCY SENSOR SWITCH

RECESSED DOWN LIGHT,24 HR CIRCUIT UNSWITCHED WITH BATTERY BACK UP

PROJECTNORTH

TRUE NORTH

Page 20: YU MIN LIU _ 2017 PORTFOLIO_FULL 11_17

20' - 0 1/2"

11"18' - 2 3/8"11"

9'-0"

8'-0"

9'-0"

9'-0"

LOBBY TELLERS105

LOBBY101

3' -

5 7/

8"6"

6' -

0 3/

8"

CO

RR

IDO

R 1

MAIN TEE SPLICE

FIRE EXPANSION NOTCHCROSS CHANNEL

SHEETROCK BRAND GYPSUM PANEL

MAIN TEE

12 GA. HANGER WIRE

SUSPENDED GYPSUM CEILING GRID

MAX

CONDITION AT WALL

FACE OF WALL

WALL TRIMOR ANGLE

CEILING PANELMAIN RUNNER

CROSS RUNNER

HANGER WIRESHANG FROMBEAMS & PERLINSONLY

PROVIDE #16 GA. TIES ORMETAL STRUTS SECURELYATTACHED TO PREVENTSPREADING OF RUNNERS

8"

LAY-IN CEILING DETAILS 2

#12 GA. VERT. HANGERWIRE @ 4'-0" O.C. BOTH

DIRECTIONS ALONGEACH MAIN RUNNER,

WRAPPED TIGHTLY ATLEAST 2 FULL TURNS

45 DEGREE SPLAY WIREBRACING IN PLANE OFRUNNER, ALL WIRESATTACHED TO THEMAIN RUNNER IN 4DIRECTIONS. LOCATEFOR LATERAL BRACING@ 12'-0" O.C.

CROSS RUNNER

SPLICE

MAIN RUNNER

SPLAY WIRE BRACE

LAY IN CEILING DETAIL

1' -

0"

1' - 0"

SUPPORT TO STRUCT. ABOVE

25 GA. 3 5/8" MTL. STUD @ 16" O.C.

SINGLE TUBE FLUORESCENT LIGHT FIXTURE

5/8" GYP BOARD PAINTED.

EGG CRATE LENS

5/8" TYPE "X" GWB OVER METAL STUDS

1" DIA. VENT HOLES AT 2'-0" O.C.

ROUNDED CORNER BEAD

FURR DOWN DETAIL @ RESTROOM

Page 21: YU MIN LIU _ 2017 PORTFOLIO_FULL 11_17

C

D

E

F

G

654

3

1 2

2.1

A

B

MECHANICAL ROOM206

MEN203

WOMEN204

COMPUTER ROOM205

CORRIDOR 1207

STG208

GENERAL STORAGESPACE

200

BREAK ROOM209

BOARDROOM210

ELEVATOR LOBBY

202

STG201

LOBBY101

R/A

R/A

VOID

NOTE:

EXISTING 2 X 4 CEILING GRID ANDLAY-IN TILE IN THIS AREA.

REPLACE EXISTING 2 X 4 LIGHTFIXTURES IN THIS AREA WITH (20)NEW 2 X 2 FIXTURES.

USE CROSS TEE AT CEILING GRIDAND CUT CEILING TILE TO FIT.

REFER TO ELECTRICAL.

1.1

7

SECOND FLOOR REFLECTED CEILING PLAN

LEGEND

GYPSUM BOARD W/ PAINTED FINISH

2' X 2' GRID AND ACOUSTICAL TILE

EXHAUST FAN

2' X 2' RECESSED FLUORESCENT LIGHT FIXTURE,24 HR CIRCUIT UNSWITCHED WITH BATTERY BACK UP

SINGLE POLE SWITCH

EMERGENCY EXIT LIGHT

ACCESS PANEL

PENDANT LIGHTING

MOTOR BANK LANE LIGHT.RE: ELECTRICAL

RECESSED DOWN LIGHT

RETURN AIR

SUPPLY AIR

CEILING HEIGHT ABOVE FINISHED FLOOR (A.F.F.)AS NOTED

2' X 2' RECESSED FLUORESCENT LIGHT FIXTURE.

2 X 2 RECESSED FLUORESCENT LIGHT FIXTURE.NIGHT LIGHT

SINGLE POLE OCCUPANCY SENSOR SWITCH

RECESSED DOWN LIGHT,24 HR CIRCUIT UNSWITCHED WITH BATTERY BACK UP

PROJECTNORTH

TRUE NORTH

Page 22: YU MIN LIU _ 2017 PORTFOLIO_FULL 11_17

18 GA. 3 5/8" MTL.STUD @ 16" O.C.

R-30 BATT INSULATION

ROUNDED CORNERREINFORCING, TYPICAL

LAY-IN CEILING TILE SYSTEMWITH ACOUSTICAL CEILING TILE.

REFER TO FINISH SCHEDULE,

SHT. A05.02

1' - 0" 2' - 10 1/4"

SUPPORT TOSTRUCTURE ABOVE

NARROW STAGGEREDFLUORESCENT LIGHT FIXTURE

5 3/

4"

9 3/

4"5

3/4"

9'-0"A.F.F.

8'-6"A.F.F.

CORRIDOR 2LOBBY

5" 7"

1X10 MAHAGONY STAINGRADE, 1/2" BEVEL TOP AND

BOTTOM EDGE

5/8" GWB OVER METAL STUDS

5/8" GWB OVER METAL STUDS

METAL TRACK SUPPORT TOSTRUCTURE

5/8" GWB OVER 3/4" PLYWOOD

18 GA. 3 5/8" MTL. STUD @ 16" O.C.

1/2"

CEILING DETAIL @ CORRIDOR 2

18 GA. 3 5/8" MTL. STUD@ 16" O.C.

R-30 BATT INSULATION

ROUNDED CORNERREINFORCING, TYPICAL

LAY-IN CEILING TILE SYSTEM WITHACOUSTICAL CEILING TILE. REFER TOFINISH SCHEDULE, SHT. A05.02

1' - 0"5' - 0"

SUPPORT TO STRUCT. ABOVE18 GA. 3 5/8" MTL. STUD.@ 16" O.C.

NARROW STAGGEREDFLUORESCENT LIGHT FIXTURE

1' -

0"

9'-0"A.F.F.

8'-0"A.F.F.

LOBBY TELLERS LOBBY

5 1/8"6 7/8"

1X10 MAHAGONY STAIN GRADE,1/2" BEVEL TOP AND BOTTOMEDGE

5/8" GWB OVER METAL STUDS

5/8" GWB OVER METAL STUDS

METAL TRACK SUPPORT TOSTRUCTURE

9'-0"A.F.F.

1' -

7 7/

8"

SUPPORT TO STRUCTUREABOVE

5/8" GWB OVER 3/4" PLYWOOD

18 GA. 3 5/8" MTL. STUD @ 16" O.C.

EXISTING STRUCTURAL COLUMN,MILLWORK CLAD.

NON STRUCTURAL COLUMNTO MATCH MILLWORK.

1/4"

8'-0"A.F.F.

1' -

0"10

"

WALL BEYOND

1' - 0"

CEILING DETAIL AT TELLERS

Page 23: YU MIN LIU _ 2017 PORTFOLIO_FULL 11_17

The intent of the project is to give extra gallery space and learning space for the Contemporary Arts Museum Houston. The project program includes Public Display, education space and an administrative space. One of the unique program in this is project is a Children’s Art studio. It allows artistes to teach the younger generations about art and different technique of creating art.

The concept of the project is utilize push and pull movement on series of boxes allowing the building to develop outdoor spaces the on the second level as well as natural skylights for spaces below.

The building program is divided into three main categories: galleries, education, and administrative. The building is recess below grade to allow more space for the gallery space and performance space. The public will be walking through a series of natural light in the space as they make their way to the performance art space at west end of the building. This “recess” movement allows the project to develop an amphitheater condition for the courtyard allowing outdoor mini performance for the community. This project seems like the internal connection to the CAMH is located on the second level but it’s actually connected through the basement, where the public are able to walk through different gallery spaces before arriving to CAMH. The upper eastside level houses workshops and studios for CAMH to host any community events promoting hands on art work programs for children. The café is located near the upper level of the auditorium where the public can enjoy the outdoor space after a performance over a cup of coffee.

ART EXPOLRATION CENTER OF HOUSTON / 2014Instructor: Matt Johnson

Page 24: YU MIN LIU _ 2017 PORTFOLIO_FULL 11_17

EDUCATION: PREFORMANCE

GALLERYCHILDRAN ART STUDIO

ROOF GARDENSKYLIGHTSEXTERIOR

PREFORMACE

TERRACESKYLIGHTS

EXISTING BUILIDNGCAMH

Site Location Transportation flow Parks / Recreation Education Facilities

Introducing outdoor space

Divide form into two levels

Placement of form

Marking entrane to the public

Existing Building Push and pull

Page 25: YU MIN LIU _ 2017 PORTFOLIO_FULL 11_17

SITE PLAN SITE PPLAN

BLACK BOX THEATER

DIGITAL EDITING

SUITEGALLERY

BASEMENT LEVEL

UP

UP

RAMP

UP

RAMP

DIGITAL EDITING

SUITE

DIGITAL EDITING

SUITE

DIGITAL LAB OFFICE GALLERY

Page 26: YU MIN LIU _ 2017 PORTFOLIO_FULL 11_17

BERTHEA ST

MO

NTR

OS

E B

LVD

BISSONNET ST

BAYA

RD

LN

MATERIALPRODUCTTRADENAMEMODELNUMBER

MATERIALPRODUCTTRADENAMEMODELNUMBER

ESTCODEMATERIALPRODUCTTRADENAMEMODELNUMBER

MATERIALPRODUCTTRADENAMEMODELNUMBER

ESTCODE

UPUP UP

UP

RAMP

UP

AB

AB

CC

LEVEL 1

STREETSIDEGALLERY

INFORMATIONCENTER

WORKROOMOFFICEOFFICE

OFFICEOFFICE

OFFICEOFFICE

CONTROLROOM

AUDITORIUM

STAGE

RESTROOMRESTROOM

STAGE

GREEN ROOM

LEVEL 2

WORKROOM

ROOF GARDEN

GALLERY

AUDITORIUMRESTROOM RESTROOM

CAFE

OPEN WORK-ROOM

CHILDERN ART STUDIO

UPUP

UP

Page 27: YU MIN LIU _ 2017 PORTFOLIO_FULL 11_17

BERTHEA ST

MO

NTR

OSE B

LVD

BISSONNET ST

BA

YAR

D LN

up

up

up

upup

B - 1

C

2 4 6 7

A

B

D

1 3 5

43' -

7"16

' - 7"

24' -

7"

84' -

9"

27' - 0" 26' - 0" 26' - 6" 26' - 6" 26' - 4" 35' - 2"

167' - 6"

STREETSIDE GALLERY

WORKROOM

INFORMATION CENTER

STAGE

SEATING

GREEN ROOM

RESTROOM

STAGE

AUDITORIUM

CONTROL ROOM

OFFICE

OFFICEOFFICE

OFFICE

OFFICE OFFICE

LEVEL 1

A

B

C

D

1 2 3 4 5 6 7

27' - 0" 26' - 0" 26' - 6" 26' - 6" 26' - 4" 35' - 2"

167' - 6"26

' - 0 1

/2"

34' -

1 1/2

"24

' - 7"

84' -

9"

DEGITAL LAB

OFFICE

DEGITAL EDITING

SUITE

DEGITAL EDITING

SUITE

DEGITAL EDITING

SUITE

GALLERY

EXISTING BUILDING

GALLERY

BLACK BOX THEATER

BASEMENT LEVEL

Page 28: YU MIN LIU _ 2017 PORTFOLIO_FULL 11_17

A - 0

A

A -1

B

B - 1

C

D

D -1

D - 2

1 2 3 4 5 6 7

7.1

W10

X49

W10

X49

W10

X49

W10

X49

W10X49

94X01

W94

X01W

W10X49

W10X49

W10X49

W10X49

94X01W94X01W

W10

X49

W10X49

W10

X49

W27

X94

W27

X94

W27

X94

49X72W49X72W

W27

X94

49X72

W49

X72W

W10

X49

W10

X49

W10X49

94X01

W94

X01W

94X01

W94

X01W

W10X49

W10

X49

W10

X49

W10

X49

W10

X49

W10

X49

W10

X49

W10X49

W10

X49

W10X49W10X49

W10X49

W10X49

W10X49W10X49

W10X49

W10X49

W10X49

W10X49W10X49

W10X49

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

2 8

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X28

W8X28

W8X28

W8X28

W8X28

W8X28

W8X28

W8X28

W8X28

W8X28

W8X28

W8X28

W8X28

W8X28

W8X28

W8X28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W10X49

W10X49

W10X49

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

1

S-107

2

S-107

14' -

1"10

' - 10

"13

' - 9"

16' -

7"17

' - 6 1

/2"

26' -

0 1/2

"9'

- 1"

2' - 1

1/2"

129'

- 0 1/

2"

27' - 0" 26' - 0" 26' - 6" 26' - 6" 26' - 4" 35' - 2" 14' - 8"

182' - 2"

A

B

2 3 4 5 6

A - 0

A -1

B - 1

D -1

D - 2

7.1

71

D

C

1

2

S-107

S-107

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W10X49W10X49

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28W

8X28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W8X28

W8X28

W8X28

W8X28

W8X28

W8X28

W8X28

W8X28

W8X28

W8X28

W8X28

W8X28

W8X28

W8X28

W8X28

W8X28

W8X

28

W8X

28

W8X

28

W8X

28

82X8

W82

X8W

W8X

28

W8X

28

W8X

28

W8X

28

W8X

28

W10

X49

W10

X49

W10

X49

W10

X49

W10X49

94X01

W94

X01W

W10X49

94X01W94X01W

94X01W94X01W

W10X49

W10

X49

W10

X49

W10

X49

W10

X49

W10

X49

W10X49

W10

X49

W10X49

W10

X49

W10

X49

W10X49

W10

X49

W10X49

W10X49

W10

X49

W10

X49

W10

X49

W10

X49

W10X49

W10X49

W10X49

W10X49

W10

X49

W10X49

94X01W94X01W

W10X49

W10

X49

94X01W94X01W

W10X49 W10X49

W27

X94

W27

X94

W27

X94

W27X94

49X72

W49

X72W

49X72

W

W27X94

W10

X49

W10

X49

W10X49

W10X49

W10X49

W10

X49

W10X49

W10

X49

W10X49

W10

X49

27' - 0" 26' - 0" 26' - 6" 26' - 4" 35' - 2"

26' -

0 1/

2"34

' - 1

1/2"

24' -

7"

24' -

11"

52' -

8"

182' - 2"

30' -

4"2'

- 1 1

/2"

128'

- 6 1

/2"

26' - 6"

Level 2

ROOF Level28' - 6"

LEVEL B-20' - 0"

LEVEL 1-6' - 0"

A - 0 A A -1 B B - 1 C D D -1 D - 2

14' - 1" 24' - 7" 16' - 7" 17' - 6 1/2" 26' - 0 1/2" 9' - 1"

107' - 10 1/2"

SECTION 1

Level 2

ROOF Level28' - 6"

LEVEL B-20' - 0"

LEVEL 1-6' - 0"

A - 0 A A -1 B B - 1 C D D -1 D - 2

14' - 1" 24' - 7" 16' - 7" 17' - 6 1/2" 26' - 0 1/2" 9' - 1"

107' - 10 1/2"

SECTION 2

Page 29: YU MIN LIU _ 2017 PORTFOLIO_FULL 11_17

NORTH ELEVATIONEAST ELEVATIONSECTION C - C

CAMH

SECTION B - B

CAMH

SECTION A - A

Page 30: YU MIN LIU _ 2017 PORTFOLIO_FULL 11_17
Page 31: YU MIN LIU _ 2017 PORTFOLIO_FULL 11_17

NOBEL CENTER: Transform / 2014Instructor: Matt Johson

The Nobel center situated on Blasieholmen peninsula in Stockholm. As an architectural representation of the Nobel Prize, the Nobel Center will serve as a space to promote creativity and innovative thinking in finding solutions for the world's major challenges of today and of the future.

This project is base on the idea of performance driven structure. It transfrom from landscape to hardscape to a ventilated facade system for the building. The Ventilated facade is made up of glass and perforated panels, it will allow the building to retain solar heat and allow the hot air raise through the building to keep the interior of the building warm.

The circulation of the site is to allow public to pass through the project with a direct connection to the water but also educate the public about the Noble Prize druing the process. The performance space and gallery usage is located on the ground floor. The cafe is located on the second floor. The third and fourth are more pivate usages such as library, workshop, conference rooms.

Page 32: YU MIN LIU _ 2017 PORTFOLIO_FULL 11_17

SITE EXISTING SITE CiRCULATION

MASSING FOOTPRINTPLAZA SPACECIRCULATION THROUGH THE SITE

PARKING

MASSING DIAGRAM

Page 33: YU MIN LIU _ 2017 PORTFOLIO_FULL 11_17

PLACED FORM BASE ON PROGRAMS LEVEL SEPERATION

VERTICAL CIRCULATION CLADDING FACADE

UPPER LEVEL CONNECTION MIMICK LANDSCAPE

TRANSFRORM DIAGRAM

Page 34: YU MIN LIU _ 2017 PORTFOLIO_FULL 11_17

SITE PLAN

OVERVIEW

WALL SECTION DETAIL + 3D RENDERING

Page 35: YU MIN LIU _ 2017 PORTFOLIO_FULL 11_17

up

up

RESTROOM

STAGEGREEN ROOM CONTROL

ROOM

AUDITORIUM

SHOP

CLOAK RM

INFORMATION CENTER

VISITOR AREA

VIDEO ROOM

SPECIAL GALLERY

BACK OFFICE

LOADING LOGISTICS

up

down

down

up

A

A’

B’

B

AA

up

RESTROOM

STAGE

CAFE

MEZZANINE

KITCHEN

STG

CATWALK

GROUND LEVEL LEVEL 2

NOTHEAST ELEVATION EAST ELEVATION

Page 36: YU MIN LIU _ 2017 PORTFOLIO_FULL 11_17

up

up

WORKSHOP

OFFICE

CONFERENCE RM

LIBRARY

down

CONFERENCE ROOM

OFFICE

OFFICE

OFFICE

RESTROOM

down

OFFICE

LEVEL 3 LEVEL 4

SOUTH ELEVATION SECTION A - A” SECTION B - B”SOUTH ELEVATION

stage

catwalk

office

visitor area

SESECTCCT OIOIONN AA - A”A”

stage

catwalk

office

visitorarea

conference room

office

auditorium

mezzanine

control room

shop

SESECTCTIOIONN BB - B”B”

visitor area

special gallery

back office

kitchencafe

library

office