zambia prsp: user-producer workshop

18
ZAMBIA PRSP: ZAMBIA PRSP: User-Producer User-Producer Workshop Workshop By Buleti Nsemukila, Ph.D 1

Upload: indira-avery

Post on 31-Dec-2015

40 views

Category:

Documents


0 download

DESCRIPTION

ZAMBIA PRSP: User-Producer Workshop. By Buleti Nsemukila, Ph.D. 1. Zambia is one of the poor countries currently working on the PRSP under the HIPC initiative; PRSP Secretariat operates under the Ministry of Finance and Economic Development. Background: PRSP Process in Zambia. 2. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: ZAMBIA PRSP:  User-Producer Workshop

ZAMBIA PRSP:ZAMBIA PRSP: User-Producer Workshop User-Producer Workshop

By

Buleti Nsemukila, Ph.D

1

Page 2: ZAMBIA PRSP:  User-Producer Workshop

Background: PRSP Process in Zambia

Zambia is one of the poor countries currently working on the PRSP under the HIPC initiative;

PRSP Secretariat operates under the Ministry of Finance and Economic Development

2

Page 3: ZAMBIA PRSP:  User-Producer Workshop

PRSP in Zambia has identified three (3) themes:

o Economico Socialo Crosscutting

3

Page 4: ZAMBIA PRSP:  User-Producer Workshop

Economic themeEconomic theme:

the main thrust is to have rapid and

sustainable growth through creation of wealth and to be driven by the revitalization of agriculture and mining sectors;

Social themeSocial theme:

to have a healthy and enlightened society contributing positively to economic growth – includes elements of education and health interventions;

4

Page 5: ZAMBIA PRSP:  User-Producer Workshop

CrosscuttingCrosscutting:

include HIV/AIDS, environment, gender and governance concerns for all issues.

5

Page 6: ZAMBIA PRSP:  User-Producer Workshop

Stages in the Zambian PRSP:

Consultations Formation of sector working groups Preparation of sector papers

6

Page 7: ZAMBIA PRSP:  User-Producer Workshop

Working Groups:

o Macroeconomic o Agricultureo Tourismo Miningo Industry/Manufacturingo Healtho Education

7

Page 8: ZAMBIA PRSP:  User-Producer Workshop

Current Status:

Final draft produced after grass root consultations.

Final Document to be presented to major stakeholders in October 2001.

9

Page 9: ZAMBIA PRSP:  User-Producer Workshop

Overview of Zambia’s Statistical System

An Act of Parliament (Cap 425) of the Laws of Zambia of 1964 guides the Zambian Statistical System.

Under the Act, the Director of CSO is required to carry out all censuses and surveys and to organize a coordinated scheme of social and economic statistics relating to Zambia.

CSO is a government department under Ministry of Finance and Economic Development.

10

Page 10: ZAMBIA PRSP:  User-Producer Workshop

11

Current statistical system comprise:

o Central Statistics Office

o Statistical units in sector ministries

o University research institutes

o Bank of Zambia

o Statistical units in private sector and NGOs

Page 11: ZAMBIA PRSP:  User-Producer Workshop

12

Major Sources of Data:

o Census

o Household surveys

o Administrative records

o Qualitative data derived from participatory techniques

Page 12: ZAMBIA PRSP:  User-Producer Workshop

User-Producer Workshop

13

Organised by the CSO and the PRSP secretariat.

Financially and logistically supported by the European Union and GTZ.

Participation (more than 70) from: Government institutions Research community Civil society and NGOs International organization

Page 13: ZAMBIA PRSP:  User-Producer Workshop

15

Major Objectives of Workshop

Provide highlights on the types of data inputs required for the implementation of the PRSP;

Bring together users and producers of poverty data so as to ensure relevance, timeliness and accuracy of produced data;

Institutionalise the dialogue between users and producers of data;

Page 14: ZAMBIA PRSP:  User-Producer Workshop

16

Workshop as a strategy:Used as strategy to establish a permanent and on-going dialogue between users and producers of information towards the improvement of the poverty monitoring system in Zambia.

Expected Outputs:• relevant recommendations,• general framework of required data,• setting priorities and• itemizing the programme activities that would achieve the establishment of a good

system of poverty statistics in Zambia.

Page 15: ZAMBIA PRSP:  User-Producer Workshop

Lessons Learnt

17

The need to market existing data at the CSO- dialogue between users and producers through User-Producer Committee

The need for a significant improvement in analytical skills

- training in data-handling (more than 60 participants trained)

The need was recognized for the CSO to improve its methods and means of dissemination

- Data available on CD- rom to improve access to data.

Page 16: ZAMBIA PRSP:  User-Producer Workshop

18

The need was identified to develop and strengthen administrative record keeping through management information system,

The need to establish coordination mechanism in the Zambian statistical system:

- establishment of National Statistical Council- establishment of National User-Producer Committee- preparation of draft legal framework to be submitted for legislation- preparation of a proposal for the review of Zambia’s statistical system.

Page 17: ZAMBIA PRSP:  User-Producer Workshop

19

The need to strengthen existing poverty data sources, institutional building and dissemination;

The need for awareness activities on poverty through organizing a national forum on poverty issues:

- Stakeholder Summit in October- Annual Poverty Conference

Page 18: ZAMBIA PRSP:  User-Producer Workshop

20

Even though a statistical system has existed in Zambia since 1964, the PRSP process has enabled stakeholders rethink over the need to strengthen the system to accommodate new demands and challenges. This is true for the need to improve coordination of poverty monitoring and analysis.

The user-producer workshop provided an opportunity to strengthen the draft poverty monitoring and evaluation chapter of the Zambian PRSP.

Conclusion