  • ZXMW PR10 S400&S500 (V2.00) Fast Installation Guide

    ZXMW PR10 S400&S500 (V2.00)

    Fast Installation Guide

    ZTE CORPORATION

    Microwave Product Support Dept.

    Internal Use Only

  • Microwave Product Support Dept.

    Internal Use Only

    All Rights reserved, No Spreading abroad without Permission of ZTE

    ZTE CORPORATION

    Address: NO. 55Hi-tech Road SouthShenZhenP.R.China518057

    http://dms.zte.com.cnWebsite:

    ZXMW PR10 S400&S500 (V2.00) Fast Installation Guide

    LEGAL INFORMATION

    By accepting this certain document of ZTE CORPORATIN you agree to the following terms. If you do not agree to the following terms, please notice that you are not allowed to use this document.

    Copyright 20 1 1 ZTE CORPORATION. Any rights not expressly granted herein are reserved. This document contains proprietary information of ZTE CORPORATION. Any reproduction, transfer, distribution, use or disclosure of this document or any portion of this document, in any form by any means, without the prior written consent of ZTE CORPORATION is prohibited.

    and are registered trademarks of ZTE CORPORATION. ZTEs company name, logo and product names referenced herein are either trademarks or registered trademarks of ZTE CORPORATION. Other product and company names mentioned herein may be trademarks or trade names of their respective owners. Without the prior written consent of ZTE CORPORATION or the third party owner thereof, anyones access to this document should not be construed as granting, by implication, estopped or otherwise, any license or right to use any marks appearing in the document.

    The design of this product complies with requirements of environmental protection and personal security. This product shall be stored, used or discarded in accordance with product manual, relevant contract or laws and regulations in relevant country (countries).

    This document is provided as is and as available. Information contained in this document is subject to continuous update without further notice due to improvement and update of ZTE CORPORATIONs products and technologies.

    http://[email protected]:

  • Microwave Product Support Dept.

    Internal Use Only

    All Rights reserved, No Spreading abroad without Permission of ZTE

    Revision History

    Product Version Document Version Serial Number Reason for Revision

    V2.00 R1.0 None First published

    V2.00 R1.1 NoneModify the reviewed

    problems

    DateDocument

    VersionPrepared by Reviewed by

    2010-7-15 R1.0 Zhang Juan Wang Yi, Xue Bin, Wang Jue

    2010-8-20 R1.1 Zhang Juan Alwin Joshua

    Author

    Approved by

    Guo Chaohong

    Guo Chaohong

    ZXMW PR10 S400&S500 (V2.00) Fast Installation Guide

    V2.00 R1.2 NoneModify the reviewed

    problems

    2010-8-20 R1.2 Zhang Juan Song Wei Guo Chaohong

  • Microwave Product Support Dept.

    Internal Use Only

    All Rights reserved, No Spreading abroad without Permission of ZTE

    Applicable to: installation engineers

    Proposal: Before reading this document, it is recommended to understand the following knowledge and skills

    SEQ Knowledge and skills Reference material

    1Know engineering installation basics of

    communication equipmentNone

    2 Know safety precautions during installation None

    Follow-up document: After read this document, you may need the following information

    SEQ Reference material Information

    1ZXMW PR10 S400&S500(V2.00)

    Microwave Project Commissioning Guide

    This manual specifies the commissioning regulations of ZXMW

    PR10 S400&S500 product, guarantee and improve installation

    quality, unifies the commissioning procedure, as well as

    regulates and guides the on-site commissioning by

    commissioning personnel.

    2ZXMW PR10 S400&S500(V2.00)

    Microwave Acceptance Test Manual

    This manual describes the precondition and safety

    points,General test conditions and instruments and Test

    items including test information and test procedures.

    ZXMW PR10 S400&S500 (V2.00) Fast Installation Guide

  • -I-

    Content

    1 Precautions.1

    2 Tools and Auxiliary Material2

    2-1 Tools 2

    2-2 Equipment Modules 4

    2-3 Project Auxiliary Material 5

    3 Interface. 6

    3-1 ODU & Hybrid Coupler Interface6

    3-2 IDU Interface..7

    4 Installation Modes of Outdoor Unit Equipment.. 8

    4-1 Direct Installation...... 8

    4-2 Remote Installation... 9

    5 Changing the polarization direction of the antenna. .. 10

    6 Installing 11-38GHz ODU. .. .11

    6-1 1+0 Direct Installation11

    6-2 1+1 Direct Installation12

    6-3 1+0 Remote Installation .. .. 14

    6-4 1+1 Remote Installation ..15

    Microwave Product Support Dept.

    Internal Use Only

    All Rights reserved, No Spreading abroad without Permission of ZTE

    ZXMW PR10 S400&S500 (V2.00) Fast Installation Guide

    7 Installing 7-8GHz ODU..20

    7-2 1+0 Remote Installation .. .. 21

    7-3 1+1 Remote Installation .. . 22

    7-1 Installing the ODU Installation Bracket 20

  • -II-

    Content

    8 Installing ODU Cables.23

    8-1 Installing the ODU PGND Cable .23

    8-3 Installing the IF Cable - Making Waterproof Curves.25

    8-4 Grounding the IF Cable - Grounding Points ...26

    8-5 Grounding the IF Cable - Installing the Grounding Clip.27

    9 Installing the Indoor Unit Equipment ....28

    9-1 Installation Flow of Indoor Unit Equipment ... ... ....28

    9-2 Installing the Rack........ .. ...29

    Microwave Product Support Dept.

    Internal Use Only

    All Rights reserved, No Spreading abroad without Permission of ZTE

    Appendix.......37

    A-1 Terminating the IF Cable with Connectors... .......37

    A-2Waterproofing Outdoor Connectors. ..... ......... .38

    9-3 Installing the IDU.....................30

    9-4 Installing the I/O Board..............31

    9-5 Installing the DDF Distribution Box................32

    10-1 Installing Power Cables...............33

    10-2 Installing IF Cables.....................34

    10-3 Installing 75 E1 Cables.................35

    10-4 Installing 120 E1 Cables.......................36

    ZXMW PR10 S400&S500 (V2.00) Fast Installation Guide

    8-2 Installing the IF Cable . 24

    10 Installing the Indoor Unit Equipment Cables......33

  • 1 Precautions

    Note

    Danger

    Danger

    Danger

    Hoisting Heavy ObjectsWhen heavy objects are hoisted, do not stand or walk under the boom or the objects.

    Caution

    MicrowaveStrong radio frequency can harm the human body. Do not stay too close to the antenna in the emitting direction of the

    antenna when the microwave communication equipment is working. Before installing or maintaining an antenna on the

    iron tower or the mast installed with more than one antenna, avoid the strong radiation from the other antennas.

    Caution

    IF CableBefore installing or removing an IF cable, turn off the ODU power switch.

    -1-

    Working at Heights When working at heights, prevent objects from falling down.

    ThunderstormHigh voltage and AC operations, or operations on an iron tower and a mast on a thunderstorm day are prohibited.

    This document aims a t providing simple and distinctive guidelines for hardware installation. For details on the

    installation operation steps, refer to the Installation Guide delivered in the form of CD-ROM along with the equipment.

    1-1 Precautions

    Microwave Product Support Dept.

    Internal Use Only

    All Rights reserved, No Spreading abroad without Permission of ZTE

  • -2-

    2-1 Tools

    2 Tools and Auxiliary Material

    Crowbar: to open boxes Hammer: To open boxes Flat screwdriver: to open boxes

    Side cutting pliers: to cut cables and

    cable ties Do not damage cables

    during operation.

    Cross screwdriver: to fasten bolts. Do

    not damage equipments during

    operation.

    Wrenches: to fix poles and antennas

    on the tower

    Adjustable wrench: to fix poles and

    antennas on the tower.

    Long nose pliers: to make feeder cable

    connectors. Do not damage feeder

    cable.

    Flat nose pliers: to make cables. Do

    not damage cables.

    Files: to trim the cable core when

    assembling cable connectors

    Wire stripping pliers: to strip and cut

    Wires.

    Crimping pliers: to crimp and

    assemble cable connectors. Pay

    attention to crimping force and do not

    damage connectors.

    Allen wrench: to fasten allen bolts on

    equipments

    Cutter: to make cable connectors. Do

    not damage the cable core during

    operation.

    Multimeter: to measure voltage and

    resistance and test short or open of

    connectors. Please pay attention to

    polarities.

    Manual winch: to lift equipments

    Safety belt: to be used while working

    on the tower. Make sure the locking

    ring is firm and stable.

    Safety helmet: to be used in outdoor

    operation and while working on the

    tower

    Microwave Product Support Dept.

    Internal Use Only

    All Rights reserved, No Spreading abroad without Permission of ZTE

  • -3-

    2-1 Tools

    2 Tools and Auxiliary Material

    Pulley and ropes (lifting rope and pilot

    rope): to lift equipments including

    pole, antenna, hybrid, ODU and IF

    cable.

    Wrench: to lift equipments. Confirm

    the spindle is not loose to prevent

    accidents during lifting.

    Interphone: to be used during antenna

    alignment. Check the performance

    and battery before alignment.

    Compass: to measure azimuth during

    antenna installation. Please keep away

    from magnetic filed such as tower.

    Soldering iron and soldering tin: to

    solder cable connectors. Preheat the

    iron for 2~3 minutes before soldering.

    Impact dill: to drill holes. Decide hole

    position before drilling

    Spirit level: to check vertical and

    horizontal error such as in rack

    installation and antenna polarization

    adjustment.

    Antistatic gloves and antistatic wrist

    strap: to be used during indoor

    installation.

    Cleaner: to clear the sites after

    installation

    Microwave Product Support Dept.

    Internal Use Only

    All Rights reserved, No Spreading abroad without Permission of ZTE

  • Pole ZXMW PR10 S400 IDU

    Antenna ZXMW PR10 S500 IDU

    7GHz8GHz ODU 13GHz38GHz ODU

    7/8GHz Hybrid 13GHz38GHz Hybrid

    -4-

    2-2 Equipment Modules

    2 Tools and Auxiliary Material

    Microwave Product Support Dept.

    Internal Use Only

    All Rights reserved, No Spreading abroad without Permission of ZTE

    1+0 only 16E1+Ethernet IDU

    1+0 only 16E1 IDU

    1+0 Expandable 16E1 IDU

    1+0 Expandable 16E1+Ethernet IDU

    1+0 Expandable 32E1 IDU

    1+1 Protected 16E1 IDU

    1+1 Protected 16E1+Ethernet IDU

    1+1 Protected 32E1 IDU

  • -5-

    2-3 Project Auxiliary Material

    2 Tools and Auxiliary Material

    Ground Cable IF Cable DB44 Connector

    Power Supply Cable Waterproof insulation tape PVC tape

    Tie N Type Connector L Type Connector

    Microwave Product Support Dept.

    Internal Use Only

    All Rights reserved, No Spreading abroad without Permission of ZTE

    75 E1 Cable 75 E1 Cable Connector 120 E1 Cable

  • -6-

    3 Interface

    3-1 ODU & Hybrid Coupler Interface

    Microwave Product Support Dept.

    Internal Use Only

    All Rights reserved, No Spreading abroad without Permission of ZTE

    7GHz ~ 8GHz ODU Interface 11GHz ~ 38GHz ODU Interface

    11GHz~38GHz Hybrid Coupler Interface

    Functions of ODU Interface

    Interface Type

    BNC Connector

    Function

    AGC level monitoring

    Grounding cable interface System grounding

    Coaxial type-N Connector Connected to IDU

    11GHz~38GHz Hybrid Coupler Interface

    BNC Connector

    Coaxial type-N

    Connector

    Grounding Cable Interface

    Grounding

    Cable Interface

    Coaxial type-N

    Connector BNC

    Connector

    Antenna

    Interface

    Main Spur Track Interface

    Auxiliary

    Spur Track

    Interface

    Antenna

    Interface

    Waveguide

    Interface

  • -7-

    3 Interface

    3-2 IDU Interface

    ZXMW PR10 S400 IDU Interface

    ZXMW PR10 S500 IDU Interface

    All Rights reserved, No Spreading abroad without Permission of ZTE

    Microwave Product Support Dept.

    Internal Use Only

    EOW Call Button

    System

    Status LED

    Modem

    Status LED

    EOW

    Interface

    DSC

    Interface

    NMS LA

    Interface

    NMS LAN

    Interface

    System

    Reset Button

    ODU

    Status LED

    IF

    InterfaceEDI

    Interface

    Traffic

    Interface

    Power

    Connector

    Interface

    Power

    On/Off

    Fuse

    Ethernet

    Interface

    IF

    InterfaceODU

    Status LED

    MU

    Status LED

    Ground

    Fuse

    Power

    On/Off

    Power

    Connector

    Interface

    Traffic

    Interface

    Ethernet

    InterfaceEOW

    Interface

    DSC

    Interface

    NMS LA

    Interface

    NMS LAN

    Interface

    System

    Reset Button

    Alarm/Maint

    Status LED

    EDI

    Interface

    EOW Call

    Button

  • -8-

    4-1 Direct Installation

    4 Installation Modes of Outdoor

    Unit Equipment

    1+0 Unprotected only for 11 to 38GHz ODU 1+1 Protected only for 11 to 38GHz ODU

    Microwave Product Support Dept.

    Internal Use Only

    All Rights reserved, No Spreading abroad without Permission of ZTE

  • -9-

    4-2 Remote Installation

    Microwave Product Support Dept.

    Internal Use Only

    All Rights reserved, No Spreading abroad without Permission of ZTE

    4 Installation Modes of Outdoor

    Unit Equipment

    1+0 Unprotected Remote Installation (for 1138GHz ODU)

    1+0 Unprotected Remote Installation (for 78GHz ODU)

    1+1 Protected Remote Installation (for 1138GHz ODU)

    1+1 Protected Remote Installation (for 78GHz ODU)

  • -10-

    5-1 Changing the polarization direction of the antenna

    5 Changing the polarization

    direction of the antenna

    The antennas are available in multiple types. This procedure for changing the antenna polarization direction

    is provided for reference only. In actual installation, follow the instructions packed with the antenna.

    Changing the polarization direction of the antenna

    Single-polarized antenna-vertically polarized Single-polarized antenna-horizontally polarized

    CAUTION

    1 Loosen the fastening screws to allow the feeder boom to rotate freely.

    2

    3

    Rotate the feeder boom 90 degrees to the left or right.

    Tighten the fixing screws and apply glue around the screws.

    Microwave Product Support Dept.

    Internal Use Only

    All Rights reserved, No Spreading abroad without Permission of ZTE

    1

    2

    Fastening Screw

    Feeder Boom

  • -11-

    6-1 1+0 Direct Installation

    6 Installing 11-38GHz ODU

    The following describes the procedure for installing the ODU on the antenna. The procedure for installing

    the ODU on the ODU adapter is similar.

    Applying the appropriate lubricant

    Installing the ODU on the antenna

    Microwave Product Support Dept.

    Internal Use Only

    All Rights reserved, No Spreading abroad without Permission of ZTE

    Vertical polarization Horizontal polarization

    UPPlate marked with V

    UPPlate marked with H

    ODU

    Hole for guide PIN

    O Ring

    Fasten the four M6 screws to fix ODU on the

    antenna bracket4

    3Align the flange of ODU with that of the

    antenna

    1Keep the polarization indicator on the ODU

    pointing to the polarization direction of the antenna.

    2Insert guide pin on the hole of the bracket to set the

    position of screws

    ODU

    Antenna

    ODU FlangeAntenna Flange

    Note

    Note

    Screws

    Screws

    Guide PIN

    Remove the

    protective caps.

    Apply the appropriate quantity of lubricant on the

    gasket of the feed boom and the surface of the

    waveguide near the gasket.

  • -12-

    6-2 1+1 Direct Installation

    6 Installing 11-38GHz ODU

    Note

    The following describes the procedure for installing the hybrid coupler on the antenna.

    CAUTION The hybrid couplers are available in multiple types. This procedure for installing the hybrid coupler is provided for

    reference only. In actual installation, follow the instructions packed with the hybrid coupler.

    By default, the hybrid coupler applies vertical polarization. If horizontal polarization is required, change the polarization direction of the hybrid coupler.

    According to the request change Hybrid Coupler polarization to Horizontal polarization

    Microwave Product Support Dept.

    Internal Use Only

    All Rights reserved, No Spreading abroad without Permission of ZTE

    Vertical polarization

    Horizontal polarization

    Guide Pin

    Hybrid Coupler

    Screw

    Antenna Connection Unit

    1Loosen the two screws on the polarization chip,

    and rotate the antenna connection unit 2 Adjust the polarization direction, and then fasten the screws

    Install Hybrid Coupler on the Antenan

    1Use M5 screws to install the bracket and the

    handle on the hybrid coupler.2

    Check the polarization direction, and use M6 screws to install the

    Hybrid coupler on the antenna.

    M6 Screw

    Hybrid Coupler

    Short Plate

    Antenna

    Guide PIN

    O Ring

    Flat Washer

    Bracket

    Hybrid

    Coupler

    Bracket

    HandleM5 Head Cap Screw

    M5x12(10ea)

  • -13-

    6-2 1+1 Direct Installation (continued)

    6 Installing 11-38GHz ODU

    Installing the ODU on the hybrid coupler

    2

    Microwave Product Support Dept.

    Internal Use Only

    All Rights reserved, No Spreading abroad without Permission of ZTE

    1

    ODU Port

    Move the short plate

    O Ring

    Insert the O-Ring into the two ODU ports on the Hybrid coupler and move the short plate

    Install the two ODUs on the combiner respectively, and fix each ODU with four screws

    O Ring

    ODU

    O Ring

    ODU

  • -14-

    6-3 1+0 Remote Installation

    6 Installing 11-38GHz ODU

    Microwave Product Support Dept.

    Internal Use Only

    All Rights reserved, No Spreading abroad without Permission of ZTE

    1

    2

    3

    Install the ODU adapter at an appropriate position on the antenna pole

    Mounting Plate Assembly

    Assemblys jaws

    Rods(4)

    Take out the flexible waveguide

    Use the flexible waveguide to connect the waveguide interface at the antenna with that at the ODU adapter

    Remove tap and connect waveguide here

    Twistable Flexible

    Waveguide

    NoteBy default, ODU is vertically polarized. The polarization direction of ODU must be consistent with that of the

    antenna, otherwise, the polarization direction should be adjusted. For operation details refer to 1 1+0 Direct

    Installation

    Before installation, The antenna is installed.

    Installing the flexible waveguide

    Frequency bandMaximum twist

    degree

    Minimum E-bend

    radius

    Minimum H-bend

    radius

    7/8 GHz 249 76 mm 152 mm

    11 GHz 280 64 mm 127 mm

    13 GHz 330 64 mm 115 mm

    15 GHz 405 52 mm 102 mm

    18/23/26/32/38 GHz 465 38 mm 76 mm

    The flexible waveguide can be bent only within its maximum twist

    angle and at the larger area side. The E-bend radius and H-bend radius

    cannot be smaller than the minimum bending radius.

    In the case of separate installation, the antenna must provide the

    standard flange interface. If the existing interface is not a flange

    interface, convert the interface type according to the antenna

    instruction.

    CAUTION

    Keep the direction of the waveguide cavity of

    the flexible waveguide consistent with that of

    the adapter, and fix the flexible waveguide in a

    proper position.

  • -15-

    6-4 1+1 Remote Installation

    6 Installing 11-38GHz ODU

    Microwave Product Support Dept.

    Internal Use Only

    All Rights reserved, No Spreading abroad without Permission of ZTE

    1 Assemble the bracket and handle to the hybrid coupler

    2 Assemble parts of pole mounting bracket used to mount the hybrid coupler

    M5 Head Cap Screw

    Mount Arm

    Truss

    Mount

    Holder

    M12x200 Screw

    3 Screw the Mount Arm and the Truss with the M6 25 Screw, Flat Washer (2), Spring Washer (1), Nut, at four positions.

    Mount Arm

    Truss

    Truss

    Mount Arm

    M6x25 Screw, Nut,Flat

    Washer x 2Spring Washer

  • -16-

    6-4 1+1 Remote Installation (continued)

    6 Installing 11-38GHz ODU

    Microwave Product Support Dept.

    Internal Use Only

    All Rights reserved, No Spreading abroad without Permission of ZTE

    4 Determine centre off set

    5 Fit the guide pin of the hybrid coupler to the Guide Pin Hole of the Mount Arm, Install the HYB onto the bracket with the M6 35 Screw, Flat Washer (2), Nut (2), at four positions,

    Note When either Main or Standby ODU is removed, attach the short plate over the ODU port. Tightening torque is 3.0

    Nm 10%.

    Hybrid

    Coupler Hybrid

    Coupler top

    M6x35 Screw, Nut x 2,Flat

    Washer x 2

  • -17-

    6-4 1+1 Remote Installation (continued)

    6 Installing 11-38GHz ODU

    Microwave Product Support Dept.

    Internal Use Only

    All Rights reserved, No Spreading abroad without Permission of ZTE

    6 Install the hybrid coupler to the mounting pole using the M12x 200 Screw, Flat Washer, Nut

    7 Adjust direction of the Bracket for Waveguide Port of the hybrid coupler orientation.

    Pole Diameter:

    50 to 115mm

    Mount Holder

    M12x200 Screw, Nut x 2,

    Flat Washer x 2

    Pole

    Mount Holder

    M12x200 Screw, Nut x 2,

    Flat Washer x 2

    Waveguide Port

    Double Nut tightening Determination of the

    attachment direction.

    After the installing direction of the

    waveguide has been decided, tighten double

    nuts.

    Hybrid Coupler

  • -18-

    6-4 1+1 Remote Installation (continued)

    6 Installing 11-38GHz ODU

    Microwave Product Support Dept.

    Internal Use Only

    All Rights reserved, No Spreading abroad without Permission of ZTE

    8 Confirm the ODU Type, which is Master or Slave.

    9 Install the ODU onto the hybrid coupler.

    NoteThe ODU should be attached by turning the plate marked V up position for both Main ODU and Standby ODU.

    CAUTIONThe same type must be installed onto the hybrid coupler

  • -19-

    6-4 1+1 Remote Installation (continued)

    6 Installing 11-38GHz ODU

    Microwave Product Support Dept.

    Internal Use Only

    All Rights reserved, No Spreading abroad without Permission of ZTE

    10 Connect the flexible waveguide (WG) to the ODU and fix the waveguide to the ODU with four (4) bolts.

    Before connecting the WG to the antenna, confirm which polarization is applied to the Master and Slave ODU.

    Note

    Waveguide Port

    Waveguide

    Hybrid Coupler

    O Ring

  • -20-

    7-1 Installing the ODU Installation Bracket

    7 Installing 7-8GHz ODU

    Note

    This operation is required only when the radio site needs to be configured with the lightning arrester.

    Microwave Product Support Dept.

    Internal Use Only

    All Rights reserved, No Spreading abroad without Permission of ZTE

    1 Confirm there is no part missing.

    2 Put the ODU installation bracket on the pole.

    3 Tighten the fixing screws

    4 The fixed ODU Installation Bracket as shown in the following figure.

  • -21-

    7-2 1+0 Remote Installation

    7 Installing 7-8GHz ODU

    Note

    Before Installing the ODU, you must conform the following is ok:

    The antenna is installed

    The ODU is hoisted to the installation platform, and is in good condition.

    The ODU's type is consistent with that in the plan.

    Microwave Product Support Dept.

    Internal Use Only

    All Rights reserved, No Spreading abroad without Permission of ZTE

    1

    2

    Put the ODU on the bracket as shown in the following figure.

    Tighten the four screws

    Note

    Put the sign V of ODU on the vertical position, and H

    on the horizontal position

    3 Use the flexible waveguide to connect the waveguide interface at the antenna with that at the ODU adapter

    ODU

    Bracket

    Coaxial Cable

    Tighten Bolts(M5)

  • -22-

    7-3 1+1 Remote Installation

    7 Installing 7-8GHz ODU

    Note

    Before Installing the ODU, you must conform the following is ok:

    The antenna is installed

    The ODU is hoisted to the installation platform, and is in good condition.

    The ODU's type is consistent with that in the plan.

    Microwave Product Support Dept.

    Internal Use Only

    All Rights reserved, No Spreading abroad without Permission of ZTE

    1

    2

    Put the ODU on the bracket as shown in the following figure.

    Tighten the four screws

    Note

    Put the sign V of ODU on the vertical position, and H

    on the horizontal position

    3 Use the flexible waveguide to connect the waveguide interface at the antenna with that at the ODU adapter

    Bolt

    Hybrid

    Coupler

    N TypeAntenan

    ODU1

    ODU2Coaxial

    Cable

    Pole

    Bracket

    Coaxial Cable

    Tighten Bolts(M5)

    ODU

  • -23-

    8-1 Installing the ODU PGND Cable

    8 Installing ODU Cables

    ODU PGND Cable

    Microwave Product Support Dept.

    Internal Use Only

    All Rights reserved, No Spreading abroad without Permission of ZTE

    Remove the antirust

    coating and oxide layer

    before connecting ODU

    grounding cable to the

    tower grounding point.

    Make waterproof and

    antirust treatment to the

    grounding point after

    connecting.

    Connect the grounding

    cable to the nearest

    grounding point to ODU

    of tower or grounding

    copper busbar.

    Tower grounding point

  • -24-

    8-2 Installing the IF Cable

    8 Installing ODU Cables

    CAUTION

    Bind the IF cable first to prevent its type-N connector from being pulled.

    Take waterproof measures (waterproof curves) for the part of the IF cable below the ODU and the part of the IF cable outside the IDU room.

    The feeder must have a waterproof

    arch before entering an equipment

    room.

    Microwave Product Support Dept.

    Internal Use Only

    All Rights reserved, No Spreading abroad without Permission of ZTE

    Reserve IF cable of proper length

    (5m~10m recommended) at the ODU

    end. Make it into a circle and fix on

    tower.

    Tie the cable every 1.0m~1.5m.

    IF cables shall be lined and tied closely

    together. Distance between ties should

    be constant.

    Do waterproof treatment to the ODU IF

    cable connector.

    When winding tape, the upper layer

    should cover 2/3 of the layer under it.

  • -25-

    8-3 Installing the IF Cable - Making Waterproof Curves

    8 Installing ODU Cables

    IDU

    IF Cable

    Waterproof arch

    ODU

    Waterproof arch

    Note

    Coil the IF cable into a circle with a diameter of 0.6 m and bind it onto the mast after the IF cable passes the

    waterproof curve under the ODU for future adjustment of the antenna position.

    Microwave Product Support Dept.

    Internal Use Only

    All Rights reserved, No Spreading abroad without Permission of ZTE

  • -26-

    8-4 Grounding the IF Cable - Grounding Points

    8 Installing ODU Cables

    1. The place about one meter away from the IF interface of the ODU

    2. The place about 0.5 to 1 meter away from the cable entry of equipment room or outdoor cabinet

    3. The place on the roof edge about one meter away from the turning point of the wiring ladder

    4. The middle point of the cable (when the cable is longer than 60 meters)

    5. The place on the roof edge about one meter away from the turning point of the wiring ladder (when the horizontal portion

    of the cable on the roof-top is longer than 30 meters)

    6. The middle point of the horizontal portion of the cable (when the horizontal portion on the roof-top is longer than 60

    meters)

    CAUTION

    The grounding point depends on the installation mode and the length of the IF cable. Generally, the IF cable should be grounded

    to a minimum of three points. When the IF cable is longer than 60 meters, add a grounding point for every extra 30 meters.

    Antenna should be located in protective area of lightning arrester, and the area is a 45 arc area from the top of lightning

    arrester. (This area may be 30 from the top according to technical agreement or project design requirements).

    Lightening protection angle should meet the below requirements:

    For plain area: 45

    For mountain or lightening area: 30

    Microwave Product Support Dept.

    Internal Use Only

    All Rights reserved, No Spreading abroad without Permission of ZTE

    ODU

    IDU

    1 6 5

    2

    IDU

    ODU

    1

    2

    3

    4

    4545

  • -27-

    8-5 Grounding the IF Cable - Installing the Grounding Clip

    8 Installing ODU Cables

    Selecting the installation position of the grounding clip and stripping off the cable sheath

    Fixing the grounding clip and waterproofing it

    The angle resulting from the grounding wire of the clip and the IF cable should not be larger than 15

    degrees. When the IF cable is vertically routed, the grounding wire of the clip should be led

    downwards.

    Microwave Product Support Dept.

    Internal Use Only

    All Rights reserved, No Spreading abroad without Permission of ZTE

  • -28-

    9-1 Installation Flow of Indoor Unit Equipment

    9 Installing the Indoor Unit Equipment

    Microwave Product Support Dept.

    Internal Use Only

    All Rights reserved, No Spreading abroad without Permission of ZTE

    Installing the Rack

    Start

    Referring to P29

    Installing the IDU

    Referring to P30

    Installing the I/O Board

    End

    Installing the DDF Distribution Box

    Installing the Cables

    Referring to P31

    Referring to P32

    Referring to P33~P36

  • -29-

    9-2 Installing the Rack

    9 Installing the Indoor Unit Equipment

    Step 1: Confirm the rack

    installation position

    Microwave Product Support Dept.

    Internal Use Only

    All Rights reserved, No Spreading abroad without Permission of ZTE

    0.8m1.2m

    1.0m

    Confirm the rack position

    according to the plan view of the

    equipment room.

    Installation procedure Picture Inspection

    Step 2: Fix the rackFix the rack according to the

    installation requirements.

    Step 3: Check the stability

    of the rack.None

    Vertical error of racks (cable

    racks, power cabinets) should

    not exceed 1 of the racks height.

    Step 4: Install rack

    grounding cable.

    Ground the rack to the indoor

    grounding busbar.

    Grounding cable shall be larger

    than 16mm2.

    Grounding BarGrounding in Rack

  • -30-

    9-3 Installing the IDU

    9 Installing the Indoor Unit Equipment

    Step 1: Take out IDU from

    the antistatic bag.

    Microwave Product Support Dept.

    Internal Use Only

    All Rights reserved, No Spreading abroad without Permission of ZTE

    Check if there is any damage in

    appearance and if there is any

    missing part.

    Installation procedure Picture Inspection

    Step 2: Confirm the

    installation position of

    IDU on the rack. Install

    floating nuts to the

    corresponding holes on

    the rack.

    2 floating nuts are needed at

    each side. Corresponding nuts

    of each side shall be horizontal.

    Step 3: Install IDU

    There must be 1U space

    between 2 equipments (IDU

    and IDU, IDU and I/O board).

    Step 4: Install IDU

    grounding cable

    Connect the cable properly to

    the nearest grounding point.

    2. Floating nuts

    1. Installation holes

  • -31-

    9-4 Installing the I/O Board

    9 Installing the Indoor Unit Equipment

    Microwave Product Support Dept.

    Internal Use Only

    All Rights reserved, No Spreading abroad without Permission of ZTE

    Installation procedure Picture Inspection

    Step 1: Confirm the

    installation position of

    IDU on the rack. Install

    floating nuts to the

    corresponding holes on

    the rack.

    2 floating nuts are needed at

    each side. Corresponding nuts

    of each side shall be horizontal.

    Step 2: Fix the I/O board to

    the rack and tighten the

    bolts.

    There must be 1U space

    between 2 equipments (IDU

    and IDU, IDU and I/O board).

    Step 3: Install protective

    grounding cableNone

    Connect properly to the

    grounding point nearest to the I/

    O board.

    2. Floating nuts

    1. Installation holes

  • -32-

    9-5 Installing the DDF Distribution Box

    9 Installing the Indoor Unit Equipment

    Microwave Product Support Dept.

    Internal Use Only

    All Rights reserved, No Spreading abroad without Permission of ZTE

    Installation procedure Picture Inspection

    Step 1: Install the DDF

    distribution box to the

    rack.

    None None.

    Step 2: Install grounding

    cable for DDF distribution

    box.

    Connect the grounding cable

    properly to the grounding point

    nearest to the box.

  • -33-

    10-1 Installing Power Cables

    10 Installing the Indoor Unit

    Equipment Cables

    Microwave Product Support Dept.

    Internal Use Only

    All Rights reserved, No Spreading abroad without Permission of ZTE

    Installation procedure Picture Inspection

    Step 1: Strip the power

    cable for 5mm~7mm at

    the end without connecter.

    Do not damage wire core when

    stripping.

    Step 2: Connect the

    stripped wire into the

    power distribution box

    and fasten the bolts.

    Test the power supply polarity

    with a multimeter before

    installation to avoid reverse.

    Shut down power before

    installing or taking off IDU

    power cable,connect to fuse of

    7A~10A. If there is no such fuse

    in power cabinet, connect to the

    smallest one on the cabinet.

    When connecting the power

    cable, connect -48V and GND

    wire separately at 2 ends of the

    connector bar.

    Step 3: Check the power

    supply voltageNone

    Nominal voltage for ZXMW

    PR10 is -48V. Acceptable

    voltage range is -58V~-40V

    Step 4: Line cables along

    the rack to IDU.None

    Line power cables straightly

    along the inner side of the rack.

    Line power cables, signal

    cables and grounding cables

    separately.

    Step 5: Plug the connector

    into the IDU power port

    and fasten the bolts.

    Fix the connector tight.

  • -34-

    10-2 Installing IF Cables

    10 Installing the Indoor Unit

    Equipment Cables

    Microwave Product Support Dept.

    Internal Use Only

    All Rights reserved, No Spreading abroad without Permission of ZTE

    Installation procedure Picture Inspection

    Step 1: Line indoor IF

    cables

    Line IF cables to the designed

    position according to the

    requirements.

    Step 2: Fix IF cables

    Check the IF cable connectors

    when installing IF cables

    indoor. The cable should go

    down straightly first and bend

    smoothly after 50mm.

  • -35-

    10-3 Installing 75 E1 Cables

    10 Installing the Indoor Unit

    Equipment Cables

    Microwave Product Support Dept.

    Internal Use Only

    All Rights reserved, No Spreading abroad without Permission of ZTE

    Installation procedure Picture Inspection

    Step 1: Plug the DB44

    connector to E1 port on

    IDU panel.

    Equipment default resistance is

    120. If the connection is 75 mode, switch the resistance in

    the IDU.

    Step 2: Lay the cables

    Lay the power supply cable,

    signal cable and grounding

    cable separately according to

    the specifications.

    Step 3: Make E1 cable

    connectors

    Measure the distance between

    DDF and I/O board and cut

    proper length of cable.

    After E1 connectors are made,

    test with a multimeter.

    Step 4: Fix E1 cables

    Fix the cables with ties after

    laying the cables. Cut the

    redundant part of ties flat and

    neat.

    Stick labels according to

    Microwave Equipments Label

    Specifications.

  • -36-

    10-4 Installing 120 E1 Cables

    10 Installing the Indoor Unit

    Equipment Cables

    Microwave Product Support Dept.

    Internal Use Only

    All Rights reserved, No Spreading abroad without Permission of ZTE

    Installation procedure Picture Inspection

    Step 1:Plug DB44

    connector to the E1 port of

    IDU. Lay the cables along

    the rack to the DDF

    distribution box.

    Lay the power supply cable,

    signal cable and grounding

    cable separately according to

    the specifications.

    Step 2: Plug the cable into

    DDF distribution box

    according to the wire

    sequence.

    Plug the wire into the DDF

    distribution box only with a clamping

    pincer.

    Stick labels according to

    Microwave Equipments Label

    Specifications.

  • -37-

    A-1 Terminating the IF Cable with Connectors

    Appendix

    Stripping off the cable sheath

    16mm

    Gliding the lock nut and clamp 1 over the cableFolding back the braided shield to cover clamp 1, and

    binding the braided shield by using clamp 2

    Lock nut Clamp 1 Clamp 2Cutting the redundant part

    of the shielding layer

    Stripping off the dielectric insulating layer Stripping off the dielectric insulating layer

    6mm

    Filing the core wire head into

    an arc shape

    Installing the body of the connector

    Body of the connector

    Fixing the connector

    Rotating to tighten the lock nut

    15Nm

    Microwave Product Support Dept.

    Internal Use Only

    All Rights reserved, No Spreading abroad without Permission of ZTE

  • -38-

    A-2 Waterproofing Outdoor Connectors

    Appendix

    Wrapping a layer of PVC tape

    PVC tape

    Wrapping three layers of waterproof insulation tape

    Waterproof insulation tape

    Wrapping three layers of PVC tape over the

    waterproof insulation tape

    Using the outdoor bundling strap to bind the PVC

    tape tight at both ends

    Microwave Product Support Dept.

    Internal Use Only

    All Rights reserved, No Spreading abroad without Permission of ZTE

    ZXMW PR10 S400&S500 (V2.00) Fast Installation Guide_R1.2.vsdZXMW PR10 S400&S500 (V2.00) Fast Installation GuideLegal InformationRevision History&AuthorReader InformationContent 1Content 21-1 Precautions2-1 Tools (1)2-1 Tools(2)2-2 Equipment Modules2-3 Project Auxiliary Material3-1 ODU & Hybrid Coupler Interface3-2 IDU Interface4-1 Direct Installation4-2 Remote Installation5-1 Changing the polarization direction of the antenna6-1 1+0 Direct Installation6-2 1+1 Direct Installation(1)6-2 1+1 Direct Installation (2)6-3 1+0 Remote Installation 6-4 1+1 Remote Installation(1) 6-4 1+1 Remote Installation (2)6-4 1+1 Remote Installation (3)6-4 1+1 Remote Installation (4)6-4 1+1 Remote Installation (5)7-1 Install the ODU Installation Bracket7-2 1+0 Remote Installation7-3 1+1 Remote Installation8-1 Installing the ODU PGND Cable 8-2 Installing the IF Cable 8-3 Installing the IF Cable - Making Waterproof Curves8-4 Grounding the IF Cable - Grounding Points8-5 Grounding the IF Cable - Installing the Grounding Clip9-1 Installation Flow of Indoor Unit Equipment9-2 Install the Rack9-3 Install the IDU9-4 Install the I/O Board9-5 Install the DDF Distribution Box10-1 Install Power Cables10-2 Install IF Cables10-3 Install 75 E1 Cables10-4 Install 120 E1 CablesA-1 Terminating the IF Cable with ConnectorsA-2 Waterproofing Outdoor Connectors