© abb group november 12, 2015 | slide 1 icv implementation in region erp- status update march 2011...

17
© ABB Group June 20, 2022 | ICV Implementation in Region ERP- Status update March 2011 & Plan for Go-Live REMSC, 2011

Upload: neal-wheeler

Post on 13-Jan-2016

217 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: © ABB Group November 12, 2015 | Slide 1 ICV Implementation in Region ERP- Status update March 2011 & Plan for Go-Live REMSC, 2011

© ABB Group April 21, 2023 | Slide 1

ICV Implementation in Region ERP- Status update March 2011 & Plan for Go-Live

REMSC, 2011

Page 2: © ABB Group November 12, 2015 | Slide 1 ICV Implementation in Region ERP- Status update March 2011 & Plan for Go-Live REMSC, 2011

© ABB, SREMSC April 21, 2023 | Slide 2

ICV Implementation-REMSC countries

Recap of the activities for ICV implementation as of Mar-2011 Further activities to be completed for Go-Live Points raised by countries so far and clarifications/ explanations ICV Transactions for business users Country Mappings Dashboard (summary of mappings done so far by countries in terms of profit

center, customers and vendors) Long term approach for ICV- elimination of duplicates and have ICV ID as Local ID ICV further developments awaited:

Online connectivity with MDM server to get updated ICV details without the need to upload in the local ERP

Partner function enhancement (MDM database to have the functionality to hold multiple addresses (Sold to, Ship to) etc., for the same ICV ID

ICV data in the interfaces (OMS/ BOL/ B2B etc.,)

Page 3: © ABB Group November 12, 2015 | Slide 1 ICV Implementation in Region ERP- Status update March 2011 & Plan for Go-Live REMSC, 2011

© ABB Group April 21, 2023 | Slide 3

Recap of the activities for ICV implementation as of Mar-2011

ICV implementation activity description Date

Mail communication sent to countries for mapping the ICV data (Profit Center, Customers, Vendors)

23-Nov-10

ICV initial package 06-Dec-10

Kick off meeting with ICV team and pilot countries 09-Dec-10

Demo of the ICV fields in master and transaction data after import of ICV package and initial testing within REMSC

15-Dec-10

ICV initial assessment 23-Dec-10

Meeting with the ICV team and the first pilot countries (AU, SG, IN) proposed by ICV team 24-Jan-11

Discussions with the countries (TH, AU, SG, IN, NZ, AE, MY) 14-Feb to 25-Feb-11

Delivery of package with final set of corrections 03-Mar-11

Local enhancements for template specific validations in consultation with ICV team

(details of the package corrections and local enhancements attached in the presentation)

2nd week Mar-11

ICV Mar11 corrections

Page 4: © ABB Group November 12, 2015 | Slide 1 ICV Implementation in Region ERP- Status update March 2011 & Plan for Go-Live REMSC, 2011

© ABB, SREMSC April 21, 2023 | Slide 4

Further activities to be completed for Go-Live

Additions/ Change in Global fixed values for customers/ vendors which needs to be resolved as part of Gate 3 checklist for ICV implementation. Concurrence/ formal approval is required from countries to move these mappings/ validations. Parameters involved are as follows:

Region field in customer master (account groups 2500, 2600) to make it optional for all countries except IN from current mandatory settings

Search term1 in customer/ vendor master to be mapped with Abacus Specific blocking reason for ICV

Explanation of the above parameters are given in the coming slides A feedback excel sheet is sent along with this email in which the countries need to send the

feedback latest by 31-Mar-11

Page 5: © ABB Group November 12, 2015 | Slide 1 ICV Implementation in Region ERP- Status update March 2011 & Plan for Go-Live REMSC, 2011

Customer/ Vendor master –Mandatory fields mapped in ICV customizing

We need to map minimum of those fields which are mandatory in our SAP systemCustomer/ vendor master fields mapped in ICV customizingName, Search term1, Country (account groups 1500, 1600, 1800, 2500, 2600, 2800)City , Region (only for customer account groups 2500, 2600)Technically those fields which are mapped in ICV customizing will be filled with the data from ICV connector / table into the customer/ vendor master when the user is creating through ICV transaction

Page 6: © ABB Group November 12, 2015 | Slide 1 ICV Implementation in Region ERP- Status update March 2011 & Plan for Go-Live REMSC, 2011

© SAS ERP-SERMSCApril 21, 2023 | Slide 6

Customer/ Vendor Master Fields- Change in Optional/ Mandatory due to ICV

■For creation of vendors/ customers through ICV transaction, we need to have the minimum number of parameters which are mandatory as per our system configuration for creating a customer/ vendor

■Currently for Internal customers and vendors mandatory field mappings are as follows■Customer account groups 2900, vendor account groups 1500, 1600, 1800: Name, Search Term1,

Country■Customer account groups 2500, 2600 : Name, Search Term1, Country, City, Region

■This needs to be maintained in the mapping table for ICV where we relate the field in customer/ vendor with respect to ICV custom table. During creation of customer/ vendor through ICV transaction, values in ICV table will populate the values in our customer/ vendor master

■Region Field mandatory / optional in customer master (Account groups-2500, 2600)■Currently Region is mandatory for customers belonging to 2500, 2600 account groups for all

countries■With ICV implementation when the user is creating a customer through the ICV transaction

/ABBICV/ICV_CR which will be available for the users through the area menu ZCAGLICV_USERS, since the region value is not there in ICV data system will throw error

■As per business requirement Region is required only for country IN due to taxation requirements■Hence we propose to make the Region field optional for other countries and bring in validation to

enter the region only for IN for the above account groups■Search term to be mapped for Abacus

■Currently most of the countries are using search term for Abacus codes relevant for the customer / vendor

■So we propose for mapping the Abacus code to the search term in customer / vendor master■With this mapping, when the user is creating a customer/ vendor through the ICV transaction, it will

populate the Abacus values from the ICV table■Both the above are illustrated in the coming slides

Page 7: © ABB Group November 12, 2015 | Slide 1 ICV Implementation in Region ERP- Status update March 2011 & Plan for Go-Live REMSC, 2011

Customer Master –Region Field mandatory

Currently Region field is mandatory for customer account groups 2500, 2600 for all the countries. This needs to be mandatory only for IN and other countries are maintaining some value since there is a system prompt In the ICV data, since Region field value is not there, while trying to create a customer/ vendor through ICV transaction, user can’t create a record. To avoid this it is proposed to have the Region field optional for other countries and bring in validation only for IN to input the value. In the ICV creation transaction itself, a validation through enhancement is planned

Page 8: © ABB Group November 12, 2015 | Slide 1 ICV Implementation in Region ERP- Status update March 2011 & Plan for Go-Live REMSC, 2011

Customer Master –Region Field mandatory

During Creation of a customer through ICV transaction for account groups 2500, 2600 if the country code of customer is IN (India) system will prompt for entering the Region. For all other countries system will not prompt for Region. If any other countries want Region to be mandatory, please specify the same in the feedback excel sheet

Page 9: © ABB Group November 12, 2015 | Slide 1 ICV Implementation in Region ERP- Status update March 2011 & Plan for Go-Live REMSC, 2011

Customer Master –Search Term1 field & Abacus code

Currently most of the countries are maintaining the ABACUS code of the Internal customer/ vendor in the Search term 1 field or in some cases ABACUS –PG

We want the confirmation from the countries whether we can map this field to the Abacus code. Impact of this will be during creation of customer/ vendor, system will copy the Abacus field value from the ICV connector / table into this field

Those countries who are filling up with ABACUS-PG need to take note that PG is available in the ICV tab and also search functionality with respect to ABACUS-BU-PG is available at master data level and also transaction level (PO or SO) . So they can manage only with ABACUS in search term1 field

Page 10: © ABB Group November 12, 2015 | Slide 1 ICV Implementation in Region ERP- Status update March 2011 & Plan for Go-Live REMSC, 2011

Customer Master –Blocking Reason

It is proposed to have a new blocking reason 90 (Block from ICV) for the customer master. The same will be mapped in ICV configuration. If a particular ICV ID is “Set to inactive” in ICV MDM server, theni)After the ICV connector is implemented, those records which are mapped to Inactive ICVs in SAP system will be set with this new blocking reason 90 (Order block)ii)While one can perform already open transactions, further sales orders can’t be created for those

Page 11: © ABB Group November 12, 2015 | Slide 1 ICV Implementation in Region ERP- Status update March 2011 & Plan for Go-Live REMSC, 2011

© ABB Group April 21, 2023 | Slide 11

ICV Transactions for business usersTransaction Code Transaction

ZCAGLICV_USERS Area menu for ICV

ZCAGLICV04 ICV Mapping Percentage

/ABBICV/ICV_CR ICV Customer/Vendor creation

/ABBICV/DATA_MIGRT ICV data migration

All the above transactions have been given to the UATIDs of the countries. In production environment once the package is moved in April-11 request for assigning transactions to relevant master roles will be placed

Page 12: © ABB Group November 12, 2015 | Slide 1 ICV Implementation in Region ERP- Status update March 2011 & Plan for Go-Live REMSC, 2011

© ABB Group April 21, 2023 | Slide 12

Recap of the activities for ICV implementation as of Mar-2011ICV implementation activity description Date

Mail communication sent to countries for mapping the ICV data (Profit Center, Customers, Vendors)

23-Nov-10

ICV initial package 06-Dec-10

Kick off meeting with ICV team and pilot countries 09-Dec-10

Demo of the ICV fields in master and transaction data after import of ICV package and initial testing within REMSC

15-Dec-10

ICV initial assessment 23-Dec-10

Meeting with the ICV team and the first pilot countries (AU, SG, IN) proposed by ICV team 24-Jan-11

Discussions with the countries (TH, AU, SG, IN, NZ, AE, MY) 14-Feb to 25-Feb-11

Delivery of package with final set of corrections 03-Mar-11

Local enhancements for template specific validations in consultation with ICV team

Page 13: © ABB Group November 12, 2015 | Slide 1 ICV Implementation in Region ERP- Status update March 2011 & Plan for Go-Live REMSC, 2011

© ABB Group April 21, 2023 | Slide 13

Process Flow for ICV- Migration, creation or changeActivity

DescriptionCountry ICV team REMSC Remarks

Migration of existing records

Mapping of Profit centers, customers/ vendors to be done with ICV Level 2 ID

Upload the mappings of profit centers, customers/ vendors

For the mapped profit centers, customers/ vendors ICV details will be populated into master data which will further flow to transactions

Creation of new Internal customer/ vendor (account groups 2500, 2600, 2800, 1500, 1600, 1800)

Create the record with respect to ICV details through the transaction /ABBICV/ICV_CR

N.A

Change of ICV details for a particular record (scenario: if a particular record has a wrong assignment of ICV)

Country team to provide the

Change of address details

Page 14: © ABB Group November 12, 2015 | Slide 1 ICV Implementation in Region ERP- Status update March 2011 & Plan for Go-Live REMSC, 2011

© ABB Group April 21, 2023 | Slide 14

Points raised by countries and clarificationsPoints raised by countries/

DoubtsClarification Country

What needs to be done for flow of ICV details in open transactions

Logic in the forms is system will look for the transaction for the ICV details and if it is not there then it will fetch the ICV details from master data (customer/ vendor). So there is no need to go into the open transaction and change any parameters for getting the ICV details

All countries

IDTO vendors and customers (account groups 1600, 2600) to be included in ICV mapping

ICV configuration has been done for the same and so the ICV details will flow to the master data and later into transactions for these account groups. Those countries who want the ICV details for these account groups, should specify in their solution manager calls for Forms to include the IDTO customer/ vendors also. Those countries who don’t want to consider the IDTO will still get the blank ICV tabs in the customer/ vendor master and their forms will not carry any ICV details

TH

Link to the ICV portal High Level Q&A for ICV roll-out in ABB

http://inside.abb.com/cawp/gad00914/9c82bcb38d99f5d3c12577fa0041f2ab.aspx

Page 15: © ABB Group November 12, 2015 | Slide 1 ICV Implementation in Region ERP- Status update March 2011 & Plan for Go-Live REMSC, 2011

© ABB Group April 21, 2023 | Slide 15

Country Mappings Dashboard

Category Mapping File

Overall mapping status of the countries as of 20-Mar-11

Page 16: © ABB Group November 12, 2015 | Slide 1 ICV Implementation in Region ERP- Status update March 2011 & Plan for Go-Live REMSC, 2011

© ABB, SREMSC April 21, 2023 | Slide 16

Long term approach for ICV- elimination of duplicates and have ICV ID as Local ID

After the implementation of ICV, we are going to have multiple vendor/ customer codes per ICV ID in many cases because we are following mapping method

To eliminate

Page 17: © ABB Group November 12, 2015 | Slide 1 ICV Implementation in Region ERP- Status update March 2011 & Plan for Go-Live REMSC, 2011

© ABB, SREMSC April 21, 2023 | Slide 17