( by post) south central railway office of the to smt...

25
( BY POST) SOUTH CENTRAL RAILWAY Office of the Divl.Railway Manager Personnel branch IV floor, Sanchalan Bhavan, Secunderabad. No.SCR/P-SC/Sett/665/PA-2011/A-11 Dated: -12-2011. To Smt Nagamma, W/o (L) Bheemaiah Ellaiah, H No 3-2-157 Kummargalli, Tandur R R Dist 501141 Sub: Revised PPO in favour ofSmt Nagamma W/o (L) Bheemaiah Ellaiah, Cabin man/Rukmapur retired on 30-06-1986 and Died on 04-08-1986. Ref:- Your representation dated 14-09-2011 to ensuing Pension Adalat-2011. With reference to your representation to ensuing Pension Adalat-2011, you are hereby advised that a Revised Pension Payment Order towards pre-2006 has been issued, a copy of the same is enclosed. Please Note. Encl: As above. ( A SUBBA RAO ) DPO/SC For Divl.Railway Manager (P)/SC.

Upload: lamthien

Post on 22-Mar-2019

228 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ( BY POST) SOUTH CENTRAL RAILWAY Office of the To Smt ...scr.indianrailways.gov.in/cris/uploads/files/1323866264547-OPTG.pdf · ( BY POST) SOUTH CENTRAL RAILWAY Office of the Divl.Railway

( BY POST)

SOUTH CENTRAL RAILWAY Office of the Divl.Railway ManagerPersonnel branch IV floor,Sanchalan Bhavan,Secunderabad.

No.SCR/P-SC/Sett/665/PA-2011/A-11 Dated: -12-2011.

ToSmt Nagamma,W/o (L) Bheemaiah Ellaiah,H No 3-2-157 Kummargalli,Tandur R R Dist501141

Sub: Revised PPO in favour ofSmt Nagamma W/o (L) Bheemaiah Ellaiah, Cabin man/Rukmapur retired on 30-06-1986 and Died on 04-08-1986.

Ref:- Your representation dated 14-09-2011 to ensuing Pension Adalat-2011.

With reference to your representation to ensuing Pension Adalat-2011,

you are hereby advised that a Revised Pension Payment Order towards pre-2006

has been issued, a copy of the same is enclosed.

Please Note.

Encl: As above.( A SUBBA RAO ) DPO/SC

For Divl.Railway Manager (P)/SC.

Page 2: ( BY POST) SOUTH CENTRAL RAILWAY Office of the To Smt ...scr.indianrailways.gov.in/cris/uploads/files/1323866264547-OPTG.pdf · ( BY POST) SOUTH CENTRAL RAILWAY Office of the Divl.Railway

( BY POST)

SOUTH CENTRAL RAILWAY Office of the Divl.Railway ManagerPersonnel branch IV floor,Sanchalan Bhavan,Secunderabad.

No.SCR/P-SC/Sett/665/PA-2011/A-1 Dated: -12-2011.

ToSri Abdul Aziz,H No 4-20 Mambapur Village,Peddamul Mandal,R R Dist.

Sub:- Revised PPO in favour of Sri Abdul Aziz, Points man-A/Rukmapur,Vol. Retired on 12-06-1991.

Ref:- Your representation dated 14-09-2011 to ensuing Pension Adalat-2011.

With reference to your representation to ensuing Pension Adalat-2011,

you are hereby advised that a Revised Pension Payment Order towards pre-2006

has been issued, a copy of the same is enclosed.

Please Note.

Encl: As above.

( A SUBBA RAO ) DPO/SC

For Divl.Railway Manager (P)/SC.

Page 3: ( BY POST) SOUTH CENTRAL RAILWAY Office of the To Smt ...scr.indianrailways.gov.in/cris/uploads/files/1323866264547-OPTG.pdf · ( BY POST) SOUTH CENTRAL RAILWAY Office of the Divl.Railway

( BY POST)

SOUTH CENTRAL RAILWAY Office of the Divl.Railway ManagerPersonnel branch IV floor,Sanchalan Bhavan,Secunderabad.

No.SCR/P-SC/Sett/665/PA-2011/A-54 Dated: -12-2011.ToSri D Prithvi Rajex. SWM/YGLH No 1-6-64Jubilee Market,Kazipet, Warangal Dist.506003

Sub:- Revised PPO in favour of Sri D Prithviraj ex. SWM/YGLRetired on 22-06-2005.

Ref:- Your representation dated 20-10-2011 to ensuing Pension Adalat-2011.

With reference to your representation to ensuing Pension Adalat-2011,

you are hereby advised that a Revised Pension Payment Order towards

pre-2006 has been issued, a copy of the same is enclosed.

Please Note.

Encl: As above.

( A SUBBA RAO ) DPO/SC

For Divl.Railway Manager (P)/SC.

Page 4: ( BY POST) SOUTH CENTRAL RAILWAY Office of the To Smt ...scr.indianrailways.gov.in/cris/uploads/files/1323866264547-OPTG.pdf · ( BY POST) SOUTH CENTRAL RAILWAY Office of the Divl.Railway

( BY POST)

SOUTH CENTRAL RAILWAY Office of the Divl.Railway ManagerPersonnel branch IV floor,Sanchalan Bhavan,Secunderabad.

No.SCR/P-SC/Sett/665/PA-2011/A-44 Dated: -12-2011.

ToSri M V Narsimha Murthy,H No 2/8-12/6 Ramarao PetNear mandal Office,Peddapuram Post,E G Dist – 533437

Sub:- Revised PPO in favour of Sri M V Narasimha Murthy,SM/MLMG retired on 31-07-1996.

Ref:- Your representation dated 05-10-2011 to ensuing Pension Adalat-2011.

With reference to your representation to ensuing Pension Adalat-2011,

you are hereby advised that a Revised Pension Payment Order towards

pre-2006 has been issued, a copy of the same is enclosed.

Please Note.

Encl: As above.

( A SUBBA RAO ) DPO/SC

For Divl.Railway Manager (P)/SC.

Page 5: ( BY POST) SOUTH CENTRAL RAILWAY Office of the To Smt ...scr.indianrailways.gov.in/cris/uploads/files/1323866264547-OPTG.pdf · ( BY POST) SOUTH CENTRAL RAILWAY Office of the Divl.Railway

( BY POST)

SOUTH CENTRAL RAILWAY Office of the Divl.Railway ManagerPersonnel branch IV floor,Sanchalan Bhavan,Secunderabad.

No.SCR/P-SC/Sett/665/TA-15/PA-2011/NA-58 Dated: -12-2011.

ToSri M Satyanarayana,ex. Sr Pass Guard /DKJ H No 1-7-103 New Nehru StreetDornakal, Warangal Dist506381

Sub:- Refund of Rs 15647.00 recovered towards over payment.Ref:- Your application dated 28-10-2011 to ensuing Pension Adalat-2011.

Reference representation cited, the following information is furnished.The Hon’ble High court of Andhra Pradesh has made interim suspension

of order dated 02.02.2005 passed by the Hon’ble CAT/Hyderabad in O A No 572/2004 vide order dated 09.03.2006 passed in WP No 19435 of 2005 in WP No 15294 of 2005.

In view of the above, CP No 94/2005 in OA No 572/2004 filed by you has been closed for the present vide order dated 06.04.2006 passed by the Hon’ble CAT/Hyderabad.

As such your request for refund of Rs 15647 (recovered towards over payment) cannot be considered for the present.

( A SUBBA RAO ) DPO/SC

For Divl.Railway Manager (P)/SC.

Page 6: ( BY POST) SOUTH CENTRAL RAILWAY Office of the To Smt ...scr.indianrailways.gov.in/cris/uploads/files/1323866264547-OPTG.pdf · ( BY POST) SOUTH CENTRAL RAILWAY Office of the Divl.Railway

( BY POST )

SOUTH CENTRAL RAILWAY Office of theDivl.Railway Manager, (P)V floor, Sanchalan Bhavan,Secunderabad.

No.SCR/P-SC/660/PA/2011/NA-20 Dated: -12-2011

ToSri. B Jampaiah,ex.Station Porter/KZJH No. 5-21/10 Madikonda,Dist Warangal (AP)

Sub:- Difference of DCRG and EOL due to DA enhanced from 35% to 45% w.e.f. 07.07.2010.

Ref:- Your representation dated 15.09.2011 to ensuing Pension Adalat-2011.

The payment particulars of difference of Retirement gratuity and Encashment of Leave due to enhancement of DA with effect from 01.07.2010 is given as under:-

An amount of Rs 28,222/- is passed vide Co7 No 698 dated 24.10.2011 and credited to State Bank of Hyderabad/Kazipet branch bearing account No.52197855455 on 28.10.2011

( A SUBBARAO ) D P O/SC

For Divl. Railway Manager (P)/SC

Page 7: ( BY POST) SOUTH CENTRAL RAILWAY Office of the To Smt ...scr.indianrailways.gov.in/cris/uploads/files/1323866264547-OPTG.pdf · ( BY POST) SOUTH CENTRAL RAILWAY Office of the Divl.Railway

(BY POST)

SOUTH CENTRAL RAILWAY Office of theDivl. Railway Manager,Personnel branch IV floor,Sanchalan Bhavan Secunderabad.

No.SCR/P-SC/660/PA/2011/NA-62 Dated: .12.2011.

To,Smt P Yadamma,C/o B Samba Murthy,H No. 4-95 Janatha Nagar,Kadipikonda. KazipetWarangal 506003.

Sub: Payment of settlement dues and family pension from 29.08.2000 – case of Sri P Paremeshwar S/o Kanakiah, P Man/SS/WL Missing from 29.08.2000.Ref:- Your representation to ensuing Pension Adalat-2011

dated 21.10.2011.

Reference to representation cited, You are advised to submit the following documents to examine the case for arranging the payment of settlement dues and family pension from 29.08.2000.

1 Copy of FIR filed in the respective Police Station.2. Indemnity Bond in prescribed proforma.3. Final report of the Sub Inspector of Police from the respective police station.

On receipt of the above documents, the case will be considered for further process,

( A SUBBARAO ) D P O/SC

For Divl. Railway Manager (P)/SC

Page 8: ( BY POST) SOUTH CENTRAL RAILWAY Office of the To Smt ...scr.indianrailways.gov.in/cris/uploads/files/1323866264547-OPTG.pdf · ( BY POST) SOUTH CENTRAL RAILWAY Office of the Divl.Railway

( BY POST )

SOUTH CENTRAL RAILWAY Office of theDivl.Railway Manager, (P)IV floor, Sanchalan Bhavan,Secunderabad.

No.SCR/P-SC/665/Sett/PA/2011/A-41 Dated: 09-12-2011

To, ToSmt Anjana Bai, Smt Jana Bai.W/o (L) Sri Babu Rao Gaikwad, W/o (L) Sri Babu Rao Gaikwad,R/o Tondar Tq. Udgir, Vill Kalkoti, Post Chakur,Latur Dist. Dist Latur.

Sub:- Request for family pension – case of Sri B N Gaikwad,Points Man-A/Chakur, retired on 30.06.1994 andExpired on 07.08.2006.

Ref:- 1. Application of Smt Jana Bai dated 20.09.2011.2. Application of Smt Anjana Bai dated 21.10.2011.

Both of you have applied for sanction of family pension consequent on death of Sri Babu Gaikwad, Points Man-A/Chakur retired on 30.06.1994 and expired on 07.08.2006.

You are therefore advised to get your rights declared from the Hon’ble Court of law as wife of the deceased employee, duly impleading each other and the Railway Administration for sanction of family pension.

( A SUBBARAO ) D P O/SC

For Divl. Railway Manager (P)/SC

Page 9: ( BY POST) SOUTH CENTRAL RAILWAY Office of the To Smt ...scr.indianrailways.gov.in/cris/uploads/files/1323866264547-OPTG.pdf · ( BY POST) SOUTH CENTRAL RAILWAY Office of the Divl.Railway

( BY POST )

SOUTH CENTRAL RAILWAY Office of theDivl.Railway Manager, (P)IV floor, Sanchalan Bhavan,Secunderabad.

No.SCR/P-SC/665/Sett/PA/2011/A-73 Dated: -12-2011

ToSri G Rama Krishna Sastry,ex. Dy. SS/HYBFlat No. 10 Arya Appartments,Street No 2 Vani Nagar, Malkajgiri,Hyderabad - 500047

Sub:- Refund of Security deposit and Inclusion of Mentally Challanged Son’s name in the PPO.

Ref:- Your representation dated 28.10.2011 to Pension Adalat-2011.

Reference your representation cited, the following information is furnished.

1. As no documentary proof for having paid Rs 300/- towards security deposit has been made available the said amount cannot be refunded. Further on verification of your service record there is no mention regarding payment of Security Deposit of Rs 300/-.

2. The Mentally challenged elder son’s name cannot be considered for grant of family pension as he is married. The inclusion of mentally challenged Second son’s name in the PPO will be considered as and when contingency arises on submission of required documents.

Please note.

( A SUBBARAO ) D P O/SC

For Divl. Railway Manager (P)/SC

Page 10: ( BY POST) SOUTH CENTRAL RAILWAY Office of the To Smt ...scr.indianrailways.gov.in/cris/uploads/files/1323866264547-OPTG.pdf · ( BY POST) SOUTH CENTRAL RAILWAY Office of the Divl.Railway

(BY POST)

SOUTH CENTRAL RILWAY Office of theDivl. Railway Manager (P)IV floor, Sanchalan Bhavan,

Secunderabad.

No: SCR/P-SC/665/LR-6/NA-67 Date: -12-2011.

ToSmt Zaheera Bee,W/o (L) Syed Ibrahim,H No 1-1-1253 Street No 6Venkatadri Nagar, Kazipet,Warangal Dist 506003.

Sub:- Revised Pension Payment Order (pre-2006) in case of Sri Syed Ibrahim, ex. Points Man/KZJ Expired on 18.12.1970.

Ref:- Your representation to the XXVI Pension Adalat-2011Dated 24.10.2011.

With reference to your representation to XXVI Pension Adalat-2011 you are hereby advised that a Revised Pension Payment Order, consequent on implementation of VI CPC scales has been issued. The copy of the same is enclosed.

Please note.

( A SUBBA RAO ) DPO/SC

For Divl.Railway Manager (P)/SC.

Page 11: ( BY POST) SOUTH CENTRAL RAILWAY Office of the To Smt ...scr.indianrailways.gov.in/cris/uploads/files/1323866264547-OPTG.pdf · ( BY POST) SOUTH CENTRAL RAILWAY Office of the Divl.Railway

(BY POST)

SOUTH CENTRAL RILWAY Office of theDivl. Railway Manager (P)IV floor, Sanchalan Bhavan,

Secunderabad.

No: SCR/P-SC/665/LR-6/NA-59 Date: -12-2011.

ToKum D Mangamma,D/o (L) Anjaiah Earaiah,ex Badge BoyH No 2-8-273/10Wadde Plli, Kazipet,Warangal Dist.

Sub:- Restoration of family pension.

Ref:- Your representation to the XXVI Pension Adalat-2011dated 14.10.2011.

Reference representation cited, the following information is furnished.

This office Lr.No.SCR/P-SC/745/4/RTIA/Settle/139*9 dated 17/8/2011 addressed to you calling for required documents which was sent to you address on 18/8/2011 has been returned to this office undelivered. The said letter has been sent to the address furnished by you. However, a copy of the same is enclosed.

As such, you request for restoration of family pension will be processed on receipt of the required documents, if eligible.

( A SUBBA RAO ) DPO/SC

For Divl.Railway Manager (P)/SC.

Page 12: ( BY POST) SOUTH CENTRAL RAILWAY Office of the To Smt ...scr.indianrailways.gov.in/cris/uploads/files/1323866264547-OPTG.pdf · ( BY POST) SOUTH CENTRAL RAILWAY Office of the Divl.Railway

(BY POST)

SOUTH CENTRAL RILWAY Office of theDivl. Railway Manager (P)IV floor, Sanchalan Bhavan,

Secunderabad.

No: SCR/P-SC/665/Sett/PA/2011/A-72 Date: -12-2011.

ToSmt Bodigela Shakuntala,W/o (L) Anjaiah Laxmaiah,H No 10-65 Krishna Mandir,Shamshabad (P&M)R R Dist 501218

Sub:- Family Pension in favour of Smt B Shakuntala,W/o (L) Sri Anjaiah Laxmaiah, SWM/PTKPVol Retd. On 11.06.1978 and expired on 11.06.1991.

Ref:- Your application dated 28/10/2011.

With reference to your representation, it is advised that on verification of old ledgers available in this office, it is observed that (L) Anjaiah Laxmaiah, ex SWM/PTKP vol Retired on 11-6-1978 was a SRPF retiree and he was entitled for ex-gratia pension and not pension. Hence the following documents may be submitted to this office do deal further if eligible.

1. Application (in Proforma) in Quadruplicate for grant of ex-gratia pension..

2. PPO if issued in favour of (L) Anjaiah Laxmaiah. 3 Death certificate of (L) Anjaiah Laxmaiah.

Please note.

( A SUBBA RAO ) DPO/SC

For Divl.Railway Manager (P)/SC.

Page 13: ( BY POST) SOUTH CENTRAL RAILWAY Office of the To Smt ...scr.indianrailways.gov.in/cris/uploads/files/1323866264547-OPTG.pdf · ( BY POST) SOUTH CENTRAL RAILWAY Office of the Divl.Railway

( BY POST)

SOUTH CENTRAL RAILWAY Office of the Divl.Railway ManagerPersonnel branch IV floor,Sanchalan Bhavan,Secunderabad.

No.SCR/P-SC/Sett/665/T-15/PA-2011/A-40 Dated: -12-2011.

ToSri Y Neela Raju,H No 65-6-2/1Mehar nagar, Near Govt Polytechnic CollegeKakinada 533001 E G Dist AP

Sub:- Revised PPO in favour of Sri Y Neela Raju, Guard M&E/KZJRetired on 31-07-2002.

Ref:- Your representation dated 27-09-2011 to XXVIPension Adalat-2011.

With reference to your representation to ensuing Pension Adalat-2011, you are hereby advised that a Revised Pension Payment Order towards pre-2006 has been issued, a copy of the same is enclosed.

Please Note.

Encl: As above.( A SUBBA RAO ) DPO/SC

For Divl.Railway Manager (P)/SC.

Page 14: ( BY POST) SOUTH CENTRAL RAILWAY Office of the To Smt ...scr.indianrailways.gov.in/cris/uploads/files/1323866264547-OPTG.pdf · ( BY POST) SOUTH CENTRAL RAILWAY Office of the Divl.Railway

( BY POST)

SOUTH CENTRAL RAILWAY Office of the Divl.Railway ManagerPersonnel branch IV floor,Sanchalan Bhavan,Secunderabad.

No.SCR/P-SC/Sett/665/T-15/PA-2011/A-27 Dated: -12-2011.

ToSri Md. MaqboolH No 4-16 Kadipikonda Post,Kazipet, Warangal Dist,506003

Sub:- Revised PPO in favour of Sri Md.Maqbool, Guard M&E/KZJRetired on 31-01-2005.

Ref:- Your representation dated 14-09-2011 to ensuingPension Adalat-2011.

With reference to your representation to XXVI Pension Adalat-2011, you are hereby advised that a Revised Pension Payment Order towards Pre-2006 has been issued, a copy of the same is enclosed.

Please note.

Encl: As above.( A SUBBA RAO ) DPO/SC

For Divl.Railway Manager (P)/SC.

Page 15: ( BY POST) SOUTH CENTRAL RAILWAY Office of the To Smt ...scr.indianrailways.gov.in/cris/uploads/files/1323866264547-OPTG.pdf · ( BY POST) SOUTH CENTRAL RAILWAY Office of the Divl.Railway

( BY POST)

SOUTH CENTRAL RAILWAY Office of the Divl.Railway ManagerPersonnel branch IV floor,Sanchalan Bhavan,Secunderabad.

No.SCR/P-SC/Sett/665/PA-2011/NA-5 Dated: 09-12-2011.

ToSmt Ishrath KhatoonW/o Late Md EliasH No : 1-4-119Indira Nagar ColonyTandurRR Dist – 501141

Sub:- Refund of ` 18,948 kept in deposit.Ref:- Your representation dated 13.09.2011 to ensuing

Pension Adalat-2011.

With reference to your representation to XXVI Pension Adalat-2011,It is advised that, out of ` 18,948/- kept in deposit, you have already been paid ` 7719 vide Co7 No : 108118 dt 28.03.2002 and a release voucher for the remaining amount of ` 11,220/- (` 18948-7719 = 11229) has been sent to Sr DFM/SC on 9.12.2011 for arranging payment.

Please note.

( A SUBBA RAO ) DPO/SC

For Divl.Railway Manager (P)/SC.

Page 16: ( BY POST) SOUTH CENTRAL RAILWAY Office of the To Smt ...scr.indianrailways.gov.in/cris/uploads/files/1323866264547-OPTG.pdf · ( BY POST) SOUTH CENTRAL RAILWAY Office of the Divl.Railway

( BY POST)

SOUTH CENTRAL RAILWAY Office of the Divl.Railway ManagerPersonnel branch IV floor,Sanchalan Bhavan,Secunderabad.

No.SCR/P-SC/Sett/665/PA-2011/NA-5 Dated: 09-12-2011.

ToSmt Ishrath KhatoonW/o Late Md EliasH No : 1-4-119Indira Nagar ColonyTandurRR Dist – 501141

Sub:- Refund of ` 18,948 kept in deposit.Ref:- Your representation dated 13.09.2011 to ensuing

Pension Adalat-2011.

With reference to your representation to XXVI Pension Adalat-2011,It is advised that, out of ` 18,948/- kept in deposit, you have already been paid ` 7719 vide Co7 No : 108118 dt 28.03.2002 and a release voucher for the remaining amount of ` 11,220/- (` 18948-7719 = 11229) has been sent to Sr DFM/SC on 9.12.2011 for arranging payment.

Please note.

( A SUBBA RAO ) DPO/SC

For Divl.Railway Manager (P)/SC.

Page 17: ( BY POST) SOUTH CENTRAL RAILWAY Office of the To Smt ...scr.indianrailways.gov.in/cris/uploads/files/1323866264547-OPTG.pdf · ( BY POST) SOUTH CENTRAL RAILWAY Office of the Divl.Railway

( BY POST)

SOUTH CENTRAL RAILWAY Office of the Divl.Railway ManagerPersonnel branch IV floor,Sanchalan Bhavan,Secunderabad.

No.SCR/P-SC/Sett/665/PA-2011/A-38 Dated: 09-12-2011.To,

Smt V Sudha RaniW/o Late Sh.V.Hanumantha RaoH No : 1-2-194Rahmat Nagar,KAZIPET – WARANGAL Dist - 506003

Sub:- Request for post-2006 revised PPO – Case of Sri (L) Shri.V.Hanumantha Rao, ASM / NSKL, DOD 22.02.2006.

Ref:- Your application dated 23.09.2011.

* * * *

With reference to your representation, it is advised that the case file of Sri (L) Shri.V.Hanumantha Rao, has been called for from Sr.DFM/SC, on receipt of which pension will be revised and post-2006 revised PPO will be issued.

Please note.

( A SUBBA RAO ) DPO/SC

For Divl.Railway Manager (P)/SC.

Page 18: ( BY POST) SOUTH CENTRAL RAILWAY Office of the To Smt ...scr.indianrailways.gov.in/cris/uploads/files/1323866264547-OPTG.pdf · ( BY POST) SOUTH CENTRAL RAILWAY Office of the Divl.Railway

( BY POST)SOUTH CENTRAL RAILWAY Office of the

Divl.Railway ManagerPersonnel branch IV floor,Sanchalan Bhavan,Secunderabad.

No.SCR/P-SC/Sett/665/PA-2011/A-7 Dated: 09-12-2011.To,

Kum Tulsi Bai,D/o (L) Shri Nawrajee Ramjee,PM/Bhalki Station,H.No.8-108, Near Railway Station, Dharur-(Post Mandal)RR Dist – 501141

Sub:- Sanction of family pension to unmarried daughter – case of late Shri Nawrajee Ramjee, Points Man/Bhalki DOR.09.12.1979/ Expired on 27.01.1981.

Ref:- Your representation pension adalat 2011 dt.13.09.2011.

* * * *

With reference to your representation cited, it is advised that your case for sanction of family pension will be processed further on submission of welfare inspector’s report after verifying the genuineness of the claim.

Please note.

( A SUBBA RAO ) DPO/SC

For Divl.Railway Manager (P)/SC.

Page 19: ( BY POST) SOUTH CENTRAL RAILWAY Office of the To Smt ...scr.indianrailways.gov.in/cris/uploads/files/1323866264547-OPTG.pdf · ( BY POST) SOUTH CENTRAL RAILWAY Office of the Divl.Railway

( BY POST)SOUTH CENTRAL RAILWAY Office of the

Divl.Railway ManagerPersonnel branch IV floor,Sanchalan Bhavan,Secunderabad.

No.SCR/P-SC/Sett/665/PA-2011/NA-37 Dated: 09-12-2011.To,

Shri T Venkata Rama Rao,H.No.25-6-203,Kazipet,Warangal Dist-506003.

Sub:- Incorporation of DOB of Smt. T Hymavathi – case of Shri T.V.Rama Rao, M&E Guard/KZJ, Rtd. On 30.06.1990.

Ref:- Your representation pension adalat 2011 dt.17.10.2011.

* * * *

With reference to your representation cited, it is advised that the DOB of Smt. T Hymavathi has been incorporated in the pension on payment order and a corrigendum is issued on 05.12.2011 in this regard. (copy enclosed).

Please note.

( A SUBBA RAO ) DPO/SC

For Divl.Railway Manager (P)/SC.

Page 20: ( BY POST) SOUTH CENTRAL RAILWAY Office of the To Smt ...scr.indianrailways.gov.in/cris/uploads/files/1323866264547-OPTG.pdf · ( BY POST) SOUTH CENTRAL RAILWAY Office of the Divl.Railway

( BY POST)SOUTH CENTRAL RAILWAY Office of the

Divl.Railway ManagerPersonnel branch IV floor,Sanchalan Bhavan,Secunderabad.

No.SCR/P-SC/Sett/665/PA-2011/NA-53 Dated: 09-12-2011.To,

Shri A ArasanH.No.85/F3 Extn,OPP. Annai Hospital,Trichy Road, Thuraiyur,Tamil Nadu-621010.

Sub:- Request for payment of FMA.Ref:- Your representation pension adalat 2011 dt.25.10.2011.

* * * *

With reference to your representation cited, it is advised that your request for payment of FMA has been sanctioned by the pension sanctioning authority (PSA) and forwarded to Sr.DFM/SC on dt.09.12.2011 for further action.

Please note.

( A SUBBA RAO ) DPO/SC

For Divl.Railway Manager (P)/SC.

Page 21: ( BY POST) SOUTH CENTRAL RAILWAY Office of the To Smt ...scr.indianrailways.gov.in/cris/uploads/files/1323866264547-OPTG.pdf · ( BY POST) SOUTH CENTRAL RAILWAY Office of the Divl.Railway

( BY POST)SOUTH CENTRAL RAILWAY Office of the

Divl.Railway ManagerPersonnel branch IV floor,Sanchalan Bhavan,Secunderabad.

No.SCR/P-SC/Sett/665/PA-2011/NA-30 Dated: 09-12-2011.To,

Smt B Sumitrabai Sesha Rao,W/O (L) Sri B Sesha Rao SaiduSamata Nagar, Jirewadi (post)Parli Vaijnath, KannerwadiDist, Beed, Maharashtra (state)

Sub:- Request for arranging the payment of RG, Commutation of pension EOL – case of Sri B Sesha Rao Saidu, PM-A/Ghatnandur, Retd on 31.01.2005/DOD on 14.09.2010.

Ref:- Your representation pension adalat 2011 dt.17.09.2011.

* * * *

With reference to your representation cited, it is advised that your case file has been called for from Sr.DFM/SC, on receipt of which, your case will be examined and processed further in eligible.

Please note.

( A SUBBA RAO ) DPO/SC

For Divl.Railway Manager (P)/SC.

Page 22: ( BY POST) SOUTH CENTRAL RAILWAY Office of the To Smt ...scr.indianrailways.gov.in/cris/uploads/files/1323866264547-OPTG.pdf · ( BY POST) SOUTH CENTRAL RAILWAY Office of the Divl.Railway

( BY POST)SOUTH CENTRAL RAILWAY Office of the

Divl.Railway ManagerPersonnel branch IV floor,Sanchalan Bhavan,Secunderabad.

No.SCR/P-SC/Sett/665/PA-2011/A-5 Dated: 09-12-2011.To,

Mrs Rukki Bai,W/O (L) Sri Shankar JaniaSafaiwali,SERAM Railway Stn,SERAM (Post & TQ)Gulbarga (Dist) Karnataka.

Sub:- Request for sanction of additional relief on death of Govt. servants covered by NPS – Case of Shankar Jania, Yard Porter/ Ghatnandur, Exp. On 23.11.2004.

Ref:- Your representation pension adalat 2011 dt.13.09.2011.

* * * *

With reference to your representation cited, it is advised that your request for payment of family pension and settlement dues, if any, has been considered and forwarded to Sr.DFM/SC for further process vide this office letter of even No. dt. 06.12.2011.

Please note.

( A SUBBA RAO ) DPO/SC

For Divl.Railway Manager (P)/SC.

Page 23: ( BY POST) SOUTH CENTRAL RAILWAY Office of the To Smt ...scr.indianrailways.gov.in/cris/uploads/files/1323866264547-OPTG.pdf · ( BY POST) SOUTH CENTRAL RAILWAY Office of the Divl.Railway

( BY POST)SOUTH CENTRAL RAILWAY Office of the

Divl.Railway ManagerPersonnel branch IV floor,Sanchalan Bhavan,Secunderabad.

No.SCR/P-SC/Sett/665/PA-2011/NA-31 Dated: 09-12-2011.To,

Shri P Manikyala Rao,H.No.2-72/6,Kothapally – (Village),Jammikunta – (Post and Mandal)Karim Nagar (dist) – 505122.

Sub:- Recovery of excess payment of pension to Sri P Manikyala Rao, Rtd. On 31.12.1991 as ASM/UPPAL.

Ref:- Your representation pension adalat 2011 dt.10.10.2011.

* * * *

With reference to your representation cited, it is advised that your grievance for correction in commuted amount of ` 286/- instead of ` 1045/- has been redressed and a corrigendum is issued on dt.12.08.2011 in this regard. ( copy enclosed).

Please note.

( A SUBBA RAO ) DPO/SC

For Divl.Railway Manager (P)/SC.

Page 24: ( BY POST) SOUTH CENTRAL RAILWAY Office of the To Smt ...scr.indianrailways.gov.in/cris/uploads/files/1323866264547-OPTG.pdf · ( BY POST) SOUTH CENTRAL RAILWAY Office of the Divl.Railway

( BY POST)SOUTH CENTRAL RAILWAY Office of the

Divl.Railway ManagerPersonnel branch IV floor,Sanchalan Bhavan,Secunderabad.

No.SCR/P-SC/Sett/665/PA-2011/NA-34 Dated: 12-12-2011.

To,Sri. Taj MohammedH.No. 1-6-141,Bapuji Nagar,Kazipet, Warangal (dist.)-506003.

Sub:- Fixation of pay on promotion as Sr. Goods Guard- case of Sri. Taj Mohd. s/o Sri. Raj Mohd. , Pass Guard/SC, Rtd. On 31.12.2010.

Ref:- Your application dated 11.10.2011.

With reference to your representation cited, it is advised that your pay after promotion as Sr. Goods Guard in Scale Rs. 5000-8000 from Goods guard scale Rs. 4500-7000 has already been fixed correctly and needs no revision in retirement benefits. However, your request for stepping up of pay is under examination.

Please note.

( A SUBBA RAO ) DPO/SC

For Divl.Railway Manager (P)/SC.

Page 25: ( BY POST) SOUTH CENTRAL RAILWAY Office of the To Smt ...scr.indianrailways.gov.in/cris/uploads/files/1323866264547-OPTG.pdf · ( BY POST) SOUTH CENTRAL RAILWAY Office of the Divl.Railway

(BY POST)

SOUTH CENTRAL RAILWAY Office of theDivl. Railway Manager,Personnel branch IV floor,Sanchalan Bhavan Secunderabad.

No.SCR/P-SC/665/PA/2011/A-62 Dated: 09.12.2011.

To,Smt P Yadamma,C/o B Samba Murthy,H No. 4-95 Janatha Nagar,Kadipikonda. KazipetWarangal 506003.

Sub: Payment of settlement dues and family pension from 29.08.2000 – case of Sri P Paremeshwar S/o Kanakiah, P Man/SS/WL Missing from 29.08.2000.

Ref:- Your representation to ensuing Pension Adalat-2011 dated 21.10.2011.

Reference to representation cited, you are advised to submit the following documents to examine the case for arranging the payment of settlement dues and family pension from 29.08.2000.

1. Copy of FIR filed in the respective Police Station.2. Indemnity Bond in prescribed proforma.3. Final report of the Sub Inspector of Police from the respective police

station.

On receipt of the above documents, the case will be considered for further process.

( A SUBBARAO ) D P O/SC

For Divl. Railway Manager (P)/SC