深圳深南电燃机工程技术有限公司 shenzhen shennan power gas turbine engineering...

29
深深深深深深深深深深深深深深深 深深深深深深深深深深深深深深深 SHENZHEN SHENNAN POWER GAS TURBINE ENGINEERING TECHNIQUE CO., LTD SHENZHEN SHENNAN POWER GAS TURBINE ENGINEERING TECHNIQUE CO., LTD www.nspower-epc.cn Oct ,2008

Post on 21-Dec-2015

473 views

Category:

Documents


18 download

TRANSCRIPT

Page 1: 深圳深南电燃机工程技术有限公司 SHENZHEN SHENNAN POWER GAS TURBINE ENGINEERING TECHNIQUE CO., LTD  Oct,2008

深圳深南电燃机工程技术有限公司深圳深南电燃机工程技术有限公司 SHENZHEN SHENNAN POWER GAS TURBINE ENGINEERING TECHNIQUE CO., LTDSHENZHEN SHENNAN POWER GAS TURBINE ENGINEERING TECHNIQUE CO., LTD

www.nspower-epc.cn

Oct ,2008

Page 2: 深圳深南电燃机工程技术有限公司 SHENZHEN SHENNAN POWER GAS TURBINE ENGINEERING TECHNIQUE CO., LTD  Oct,2008

www.nspower-epc.cn

Contents

Company Profile

Growth & Resources

Achievement & Development

World Records & Partnership

Pilot Projects

Page 3: 深圳深南电燃机工程技术有限公司 SHENZHEN SHENNAN POWER GAS TURBINE ENGINEERING TECHNIQUE CO., LTD  Oct,2008

www. nspower-epc.com

Company Profile

Formerly were

Established at

Investment proportion

Main business scope

Shenzhen Nanshan Power Co., Ltd. Engineering Dept.

Feb., 2004

The Company was a joint venture established in Feb., 2004 , with 60% of

investment by Shenzhen Nanshan Power Co., Ltd. (“NSRD”) and 40% of investment by Nangang Power (Hong Kong) Co., Ltd.

In Share Reform at Oct. 2007, NSRD purchased all the shares and the Company becomes a wholly-owned subsidiary company of NSRD.

EPC project for the power plants, technical consultancies, O&M, technical training,

spare parts and repairing services.

Page 4: 深圳深南电燃机工程技术有限公司 SHENZHEN SHENNAN POWER GAS TURBINE ENGINEERING TECHNIQUE CO., LTD  Oct,2008

Group Company Profile

Established in April, 1990, Shenzhen Nanshan Power Co.,Ltd. (NSRD) is being engaged in

the production and supply of electricity and thermal power. In 1994, NSRD had it’s A – shares

and B – shares listed in Shenzhen Stock Exchange for trading.

In just 18 years, NSRD has enabled itself to grow from a small GT power plant to one of the

largest GT power plant in China with a total assets of more than 5.8 billion RMB and total net

assets of nearly 1.7 billion RMB. The total tax payment is 2.38billion RMB and awarded as

“Shenzhen Law –abiding Big Tax Payer.

NSRD’ total installed capacity is 1500MW, and has become one of key power producers in

Guangdong province. Being a leading GT power company in China, NSRD has also tried to

developed the business in the different power sectors, such as coal power generation and

nuclear power generation.

www. nsrd.com.cn

Page 5: 深圳深南电燃机工程技术有限公司 SHENZHEN SHENNAN POWER GAS TURBINE ENGINEERING TECHNIQUE CO., LTD  Oct,2008

www. nspower-epc.com

Growth

Nanshan Power Plant

NS

RD

Pow

er Plant P

hase V

1×S109E

/180MW

NS

RD

Pow

er Plant P

hase VI

1×S109E

/180MW

Baochang Power Plant

EP

C1×S

109E/180M

WThe Company

established

The Com

pany established

2004.02

2001 2002 2003 2004

Nanshan Power Plant

Page 6: 深圳深南电燃机工程技术有限公司 SHENZHEN SHENNAN POWER GAS TURBINE ENGINEERING TECHNIQUE CO., LTD  Oct,2008

Staff Constitution

www. nspower-epc.com

Page 7: 深圳深南电燃机工程技术有限公司 SHENZHEN SHENNAN POWER GAS TURBINE ENGINEERING TECHNIQUE CO., LTD  Oct,2008

Resources

Shenzhen Shennan Power Gas Turbine Engineering Technique Co., Ltd.Shenzhen Shennan Power Gas Turbine Engineering Technique Co., Ltd.Shenzhen Shennan Power Gas Turbine Engineering Technique Co., Ltd.Shenzhen Shennan Power Gas Turbine Engineering Technique Co., Ltd.

Resources Complementation

TalentsTalents(Technique & Management)(Technique & Management)

ReputationReputation(NSRD)(NSRD)

ResourcesResources(Subsidiary (Subsidiary Power Plant)Power Plant)

EPC partnerEPC partner

www.nspower-epc.cn

Page 8: 深圳深南电燃机工程技术有限公司 SHENZHEN SHENNAN POWER GAS TURBINE ENGINEERING TECHNIQUE CO., LTD  Oct,2008

www.nspower-epc.cn

Main Business Scope

EPC

Gas Turbine Combined Cycle Power Plant Project

Project Management

Technical Consultancy

Commissioning

Technical training

O&M

Technical modification

Page 9: 深圳深南电燃机工程技术有限公司 SHENZHEN SHENNAN POWER GAS TURBINE ENGINEERING TECHNIQUE CO., LTD  Oct,2008

Achievement

www.nspower-epc.cn

Name of Project Model/Capacity Type of project Time

NANSHAN Gas Turbine Power Plant phase I-IV

3×PG5361P/75MW1×PG6531B/36MW1×PG6541B/37MW1×PG9171E/123MW

EPC1990 ~ 1993

SUZHOU GAODA Power Plant 1×PG6541B/37MW O&M Technique 1994

ZHEJIANG RUIAN Power Plant 1×PG6541B/37MW Project Consultancy 1995

NANSHAN Gas Turbine Power Plant Phase V 1×S109E/180MW EPC 2001

NANSHAN Gas Turbine Power Plant Phase VI 1×S109E/180MW EPC 2002

BAOCHANG Power Plant 1×S109E/180MW EPC 2003

NEW POWER Gas Turbine Power Plant 1×S109E/180MW EPC 2003

Qinhuangdao 9F Commissioning Station ----Technical

Consultancy2003

NANLANG Gas Turbine Power Plant 2×S109E/360MW EPC 2004

FUHUADE Gas Turbine Power Plant 2×S109E/360MW EPC 2004

JINHUA Gas Turbine Power Plant 1×S109E/180MW Project Consultancy 2004

FOSHAN SHAKOU Power Plant 2×S109E/360MW EPC 2005

Page 10: 深圳深南电燃机工程技术有限公司 SHENZHEN SHENNAN POWER GAS TURBINE ENGINEERING TECHNIQUE CO., LTD  Oct,2008

Achievement

www.nspower-epc.cn

Name of Project Model/Capacity Type of project Time

MEISHI Power PlantGT3E2

LNG ModificationProject Management 2005

TONGMING Gas Turbine Power Plant 2×S109E/360MW EPC 2005

DONGXING Gas Turbine Power Plant 2×S109E/360MW EPC 2005

WEIMEI Gas Turbine Power Plant 2×S109E/360MW EPC 2005

NANSHAN Power Plant Oil-to-Gas Project 2×S109E/360MW Technical Consultancy 2007

WEIMEI Power Plant Oil-to-Gas Project 2×S109E/360MW Technical Consultancy 2007

SOLIG Gas Turbine Power Plant 2×S109E/360MW Commissioning and O&M 2008

BEIJING ZHENGDONG Power Plant PG6581B/119.2MW Startup commissioning 2008

QINGHAI GEERMU Power Plant 2×S109E/360MW Technical Consultancy 2008

HUBEI HUADIAN WUCHANG Power Plant 1×S109E/360MWCommissioning & Technical

Training2008

AZERBAIJAN JANUB Project 2×S209E/360MW Consultancy & Design 2008

NANLANG Power Plant Oil-to-Gas Project 2×S109E/360MW Technical Consultancy 2008

Page 11: 深圳深南电燃机工程技术有限公司 SHENZHEN SHENNAN POWER GAS TURBINE ENGINEERING TECHNIQUE CO., LTD  Oct,2008

www. nspower-epc.comwww. nspower-epc.com

World Records

The world record frame for 9E installation in 37 days

The new world record for 9E installation in 33 days

The establishment of strategic cooperative partnership

Page 12: 深圳深南电燃机工程技术有限公司 SHENZHEN SHENNAN POWER GAS TURBINE ENGINEERING TECHNIQUE CO., LTD  Oct,2008

BAOCHANG Power Plant ( 2x109E)

ZHEJIANG BANSHAN Power Plant ( 9F Units)

ZHEJIANG YUYAO Power Plant (9E Units)

JIANGSU ZHANGJIAGANG Power Plant (9F)

JIANGSU QISHUYAN Power Plant ( 9F Units)

JIANGSU WANGTING Power Plant ( 9F Units)

GUANGZHOU ZHUJIANG Power Plant (9F Unit))

FUHUADE Gas Turbine Power Plant (9E&V94.2)

FUNENG Gas Turbine Power Plant (2x109E)

JINHUA Gas Turbine Power Plant (9E units)

TONGMING Gas Turbine Power Plant (2x109E)

BEIJING JINGFENG Power Plant (M701 / 9F)

HUIZHOU LNG Power Plant (M701 / 9F)

SHENZHEN QIANWAN Power Plant (M701/9F)

Technical Training

NSRD (ZHONGSHAN) Power Co., Ltd. (9E)

XIAOSHAN power plant ( 9F)

FOSHAN SHAKOU Power Plant (9E)

ZHONGSHAN YONG’AN Power Plant (9E)

GUANGDONG HUIZHOU LNG Power Co., Ltd. (M701)

INNER MONGOLIA SOLIG power plant ( 9E)

DONGXING Power Plant (9E)

WEIMEI Gas Turbine Power Plant ( 2x109E)

QINGHAI HUANGHE Power Plant (9E)

ZHANGJIAGANG HUAXING Power Plant (9F)

HUADIAN ( BEIJING ) Power Co., Ltd. (9F)

HUBEI HUADIAN (Wuchang) Power Co., Ltd. (O&M)

FUJIAN United Petroleum & Chemical Corporation (9F)

SHENHUA Coal Liquefaction Corporation (Reverse Osmosis )

NSRD/HQ

Total: 37 terms, 28 power plants, 921 kernel technical staffTotal: 37 terms, 28 power plants, 921 kernel technical staff

Page 13: 深圳深南电燃机工程技术有限公司 SHENZHEN SHENNAN POWER GAS TURBINE ENGINEERING TECHNIQUE CO., LTD  Oct,2008

www.nspower-epc.cn

Overseas Expansion

March on overseas

Harvest in overseas

Set foot in Overseas

Participation in Bangladesh Margaret Gas Turbine CCPP Project in 2005

Participation in development of nearly 30 overseas projects since 2005 on basis of technical strength

Signature of Consultant Contract and Engineering Design Service Contract for Azerbaijan JANUB CCPP Project in August, 2007

Page 14: 深圳深南电燃机工程技术有限公司 SHENZHEN SHENNAN POWER GAS TURBINE ENGINEERING TECHNIQUE CO., LTD  Oct,2008

Overseas ExpansionOverseas Expansion

www. nspower-epc.comwww. nspower-epc.com

CONSULT

PMC

ENGINEERING

EPC TRAINNING

SPARE PARTS

O & M

LTSA

Page 15: 深圳深南电燃机工程技术有限公司 SHENZHEN SHENNAN POWER GAS TURBINE ENGINEERING TECHNIQUE CO., LTD  Oct,2008

www. nspower-epc.com

International Strategic Cooperative Partnership

GE & NSRDStrategic Cooperative Partnership

Page 16: 深圳深南电燃机工程技术有限公司 SHENZHEN SHENNAN POWER GAS TURBINE ENGINEERING TECHNIQUE CO., LTD  Oct,2008

NSRD & GE www. nspower-epc.com

NSRD: Our strengths become your advantages

NSRD has put 9E Units in Nanshan Power Plant manufactured by GE into commercial operation in 1993 GE initiates its sales of 9E Units in China

NSRD has successfully completed HFO modification and combined cycle alteration in 1990s

GE has fully recognized achievement made by NSRD on technical field.

In 21st century, NSRD-EPC has participated in constructing nearly 30 sets of 9E units manufactured by GE in China, continuing to break world records made by itself and keeping the world record for 9E installation in 33 days till now.

GE has awarded NSRD the world record frame and established strategic cooperative partnership with NSRD.

9E units recommended by NSRD-EPC has won the bid of Azerbaijan JANUB Project in Oct. 2008

GE has realized the first breakthrough in GT sales order in Azerbaijan.

NSRD GE

Page 17: 深圳深南电燃机工程技术有限公司 SHENZHEN SHENNAN POWER GAS TURBINE ENGINEERING TECHNIQUE CO., LTD  Oct,2008

www. nspower-epc.com

International Strategic Cooperative Partnership

Page 18: 深圳深南电燃机工程技术有限公司 SHENZHEN SHENNAN POWER GAS TURBINE ENGINEERING TECHNIQUE CO., LTD  Oct,2008

National Strategic Cooperative Partnership

National engineering enterprises & NSRDStrategic Cooperative Partnership

www. nspower-epc.comwww. nspower-epc.com

Page 19: 深圳深南电燃机工程技术有限公司 SHENZHEN SHENNAN POWER GAS TURBINE ENGINEERING TECHNIQUE CO., LTD  Oct,2008

Pilot Project

---- SOLIG Power Plant 2X109E---- SOLIG Power Plant 2X109E

www. nspower-epc.comwww. nspower-epc.com

Page 20: 深圳深南电燃机工程技术有限公司 SHENZHEN SHENNAN POWER GAS TURBINE ENGINEERING TECHNIQUE CO., LTD  Oct,2008

Pilot Project

TONGMING Power Plant 2X109ETONGMING Power Plant 2X109E

www. nspower-epc.comwww. nspower-epc.com

Page 21: 深圳深南电燃机工程技术有限公司 SHENZHEN SHENNAN POWER GAS TURBINE ENGINEERING TECHNIQUE CO., LTD  Oct,2008

Pilot Project

---- GAOBU Power Plant 2X109E---- GAOBU Power Plant 2X109E

www. nspower-epc.comwww. nspower-epc.com

Page 22: 深圳深南电燃机工程技术有限公司 SHENZHEN SHENNAN POWER GAS TURBINE ENGINEERING TECHNIQUE CO., LTD  Oct,2008

Pilot Project

---- FOSHAN Power Plant 2X109E---- FOSHAN Power Plant 2X109E

www. nspower-epc.comwww. nspower-epc.com

Page 23: 深圳深南电燃机工程技术有限公司 SHENZHEN SHENNAN POWER GAS TURBINE ENGINEERING TECHNIQUE CO., LTD  Oct,2008

Pilot Project

---- DONGXING Power Plant 2X109E---- DONGXING Power Plant 2X109E

www. nspower-epc.comwww. nspower-epc.com

Page 24: 深圳深南电燃机工程技术有限公司 SHENZHEN SHENNAN POWER GAS TURBINE ENGINEERING TECHNIQUE CO., LTD  Oct,2008

Pilot Project

-----BAOCHANG Power Plant 2X109E-----BAOCHANG Power Plant 2X109E

www. nspower-epc.comwww. nspower-epc.com

Page 25: 深圳深南电燃机工程技术有限公司 SHENZHEN SHENNAN POWER GAS TURBINE ENGINEERING TECHNIQUE CO., LTD  Oct,2008

Pilot Project

----- NEW POWER Power Plant----- NEW POWER Power Plant

www. nspower-epc.comwww. nspower-epc.com

Page 26: 深圳深南电燃机工程技术有限公司 SHENZHEN SHENNAN POWER GAS TURBINE ENGINEERING TECHNIQUE CO., LTD  Oct,2008

Pilot Project

---- NANSHAN Power Plant---- NANSHAN Power Plant

www. nspower-epc.comwww. nspower-epc.com

Page 27: 深圳深南电燃机工程技术有限公司 SHENZHEN SHENNAN POWER GAS TURBINE ENGINEERING TECHNIQUE CO., LTD  Oct,2008

Pilot Project

---- Control Room---- Control Room

www. nspower-epc.comwww. nspower-epc.com

Page 28: 深圳深南电燃机工程技术有限公司 SHENZHEN SHENNAN POWER GAS TURBINE ENGINEERING TECHNIQUE CO., LTD  Oct,2008

Pilot Project

Effect Drawing for Azerbaijan JANUB Project

www. nspower-epc.comwww. nspower-epc.com

---- JANUB project, Azerbaijan---- JANUB project, Azerbaijan

Page 29: 深圳深南电燃机工程技术有限公司 SHENZHEN SHENNAN POWER GAS TURBINE ENGINEERING TECHNIQUE CO., LTD  Oct,2008

Add: 15F Hantang BuildingAdd: 15F Hantang Building 、、 Huaqiaocheng AreaHuaqiaocheng Area Shenzhen CityShenzhen City 、、 P.R.C.P.R.C.

P.C.P.C. :: 518053518053

TelTel :: +86-755-26948899+86-755-26948899

FaxFax :: +86-755-26948866+86-755-26948866