深圳深南电燃机工程技术有限公司深圳深南电燃机工程技术有限公司 SHENZHEN SHENNAN POWER GAS TURBINE ENGINEERING TECHNIQUE CO., LTDSHENZHEN SHENNAN POWER GAS TURBINE ENGINEERING TECHNIQUE CO., LTD
www.nspower-epc.cn
Oct ,2008
www.nspower-epc.cn
Contents
Company Profile
Growth & Resources
Achievement & Development
World Records & Partnership
Pilot Projects
www. nspower-epc.com
Company Profile
Formerly were
Established at
Investment proportion
Main business scope
Shenzhen Nanshan Power Co., Ltd. Engineering Dept.
Feb., 2004
The Company was a joint venture established in Feb., 2004 , with 60% of
investment by Shenzhen Nanshan Power Co., Ltd. (“NSRD”) and 40% of investment by Nangang Power (Hong Kong) Co., Ltd.
In Share Reform at Oct. 2007, NSRD purchased all the shares and the Company becomes a wholly-owned subsidiary company of NSRD.
EPC project for the power plants, technical consultancies, O&M, technical training,
spare parts and repairing services.
Group Company Profile
Established in April, 1990, Shenzhen Nanshan Power Co.,Ltd. (NSRD) is being engaged in
the production and supply of electricity and thermal power. In 1994, NSRD had it’s A – shares
and B – shares listed in Shenzhen Stock Exchange for trading.
In just 18 years, NSRD has enabled itself to grow from a small GT power plant to one of the
largest GT power plant in China with a total assets of more than 5.8 billion RMB and total net
assets of nearly 1.7 billion RMB. The total tax payment is 2.38billion RMB and awarded as
“Shenzhen Law –abiding Big Tax Payer.
NSRD’ total installed capacity is 1500MW, and has become one of key power producers in
Guangdong province. Being a leading GT power company in China, NSRD has also tried to
developed the business in the different power sectors, such as coal power generation and
nuclear power generation.
www. nsrd.com.cn
www. nspower-epc.com
Growth
Nanshan Power Plant
NS
RD
Pow
er Plant P
hase V
1×S109E
/180MW
NS
RD
Pow
er Plant P
hase VI
1×S109E
/180MW
Baochang Power Plant
EP
C1×S
109E/180M
WThe Company
established
The Com
pany established
2004.02
2001 2002 2003 2004
Nanshan Power Plant
Staff Constitution
www. nspower-epc.com
Resources
Shenzhen Shennan Power Gas Turbine Engineering Technique Co., Ltd.Shenzhen Shennan Power Gas Turbine Engineering Technique Co., Ltd.Shenzhen Shennan Power Gas Turbine Engineering Technique Co., Ltd.Shenzhen Shennan Power Gas Turbine Engineering Technique Co., Ltd.
Resources Complementation
TalentsTalents(Technique & Management)(Technique & Management)
ReputationReputation(NSRD)(NSRD)
ResourcesResources(Subsidiary (Subsidiary Power Plant)Power Plant)
EPC partnerEPC partner
www.nspower-epc.cn
www.nspower-epc.cn
Main Business Scope
EPC
Gas Turbine Combined Cycle Power Plant Project
Project Management
Technical Consultancy
Commissioning
Technical training
O&M
Technical modification
Achievement
www.nspower-epc.cn
Name of Project Model/Capacity Type of project Time
NANSHAN Gas Turbine Power Plant phase I-IV
3×PG5361P/75MW1×PG6531B/36MW1×PG6541B/37MW1×PG9171E/123MW
EPC1990 ~ 1993
SUZHOU GAODA Power Plant 1×PG6541B/37MW O&M Technique 1994
ZHEJIANG RUIAN Power Plant 1×PG6541B/37MW Project Consultancy 1995
NANSHAN Gas Turbine Power Plant Phase V 1×S109E/180MW EPC 2001
NANSHAN Gas Turbine Power Plant Phase VI 1×S109E/180MW EPC 2002
BAOCHANG Power Plant 1×S109E/180MW EPC 2003
NEW POWER Gas Turbine Power Plant 1×S109E/180MW EPC 2003
Qinhuangdao 9F Commissioning Station ----Technical
Consultancy2003
NANLANG Gas Turbine Power Plant 2×S109E/360MW EPC 2004
FUHUADE Gas Turbine Power Plant 2×S109E/360MW EPC 2004
JINHUA Gas Turbine Power Plant 1×S109E/180MW Project Consultancy 2004
FOSHAN SHAKOU Power Plant 2×S109E/360MW EPC 2005
Achievement
www.nspower-epc.cn
Name of Project Model/Capacity Type of project Time
MEISHI Power PlantGT3E2
LNG ModificationProject Management 2005
TONGMING Gas Turbine Power Plant 2×S109E/360MW EPC 2005
DONGXING Gas Turbine Power Plant 2×S109E/360MW EPC 2005
WEIMEI Gas Turbine Power Plant 2×S109E/360MW EPC 2005
NANSHAN Power Plant Oil-to-Gas Project 2×S109E/360MW Technical Consultancy 2007
WEIMEI Power Plant Oil-to-Gas Project 2×S109E/360MW Technical Consultancy 2007
SOLIG Gas Turbine Power Plant 2×S109E/360MW Commissioning and O&M 2008
BEIJING ZHENGDONG Power Plant PG6581B/119.2MW Startup commissioning 2008
QINGHAI GEERMU Power Plant 2×S109E/360MW Technical Consultancy 2008
HUBEI HUADIAN WUCHANG Power Plant 1×S109E/360MWCommissioning & Technical
Training2008
AZERBAIJAN JANUB Project 2×S209E/360MW Consultancy & Design 2008
NANLANG Power Plant Oil-to-Gas Project 2×S109E/360MW Technical Consultancy 2008
www. nspower-epc.comwww. nspower-epc.com
World Records
The world record frame for 9E installation in 37 days
The new world record for 9E installation in 33 days
The establishment of strategic cooperative partnership
BAOCHANG Power Plant ( 2x109E)
ZHEJIANG BANSHAN Power Plant ( 9F Units)
ZHEJIANG YUYAO Power Plant (9E Units)
JIANGSU ZHANGJIAGANG Power Plant (9F)
JIANGSU QISHUYAN Power Plant ( 9F Units)
JIANGSU WANGTING Power Plant ( 9F Units)
GUANGZHOU ZHUJIANG Power Plant (9F Unit))
FUHUADE Gas Turbine Power Plant (9E&V94.2)
FUNENG Gas Turbine Power Plant (2x109E)
JINHUA Gas Turbine Power Plant (9E units)
TONGMING Gas Turbine Power Plant (2x109E)
BEIJING JINGFENG Power Plant (M701 / 9F)
HUIZHOU LNG Power Plant (M701 / 9F)
SHENZHEN QIANWAN Power Plant (M701/9F)
Technical Training
NSRD (ZHONGSHAN) Power Co., Ltd. (9E)
XIAOSHAN power plant ( 9F)
FOSHAN SHAKOU Power Plant (9E)
ZHONGSHAN YONG’AN Power Plant (9E)
GUANGDONG HUIZHOU LNG Power Co., Ltd. (M701)
INNER MONGOLIA SOLIG power plant ( 9E)
DONGXING Power Plant (9E)
WEIMEI Gas Turbine Power Plant ( 2x109E)
QINGHAI HUANGHE Power Plant (9E)
ZHANGJIAGANG HUAXING Power Plant (9F)
HUADIAN ( BEIJING ) Power Co., Ltd. (9F)
HUBEI HUADIAN (Wuchang) Power Co., Ltd. (O&M)
FUJIAN United Petroleum & Chemical Corporation (9F)
SHENHUA Coal Liquefaction Corporation (Reverse Osmosis )
NSRD/HQ
Total: 37 terms, 28 power plants, 921 kernel technical staffTotal: 37 terms, 28 power plants, 921 kernel technical staff
www.nspower-epc.cn
Overseas Expansion
March on overseas
Harvest in overseas
Set foot in Overseas
Participation in Bangladesh Margaret Gas Turbine CCPP Project in 2005
Participation in development of nearly 30 overseas projects since 2005 on basis of technical strength
Signature of Consultant Contract and Engineering Design Service Contract for Azerbaijan JANUB CCPP Project in August, 2007
Overseas ExpansionOverseas Expansion
www. nspower-epc.comwww. nspower-epc.com
CONSULT
PMC
ENGINEERING
EPC TRAINNING
SPARE PARTS
O & M
LTSA
www. nspower-epc.com
International Strategic Cooperative Partnership
GE & NSRDStrategic Cooperative Partnership
NSRD & GE www. nspower-epc.com
NSRD: Our strengths become your advantages
NSRD has put 9E Units in Nanshan Power Plant manufactured by GE into commercial operation in 1993 GE initiates its sales of 9E Units in China
NSRD has successfully completed HFO modification and combined cycle alteration in 1990s
GE has fully recognized achievement made by NSRD on technical field.
In 21st century, NSRD-EPC has participated in constructing nearly 30 sets of 9E units manufactured by GE in China, continuing to break world records made by itself and keeping the world record for 9E installation in 33 days till now.
GE has awarded NSRD the world record frame and established strategic cooperative partnership with NSRD.
9E units recommended by NSRD-EPC has won the bid of Azerbaijan JANUB Project in Oct. 2008
GE has realized the first breakthrough in GT sales order in Azerbaijan.
NSRD GE
www. nspower-epc.com
International Strategic Cooperative Partnership
National Strategic Cooperative Partnership
National engineering enterprises & NSRDStrategic Cooperative Partnership
www. nspower-epc.comwww. nspower-epc.com
Pilot Project
---- SOLIG Power Plant 2X109E---- SOLIG Power Plant 2X109E
www. nspower-epc.comwww. nspower-epc.com
Pilot Project
TONGMING Power Plant 2X109ETONGMING Power Plant 2X109E
www. nspower-epc.comwww. nspower-epc.com
Pilot Project
---- GAOBU Power Plant 2X109E---- GAOBU Power Plant 2X109E
www. nspower-epc.comwww. nspower-epc.com
Pilot Project
---- FOSHAN Power Plant 2X109E---- FOSHAN Power Plant 2X109E
www. nspower-epc.comwww. nspower-epc.com
Pilot Project
---- DONGXING Power Plant 2X109E---- DONGXING Power Plant 2X109E
www. nspower-epc.comwww. nspower-epc.com
Pilot Project
-----BAOCHANG Power Plant 2X109E-----BAOCHANG Power Plant 2X109E
www. nspower-epc.comwww. nspower-epc.com
Pilot Project
----- NEW POWER Power Plant----- NEW POWER Power Plant
www. nspower-epc.comwww. nspower-epc.com
Pilot Project
---- NANSHAN Power Plant---- NANSHAN Power Plant
www. nspower-epc.comwww. nspower-epc.com
Pilot Project
---- Control Room---- Control Room
www. nspower-epc.comwww. nspower-epc.com
Pilot Project
Effect Drawing for Azerbaijan JANUB Project
www. nspower-epc.comwww. nspower-epc.com
---- JANUB project, Azerbaijan---- JANUB project, Azerbaijan
Add: 15F Hantang BuildingAdd: 15F Hantang Building 、、 Huaqiaocheng AreaHuaqiaocheng Area Shenzhen CityShenzhen City 、、 P.R.C.P.R.C.
P.C.P.C. :: 518053518053
TelTel :: +86-755-26948899+86-755-26948899
FaxFax :: +86-755-26948866+86-755-26948866