Page 1: े ीय पारेषण लेखा - srpc.kar.nic.in · 2 403/TT/2014 "Asset 2: 2*500 MVA Transformers alongwith the associated bays at ... 220 kV line bays at Madhugiri for
Page 2: े ीय पारेषण लेखा - srpc.kar.nic.in · 2 403/TT/2014 "Asset 2: 2*500 MVA Transformers alongwith the associated bays at ... 220 kV line bays at Madhugiri for

Southern Regional Power Committee (SRPC) Secretariat - RTA - January-2018 (RTA and RTDA)

भारत सरकार

GOVERNMENT OF INDIA

उजा मंालय

MINISTRY OF POWER

केीय िवुत ाधकरण

CENTRAL ELECTRICITY AUTHORITY

दिण ेीय िवुत सिमित

SOUTHERN REGIONAL POWER COMMITTEE

ेीय पारषेण लेखा

REGIONAL TRANSMISSION ACCOUNT

January 2018

बगलूर

BANGALORE

Page 3: े ीय पारेषण लेखा - srpc.kar.nic.in · 2 403/TT/2014 "Asset 2: 2*500 MVA Transformers alongwith the associated bays at ... 220 kV line bays at Madhugiri for

Southern Regional Power Committee (SRPC) Secretariat - RTA - January-2018 (RTA and RTDA)

1. Details of Transmission Charges towards LToA/MToA

DICApprovedWithdrawal/Injection(MW)

PoCRates(Rs./MW)

PoCCharges

ReliablitySupportCharges(Rs.25899/MW)

HVDC Charges(Rs.14625/MW)

Total Tr.Charges (Rs.)

Andhra Pradesh 1667.013 329532 549334128 43173970 24380065 61,68,88,163Karnatka (BESCOM) 1619.266 329532 533599964 41937370 23681765 59,92,19,099Karnatka (HESCOM) 694.799 329532 228958504 17994599 10161435 25,71,14,538Karnatka (GESCOM) 463.314 329532 152676789 11999369 6775967 17,14,52,125Karnatka (MESCOM) 287.873 329532 94863365 7455623 4210143 10,65,29,131Karnatka (CESCOM) 364.669 329532 120170105 9444562 5333284 13,49,47,951Kerala 1558.083 141740 220842684 40352792 22786964 28,39,82,440Tamil Nadu 5228.615 110441 577453469 135415900 76468494 78,93,37,863Telangana 1585.619 329532 522512200 41065946 23189678 58,67,67,824Puducherry 442.434 79142 35015112 11458598 6470597 5,29,44,307PGCIL(SR) 5.926 -- 1952807 153477 86668 21,92,952Goa(SR) 93.283 79142 7382603 2415936 1364264 1,11,62,803

Total(SR) 3,61,25,39,196tamilnadu(Farakka) 19.305 110441 2132064 499980 282336 29,14,380tamilnadu(Kahalgaon - I) 5.351 110441 590970 138586 78258 8,07,814tamilnadu(Talcher) 8.011 110441 884743 207477 117161 12,09,381tamilnadu(Coastal Energen ) 558 110441 61626078 14451642 8160750 8,42,38,470tamilnadu(ILFS,Tamilnadu) 540 110441 59638140 13985460 7897500 8,15,21,100tamilnadu(KSK mahanadiltd(Chattisgarh)) 500 110441 55220500 12949500 7312500 7,54,82,500

tamilnadu(BalcoLtd,korba,chattisgarh) 100 110441 11044100 2589900 1462500 1,50,96,500

tamilnadu(JindalPower(Chattisgarh)) 400 110441 44176400 10359600 5850000 6,03,86,000

tamilnadu(DBPower(Chattisgarh)) 208 110441 22971728 5386992 3042000 3,14,00,720

tamilnadu(Balco Ltd, Korba,Chattisgarh) 100 110441 11044100 2589900 1462500 1,50,96,500

tamilnadu(DhariwalInfrastructure Ltd, Maharashtra)

100 110441 11044100 2589900 1462500 1,50,96,500

kerala(Maithon Power Ltd-RBTPP) 140.5 141740 19914470 3638810 2054813 2,56,08,093

tamilnadu(IND- BARATHENERGY, ODISHA) 500 110441 55220500 12949500 7312500 7,54,82,500

tamilnadu(GMR(Maharashtra)) 150 110441 16566150 3884850 2193750 2,26,44,750tamilnadu(Adhunik) 100 110441 11044100 2589900 1462500 1,50,96,500karnataka(Mejia(DVC)) 200 329532 65906400 5179800 2925000 7,40,11,200karnataka(Koderma) 250 329532 82383000 6474750 3656250 9,25,14,000kerala(Mejia-DVC) 94.75 141740 13429865 2453930 1385719 1,72,69,514kerala(Raghunathpur) 46.75 141740 6626345 1210778 683719 85,20,842andhrapradesh(AndhraPradesh(KSK Mahanadi PowerCompany Limited))

347 329532 114347604 8986953 5074875 12,84,09,432

andhrapradesh(AndhraPradesh(KSK Mahanadi PowerCompany Limited))

14.5 329532 4778214 375536 212063 53,65,813

sepl(SEPL (Untied Power)) 411 204337 83982507 10644489 6010875 10,06,37,871tpcil(TPCIL (Untied Power)) 55 173038 9517090 1424445 804375 1,17,45,910telangana(TPCIL (Telangana-L_16_03)) 269.45 329532 88792397 6978486 3940706 9,97,11,589

telangana(TPCIL (Telangana-L_16_03TS2)) 570 329532 187833240 14762430 8336250 21,09,31,920

kerala(Jabhua Power Ltd) 109.25 141740 15485095 2829466 1597781 1,99,12,342

Page 4: े ीय पारेषण लेखा - srpc.kar.nic.in · 2 403/TT/2014 "Asset 2: 2*500 MVA Transformers alongwith the associated bays at ... 220 kV line bays at Madhugiri for

Southern Regional Power Committee (SRPC) Secretariat - RTA - January-2018 (RTA and RTDA)

DICApprovedWithdrawal/Injection(MW)

PoCRates(Rs./MW)

PoCCharges

ReliablitySupportCharges(Rs.25899/MW)

HVDC Charges(Rs.14625/MW)

Total Tr.Charges (Rs.)

kerala(Kerala(Jindal Power Ltd,Stage)- LTA) 190 141740 26930600 4920810 2778750 3,46,30,160

andhrapradesh(TPCIL (AndhraPradesh)- LTA) 230.55 329532 75973603 5971014 3371794 8,53,16,411

kerala(MPL (MPL U#2)-KSEB(Maithon Power Ltd-RBTPP)) 140.5 141740 19914470 3638810 2054813 2,56,08,093

telangana(TSSPDCL, Telangana(MARWA Thermal Power Plant)) 1000 329532 329532000 25899000 14625000 37,00,56,000

andhrapradesh(KSK MahanadiPower Company Limited(MToA))

38.5 329532 12686982 997112 563063 1,42,47,157

sgpl(Sembcorp Gayathri PowerLtd) 740 173038 128048120 19165260 10822500 15,80,35,880

mepl(Meenakshi) 550 79142 43528100 14244450 8043750 6,58,16,300kerala(Jindal,Raigarh, Tamnar) 142.5 141740 20197950 3690608 2084063 2,59,72,621kerala(JITPL,Odisha) 95 141740 13465300 2460405 1389375 1,73,15,080kerala(BALCO, Chattisgarh) 95 141740 13465300 2460405 1389375 1,73,15,080kerala(Jabhua Power Ltd) 95 141740 13465300 2460405 1389375 1,73,15,080andhrapradesh(from 12 WRGenerators) 70.35 329532 23182576 1821995 1028869 2,60,33,440

karnataka(South WesternRailways) 35 329532 11533620 906465 511875 1,29,51,960

telangana(from 7 ERgenerators) 45.83 329532 15102452 1186951 670264 1,69,59,667

telangana(from 12 WRgenerators) 70.42 329532 23205643 1823808 1029893 2,60,59,344

kudgi2( NTPC Kudgi 3) 884.49 204337 180734033 22907407 12935666 21,65,77,106coastal(Coastal (SR targetregion)) 262 79142 20735204 6785538 3831750 3,13,52,492

karnataka(karnataka(BESCOM)From 12 WR generators) 5.944 329532 1958738 153944 86931 21,99,613

karnataka(karnataka(MESCOM)From 12 WR generators) 1.05 329532 346009 27194 15356 3,88,559

karnataka(karnataka(CESCOM)From 12 WR generators) 1.315 329532 433335 34057 19232 4,86,624

karnataka(karnataka(HESCOM)From 12 WR generators) 2.402 329532 791536 62209 35129 8,88,874

karnataka(karnataka(GESCOM)From 12 WR generators) 0.647 329532 213207 16757 9462 2,39,426

karnataka(karnataka(BESCOM)From 12 WR generators) 28.529 329532 9401218 738873 417237 1,05,57,328

karnataka(karnataka(MESCOM)From 12 WR generators) 5.041 329532 1661171 130557 73725 18,65,453

karnataka(karnataka(CESCOM)From 12 WR generators) 6.31 329532 2079347 163423 92284 23,35,054

karnataka(karnataka(HESCOM)From 12 WR generators) 11.529 329532 3799174 298590 168612 42,66,376

karnataka(karnataka(GESCOM)From 12 WR generators) 3.108 329532 1024185 80494 45455 11,50,134

karnataka(karnataka(BESCOM)From 12 WR generators) 14.264 329532 4700444 369423 208611 52,78,478

karnataka(karnataka(MESCOM)From 12 WR generators) 2.52 329532 830421 65265 36855 9,32,541

karnataka(karnataka(CESCOM)From 12 WR generators) 3.155 329532 1039673 81711 46142 11,67,526

karnataka(karnataka(HESCOM)From 12 WR generators) 5.764 329532 1899422 149282 84299 21,33,003

karnataka(karnataka(GESCOM)From 12 WR generators) 1.554 329532 512093 40247 22727 5,75,067

karnataka(UPCL) 939 329532 309430548 24319161 13732875 34,74,82,584Total(Others) 2,83,46,20,652

Page 5: े ीय पारेषण लेखा - srpc.kar.nic.in · 2 403/TT/2014 "Asset 2: 2*500 MVA Transformers alongwith the associated bays at ... 220 kV line bays at Madhugiri for

Southern Regional Power Committee (SRPC) Secretariat - RTA - January-2018 (RTA and RTDA)

2. Summary of POWERGRID Bilateral Billing for January, 2018 thatpertains to Southern Region

As per CERC Order in Petition No.155/MP/2016 dated 04-01-2017

Details of Monthly Transmission Charges and the name of beneficiary Discom of bilateralassets of POWERGRID provided by NLDC vide email dated 06.07.2017 are as under (due tonon-availability of upstream/downstream system):

(fig in Rs.)

S.No. Petition No. Name of the AssetsBillingAmount forJanuary,2018

BeneficiaryDISCOM

1 127/TT/2014

"Asset-1: LILO of one circuit ofTuticorin JV-Madurai 400 kV (Quad)line at Tuticorin Pooling Station alongwith new 765 kV pooling station atTuticorin (initially charged at 400 kV)and 1x80 MVAR 400 kV Bus Reactorat Tuticorin Pooling Station, Asset-2:LILO of 2nd circuit of Tuticorin JV-Madurai 400 kV (Quad) line atTuticorin Pooling Station"

7528000.000 IND-BARATH

2 403/TT/2014

"Asset 2: 2*500 MVA Transformersalongwith the associated bays atMadhugiri; Asset 3: 220 kV line baysat Madhugiri for termination of 220kV D/C Madhugiri-Antharasanhalliline; Asset 4: 220 kV line bays atMadhugiri for termination of 220 kVD/C Madhugiri-Madhugiri line; Asset5: 220 kV line bays at Madhugiri fortermination of 220 kv D/C Madhugiri-Nittur line."

5718547.3 BESCOM

1016644.09 MESCOM

1287854.16 CESCOM

2453730.41 HESCOM

1636224.04 GESCOM

Page 6: े ीय पारेषण लेखा - srpc.kar.nic.in · 2 403/TT/2014 "Asset 2: 2*500 MVA Transformers alongwith the associated bays at ... 220 kV line bays at Madhugiri for

Southern Regional Power Committee (SRPC) Secretariat - RTA - January-2018 (RTA and RTDA)

3. Annex-I Entitelment of States From Stations

Entity ANDHRAPRADESH

KARNATAKA KERALA TAMIL

NADUTELANGANA

PUDUCHERRY

PGCILHVDC GOA ORISSA TOTAL

NTPC RSTPS1&2 405.146 386.921 227.536 456.157 320.944 67.577 2.156 93.283 0 1959.72

NTPC RSTPS3 101.853 97.816 57.398 115.551 81.251 17.381 0 0 0 471.25

NTPCTALCHERSTPS 2

218.341 353.018 402.448 455.474 201.107 60.408 3.77 0 190.435 1885

NTPCSIMHADRISTPS 2

251.978 186.722 79.934 199.123 215.217 14.526 0 0 0 947.5

NTPC KudgiSTPS 1 254.147 813.836 68.899 201.871 169.246 0 0 0 0 1508

NTECLVALLUR STPS 82.051 153.532 46.328 989.58 104.359 23.8 0 0 0 1399.65

NLC STAGE IIUNIT 1 42.417 132.327 56.192 168.726 54.681 67.646 0 0 0 521.99

NLC STAGE IIUNIT 2 77.307 177.638 80.302 252.053 96.749 26.969 0 0 0 711.02

NLC STAGE 1EXP 0 99.369 61.902 207.926 0 15.103 0 0 0 384.3

NLC STAGE 2EXP 0 116.37 72.54 243.36 0 17.73 0 0 0 450

NTPL 113.375 200.897 67.247 384.387 145.212 26.382 0 0 0 937.5NPCIL, MAPSKALPAKKAM 16.461 33.493 20.596 295.56 20.445 7.246 0 0 0 393.8

NPCIL,KAIGA1&2 50.308 124.316 34.024 104.6 63.225 17.327 0 0 0 393.8

NPCIL,KAIGA3 & 4 53.629 134.187 31.307 92.07 67.084 15.522 0 0 0 393.8

NPCIL,KKNPP 0 215.717 128.803 543.55 0 33.93 0 0 0 922NPCIL,KKNPPUNIT #2 0 203.762 122.626 518.625 46.1 30.887 0 0 0 922

* As per CERC Order in Petition No: 291/MP/2015 dated 30-03-2017, Simhadri Stage 1 Entitlement ofAndhra Pradesh and Telangana are not shown, as the transmission charges i.r.o AP share and TS shareare zero.

4 . Details of Regional Tranmsission Deviation

Page 7: े ीय पारेषण लेखा - srpc.kar.nic.in · 2 403/TT/2014 "Asset 2: 2*500 MVA Transformers alongwith the associated bays at ... 220 kV line bays at Madhugiri for

Southern Regional Power Committee (SRPC) Secretariat - RTA - January-2018 (RTA and RTDA)

Entity Tranmission Deviation Charges Payable (Rs)Andhra Pradesh 17,88,795Karnataka 19,58,089Kerala 16,09,681Tamil Nadu 78,54,413Telangana 8,97,821Puducherry 3,04,371PGCIL(SR) 5,326Goa(SR) 5,99,947NTPC,RSTPS 1& 2 0NTPC, RSTPS 3 2,81,324NTPC, TALCHER 2 0NTPC, SIMHADRI 2 0NTPC, SIMHADRI 1 0NTPC, KUDGI UNIT 1 3,85,052NTECL, VALLUR 0NLC Stage 2 UNIT 1 0NLC Stage2 UNIT 2 0NLC Stage 1 EXPN 0NLC Stage 2 EXPN 24,234NTPL 0NPCIL,KGS 1 & 2 0NPCIL, KGS 3 & 4 0NPCIL, MAPS 0NPCIL, KKNPP 0NPCIL, KKNPP UNIT #2 0

SellerLKPPL STAGE 2 1,80,875LKPPL STAGE 3 1,11,408MEPL 10,42,557SEL 2,70,671TPCIL 6,48,377COASTAL ENERGEN 1,50,692IL&FS 2,79,429SGPL Unit-1 4,87,897

InfirmNTPC,KUDGI Unit 2 (INFIRM) 0NTPC,KUDGI Unit 3 (INFIRM) 8,89,769NNTPP (INFIRM) 44,050MEPL 2 (INFIRM) 0

Page 8: े ीय पारेषण लेखा - srpc.kar.nic.in · 2 403/TT/2014 "Asset 2: 2*500 MVA Transformers alongwith the associated bays at ... 220 kV line bays at Madhugiri for

Southern Regional Power Committee (SRPC) Secretariat - RTA - January-2018 (RTA and RTDA)

4 (a). Details of Deviation Entity Wise in MWHr.

EntityInjectionRateRs/Mwhr

WithdrawalRateRs/Mwhr

ExcessInjectionupto120%

ExcessWithdrawalupto 120%

ExcessInjectionAbove120%(@1.25times)

ExcessWithdrawalAbove120%(@1.25times)

Charges For ExcessInjection/Withdrawalupto 120%

Charges For ExcessInjection/WithdrawalAbove 120%

BeneficiariesANDHRAPRADESH 71.8 282.1 0 4268.72 0 14.91 1204206 5258

KARNATAKA 282.1 282.1 0 951.15 0 0 268319 0KERALA 36.7 141.9 0 3717.8 0 0 527556 0TAMIL NADU 247 106.8 0 49427.16 0 0 5278821 0TELANGANA 71.8 282.1 0 741.54 0 0 209188 0PUDUCHERRY 36.7 71.8 0 637.24 0 0 45754 0PGCIL(SR) 282.1 282.1 0 0 0 0 0 0GOA(SR) 36.7 106.8 0 4306.87 0 1048.49 459974 139973

Inter State Generating StationsRSTPS 1& 2 71.8 282.1 0 0 0 0 0 0RSTPS 3 71.8 282.1 1113.56 0 0 797.8 79954 281324TALCHER 2 317.1 282.1 8398.19 0 0 0 2663066 0SIMHADRI 2 71.8 282.1 773.64 0 0 0 55547 0* SIMHADRI 1 71.8 282.1 223.33 0 0 0 16035 0* For Simhadri Stage I, charge for excess injection/Withdrawal above 120 % is not booked under beneficiaries, it isfor GeneratorKUDGI Unit 1 106.8 282.1 5.82 0 0 1091.96 622 385052NTECL 71.8 106.8 0 0 0 0 0 0NLC 2 UNIT 1 71.8 106.8 878.58 0 0 0 63082 0NLC 2 UNIT 2 71.8 106.8 839 0 0 0 60240 0NLC 1 EXPN 71.8 106.8 2893.98 0 0 0 207788 0NLC 2 EXPN 71.8 106.8 0 0 0 181.53 0 24234NTPL 141.9 106.8 14.82 0 0 0 2103 0MAPS 247 106.8 66.83 0 0 0 16507 0KAPS 1&2 106.8 282.1 8178.69 0 0 0 873484 0KAPS3&4 106.8 282.1 7872.47 0 0 0 840780 0KKNPP 106.8 106.8 6680.21 0 0 0 713446 0KKNPP UNIT2 106.8 106.8 14717.37 0 0 0 1571815 0

SELLERCOASTALENERGEN 106.8 106.8 1410.97 0 0 0 150692 0

MEPL 36.7 282.1 0 0 0 2956.56 0 1042557SEPL 36.7 282.1 0 0 0 767.59 0 270671TPCIL 176.9 282.1 3665.22 0 0 0 648377 0LKPPL 71.8 282.1 0 0 0 512.94 0 180875LKPPL3 71.8 282.1 0 0 0 315.94 0 111408IL&FS 106.8 106.8 1273.4 0 67.47 1006.91 135999 143430SGPL Unit-1 176.9 282.1 2660.65 0 77.91 0 470669 17228

Generating Station Under INFIRM StageCharges For

Excess InjectionCharges For

Excess WithdrawalNTPC,KUDGIUnit 2 106.8 -282.1 0 0 0 0 0 0

NTPC,KUDGIUnit 3 106.8 -282.1 0 0 0 -2523.273 0 889769

NNTPP 247 -106.8 0 0 0.283 -329.313 87 43963MEPL 2 36.7 -282.1 0 0 0 0 0 0

Page 9: े ीय पारेषण लेखा - srpc.kar.nic.in · 2 403/TT/2014 "Asset 2: 2*500 MVA Transformers alongwith the associated bays at ... 220 kV line bays at Madhugiri for

Southern Regional Power Committee (SRPC) Secretariat - RTA - January-2018 (RTA and RTDA)

4 (b) . Apportioning Long Term Deviation charges on ItsBeneificary

Entity ANDHRAPRADESH

KARNATAKA KERALA TAMIL

NADUTELANGANA

PUDUCHERRY

PGCILHVDC GOA

NTPC RSTPS1&2 0 0 0 0 0 0 0 0

NTPC RSTPS3 17281 16596 9738 19605 13785 2949 0 0

NTPCTALCHER 2 308465 498732 568565 643478 284117 85342 5326 0

NTPCSIMHADRI 2 14772 10947 4686 11674 12617 852 0 0

NTPCSIMHADRI 1 0 0 0 0 0 0 0 0

NTPCKUDGI UNIT1

105 336 28 83 70 0 0 0

NTECLVALLUR 0 0 0 0 0 0 0 0

NLC 2 UNIT1 5126 15992 6791 20390 6608 8175 0 0

NLC 2 UNIT2 6550 15050 6803 21355 8197 2285 0 0

NLC 1 EXP 0 53728 33470 112424 0 8166 0 0NLC 2 EXP 0 0 0 0 0 0 0 0NTPL 254 451 151 862 326 59 0 0MAPS 690 1404 863 12389 857 304 0 0KAPS 1& 2 111588 275744 75469 232012 140238 38433 0 0KAPS 3&4 114500 286496 66842 196574 143227 33141 0 0KKNPP 0 166923 99668 420600 0 26255 0 0KKNPP UNIT2 0 347371 209051 884146 78591 52656 0 0

TOTAL 579331 1689770 1082125 2575592 688633 258617 5326 0

Page 10: े ीय पारेषण लेखा - srpc.kar.nic.in · 2 403/TT/2014 "Asset 2: 2*500 MVA Transformers alongwith the associated bays at ... 220 kV line bays at Madhugiri for

Southern Regional Power Committee (SRPC) Secretariat - RTA - February-2018 (RTA and RTDA)

भारत सरकार

GOVERNMENT OF INDIA

उजा मंालय

MINISTRY OF POWER

केीय िवुत ाधकरण

CENTRAL ELECTRICITY AUTHORITY

दिण ेीय िवुत सिमित

SOUTHERN REGIONAL POWER COMMITTEE

ेीय पारषेण लेखा

REGIONAL TRANSMISSION ACCOUNT

February 2018

बगलूर

BANGALORE

Page 11: े ीय पारेषण लेखा - srpc.kar.nic.in · 2 403/TT/2014 "Asset 2: 2*500 MVA Transformers alongwith the associated bays at ... 220 kV line bays at Madhugiri for

Southern Regional Power Committee (SRPC) Secretariat - RTA - February-2018 (RTA and RTDA)

1. Details of Transmission Charges towards LToA/MToA

DICApprovedWithdrawal/Injection(MW)

PoCRates(Rs./MW)

PoCCharges

ReliablitySupportCharges(Rs.25899/MW)

HVDC Charges(Rs.14625/MW)

Total Tr.Charges (Rs.)

Andhra Pradesh 1653.963 329532 545033735 42835988 24189209 61,20,58,932Karnatka (BESCOM) 1609.087 329532 530245657 41673744 23532897 59,54,52,298Karnatka (HESCOM) 690.431 329532 227519108 17881472 10097553 25,54,98,133Karnatka (GESCOM) 460.401 329532 151716862 11923925 6733365 17,03,74,152Karnatka (MESCOM) 286.064 329532 94267242 7408772 4183686 10,58,59,700Karnatka (CESCOM) 362.377 329532 119414818 9385202 5299764 13,40,99,784Kerala 1565.697 141740 221921893 40549987 22898319 28,53,70,199Tamil Nadu 5226.567 110441 577227286 135362859 76438542 78,90,28,687Telangana 1594.184 329532 525334642 41287771 23314941 58,99,37,354Puducherry 443.276 79142 35081749 11480405 6482912 5,30,45,066PGCIL(SR) 5.926 -- 1952807 153477 86668 21,92,952Goa(SR) 93.283 79142 7382603 2415936 1364264 1,11,62,803

Total(SR) 3,60,40,80,060tamilnadu(Farakka) 19.305 110441 2132064 499980 282336 29,14,380tamilnadu(Kahalgaon - I) 5.351 110441 590970 138586 78258 8,07,814tamilnadu(Talcher) 8.011 110441 884743 207477 117161 12,09,381tamilnadu(Coastal Energen ) 558 110441 61626078 14451642 8160750 8,42,38,470tamilnadu(ILFS,Tamilnadu) 540 110441 59638140 13985460 7897500 8,15,21,100tamilnadu(KSK mahanadiltd(Chattisgarh)) 500 110441 55220500 12949500 7312500 7,54,82,500

tamilnadu(BalcoLtd,korba,chattisgarh) 100 110441 11044100 2589900 1462500 1,50,96,500

tamilnadu(JindalPower(Chattisgarh)) 400 110441 44176400 10359600 5850000 6,03,86,000

tamilnadu(DBPower(Chattisgarh)) 208 110441 22971728 5386992 3042000 3,14,00,720

tamilnadu(Balco Ltd, Korba,Chattisgarh) 100 110441 11044100 2589900 1462500 1,50,96,500

tamilnadu(DhariwalInfrastructure Ltd, Maharashtra)

100 110441 11044100 2589900 1462500 1,50,96,500

kerala(Maithon Power Ltd-RBTPP) 140.5 141740 19914470 3638810 2054813 2,56,08,093

tamilnadu(IND- BARATHENERGY, ODISHA) 500 110441 55220500 12949500 7312500 7,54,82,500

tamilnadu(GMR(Maharashtra)) 150 110441 16566150 3884850 2193750 2,26,44,750tamilnadu(Adhunik) 100 110441 11044100 2589900 1462500 1,50,96,500karnataka(Mejia(DVC)) 200 329532 65906400 5179800 2925000 7,40,11,200karnataka(Koderma) 250 329532 82383000 6474750 3656250 9,25,14,000kerala(Mejia-DVC) 94.75 141740 13429865 2453930 1385719 1,72,69,514kerala(Raghunathpur) 46.75 141740 6626345 1210778 683719 85,20,842andhrapradesh(AndhraPradesh(KSK Mahanadi PowerCompany Limited))

347 329532 114347604 8986953 5074875 12,84,09,432

andhrapradesh(AndhraPradesh(KSK Mahanadi PowerCompany Limited))

14.5 329532 4778214 375536 212063 53,65,813

sepl(SEPL (Untied Power)) 411 204337 83982507 10644489 6010875 10,06,37,871tpcil(TPCIL (Untied Power)) 55 173038 9517090 1424445 804375 1,17,45,910telangana(TPCIL (Telangana-L_16_03)) 269.45 329532 88792397 6978486 3940706 9,97,11,589

telangana(TPCIL (Telangana-L_16_03TS2)) 570 329532 187833240 14762430 8336250 21,09,31,920

kerala(Jabhua Power Ltd) 109.25 141740 15485095 2829466 1597781 1,99,12,342

Page 12: े ीय पारेषण लेखा - srpc.kar.nic.in · 2 403/TT/2014 "Asset 2: 2*500 MVA Transformers alongwith the associated bays at ... 220 kV line bays at Madhugiri for

Southern Regional Power Committee (SRPC) Secretariat - RTA - February-2018 (RTA and RTDA)

DICApprovedWithdrawal/Injection(MW)

PoCRates(Rs./MW)

PoCCharges

ReliablitySupportCharges(Rs.25899/MW)

HVDC Charges(Rs.14625/MW)

Total Tr.Charges (Rs.)

kerala(Kerala(Jindal Power Ltd,Stage)- LTA) 190 141740 26930600 4920810 2778750 3,46,30,160

andhrapradesh(TPCIL (AndhraPradesh)- LTA) 230.55 329532 75973603 5971014 3371794 8,53,16,411

kerala(MPL (MPL U#2)-KSEB(Maithon Power Ltd-RBTPP)) 140.5 141740 19914470 3638810 2054813 2,56,08,093

telangana(TSSPDCL, Telangana(MARWA Thermal Power Plant)) 1000 329532 329532000 25899000 14625000 37,00,56,000

andhrapradesh(KSK MahanadiPower Company Limited(MToA))

38.5 329532 12686982 997112 563063 1,42,47,157

sgpl(Sembcorp Gayathri PowerLtd) 740 173038 128048120 19165260 10822500 15,80,35,880

mepl(Meenakshi) 550 79142 43528100 14244450 8043750 6,58,16,300kerala(Jindal,Raigarh, Tamnar) 142.5 141740 20197950 3690608 2084063 2,59,72,621kerala(JITPL,Odisha) 95 141740 13465300 2460405 1389375 1,73,15,080kerala(BALCO, Chattisgarh) 95 141740 13465300 2460405 1389375 1,73,15,080kerala(Jabhua Power Ltd) 95 141740 13465300 2460405 1389375 1,73,15,080andhrapradesh(from 12 WRGenerators) 70.35 329532 23182576 1821995 1028869 2,60,33,440

karnataka(South WesternRailways) 35 329532 11533620 906465 511875 1,29,51,960

telangana(from 7 ERgenerators) 45.83 329532 15102452 1186951 670264 1,69,59,667

telangana(from 12 WRgenerators) 2.515 329532 828773 65136 36782 9,30,691

kudgi2( NTPC Kudgi 3) 884.49 204337 180734033 22907407 12935666 21,65,77,106coastal(Coastal (SR targetregion)) 262 79142 20735204 6785538 3831750 3,13,52,492

karnataka(karnataka(BESCOM)From 12 WR generators) 7.897 329532 2602314 204524 115494 29,22,332

karnataka(karnataka(MESCOM)From 12 WR generators) 1.395 329532 459697 36129 20402 5,16,228

karnataka(karnataka(CESCOM)From 12 WR generators) 1.747 329532 575692 45246 25550 6,46,488

karnataka(karnataka(HESCOM)From 12 WR generators) 3.191 329532 1051537 82644 46668 11,80,849

karnataka(karnataka(GESCOM)From 12 WR generators) 0.86 329532 283398 22273 12578 3,18,249

karnataka(karnataka BESCOM(From 12 WR Generators)) 114.057 329532 37585431 2953962 1668084 4,22,07,477

karnataka(karnataka MESCOM(From 12 WR Generators)) 20.151 329532 6640399 521891 294708 74,56,998

karnataka(karnataka CESCOM(From 12 WR Generators)) 25.227 329532 8313104 653354 368945 93,35,403

karnataka(karnataka HESCOM(From 12 WR Generators)) 46.091 329532 15188459 1193711 674081 1,70,56,251

karnataka(karnataka GESCOM(From 12 WR Generators)) 12.424 329532 4094106 321769 181701 45,97,576

telangana(From 12 WRGenerators) 26.825 329532 8839696 694741 392316 99,26,753

telangana(From 12 WRGenerators) 74.108 329532 24420957 1919323 1083830 2,74,24,110

karnataka(UPCL) 939 329532 309430548 24319161 13732875 34,74,82,584Total(Others) 2,89,86,16,657

Page 13: े ीय पारेषण लेखा - srpc.kar.nic.in · 2 403/TT/2014 "Asset 2: 2*500 MVA Transformers alongwith the associated bays at ... 220 kV line bays at Madhugiri for

Southern Regional Power Committee (SRPC) Secretariat - RTA - February-2018 (RTA and RTDA)

2. Summary of POWERGRID Bilateral Billing for February, 2018 thatpertains to Southern Region

As per CERC Order in Petition No.155/MP/2016 dated 04-01-2017

Details of Monthly Transmission Charges and the name of beneficiary Discom of bilateralassets of POWERGRID provided by NLDC vide email dated 06.07.2017 are as under (due tonon-availability of upstream/downstream system):

(fig in Rs.)

S.No. Petition No. Name of the AssetsBillingAmount forFebruary,2018

BeneficiaryDISCOM

1 127/TT/2014

Asset-1: LILO of one circuit ofTuticorin JV-Madurai 400 kV (Quad)line at Tuticorin Pooling Station alongwith new 765 kV pooling station atTuticorin (initially charged at 400 kV)and 1x80 MVAR 400 kV Bus Reactorat Tuticorin Pooling Station, Asset-2:LILO of 2nd circuit of Tuticorin JV-Madurai 400 kV (Quad) line atTuticorin Pooling Station

6799000.000 IND-BARATH

2 403/TT/2014

Asset 2: 2*500 MVA Transformersalongwith the associated bays atMadhugiri; Asset 3: 220 kV line baysat Madhugiri for termination of 220kV D/C Madhugiri-Antharasanhalliline; Asset 4: 220 kV line bays atMadhugiri for termination of 220 kVD/C Madhugiri-Madhugiri line; Asset5: 220 kV line bays at Madhugiri fortermination of 220 kv D/C Madhugiri-Nittur line.

5165246.1 BESCOM

918278.13 MESCOM

1163247.12 CESCOM

2216318.37 HESCOM

1477910.28 GESCOM

Page 14: े ीय पारेषण लेखा - srpc.kar.nic.in · 2 403/TT/2014 "Asset 2: 2*500 MVA Transformers alongwith the associated bays at ... 220 kV line bays at Madhugiri for

Southern Regional Power Committee (SRPC) Secretariat - RTA - February-2018 (RTA and RTDA)

3. Annex-I Entitelment of States From Stations

Entity ANDHRAPRADESH

KARNATAKA KERALA TAMIL

NADUTELANGANA

PUDUCHERRY

PGCILHVDC GOA ORISSA TOTAL

NTPC RSTPS1&2 405.691 386.165 228.569 456.153 320.13 67.573 2.156 93.283 0 1959.72

NTPC RSTPS3 101.619 97.808 57.139 115.551 81.752 17.381 0 0 0 471.25

NTPCTALCHERSTPS 2

206.897 347.626 402.387 452.815 201.645 59.789 3.77 0 210.071 1885

NTPCSIMHADRISTPS 2

250.947 186.556 80.54 197.965 217.007 14.484 0 0 0 947.5

NTPC KudgiSTPS 1 254.55 803.253 71.87 208.228 170.098 0 0 0 0 1508

NTECLVALLUR STPS 81.991 153.089 46.596 989.666 104.125 24.183 0 0 0 1399.65

NLC STAGE IIUNIT 1 42.378 131.229 56.734 167.858 55.738 68.054 0 0 0 521.99

NLC STAGE IIUNIT 2 77.335 176.617 80.99 250.402 98.677 26.998 0 0 0 711.02

NLC STAGE 1EXP 0 99.377 61.946 207.834 0 15.143 0 0 0 384.3

NLC STAGE 2EXP 0 116.37 72.54 243.36 0 17.73 0 0 0 450

NTPL 112.158 198.795 69.03 382.33 148.159 27.029 0 0 0 937.5NPCIL, MAPSKALPAKKAM 16.461 33.493 20.596 295.56 20.445 7.246 0 0 0 393.8

NPCIL,KAIGA1&2 50.308 124.316 34.024 104.6 63.225 17.327 0 0 0 393.8

NPCIL,KAIGA3 & 4 53.629 134.187 31.307 92.07 67.084 15.522 0 0 0 393.8

NPCIL,KKNPP 0 215.717 128.803 543.55 0 33.93 0 0 0 922NPCIL,KKNPPUNIT #2 0 203.762 122.626 518.625 46.1 30.887 0 0 0 922

* As per CERC Order in Petition No: 291/MP/2015 dated 30-03-2017, Simhadri Stage 1 Entitlement ofAndhra Pradesh and Telangana are not shown, as the transmission charges i.r.o AP share and TS shareare zero.

4 . Details of Regional Tranmsission Deviation

Page 15: े ीय पारेषण लेखा - srpc.kar.nic.in · 2 403/TT/2014 "Asset 2: 2*500 MVA Transformers alongwith the associated bays at ... 220 kV line bays at Madhugiri for

Southern Regional Power Committee (SRPC) Secretariat - RTA - February-2018 (RTA and RTDA)

Entity Tranmission Deviation Charges Payable (Rs)Andhra Pradesh 15,81,392Karnataka 24,56,221Kerala 18,04,433Tamil Nadu 1,02,92,015Telangana 9,79,042Puducherry 3,15,443PGCIL(SR) 5,421Goa(SR) 2,01,295NTPC,RSTPS 1& 2 0NTPC, RSTPS 3 0NTPC, TALCHER 2 0NTPC, SIMHADRI 2 0NTPC, SIMHADRI 1 0NTPC, KUDGI UNIT 1 62,855NTECL, VALLUR 0NLC Stage 2 UNIT 1 0NLC Stage2 UNIT 2 0NLC Stage 1 EXPN 0NLC Stage 2 EXPN 0NTPL 0NPCIL,KGS 1 & 2 0NPCIL, KGS 3 & 4 0NPCIL, MAPS 0NPCIL, KKNPP 0NPCIL, KKNPP UNIT #2 12,33,795

SellerLKPPL STAGE 2 2,38,375LKPPL STAGE 3 0MEPL 9,34,947SEL 2,26,211TPCIL 11,02,901COASTAL ENERGEN 73,560IL&FS 2,59,603SGPL Unit-1 2,97,371

InfirmNTPC,KUDGI Unit 2 (INFIRM) 0NTPC,KUDGI Unit 3 (INFIRM) 20,76,628NNTPP (INFIRM) 51,914MEPL 2 (INFIRM) 8,04,827

Page 16: े ीय पारेषण लेखा - srpc.kar.nic.in · 2 403/TT/2014 "Asset 2: 2*500 MVA Transformers alongwith the associated bays at ... 220 kV line bays at Madhugiri for

Southern Regional Power Committee (SRPC) Secretariat - RTA - February-2018 (RTA and RTDA)

4 (a). Details of Deviation Entity Wise in MWHr.

EntityInjectionRateRs/Mwhr

WithdrawalRateRs/Mwhr

ExcessInjectionupto120%

ExcessWithdrawalupto 120%

ExcessInjectionAbove120%(@1.25times)

ExcessWithdrawalAbove120%(@1.25times)

Charges For ExcessInjection/Withdrawalupto 120%

Charges For ExcessInjection/WithdrawalAbove 120%

BeneficiariesANDHRAPRADESH 71.8 282.1 0 3505.22 0 8.35 988823 2944

KARNATAKA 282.1 282.1 0 2763.46 0 0 779572 0KERALA 36.7 141.9 0 5264.18 0 0 746987 0TAMIL NADU 247 106.8 0 73585.55 0 0 7858937 0TELANGANA 71.8 282.1 0 1031.49 0 0 290983 0PUDUCHERRY 36.7 71.8 0 850.28 0 0.32 61050 29PGCIL(SR) 282.1 282.1 0 0 0 0 0 0GOA(SR) 36.7 106.8 0 1731.59 0 96.48 184934 12880

Inter State Generating StationsRSTPS 1& 2 71.8 282.1 1018.45 0 0 0 73125 0RSTPS 3 71.8 282.1 894.75 0 0 0 64243 0TALCHER 2 317.1 282.1 8421.9 0 0 0 2670584 0SIMHADRI 2 71.8 282.1 353.58 0 0 0 25387 0* SIMHADRI 1 71.8 282.1 314.78 0 0 0 22601 0* For Simhadri Stage I, charge for excess injection/Withdrawal above 120 % is not booked under beneficiaries, it isfor GeneratorKUDGI Unit 1 106.8 282.1 0 0 0 178.25 0 62855NTECL 71.8 106.8 0 0 0 0 0 0NLC 2 UNIT 1 71.8 106.8 821.16 0 0 0 58959 0NLC 2 UNIT 2 71.8 106.8 1167.14 0 0 0 83801 0NLC 1 EXPN 71.8 106.8 2093.12 0 0 0 150286 0NLC 2 EXPN 71.8 106.8 0 0 0 0 0 0NTPL 141.9 106.8 6.46 0 0 0 917 0MAPS 247 106.8 0 0 0 0 0 0KAPS 1&2 106.8 282.1 6204.52 0 0 0 662643 0KAPS3&4 106.8 282.1 11146.76 0 0 0 1190474 0KKNPP 106.8 106.8 10308.38 0 0 0 1100935 0KKNPP UNIT2 106.8 106.8 8655.31 0 0 9241.91 924387 1233795

SELLERCOASTALENERGEN 106.8 106.8 688.76 0 0 0 73560 0

MEPL 36.7 282.1 0 1.15 0.32 2650.43 324 934623SEPL 36.7 282.1 0 0 0.44 641.45 0 226211TPCIL 176.9 282.1 3302.52 0 67.75 1428.44 584216 518685LKPPL 71.8 282.1 0 0 0 676 0 238375LKPPL3 71.8 282.1 0 0 0 0 0 0IL&FS 106.8 106.8 2430.74 0 0 0 259603 0SGPL Unit-1 176.9 282.1 1681.01 0 0 0 297371 0

Generating Station Under INFIRM StageCharges For

Excess InjectionCharges For

Excess WithdrawalNTPC,KUDGIUnit 2 106.8 -282.1 0 0 0 0 0 0

NTPC,KUDGIUnit 3 106.8 -282.1 0 0 4469.418 -4196.982 596667 1479961

NNTPP 247 -106.8 0 0 4.589 -378.257 1417 50497MEPL 2 36.7 -282.1 0 0 297.559 -2243.676 13651 791176

Page 17: े ीय पारेषण लेखा - srpc.kar.nic.in · 2 403/TT/2014 "Asset 2: 2*500 MVA Transformers alongwith the associated bays at ... 220 kV line bays at Madhugiri for

Southern Regional Power Committee (SRPC) Secretariat - RTA - February-2018 (RTA and RTDA)

4 (b) . Apportioning Long Term Deviation charges on ItsBeneificary

Entity ANDHRAPRADESH

KARNATAKA KERALA TAMIL

NADUTELANGANA

PUDUCHERRY

PGCILHVDC GOA

NTPC RSTPS1&2 15138 14409 8529 17021 11945 2521 80 3481

NTPC RSTPS3 13853 13334 7789 15752 11145 2369 0 0

NTPCTALCHER 2 293122 492501 570084 641529 285681 84707 5341 0

NTPCSIMHADRI 2 6724 4999 2158 5304 5814 388 0 0

NTPCSIMHADRI 1 0 0 0 0 0 0 0 0

NTPCKUDGI UNIT1

0 0 0 0 0 0 0 0

NTECLVALLUR 0 0 0 0 0 0 0 0

NLC 2 UNIT1 4787 14822 6408 18960 6296 7687 0 0

NLC 2 UNIT2 9115 20816 9546 29513 11630 3182 0 0

NLC 1 EXP 0 38863 24225 81277 0 5922 0 0NLC 2 EXP 0 0 0 0 0 0 0 0NTPL 110 194 68 374 145 26 0 0MAPS 0 0 0 0 0 0 0 0KAPS 1& 2 84653 209185 57252 176009 106387 29156 0 0KAPS 3&4 162123 405654 94643 278333 202797 46925 0 0KKNPP 0 257582 153801 649038 0 40514 0 0KKNPPUNIT 2 0 204290 122943 519968 46219 30967 0 0

TOTAL 589625 1676649 1057446 2433078 688059 254364 5421 3481

Page 18: े ीय पारेषण लेखा - srpc.kar.nic.in · 2 403/TT/2014 "Asset 2: 2*500 MVA Transformers alongwith the associated bays at ... 220 kV line bays at Madhugiri for

Southern Regional Power Committee (SRPC) Secretariat - RTA - March-2018 (RTA and RTDA)

भारत सरकार

GOVERNMENT OF INDIA

उजा मंालय

MINISTRY OF POWER

केीय िवुत ाधकरण

CENTRAL ELECTRICITY AUTHORITY

दिण ेीय िवुत सिमित

SOUTHERN REGIONAL POWER COMMITTEE

ेीय पारषेण लेखा

REGIONAL TRANSMISSION ACCOUNT

March 2018

बगलूर

BANGALORE

Page 19: े ीय पारेषण लेखा - srpc.kar.nic.in · 2 403/TT/2014 "Asset 2: 2*500 MVA Transformers alongwith the associated bays at ... 220 kV line bays at Madhugiri for

Southern Regional Power Committee (SRPC) Secretariat - RTA - March-2018 (RTA and RTDA)

1. Details of Transmission Charges towards LToA/MToA

DICApprovedWithdrawal/Injection(MW)

PoCRates(Rs./MW)

PoCCharges

ReliablitySupportCharges(Rs.25899/MW)

HVDC Charges(Rs.14625/MW)

Total Tr.Charges (Rs.)

Andhra Pradesh 1636.673 329532 539336127 42388194 23936343 60,56,60,664Karnatka (BESCOM) 1609.733 329532 530458535 41690475 23542345 59,56,91,355Karnatka (HESCOM) 690.709 329532 227610718 17888672 10101619 25,56,01,009Karnatka (GESCOM) 460.586 329532 151777826 11928717 6736070 17,04,42,613Karnatka (MESCOM) 286.178 329532 94304809 7411724 4185353 10,59,01,886Karnatka (CESCOM) 362.522 329532 119462600 9388957 5301884 13,41,53,441Kerala 1575.733 141740 223344395 40809909 23045095 28,71,99,399Tamil Nadu 5240.672 110441 578785056 135728164 76644828 79,11,58,048Telangana 1599.649 329532 527135534 41429309 23394867 59,19,59,710Puducherry 442.748 79142 35039962 11466730 6475190 5,29,81,882PGCIL(SR) 5.926 -- 1952807 153477 86668 21,92,952Goa(SR) 93.283 79142 7382603 2415936 1364264 1,11,62,803

Total(SR) 3,60,41,05,762tamilnadu(Farakka) 19.305 110441 2132064 499980 282336 29,14,380tamilnadu(Kahalgaon - I) 5.351 110441 590970 138586 78258 8,07,814tamilnadu(Talcher) 8.011 110441 884743 207477 117161 12,09,381tamilnadu(Coastal Energen ) 558 110441 61626078 14451642 8160750 8,42,38,470tamilnadu(ILFS,Tamilnadu) 540 110441 59638140 13985460 7897500 8,15,21,100tamilnadu(KSK mahanadiltd(Chattisgarh)) 500 110441 55220500 12949500 7312500 7,54,82,500

tamilnadu(BalcoLtd,korba,chattisgarh) 100 110441 11044100 2589900 1462500 1,50,96,500

tamilnadu(JindalPower(Chattisgarh)) 400 110441 44176400 10359600 5850000 6,03,86,000

tamilnadu(DBPower(Chattisgarh)) 208 110441 22971728 5386992 3042000 3,14,00,720

tamilnadu(Balco Ltd, Korba,Chattisgarh) 100 110441 11044100 2589900 1462500 1,50,96,500

tamilnadu(DhariwalInfrastructure Ltd,Maharashtra )

100 110441 11044100 2589900 1462500 1,50,96,500

kerala(Maithon Power Ltd-RBTPP) 140.5 141740 19914470 3638810 2054813 2,56,08,093

tamilnadu(IND- BARATHENERGY, ODISHA) 500 110441 55220500 12949500 7312500 7,54,82,500

tamilnadu(GMR(Maharashtra)) 150 110441 16566150 3884850 2193750 2,26,44,750tamilnadu(Adhunik) 100 110441 11044100 2589900 1462500 1,50,96,500karnataka(Mejia(DVC)) 200 329532 65906400 5179800 2925000 7,40,11,200karnataka(Koderma) 250 329532 82383000 6474750 3656250 9,25,14,000kerala(Mejia-DVC) 94.75 141740 13429865 2453930 1385719 1,72,69,514kerala(Raghunathpur) 46.75 141740 6626345 1210778 683719 85,20,842andhrapradesh(AndhraPradesh(KSK Mahanadi PowerCompany Limited))

347 329532 114347604 8986953 5074875 12,84,09,432

andhrapradesh(AndhraPradesh(KSK Mahanadi PowerCompany Limited))

14.5 329532 4778214 375536 212063 53,65,813

sepl(SEPL (Untied Power)) 411 204337 83982507 10644489 6010875 10,06,37,871tpcil(TPCIL (Untied Power)) 55 173038 9517090 1424445 804375 1,17,45,910telangana(TPCIL (Telangana-L_16_03)) 269.45 329532 88792397 6978486 3940706 9,97,11,589

telangana(TPCIL (Telangana-L_16_03TS2)) 570 329532 187833240 14762430 8336250 21,09,31,920

kerala(Jabhua Power Ltd) 109.25 141740 15485095 2829466 1597781 1,99,12,342

Page 20: े ीय पारेषण लेखा - srpc.kar.nic.in · 2 403/TT/2014 "Asset 2: 2*500 MVA Transformers alongwith the associated bays at ... 220 kV line bays at Madhugiri for

Southern Regional Power Committee (SRPC) Secretariat - RTA - March-2018 (RTA and RTDA)

DICApprovedWithdrawal/Injection(MW)

PoCRates(Rs./MW)

PoCCharges

ReliablitySupportCharges(Rs.25899/MW)

HVDC Charges(Rs.14625/MW)

Total Tr.Charges (Rs.)

kerala(Kerala(Jindal PowerLtd, Stage)- LTA) 190 141740 26930600 4920810 2778750 3,46,30,160

andhrapradesh(TPCIL (AndhraPradesh)- LTA) 230.55 329532 75973603 5971014 3371794 8,53,16,411

kerala(MPL (MPL U#2)-KSEB(Maithon Power Ltd-RBTPP)) 140.5 141740 19914470 3638810 2054813 2,56,08,093

telangana(TSSPDCL,Telangana (MARWA ThermalPower Plant))

1000 329532 329532000 25899000 14625000 37,00,56,000

andhrapradesh(KSK MahanadiPower Company Limited(MToA))

38.5 329532 12686982 997112 563063 1,42,47,157

sgpl(Sembcorp GayathriPower Ltd) 740 173038 128048120 19165260 10822500 15,80,35,880

mepl(Meenakshi) 550 79142 43528100 14244450 8043750 6,58,16,300kerala(Jindal,Raigarh, Tamnar) 142.5 141740 20197950 3690608 2084063 2,59,72,621kerala(JITPL,Odisha) 95 141740 13465300 2460405 1389375 1,73,15,080kerala(BALCO, Chattisgarh) 95 141740 13465300 2460405 1389375 1,73,15,080kerala(Jabhua Power Ltd) 95 141740 13465300 2460405 1389375 1,73,15,080andhrapradesh(from 12 WRGenerators) 70.35 329532 23182576 1821995 1028869 2,60,33,440

karnataka(South WesternRailways) 35 329532 11533620 906465 511875 1,29,51,960

telangana(from 7 ERgenerators) 45.83 329532 15102452 1186951 670264 1,69,59,667

kudgi2( NTPC Kudgi 3) 884.49 204337 180734033 22907407 12935666 21,65,77,106coastal(Coastal (SR targetregion)) 262 79142 20735204 6785538 3831750 3,13,52,492

karnataka(karnataka BESCOM(From 12 WR Generators)) 3.962 329532 1305606 102612 57944 14,66,162

karnataka(karnatakaMESCOM (From 12 WRGenerators))

0.7 329532 230672 18129 10238 2,59,039

karnataka(karnataka CESCOM(From 12 WR Generators)) 0.876 329532 288670 22688 12812 3,24,170

karnataka(karnatakaHESCOM (From 12 WRGenerators))

1.601 329532 527581 41464 23415 5,92,460

karnataka(karnataka GESCOM(From 12 WR Generators)) 0.432 329532 142358 11188 6318 1,59,864

telangana(From 12 WRGenerators) 122.06 329532 40222676 3161232 1785128 4,51,69,036

karnataka(karnataka BESCOM(From 12 WR Generators)) 142.644 329532 47005763 3694337 2086169 5,27,86,269

karnataka(karnatakaMESCOM (From 12 WRGenerators))

25.202 329532 8304865 652707 368579 93,26,151

karnataka(karnataka CESCOM(From 12 WR Generators)) 31.55 329532 10396735 817113 461419 1,16,75,267

karnataka(karnatakaHESCOM (From 12 WRGenerators))

57.643 329532 18995213 1492896 843029 2,13,31,138

karnataka(karnataka GESCOM(From 12 WR Generators)) 15.539 329532 5120598 402445 227258 57,50,301

karnataka(UPCL) 939 329532 309430548 24319161 13732875 34,74,82,584Total(Others) 2,92,29,37,109

Page 21: े ीय पारेषण लेखा - srpc.kar.nic.in · 2 403/TT/2014 "Asset 2: 2*500 MVA Transformers alongwith the associated bays at ... 220 kV line bays at Madhugiri for

Southern Regional Power Committee (SRPC) Secretariat - RTA - March-2018 (RTA and RTDA)

2. Summary of POWERGRID Bilateral Billing for March, 2018 thatpertains to Southern Region

As per CERC Order in Petition No.155/MP/2016 dated 04-01-2017

Details of Monthly Transmission Charges and the name of beneficiary Discom of bilateralassets of POWERGRID provided by NLDC vide email dated 06.07.2017 are as under (due tonon-availability of upstream/downstream system):

(fig in Rs.)

S.No. Petition No. Name of the AssetsBillingAmount forMarch, 2018

BeneficiaryDISCOM

1 127/TT/2014

"Asset-1: LILO of one circuit ofTuticorin JV-Madurai 400 kV (Quad)line at Tuticorin Pooling Station alongwith new 765 kV pooling station atTuticorin (initially charged at 400 kV)and 1x80 MVAR 400 kV Bus Reactorat Tuticorin Pooling Station, Asset-2:LILO of 2nd circuit of Tuticorin JV-Madurai 400 kV (Quad) line atTuticorin Pooling Station"

7528000.000 IND-BARATH

2 403/TT/2014

"Asset 2: 2*500 MVA Transformersalongwith the associated bays atMadhugiri; Asset 3: 220 kV line baysat Madhugiri for termination of 220kV D/C Madhugiri-Antharasanhalliline; Asset 4: 220 kV line bays atMadhugiri for termination of 220 kVD/C Madhugiri-Madhugiri line; Asset5: 220 kV line bays at Madhugiri fortermination of 220 kv D/C Madhugiri-Nittur line."

5718547.3 BESCOM

1016644.09 MESCOM

1287854.16 CESCOM

2453730.41 HESCOM

1636224.04 GESCOM

Page 22: े ीय पारेषण लेखा - srpc.kar.nic.in · 2 403/TT/2014 "Asset 2: 2*500 MVA Transformers alongwith the associated bays at ... 220 kV line bays at Madhugiri for

Southern Regional Power Committee (SRPC) Secretariat - RTA - March-2018 (RTA and RTDA)

3. Annex-I Entitelment of States From Stations

Entity ANDHRAPRADESH

KARNATAKA KERALA TAMIL

NADUTELANGANA

PUDUCHERRY

PGCILHVDC GOA ORISSA TOTAL

NTPC RSTPS1&2 401.846 386.231 228.736 457.201 322.689 67.578 2.156 93.283 0 1959.72

NTPC RSTPS3 101.636 97.816 57.563 115.678 81.172 17.385 0 0 0 471.25

NTPCTALCHERSTPS 2

215.808 349.797 402.548 455.893 199.76 60.509 3.77 0 196.917 1885

NTPCSIMHADRISTPS 2

245.209 186.824 82.591 201.658 216.624 14.594 0 0 0 947.5

NTPC KudgiSTPS 1 253.249 802.086 71.453 203.321 177.891 0 0 0 0 1508

NTECLVALLUR STPS 75.023 154.428 47.959 991.712 107.011 23.518 0 0 0 1399.65

NLC STAGE IIUNIT 1 40.905 131.329 58.058 168.837 54.521 68.341 0 0 0 521.99

NLC STAGE IIUNIT 2 74.43 176.915 83.861 251.759 97.288 26.765 0 0 0 711.02

NLC STAGE 1EXP 0 99.38 61.949 207.829 0 15.141 0 0 0 384.3

NLC STAGE 2EXP 0 116.37 72.54 243.36 0 17.73 0 0 0 450

NTPL 108.171 197.077 71.117 389.019 145.84 26.277 0 0 0 937.5NPCIL, MAPSKALPAKKAM 16.461 33.493 20.596 295.56 20.445 7.246 0 0 0 393.8

NPCIL,KAIGA1&2 50.308 124.316 34.024 104.6 63.225 17.327 0 0 0 393.8

NPCIL,KAIGA3 & 4 53.629 134.187 31.307 92.07 67.084 15.522 0 0 0 393.8

NPCIL,KKNPP 0 215.717 128.803 543.55 0 33.93 0 0 0 922NPCIL,KKNPPUNIT #2 0 203.762 122.626 518.625 46.1 30.887 0 0 0 922

* As per CERC Order in Petition No: 291/MP/2015 dated 30-03-2017, Simhadri Stage 1 Entitlement ofAndhra Pradesh and Telangana are not shown, as the transmission charges i.r.o AP share and TS shareare zero.

4 . Details of Regional Tranmsission Deviation

Page 23: े ीय पारेषण लेखा - srpc.kar.nic.in · 2 403/TT/2014 "Asset 2: 2*500 MVA Transformers alongwith the associated bays at ... 220 kV line bays at Madhugiri for

Southern Regional Power Committee (SRPC) Secretariat - RTA - March-2018 (RTA and RTDA)

Entity Tranmission Deviation Charges Payable (Rs)Andhra Pradesh 20,48,723Karnataka 32,87,022Kerala 25,65,753Tamil Nadu 67,47,084Telangana 11,24,151Puducherry 3,42,610PGCIL(SR) 6,764Goa(SR) 2,65,982NTPC,RSTPS 1& 2 0NTPC, RSTPS 3 0NTPC, TALCHER 2 0NTPC, SIMHADRI 2 0NTPC, SIMHADRI 1 0NTPC, KUDGI UNIT 1 42,661NTECL, VALLUR 0NLC Stage 2 UNIT 1 0NLC Stage2 UNIT 2 0NLC Stage 1 EXPN 0NLC Stage 2 EXPN 2,10,144NTPL 0NPCIL,KGS 1 & 2 0NPCIL, KGS 3 & 4 0NPCIL, MAPS 0NPCIL, KKNPP 6,64,435NPCIL, KKNPP UNIT #2 20,68,134

SellerLKPPL STAGE 2 3,801LKPPL STAGE 3 2,37,817MEPL 4,27,188SEL 2,73,200TPCIL 8,58,699COASTAL ENERGEN 2,46,660IL&FS 2,84,062SGPL Unit-1 1,58,389

InfirmNTPC,KUDGI Unit 2 (INFIRM) 0NTPC,KUDGI Unit 3 (INFIRM) 19,02,473NNTPP (INFIRM) 73,199MEPL 2 (INFIRM) 20,02,256

Page 24: े ीय पारेषण लेखा - srpc.kar.nic.in · 2 403/TT/2014 "Asset 2: 2*500 MVA Transformers alongwith the associated bays at ... 220 kV line bays at Madhugiri for

Southern Regional Power Committee (SRPC) Secretariat - RTA - March-2018 (RTA and RTDA)

4 (a). Details of Deviation Entity Wise in MWHr.

EntityInjectionRateRs/Mwhr

WithdrawalRateRs/Mwhr

ExcessInjectionupto120%

ExcessWithdrawalupto 120%

ExcessInjectionAbove120%(@1.25times)

ExcessWithdrawalAbove120%(@1.25times)

Charges For ExcessInjection/Withdrawalupto 120%

Charges For ExcessInjection/WithdrawalAbove 120%

BeneficiariesANDHRAPRADESH 71.8 282.1 0 4551.48 0 101.23 1283973 35696

KARNATAKA 282.1 282.1 0 5640.81 0 15.57 1591273 5490KERALA 36.7 141.9 0 10241.05 0 0 1453205 0TAMIL NADU 247 106.8 0 42790.52 0 0 4570028 0TELANGANA 71.8 282.1 0 1289.35 0 0 363726 0PUDUCHERRY 36.7 71.8 0 1066.96 0 0 76608 0PGCIL(SR) 282.1 282.1 0 0 0 0 0 0GOA(SR) 36.7 106.8 0 2307.42 0 86.52 246432 11550

Inter State Generating StationsRSTPS 1& 2 71.8 282.1 2340.84 0 0 0 168072 0RSTPS 3 71.8 282.1 1909.6 0 0 0 137109 0TALCHER 2 317.1 282.1 10374.47 0 0 0 3289744 0SIMHADRI 2 71.8 282.1 326.49 0 0 0 23442 0* SIMHADRI 1 71.8 282.1 307.01 0 0 0 22043 0* For Simhadri Stage I, charge for excess injection/Withdrawal above 120 % is not booked under beneficiaries, it isfor GeneratorKUDGI Unit 1 106.8 282.1 0 0 0 120.98 0 42661NTECL 71.8 106.8 0 0 0 0 0 0NLC 2 UNIT 1 71.8 106.8 1756.44 0 0 0 126112 0NLC 2 UNIT 2 71.8 106.8 1432.93 0 0 0 102884 0NLC 1 EXPN 71.8 106.8 3319.51 0 0 0 238341 0NLC 2 EXPN 71.8 106.8 0 0 0 1574.11 0 210144NTPL 141.9 106.8 0.37 0 0 0 53 0MAPS 247 106.8 0 0 0 0 0 0KAPS 1&2 106.8 282.1 7276.4 0 0 0 777120 0KAPS3&4 106.8 282.1 11164.72 0 0 0 1192392 0KKNPP 106.8 106.8 9723.8 0 0 4977.04 1038502 664435KKNPP UNIT2 106.8 106.8 0 0 0 15491.64 0 2068134

SELLERCOASTALENERGEN 106.8 106.8 566.37 0 45.31 1349.24 60488 186172

MEPL 36.7 282.1 0 0 0.08 1211.44 0 427188SEPL 36.7 282.1 0 0 0 774.76 0 273200TPCIL 176.9 282.1 4825.14 0 23.21 0 853567 5132LKPPL 71.8 282.1 0 0 0 10.78 0 3801LKPPL3 71.8 282.1 0 0 0 674.42 0 237817IL&FS 106.8 106.8 2659.76 0 0 0 284062 0SGPL Unit-1 176.9 282.1 895.36 0 0 0 158389 0

Generating Station Under INFIRM StageCharges For

Excess InjectionCharges For

Excess WithdrawalNTPC,KUDGIUnit 2 106.8 -282.1 0 0 0 0 0 0

NTPC,KUDGIUnit 3 106.8 -282.1 0 0 5895.018 -3163.382 786985 1115488

NNTPP 247 -106.8 0 0 0.138 -547.985 43 73156MEPL 2 36.7 -282.1 0 0 13611.888 -3907.297 624445 1377811

Page 25: े ीय पारेषण लेखा - srpc.kar.nic.in · 2 403/TT/2014 "Asset 2: 2*500 MVA Transformers alongwith the associated bays at ... 220 kV line bays at Madhugiri for

Southern Regional Power Committee (SRPC) Secretariat - RTA - March-2018 (RTA and RTDA)

4 (b) . Apportioning Long Term Deviation charges on ItsBeneificary

Entity ANDHRAPRADESH

KARNATAKA KERALA TAMIL

NADUTELANGANA

PUDUCHERRY

PGCILHVDC GOA

NTPC RSTPS1&2 34464 33124 19617 39211 27675 5796 185 8000

NTPC RSTPS3 29571 28459 16748 33656 23617 5058 0 0

NTPCTALCHER 2 376632 610473 702536 795634 348625 105601 6579 0

NTPCSIMHADRI 2 6067 4622 2043 4989 5359 361 0 0

NTPCSIMHADRI 1 0 0 0 0 0 0 0 0

NTPCKUDGI UNIT1

0 0 0 0 0 0 0 0

NTECLVALLUR 0 0 0 0 0 0 0 0

NLC 2 UNIT1 9883 31729 14027 40791 13172 16511 0 0

NLC 2 UNIT2 10770 25599 12135 36429 14078 3873 0 0

NLC 1 EXP 0 61635 38421 128895 0 9391 0 0NLC 2 EXP 0 0 0 0 0 0 0 0NTPL 6 11 4 22 8 1 0 0MAPS 0 0 0 0 0 0 0 0KAPS 1& 2 99277 245324 67143 206416 124767 34193 0 0KAPS 3&4 162384 406308 94795 278781 203124 47000 0 0KKNPP 0 242975 145079 612232 0 38217 0 0KKNPPUNIT 2 0 0 0 0 0 0 0 0