  • 7/27/2019 011112 VPCL

    1/30

    Executive Director

    Vadinar Power Company Ltd

    Analyst Site Visit

    October 31- November 1

    KB Makadia

    Executive Director - Power Business, VPCL

    1

  • 7/27/2019 011112 VPCL

    2/30

    INDEX

    Introduction

    Plot Plan

    Plant Overview

    Plant Operations

    Project Journey

    Initiatives

    2Salaya TPP

  • 7/27/2019 011112 VPCL

    3/30

    Introduction

    Project Objective

    To provide uninterrupted Steam, Power & Feed water to Refinery operation as well futurerequirement by way of Cogeneration power plant.

    Installed capacity under operation

    VPCL Base Plant- 120 MWe

    3x175 = 525 TPH oil fired Boilers

    2x38.5 = 77 MW Steam Turbines

    Feed Water supply facility

    VPCL Phase 1- 380 MWe

    Combine Cycle Cogeneration Plant

    2x110 = 220 MW Gas Turbines + HRSG with supplementary firing

    VPCL Phase 2A- 510 MWe coal + FO fired cogeneration plant

    Unit #1, Boiler 1- 1x750= 750 TPH

    Unit #2, Boiler 1- 1x750= 750 TPH ( Being commissioned)

    2x105= 210 MW Steam Turbine

    3

  • 7/27/2019 011112 VPCL

    4/30

    Base

    Plant

    (120MW)

    Phase 1

    GT &

    HRSG 1

    Phase 1

    GT &

    HRSG 2

    Phase 2A

    Boiler 1Phase 2A

    Boiler 2

    Coal

    conveyor

    Cooling

    Towers

    Admin

    Building

    Pipe Rackto

    Refinery

    Fuel oil

    Tanks

    Phase 2A

    Station

    Building

    Plot Plan

    4

  • 7/27/2019 011112 VPCL

    5/30

    VPCL Plant Overview

    Boiler-2

    PFBoiler-1

    77 MW

    Boiler-2

    120 MW

    Boiler-3

    120 MW

    HRSG1HRSG2

    VHP

    HHP

    HP

    MP

    LP

    38.5MW-

    238.5M

    W-1

    Boiler-1

    PF

    105

    MW-2

    105

    MW-1

    92.8MW

    GT-1GT-2

    LP

    Coal

    HFO/CSO

    HFO

    Fuel Gas

    NG, HSDNaphtha

    Base Plant

    Phase 1

    Phase 2

    5

  • 7/27/2019 011112 VPCL

    6/30

    VPCL Operations

    6

  • 7/27/2019 011112 VPCL

    7/30

    Power Generation

    18

    76

    76

    80

    85

    92

    10

    5

    124

    125

    123 1

    28

    140

    11

    2 2 2 2 2 2 2 2

    10

    2 224 4 4 4 4

    0

    6 79

    12 1

    3

    0

    20

    40

    60

    80

    100

    120

    140

    160

    Oct-11 Nov-11 Dec-11 Jan-12 Feb-12 Mar-12 Apr-12 May-12 Jun-12 Jul-12 Aug-12 Sep-12

    MW

    POWER GENERATION

    Power Generation Power Import From Grid Auxiliary Power Consumption@ Power Generation

    Load requirement reduced due

    to Refinery Annual Shut down

    Load increased gradually as Different units of Refinery

    Train-1 commissioned and under operation now.

    Including Base plant, Phase-1 and Phase-2A.7

  • 7/27/2019 011112 VPCL

    8/30

    Plant Availability

    0.00

    10.00

    20.00

    30.00

    40.00

    50.00

    60.00

    70.00

    80.00

    90.00

    100.00

    Oct-11 Nov-11 Dec-11 Jan-12 Feb-12 Mar-12 Apr-12 May-12 Jun-12 Jul-12 Aug-12 Sep-12

    66.0

    88.6

    99.4 9

    8.5

    99.6

    98.6

    100.0

    100.0

    99.3

    99.9

    99.9

    100.0

    95.5 1

    00.0

    98.0

    99.8

    100.0

    99.5

    100.0

    100.0

    99.7

    99.4 9

    9.9 1

    00.0

    100.00

    100.00

    %

    TURBINE AVAILABILITY

    MHI STG GTG Siemens STG

    Due to 33 KV AIS to GIS reshuffling job

    Including Base plant, Phase-1 and Phase-2A.8

  • 7/27/2019 011112 VPCL

    9/30

    Plant Availability

    0.00

    10.00

    20.00

    30.00

    40.00

    50.00

    60.00

    70.00

    80.00

    90.00

    100.00

    Oct-11 Nov-11 Dec-11 Jan-12 Feb-12 Mar-12 Apr-12 May-12 Jun-12 Jul-12 Aug-12 Sep-12

    57.3

    100.0 1

    00.0

    100.0

    99.5

    99.5

    100.0

    98.8

    100.0

    93.0

    100.0

    97.9

    94.1 1

    00.0

    100.0

    93.9

    100.0

    100.0

    100.0

    100.0

    100.0

    100.0

    100.0 1

    00.0

    88.

    82

    64.

    45

    %

    BOILER AVAILABILITY

    OFB HRSG CFB

    Due to Coal Fired Boiler S/D for SH

    CFB S/D for inspection of Super heater, 102 Metallic

    foreign pieces recovered which was left inside due to

    manufacturing defect.

    Graph showing availability for Base plant Boilers, Phase-1 HRSGs and Phase-2A CFB 9

  • 7/27/2019 011112 VPCL

    10/30

    Plant Efficiency

    0

    10

    20

    30

    40

    50

    60

    70

    80

    Oct-11 Nov-11 Dec-11 Jan-12 Feb-12 Mar-12 Apr-12 May-12 Jun-12 Jul-12 Aug-12 Sep-12

    64.7

    63.2

    60.3

    62.9

    60.9

    62.8

    66.1

    68.6 6

    9.5

    74.8 6

    6.9

    63.8

    %

    PLANT COGENERATION EFFICIENCY

    Cogeneration Efficiency

    Including Base plant, Phase-1 and Phase-2A.

    10

  • 7/27/2019 011112 VPCL

    11/30

    VPCL Phase 2A

    11

  • 7/27/2019 011112 VPCL

    12/30

    Highlights Phase-IIA

    Configuration

    Project Capacity : 510MW Number of Steam Turbines : 3 (Three)

    Capacity : 2 x105MW + 1x92.8MW

    Capacity of Boilers : 750TPH

    Number of Boilers : 2 (Two)

    Type of Boilers : Pulverized Fuel and Oil Fired

    Boiler technology : Sub-critical

    Condenser Cooling : Sea Water

    Boiler-1 Made operational with coal.

    Boiler-2 light up completed on October 10,2012, steam blowing completed and restoration is in

    progress and getting ready for Coal firing.

    STG 1 & STG 2 synchronized and made operational.

    STG-3 lube / control oil flushing activity completed and restoration is in progress.

    12

  • 7/27/2019 011112 VPCL

    13/30

    Particulars (As on September 2012) VPCL P2 (510MW)

    Physical Progress (%) Overall 97.5%

    Engineering (%) 95%

    Procurement (%) 99.8%

    Construction (%) 95.7%

    Dates Synchronisation Unit 1 Synchronized

    Commercial Operations Oct. 2012

    Evacuation ProgressConnected to State Grid

    via EOL switchyard

    Statutory Approval Progress (Key approval pending) All approvals in place

    *INR/US$ - 50

    Highlights Phase-IIA

  • 7/27/2019 011112 VPCL

    14/30

    Commercial Snapshot

    14

    Unit Customer Supply Tariff FuelPower Steam

    Base Essar Oil 77 MW 230 tons/hr.Annual FC- INR

    794 Mn Fuel and

    water

    supplied by

    EOL

    Phase 1 &

    2A

    Essar Oil 300 MW 1500 tons/hr.

    Annual FC for

    Phase 1- 1750 MnAnnual FC for

    Phase 2- 3350 Mn

    ESTL 90 MW -

    Annual FC for

    Phase 1 & 2- INR

    800 Mn

    Fuel and

    water

    supplied by

    ESTL

  • 7/27/2019 011112 VPCL

    15/30

    Unit -1 pre-commissioning and commissioning activities successfully

    completed without any incident.

    Boiler -1 under operation with 100% coal firing.

    STG -1 & 2 synchronized and under operation.

    Steam and Power supply to Refinery from Phase 2A started from

    12thJuly 12 for Power and 16thJuly12 for Steam.

    Power Export to ESTL started from Sept12.

    Boiler 1 full load trial completed successfully at 750 TPH on coal.

    Refinery Train 1 which include additional unit of down stream likeVacuum Gas Oil, Deep Hydro Deep Treating, Delayed Coker Unit

    operating facility have been commissioned successfully. VPCL has

    started to supply process feed water to the expansion Refinery.

    Achievements- Phase 2A

    15

  • 7/27/2019 011112 VPCL

    16/30

  • 7/27/2019 011112 VPCL

    17/30

    Accomplishments

    The plant uninterrupted operation from last 46 months and nodisturbance to Refinery operation.

    LTI free man days 2183 days (till 25th Oct 2012).

    All Maintenance activities completed with Refinery shut-down

    schedule and with all safety consideration.

    Zero Leakage since last five years.

    Process Safety Management third party audit compliance 97%.

    17

  • 7/27/2019 011112 VPCL

    18/30

    Vadinar Power Company LimitedEssar Energy Site Visit

    Project Photographs

  • 7/27/2019 011112 VPCL

    19/30

    Phase-I & IIA: Overall View

  • 7/27/2019 011112 VPCL

    20/30

    120MW Plant

  • 7/27/2019 011112 VPCL

    21/30

    380 MW Plant

    Pipe Rack to

    Refinery

    HRSG-2HRSG-1

  • 7/27/2019 011112 VPCL

    22/30

    Phase IIA: Overall View

  • 7/27/2019 011112 VPCL

    23/30

    Phase I & IIA Overall View

  • 7/27/2019 011112 VPCL

    24/30

    Phase-IIA : Boiler-1 & Boiler-2

    Station

    Building

    Boiler 1

    Boiler 2

  • 7/27/2019 011112 VPCL

    25/30

    Phase-I & IIA : overview

    Station building Bunker Bays

    GTG - 1 GTG - 2

  • 7/27/2019 011112 VPCL

    26/30

    STG Floor STG 1

    STG 2STG 3 Commissioning

    activity under progress

    Phase-IIA : STG Floor overview

  • 7/27/2019 011112 VPCL

    27/30

    Phase-IIA : control room & Electrical room overview

  • 7/27/2019 011112 VPCL

    28/30

    Phase-IIA : Boilers & Mills overview

    Boiler 1

    Boiler 2

    Boiler 1 & 2

    Mills

  • 7/27/2019 011112 VPCL

    29/30

    Phase-IIA : Coal Conveyor & Cooling tower overview

  • 7/27/2019 011112 VPCL

    30/30

    Phase-IIA : Cooling Tower