Page 1: 05 December 2007 Revision 5 RCM2 Case Study Project Plan Cooling Fan System  (topic link) (topic

05 December 2007 Revision 5

RCM2 Case StudyProject Plan Cooling Fan Systemhttp://maintenanceforums.com (topic link)

Page 2: 05 December 2007 Revision 5 RCM2 Case Study Project Plan Cooling Fan System  (topic link) (topic

Content

• Introduction

• Why this study

• Output

• Team

• Planning

• System boundaries

• Functional Block diagram & Major Equipment

• Key information

• Let’s get started

Page 3: 05 December 2007 Revision 5 RCM2 Case Study Project Plan Cooling Fan System  (topic link) (topic

Introduction

From within the Maintenance Forum the initiative was born to conduct a “Virtual RCM” study to learn and share knowledge in an interactive way.

A Case & Operating Context is defined for the Company Ollie’s Olefins based on business impact/criticality.

There are a lot of methods which are called RCM

In this study the RCM2 methodology of John Moubray will be applied

Acrobat Document

Page 4: 05 December 2007 Revision 5 RCM2 Case Study Project Plan Cooling Fan System  (topic link) (topic

Goal and output

Make a maintenance plan which preserve the functions of the chosen Cooling Fan System throughout the

technologically useful live by selecting and applying the most cost effective technique for managing

failures and their consequences

Output:

- Maintenance schema

- Operator Care Instruction

- Modifications (can also be operational procedure)

Page 5: 05 December 2007 Revision 5 RCM2 Case Study Project Plan Cooling Fan System  (topic link) (topic

Team

Team Forum Alias

Rogier de Mulder RogierSteve Turner Steve TurnerYoussef X Abbaoui ?Johnny W Campbell Johnny W. CampbellBruno S Santos bsbsantosSteven van Els savanelsTrevor Sullivan TrevorsMike W Ward Mike66

Page 6: 05 December 2007 Revision 5 RCM2 Case Study Project Plan Cooling Fan System  (topic link) (topic

Planning

• The project kick-off is in week 41 after publishing project plan on forum

• Minimum 1 session a week depending on input

• A live chat or telecom can be organised to discuss different views if necessary

• Estimated time needed is 11 sessions, completion date end 2007 (new estimatedis febr. 2008)

• Participant are assumed to have basic RCM knowledge starting the study

Session Content

Kick off – Setup project and team 1 session (WK 42)

Functions and performance standards 1 sessions

Functional Failures & Failure Modes 2 sessions

Failure Effects 2 sessions

Failure Consequences 2 sessions

The RCM Task Selection Process 3 sessions

Spare 2 sessions

Finalizing report by facilitator 1 week

Page 7: 05 December 2007 Revision 5 RCM2 Case Study Project Plan Cooling Fan System  (topic link) (topic

System Selection (Boundary)

Arflow i.e.minimum 200 RPN

Cooling Fan System

(Audible) Alarm

Electricity380 V 3 fase

- Ambient tempeture -5 – 35 deg. Celcius- Salt sea moisture

Page 8: 05 December 2007 Revision 5 RCM2 Case Study Project Plan Cooling Fan System  (topic link) (topic

Funct. Block diagram & Major Equipement

Arflow i.e.minimum 200 RPN

Drive Convey Displace Air

Electricity380 V 3 fase

Control & Monitor

Signal (Audible) Alarm

Stop signal

E- Motor (4 bolts connected)3 thermistors

CouplingGearbox (4 bolts connected)Drive belt & pulleysShaftBearings

FAN (locking device)

On/of switchManual Emergency off switchTachometerVibrating sensorDoor switch (Protective mesh)Alarm (lamp/buzzer)

Page 9: 05 December 2007 Revision 5 RCM2 Case Study Project Plan Cooling Fan System  (topic link) (topic

Key information

• Plant located on island near to sea

• Operation 24h/7 days a week /365 day’s a year

• It can sell all product it can make

• 30 equal systems in production unit

• System supplies ambient air to refrigeration system

• Performance indicator: If fan < 200 RPM audible alarm sounds in control room

• Revenue loss of $5000 per hour if one system down for > 30 min

• System cost a lot of maintenance hours due to breakdown disturbing the process (how much cost / failure history?)

Page 10: 05 December 2007 Revision 5 RCM2 Case Study Project Plan Cooling Fan System  (topic link) (topic

Let’s get started

-Who is willing to be part of the team?

-let share email addresses within the team, mail me your email address please?

-When the team is complete I will setup a platform to share / add remark or something to be able to give your input when it suits your agenda

-We are in different time zone's I think, so live discussion can be a problem, Can we make an overview of possibilities when to discuss /chat live?

-To share learning's everyone get’s read rights on chosen platform and only team member write rights

•All information needed for study will documented and posted

-Final Result per session will be post on maintenanceforum to share learning

-English is not everyone’s native language so can give misunderstanding, treat everyone with respect, lets focus on the big picture and not argue about minor language details.

Page 11: 05 December 2007 Revision 5 RCM2 Case Study Project Plan Cooling Fan System  (topic link) (topic

Step 1 functions

-Step 1 – Describing FunctionsWe have enough information to start with defining the function

A function statement should consist of a verb,

an object and a desired standard of performance

If we miss relevant information it will be an action point for someone to retrieve of we make a decision as a group

We can use the template supplied by Rolly12

Other steps will be added during the study

Microsoft Excel Worksheet

Page 12: 05 December 2007 Revision 5 RCM2 Case Study Project Plan Cooling Fan System  (topic link) (topic

Step 1 functions

Primary functions: What's the main reason the asset exist?

Secondary functions: Asset is expected to fulfill one ore more functions in addition to their primary function

To help none of these functions is overlooked they are diveided in 7 categories (ESCAPES):

- Environmental integrity

- Safety/structural integrity

- Control/containment/comfort

- Appearance

- Protection

- Economy/Efficiency

- Superfluous functions

One of the most mistakes in the RCM process is carrying out the analysis on too low level in the equipment hierarchy.

Page 13: 05 December 2007 Revision 5 RCM2 Case Study Project Plan Cooling Fan System  (topic link) (topic

Step 2 Functional Failures

Step 2 – Describing Functional Failures

A functional failure is defined as the inability of any asset

to fulfil a function to a standard of performance

which is acceptable to the user

Functional Failures can be placed under the following headings:

• partial and total failure

• Upper and lower limits

• Gauges and indicators

• The operating context

Page 14: 05 December 2007 Revision 5 RCM2 Case Study Project Plan Cooling Fan System  (topic link) (topic

Step 2 Functional Failures

Who shoulls set the standard?

Page 15: 05 December 2007 Revision 5 RCM2 Case Study Project Plan Cooling Fan System  (topic link) (topic

Step 3 Failure Modes

A failure mode is any event which causes a functional failure

A failure mode description should at the very least consist of a noun and a verb

i.e. Bearing seizes

A list of reasonably likely failure modes should include:

• failures which have occurred before

• failure modes which are already the subject of proactive maintenance routines

• any other failure mode which have not yet occurred but which are considered to be real possibilities

Page 16: 05 December 2007 Revision 5 RCM2 Case Study Project Plan Cooling Fan System  (topic link) (topic

Step 3 Failure Modes

• How much detail?

failure modes should be defined in enough detail for it

to be possible to select a suitable failure management policy

Page 17: 05 December 2007 Revision 5 RCM2 Case Study Project Plan Cooling Fan System  (topic link) (topic

Step 4 Failure Effect

failure effect describes what happens when a failure mode occurs

The level of describing the failure effect depends whether it includes all information needed to support the evaluation of the consequences of the failure (decision diagram).

The effect of the failure should be described as if nothing was being done to prevent it.

Page 18: 05 December 2007 Revision 5 RCM2 Case Study Project Plan Cooling Fan System  (topic link) (topic

Step 4 Failure Effect

• The following should be recorded:

• What evidence (if any) that the failure has occurred

• In what ways (if any) it poses a threat to safety or environment

• In what (if any) it affects production or operations

• What physical damage (if any) is caused by the failure

• What must be done to repair the failure