05232018 pip-final pres - new mexico department of ... pip-final p… · microsoft powerpoint -...

37

Upload: others

Post on 25-Jun-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 05232018 PIP-Final Pres - New Mexico Department of ... PIP-Final P… · Microsoft PowerPoint - 05232018 PIP-Final Pres.pptx Author: pbyrd Created Date: 5/22/2018 1:43:08 PM
Page 2: 05232018 PIP-Final Pres - New Mexico Department of ... PIP-Final P… · Microsoft PowerPoint - 05232018 PIP-Final Pres.pptx Author: pbyrd Created Date: 5/22/2018 1:43:08 PM
Page 3: 05232018 PIP-Final Pres - New Mexico Department of ... PIP-Final P… · Microsoft PowerPoint - 05232018 PIP-Final Pres.pptx Author: pbyrd Created Date: 5/22/2018 1:43:08 PM
Page 4: 05232018 PIP-Final Pres - New Mexico Department of ... PIP-Final P… · Microsoft PowerPoint - 05232018 PIP-Final Pres.pptx Author: pbyrd Created Date: 5/22/2018 1:43:08 PM
Page 5: 05232018 PIP-Final Pres - New Mexico Department of ... PIP-Final P… · Microsoft PowerPoint - 05232018 PIP-Final Pres.pptx Author: pbyrd Created Date: 5/22/2018 1:43:08 PM
Page 6: 05232018 PIP-Final Pres - New Mexico Department of ... PIP-Final P… · Microsoft PowerPoint - 05232018 PIP-Final Pres.pptx Author: pbyrd Created Date: 5/22/2018 1:43:08 PM

Los LunasTransit Center

Rail Crossing

NMulti-Use Trail

Page 7: 05232018 PIP-Final Pres - New Mexico Department of ... PIP-Final P… · Microsoft PowerPoint - 05232018 PIP-Final Pres.pptx Author: pbyrd Created Date: 5/22/2018 1:43:08 PM

To improve safety for the many modes oftransportation, which converge at the NM314/Courthouse Road intersection. Theseinclude vehicular traffic, at‐grade railoperations, high pedestrian traffic, multi‐usetrail users, and both bus and rail transit users.

Need• There is a lack of auxiliary lanes on NM 314 at Courthouse.• The skewed approach on Courthouse Rd limits sight‐distance and increases crash risks.

• ADA deficiencies with pedestrian/multi‐use crossings at the intersection.

• Prepare at‐grade rail crossing for quiet zone designation• Reduction of crash occurrences

Page 8: 05232018 PIP-Final Pres - New Mexico Department of ... PIP-Final P… · Microsoft PowerPoint - 05232018 PIP-Final Pres.pptx Author: pbyrd Created Date: 5/22/2018 1:43:08 PM
Page 9: 05232018 PIP-Final Pres - New Mexico Department of ... PIP-Final P… · Microsoft PowerPoint - 05232018 PIP-Final Pres.pptx Author: pbyrd Created Date: 5/22/2018 1:43:08 PM
Page 10: 05232018 PIP-Final Pres - New Mexico Department of ... PIP-Final P… · Microsoft PowerPoint - 05232018 PIP-Final Pres.pptx Author: pbyrd Created Date: 5/22/2018 1:43:08 PM

Worn and hard to see

Page 11: 05232018 PIP-Final Pres - New Mexico Department of ... PIP-Final P… · Microsoft PowerPoint - 05232018 PIP-Final Pres.pptx Author: pbyrd Created Date: 5/22/2018 1:43:08 PM

Protected‐Permitted Phasing

Shared Left‐Thru Lane

EXISTING

IDEAL CONFIGURATION

Page 12: 05232018 PIP-Final Pres - New Mexico Department of ... PIP-Final P… · Microsoft PowerPoint - 05232018 PIP-Final Pres.pptx Author: pbyrd Created Date: 5/22/2018 1:43:08 PM

Vehicles in Intersection

Page 13: 05232018 PIP-Final Pres - New Mexico Department of ... PIP-Final P… · Microsoft PowerPoint - 05232018 PIP-Final Pres.pptx Author: pbyrd Created Date: 5/22/2018 1:43:08 PM
Page 14: 05232018 PIP-Final Pres - New Mexico Department of ... PIP-Final P… · Microsoft PowerPoint - 05232018 PIP-Final Pres.pptx Author: pbyrd Created Date: 5/22/2018 1:43:08 PM
Page 15: 05232018 PIP-Final Pres - New Mexico Department of ... PIP-Final P… · Microsoft PowerPoint - 05232018 PIP-Final Pres.pptx Author: pbyrd Created Date: 5/22/2018 1:43:08 PM
Page 16: 05232018 PIP-Final Pres - New Mexico Department of ... PIP-Final P… · Microsoft PowerPoint - 05232018 PIP-Final Pres.pptx Author: pbyrd Created Date: 5/22/2018 1:43:08 PM
Page 17: 05232018 PIP-Final Pres - New Mexico Department of ... PIP-Final P… · Microsoft PowerPoint - 05232018 PIP-Final Pres.pptx Author: pbyrd Created Date: 5/22/2018 1:43:08 PM

Advanced Mastarm

Page 18: 05232018 PIP-Final Pres - New Mexico Department of ... PIP-Final P… · Microsoft PowerPoint - 05232018 PIP-Final Pres.pptx Author: pbyrd Created Date: 5/22/2018 1:43:08 PM

(Completed)(Completed)

(Completed)

Page 19: 05232018 PIP-Final Pres - New Mexico Department of ... PIP-Final P… · Microsoft PowerPoint - 05232018 PIP-Final Pres.pptx Author: pbyrd Created Date: 5/22/2018 1:43:08 PM
Page 20: 05232018 PIP-Final Pres - New Mexico Department of ... PIP-Final P… · Microsoft PowerPoint - 05232018 PIP-Final Pres.pptx Author: pbyrd Created Date: 5/22/2018 1:43:08 PM

Benefits• Avoids Utility Relocation• Low ROW Impact• Pedestrian/Rail  Upgrades• Adds Left/Right Turn Lanes on NM 314

Challenges• Widening Encroaches Rail ROW• Expensive Utility Relocation• Does Not Address Skew

Page 21: 05232018 PIP-Final Pres - New Mexico Department of ... PIP-Final P… · Microsoft PowerPoint - 05232018 PIP-Final Pres.pptx Author: pbyrd Created Date: 5/22/2018 1:43:08 PM

Benefits• Avoids Utility Relocation• Lower ROW Impact• Removes Skew• Pedestrian/Rail Upgrades• Adds Left/Right‐Turn Lanes on NM 314

Challenges• Widening Encroaches Rail ROW• Expensive Utility Relocation

Page 22: 05232018 PIP-Final Pres - New Mexico Department of ... PIP-Final P… · Microsoft PowerPoint - 05232018 PIP-Final Pres.pptx Author: pbyrd Created Date: 5/22/2018 1:43:08 PM

Benefits• Avoids Utility Relocation

• Removes Skew• Pedestrian/Rail Upgrades

• Adds Left/Right Turn Lanes on NM 314

• Less Rail Encroachment

Challenges• Some ROW/Property Impacts

• Curvature on Juan Perea Road

• Changes Functionality of Roads

• Poor Operations of One Movement

Page 23: 05232018 PIP-Final Pres - New Mexico Department of ... PIP-Final P… · Microsoft PowerPoint - 05232018 PIP-Final Pres.pptx Author: pbyrd Created Date: 5/22/2018 1:43:08 PM

Benefits• Avoids Utility Relocation

• Removes Skew• Pedestrian/Rail Upgrades

• Adds Left/Right Turn Lanes on NM 314

• Less Rail Encroachment

• Roundabout Safety Benefits

Challenges• Some ROW/Property Impacts

• Curvature on Juan Perea Road

• Changes Functionality of Roads

• Accommodation of Adjacent Access

Page 24: 05232018 PIP-Final Pres - New Mexico Department of ... PIP-Final P… · Microsoft PowerPoint - 05232018 PIP-Final Pres.pptx Author: pbyrd Created Date: 5/22/2018 1:43:08 PM

Benefits• Avoids Utility Relocation

• Removes Skew• Pedestrian/Rail Upgrades

• Adds Left/Right Turn Lanes on NM 314

• Less Rail Encroachment

• Maintains Courthouse Function & Orientation

• Better Approach Visibility

Challenges• Greater ROW/Property Impacts

• Residence Impact

Page 25: 05232018 PIP-Final Pres - New Mexico Department of ... PIP-Final P… · Microsoft PowerPoint - 05232018 PIP-Final Pres.pptx Author: pbyrd Created Date: 5/22/2018 1:43:08 PM

Benefits• Avoids Utility Relocation• Removes Skew• Pedestrian/Rail Upgrades• Adds Left/Right Turn Lanes on NM 314

• Less Rail Encroachment• Maintains Courthouse Function & Orientation

• Better Approach Visibility• Roundabout Safety Benefits

Challenges• Greater ROW/Property Impacts

• Residence Impact• Accommodation of Adjacent Access

Page 26: 05232018 PIP-Final Pres - New Mexico Department of ... PIP-Final P… · Microsoft PowerPoint - 05232018 PIP-Final Pres.pptx Author: pbyrd Created Date: 5/22/2018 1:43:08 PM

Benefits• Avoids Utility Relocate• Pedestrian & Rail Upgrades• Removes Skew• Safety Benefits of Roundabout

Challenges• Greatest ROW Impacts• Rail runner Platform Impacts• Transit Drop‐off Impacts• Access Impacts

Page 27: 05232018 PIP-Final Pres - New Mexico Department of ... PIP-Final P… · Microsoft PowerPoint - 05232018 PIP-Final Pres.pptx Author: pbyrd Created Date: 5/22/2018 1:43:08 PM
Page 28: 05232018 PIP-Final Pres - New Mexico Department of ... PIP-Final P… · Microsoft PowerPoint - 05232018 PIP-Final Pres.pptx Author: pbyrd Created Date: 5/22/2018 1:43:08 PM

Total Crashes 172013 62014 42015 42016 3Angle 3Rear End 1Sideswipe 1Opposite Direction/One Left 5Fixed Object 1Same Direction/Both Going Stria 1Same Direction/One Right  2Same Direction/Both Left 1Vehicle Backing 1Other  1% Opposite Direction/One Left 29%

Daylight 15Night 1Dawn/Dusk 1% DayLight 88%PDO 12Injury 5Fatality 0

% PDO 71%Improper Backing 1Other Improper Turn 1Driver Inattention 2Failure to Yield the Right of Way 8Following Too Close 4Improper Driving/Turn 1Failure to Yield the Right of Way 47%

ByCa

use

NM 314 and Court House Rd.

By 

Year

ByCrash Type

By 

Time of Day

BySeverity

Page 29: 05232018 PIP-Final Pres - New Mexico Department of ... PIP-Final P… · Microsoft PowerPoint - 05232018 PIP-Final Pres.pptx Author: pbyrd Created Date: 5/22/2018 1:43:08 PM

10% Reduction in Overall Crashes

17% to 48% Reduction in Overall Crashes

5% to 13% Reduction of Injury Crashes and2% to 6% Reduction of High Severity Crashes

12% to 39% Crash Reduction and Up to a 76% Reduction in Severe Crashes

Page 30: 05232018 PIP-Final Pres - New Mexico Department of ... PIP-Final P… · Microsoft PowerPoint - 05232018 PIP-Final Pres.pptx Author: pbyrd Created Date: 5/22/2018 1:43:08 PM

Graphic Source: Florida Department of Transportation

Page 31: 05232018 PIP-Final Pres - New Mexico Department of ... PIP-Final P… · Microsoft PowerPoint - 05232018 PIP-Final Pres.pptx Author: pbyrd Created Date: 5/22/2018 1:43:08 PM
Page 32: 05232018 PIP-Final Pres - New Mexico Department of ... PIP-Final P… · Microsoft PowerPoint - 05232018 PIP-Final Pres.pptx Author: pbyrd Created Date: 5/22/2018 1:43:08 PM

ROW TRAFFIC OPERATIONS SAFETY UTILITIES CONSTRUCTABILITY ENVIRONMENTAL ACCESS CHANGESPublic Support CONSTRUCTION COST

None required Acceptable LOS No safety improvements No changes N/A No impacts No changes $0 

0.40 ROW RequiredMostly Acceptable LOS 

Except for One Movement

‐Removes Intersection Skew‐Adds NM 314 uxilary lanes

‐Upgrades pedestrian and rail‐Approach visibility to new intersection limited due to 

curvature

Some Utility Impact

Courthouse can remain open during construction

Some property impacts and change in 

Courthouse Road function and orientation

Some access impacts $2.48 Million

0.45 ROW Required Acceptable LOS

‐Removes intersection skew‐Adds NM 314 auxilary lanes‐Upgrades pedestrian and rail‐Approach visibility to new intersection limited due to 

curvature‐Roundabout Safety Benefits

Some Utility Impact

May require closure of Courthouse

Some property impacts and change in 

Courthouse Road function and orientation

With larger intersection footprint access impacts 

more challenging$2.70 Million

0.75 ROW Required Including Residence

Acceptable LOS

‐Removes intersection skew‐Adds NM 314 auxilary lanes‐Upgrades pedestrian and rail‐Approach visibility better to new intersection with no 

curvature

Some Utility Impact

Courthouse can remain open during construction

Greater property impacts including resdinece 

acquisition; Courthouse function and orientation 

mainatined

Some access impacts $2.52 Million

0.80 ROW Required Including Residence

Acceptable LOS

‐Removes intersection skew‐Adds NM 314 auxilary lanes‐Upgrades pedestrian and rail‐Approach visibility better to new intersection with no 

curvature‐Roundabout Safety Benefits

Some Utility Impact

May require closure of Courthouse

Greater property impacts including residence 

acquisition; Courthouse function and orientation 

mainatined

With larger intersection footprint access impacts 

more challenging$2.83 Million

ALTERNATIVES

NO‐BUILD ALTERNATIVE

Pending Public Meeting

3A

3B

3C

3D

Page 33: 05232018 PIP-Final Pres - New Mexico Department of ... PIP-Final P… · Microsoft PowerPoint - 05232018 PIP-Final Pres.pptx Author: pbyrd Created Date: 5/22/2018 1:43:08 PM

Benefits• Removes Skew• Pedestrian/Rail Upgrades

• Adds Left/Right Turn Lanes on NM 314

• Less Rail Encroachment

• Maintains Courthouse Function & Orientation

• Better Approach Visibility

Challenges• Greater ROW/Property Impacts

• Residence Impact

Page 34: 05232018 PIP-Final Pres - New Mexico Department of ... PIP-Final P… · Microsoft PowerPoint - 05232018 PIP-Final Pres.pptx Author: pbyrd Created Date: 5/22/2018 1:43:08 PM

Original RSA Complete

2015 –2016

RSA Update and Alternative 

Selection

Preliminary and Final Design

Construction

2015 –2016

June 2018 Mid 2018 /Late 2019

Spring/Summer

2020

Page 36: 05232018 PIP-Final Pres - New Mexico Department of ... PIP-Final P… · Microsoft PowerPoint - 05232018 PIP-Final Pres.pptx Author: pbyrd Created Date: 5/22/2018 1:43:08 PM

http://dot.state.nm.us/content/nmdot/en/ProjectsD3.html#nm314courthouse

Page 37: 05232018 PIP-Final Pres - New Mexico Department of ... PIP-Final P… · Microsoft PowerPoint - 05232018 PIP-Final Pres.pptx Author: pbyrd Created Date: 5/22/2018 1:43:08 PM