AP1000 Standard Design: Ready for the Nuclear Renaissance

The Current Status ofNew Nuclear Plants in the United States

George DavisWestinghouse Electric Company

Page 2: 1 AP1000 Standard Design: Ready for the Nuclear Renaissance The Current Status of New Nuclear Plants in the United States George Davis Westinghouse Electric

2

New Nuclear Plants Being Planned or Built to Help Improve the Environment• Issues driving interest in nuclear energy:

– Avoiding emissions– Providing reliable, economic base-load electricity generation– Improving energy security– Reducing energy imports– Re-building U.S. manufacturing infrastructure– Creating export opportunities

• Construction of new nuclear plants underway overseas • Regulatory approval of new plants underway in the U.S.

Page 3: 1 AP1000 Standard Design: Ready for the Nuclear Renaissance The Current Status of New Nuclear Plants in the United States George Davis Westinghouse Electric

3

New NRC Licensing Process Will Be Completed Before Construction Begins

ITAAC metConstruction Operation

Combined Construction &

OperatingLicense(COL)

Early Site Permit(ESP)

Design Certification

Page 4: 1 AP1000 Standard Design: Ready for the Nuclear Renaissance The Current Status of New Nuclear Plants in the United States George Davis Westinghouse Electric

4

Current and Planned License

Applications for New Nuclear Plants

Source: Nuclear Regulatory Commission

Page 5: 1 AP1000 Standard Design: Ready for the Nuclear Renaissance The Current Status of New Nuclear Plants in the United States George Davis Westinghouse Electric

5

Source: Nuclear Regulatory Commission

Page 6: 1 AP1000 Standard Design: Ready for the Nuclear Renaissance The Current Status of New Nuclear Plants in the United States George Davis Westinghouse Electric

6

Source: Nuclear Regulatory Commission

Page 7: 1 AP1000 Standard Design: Ready for the Nuclear Renaissance The Current Status of New Nuclear Plants in the United States George Davis Westinghouse Electric

7

Westinghouse Has Orders for 8 AP1000 Units – So Far

• China Projects (w/ first unit operational in 2013):– Sanmen (2 units) – Haiyang (2 units)

• U.S. Projects (w/ first unit operational in 2016):– Vogtle (2 units)– Summer (2 units)

• Both U.S. projects pending state regulatory approvals

• Contracts for remainder of U.S. projects (10 units) in varying stages of negotiation

Page 8: 1 AP1000 Standard Design: Ready for the Nuclear Renaissance The Current Status of New Nuclear Plants in the United States George Davis Westinghouse Electric

8

AP1000 Construction Underway at Sanmen Site in China

• Excavation commenced in February 2008• First concrete scheduled for March 2009• Commercial operation scheduled for November 2013

Page 9: 1 AP1000 Standard Design: Ready for the Nuclear Renaissance The Current Status of New Nuclear Plants in the United States George Davis Westinghouse Electric

9

Machining of Heavy Component Forgings in Korea

SG-Tubesheet

RV-Transition Ring

RV-Lower Shell

SG-Lower Shell

Page 10: 1 AP1000 Standard Design: Ready for the Nuclear Renaissance The Current Status of New Nuclear Plants in the United States George Davis Westinghouse Electric

10

Containment Vessel Plate Fabrication in China

Page 11: 1 AP1000 Standard Design: Ready for the Nuclear Renaissance The Current Status of New Nuclear Plants in the United States George Davis Westinghouse Electric

11

Simplification of Design, Using Passive Features, Improves Safety

Typical PWR AP1000

Page 12: 1 AP1000 Standard Design: Ready for the Nuclear Renaissance The Current Status of New Nuclear Plants in the United States George Davis Westinghouse Electric

12

Simplification Reduces Costs to Build and Operate AP1000

Page 13: 1 AP1000 Standard Design: Ready for the Nuclear Renaissance The Current Status of New Nuclear Plants in the United States George Davis Westinghouse Electric

13

Modularization Reduces Construction Schedule and Risks

Pump/Valve Module

Raceway Module Structural ModuleDepressurization Module

Module Type

Structural

Piping

Mechanical Equipment

Electrical Equipment

TOTAL

Number

122

154

55

11

342

Page 14: 1 AP1000 Standard Design: Ready for the Nuclear Renaissance The Current Status of New Nuclear Plants in the United States George Davis Westinghouse Electric

14

Issues Important to Nuclear Energy

• Continued public and political support• Stable regulatory environment• Availability of financing• Management of used fuel• Expansion of manufacturing infrastructure• Training of construction workforce• State-level programs that support long-term, stable

generating options• Equal treatment with other non-emitting technologies