1 experiences in promoting sustained impetus for water & sanitation presented by eng malaquen...

26
1 EXPERIENCES IN PROMOTING SUSTAINED IMPETUS FOR WATER & SANITATION PRESENTED BY ENG MALAQUEN MILGO - CEO ATHI WATER SERVICES BOARD

Upload: harmony-roulston

Post on 14-Dec-2015

217 views

Category:

Documents


0 download

TRANSCRIPT

1

EXPERIENCES IN PROMOTING SUSTAINED IMPETUS FOR WATER & SANITATION

PRESENTED BY ENG MALAQUEN MILGO - CEO

ATHI WATER SERVICES BOARD

2

VISION

A future with reliable, affordable, and safe water and sewerage services that exceed our customers’ expectations

MISSION

 

To improve the quality of life of our community by ensuring access to safe water and sewerage services.

Introduction• AWSB was formed in March 2003

as a result of Water Act 2002;

• Mandate: broadly responsible for developing infrastructure and provision of Water supply and sewerage services;

• Coverage: Nairobi City, Thika East , Thika West, Ruiru, Gatanga, Kiambu East, Gatundu, Limuru, Lari and Kikuyu Districts;

• Area of coverage is about 4,000Km2 with a population of 5million people.

• Source: Water Service Boards Areas of jurisdiction, Ministry of Water and Irrigation

RIFTVALLEY

LAKE V ICTO RIA NO RTH

TAN ATHICO AST

NO R TH ER N

LAKEVICTO RIASO UTH

TAN A

ATH I

Historical background – Nairobi Supply

• The initial water supply facility for Nairobi was constructed in 1899 abstracting water from Nairobi river in the Athi river catchment.

• Kikuyu springs were first water source developed in 1900-1906. The yield from this source was 5,000m3/day.

• Ruiru (photo) is the second water source developed during 1936 to 1938. Ruiru dam completed in 1950. The yield is 22,000m3/day.

Developed Water Sources for Nairobi City

• Third is Sasumua dam located up stream of the Chania river was completed in 1956. Production is 57,000m3/day.

• Lately, Thika dam and Ngethu t/works system were developed from 1974 to 1994 in three phases. Total capacity is 440,000m3/day.

(schematic diagram on source next slide)

•Ruiru 2

Summary of Existing Water Production for Nairobi

Source Rated capacity (m3/day)

Treated water flows (m3/day)

Kikuyu springs 5,000 (11,000) 4,800 (11,000)

Ruiru dam 22,000 18,000

Sasumua dam 59,000 42,000

Thika Dam 440,000 327,000

Total 532,000 398,000

Development objectives of WaSSIP II

• Rehabilitating selected existing water production, transmission, storage and distribution facilities and waste water collection, treatment and disposal facilities

• Construction of new water treatment works in identified towns

• Expanding piped water supply services to underserved areas and through expansion of primary and secondary distribution systems

• Refining and strengthening the institutional structure, emphasizing on increasing accountability and transparency of the institutional, governance and management framework

Challenges….. (some)

• Huge investment estimated at Kshs 42 Billion required to develop infrastructure to meet medium term (2020) water demands;

• Competing needs for scarce water resources. Athi catchment is said to have 162m3/cap/year against the available 650m3/cap/year Nationally.

• High unaccounted for water.• Environmental degradation and climate change

effects;

NAIROBI PROJECTED POPULATION BY YEAR 2030

YEARPROJECTED

POPULATION %GE GROWTH

2005 2,775,087 24

2010 3,441,748 20

2015 4,147,304 20

2020 4,997,498 16

2025 5,793,470 16

2030 6,716,220

SOURCE: NAIROBI NETWORK MODELLING FINAL REPORT (AUG 2007) by Suereca/CAS JV

NAIROBI PROJECTED WATER DEMAND BY YEAR 2030

YEARPROJECTED WATER

DEMAND%GE GROWTH

DEMAND2005 542,217 24 2010 672,994 21 2015 816,141 20 2020 981,212 17 2025 1,147,327 17 2030 1,340,073 SOURCE: NAIROBI NETWORK MODELLING FINAL REPORT (AUG 2007) by Suereca/CAS JV

SITUATION ANALYSIS

• Currently, the water demand stands at 672,994 m3 per day against a production of 501,350 m3 per day – hence a deficit of 171,644 m3/day which is 25% deficit

• It is estimated that current service levels for Nairobi City stand at 76 l/c/d (Source: Draft Working Paper No 1 of February 2011, Agis BCEOM/MIPP)

 Current Status on Sewerage  • The sewerage infrastructure in Nairobi only covers 25% of the area and serves about 40% of the population.

• Currently, there are 178,099 connections to the existing sewerage network.

Completed works

• Rehabilitation of Sasumua dam spillway and embankment to restore the dam’s storage capacity from 5 million m3 to 16 million m3.

• Rehabilitation of 23kms of water network within the city of Nairobi and two booster stations aimed at reducing ufw by 35% by December 2011

• Drilled and equipped 45 boreholes in the Nairobi City in low income and high density areas producing 20,00 m3 per day.

•  

14

• Construction of 40 elevated tanks of various capacities with a total storage capacity of 1,500 m3.

• Constructed 4 new water treatment plants to produce 23,000 m3 per day.

• Constructed 2 new water treatment plants in Komothai, and Bathi to produce 9,000 m3 per day.

15

On-going works

• Constructing a new raw water intake works and 2 treatment plants to produce 13,000 m3 per day in Ruiru, and 4,000 m3 in Juja.

• Supply of 340Km water pipes and assorted fittings, 10Km sewers, manhole rings and fittings. WSPs implemented the works under the KKV programme

16

• Rehablitation works for the main Ngethu to Gigiri. The scope of works includes construction of 17Km transmission main from Kwamaiko to Gigiri reservoir and rehabilitation of Ngethu-Gigiri pipeline

• Construction of 20 water kiosks, 20 ablution blocks, drilling and equipping 6 boreholes, 6 elevated steel tanks capacity 48m3 each, and connection of existing facilities to the water and sewer network is ongoing. The works are under the project construction of Independent Water Supply Points and Sanitation Blocks in informal settlements

17

Sewerage works - Completed

• Construction of 1km f sewer in Umoja

• Construction of 27 kms trunk sewers

• Construction of 6 nos ponds, desludging of 1 fulcultation ponds and 3 maturation ponds

• Rehabilitation of Ngong river trunk sewers to reduce spillage into the Ngong River

18

Sewerage – Ongoing

• Laying of 40kms of sewer pipes in the informal settlements of Nairobi City by end of June 2012

• Laying of 8kms of sewer with 193 manholes to benefit 200,000 people.

• Construction of sanitation facilities in Kiambogo, Kirasha, Gathangari, Githirioni, and Utugi schools. Other works under lot 2 are substructure walling in Wamitaa, Ndundu, Kiawandiga, Ndunyu Chege and Rubiro primary schools. All the VIP latrines are completed and in use by the students

19

• Rehabilitating of Eastleigh Business district infrastructure to make it a modern CBD Works carried out include trenching of 2km sewerline along Muinami- Muratina streets and laid 700m sewer lines. The project trenched and pipelaid 6.5km water pipelines.

20

• Athi Water Services board is implementing community water project in informal settlements in Nairobi City and the districts of Lari, Kiambu West, Kiambu East, Kikuyu, Gatundu South, Gatundu North, Gatanga, Ruiru, Githunguri, Thika East and Thika West.

• CPC Projects implemented in all districts except Kiambu West, Ruiru and Thika West

• 17 projects financed so far. Total funds received by the CBOs amount to KShs. 101,347,816.

• Out of these, 16 CBOs have received total funding from WSTF, i.e. 1st & 2nd disbursements

• 3 CBO have signed funding agreements and are awaiting release of funds

Community Water Projects

Future works

• Construction of Maragua Dam

• Construction of the Northern Collector Tunnel to relay water to the main treatment plants

• Rehabilitation and improvement of various water treatment woks of Mwagu intakes, construction of Kiambu Water project,.

22

• Other projects are construction of a water reticulation system for Ruiru and Juja, construction of Gatanga and Gatundu community water supply and construction of Kamiti dam and construction of Gigiri – JKIA water pipeline and development of two deep exploratory wells

23

Challenges

• Currently we still have high ufw standing globally at 36% with some schemes having ufw as high as 85% - Ithanga

• Huge capital investment requirements• Our WSPs are still on a tariff which is not able to

meet operational expenses with very high utility power bills

• Implementation of the new constitution which raises issues about status of Boards and ability to borrow.

24

Way forward

• AWSB has negotiated funding from various agencies to continue with the investment momentum to the tune of USD 160 million (IDA – 145 million and AFD 15 million USD)

• The Board has developed a shopping basket of Kshs 40 billion and is keen to continue implementing targeted projects within its mandate

25

• Thank you

• Eng Malaquen Milgo

• CEO – Athi Water Services Board

26