JSW Steel LimitedJSW Steel Limited
J Soft Solutions LimitedJ Soft Solutions LimitedSouth West Port LimitedSouth West Port LimitedJaigad Port LimitedJaigad Port Limited
JSW Cement LimitedJSW Cement Limited JSW Aluminum Limited JSW Aluminum Limited
India’s largest pvt sector steel producerIndia’s largest pvt sector steel producer
JSW Energy LimitedJSW Energy Limited
JSW Group – Business Verticals
2
3
Pan India Presence & Global Foot Print
80 & 120kms
Goa
Delhi
Ratnagiri
TarapurVasind
Salem
Barmer
Vijayanagar
Haldia/ Kulpi
Jaigarh
NimdihSalboni
Kutehar
Utkal
Panyam
Bangalore
• Operations Unit
INDIA
CHINAUSA
UK
INDONESIA
MOZAMBIQUE
DUBAI •
•
•
•
•
••
• Operations Support
• Operations Unit
INDIA
CHINAUSA
UK
INDONESIA
MOZAMBIQUE
DUBAI •
•
•
•
•
••
• Operations Support
Chile
MumbaiVizag
Jaipur
Steel
Energy
Mtpa
Aluminium
Cement
Port Capacity
MW
Mtpa
Mtpa
Mtpa
Proposed
1.4
5.30.3
7.8
-
1125
7 12
11
10,000
Existing
Capacities
4
7
Established energy company
Established energy company
Building integrated model with presence across value
chain
Building integrated model with presence across value
chain
Generating power profitably since 2000
Generating power profitably since 2000
Amongst the top 5 power traders in India by volumeAmongst the top 5 power traders in India by volume
Diversified portfolio of projects
Diversified portfolio of projects
Experience in Project management and execution
Experience in Project management and execution
Strengths
Energy
Key Management Team
Name Designation
Mr. S. S. Rao Jt. Managing Director & CEO
Mr. Sanjay Sagar President – Project Development
Mr. R.R. Pillai COO of 260 MW & 600 MW project at Vijaynagar
Mr. Upinder Singh COO RWPL, 1080 MW project at Barmer
Mr. K.J. Varkey Sr. V.P. in charge of 1200 MW project at Ratnagiri
Mr. Pramod Menon A.V.P. & Chief Financial Officer
9
11
Establishing Presence Across value chain …
Distribution
Trading
A balanced corporate strategy to take advantage of huge demand / supply mismatch in the power sector.
En
d t
o E
nd
So
luti
on
P
rov
ide
r Aim to build an integrated energy company
Poised to achieve
10000 MW capacity by 2015
■ Strong project implementation capabilities
Transmission
Generation
Mining
Equipment manufacturing & EPC
12
Under OperationUnder Operation
Generation
Beyond Generation
Under ConstructionUnder Construction
Overview of Energy Business
End – to – End integrated model
Trading /Transmission / Equipment
manufacturing / Mining
Trading /Transmission / Equipment
manufacturing / Mining
Distribution Distribution
Existing
Planned
Already in possession
Under DevelopmentUnder Development
Power Trading
Transmission Joint Venture with MSETCL for setting up Transmission facility
Amongst the top 5 power trading companies Quantum for FY’ 09 E -2.05 billion units
Amongst the top 5 power trading companies Quantum for FY’ 09 E -2.05 billion units
Beyond Generation
Equipment Mfg Joint Venture with Toshiba Corp., Japan for Steam Turbine Generator facility
Joint Venture with Toshiba Corp., Japan for Steam Turbine Generator facility
13
Mining Lignite mines at Kapurdi & Jalipa, Rajasthan Thermal coal in Orissa & West Bengal Coal Mines in Mozambique, Swaziland &
Indonesia
15
Company Capacity Land Fuel Approvals Financial closure
Off - take
JSWEL 600 MW Already
In possession
100%
Tied-up
Achieved Achieved 51% with JSWSL,
JSWCL & 49% ST
JSWERL 1200 MW Already
In possession
100%
Tied-up
Achieved Achieved 50 % LT,
50 % ST
RWPL (Phase 1)
1080 MW Already
In possession
Captive
Lignite
Mining
Achieved Achieved 100% PPA Agreement
RWPL (Phase 2)
270 MW Available 100%
Tied-up
Under Progress
Sanction Received
100% ST
KUTEHAR - HYDRO
260 MW Under allotment
N/A Achieved Sanction Received
100% Merchant
Power
Overview - Projects under Construction
* LT – Long term PPA* ST – Short term PPA
16
Company Capacity Location Commissioning
JSWEL 600 MW Karnataka 300 MW - Jun’ 2009
300 MW - Aug’ 2009
300 MW – Jun 2012
300 MW – Oct 1012
JSWERL 1200 MW Maharashtra 300 MW - Dec’ 2009
300 MW - Mar’ 2010
300 MW - Jun’ 2010
300 MW - Sept’ 2010
RWPL (Phase 1) 1080 MW Rajasthan 135 MW - Aug’ 2009
135 MW - Sep’ 2009
135 MW - Nov’ 2009
135 MW - Dec’ 2009
135 MW - Feb’ 2010
135 MW - Apr’ 2010
135 MW - Jun’ 2010
135 MW - Aug’ 2010
RWPL (Phase 2) 270 MW Rajasthan 135 MW - Apr’ 2012
135 MW - Jul’ 2012
JSWEL 260 MW Himachal Pradesh 260 MW - Dec’ 2014
Implementation Schedule
Already Synchronized
22
Overview - Projects Under Development
Projects Capacity (MW)
Land Fuel DPR Off-take
JSWERL
(Phase - 2)
3200 Acquired Tied up Completed Mix of LT & ST
Chhatisgarh 1320 Under
Acquisition
Captive Mine
In Progress Mix of LT & ST
West Bengal 1600 Acquired Captive Linkage
In Progress 51% JSWBSL & 49% WBSEB
Gujarat 1600 Under Acquisition
Imported Coal
Completed Mix of LT & ST
Orissa 1600 Land Identified
40% tied up & Balance in progress
Completed Mix of LT & ST
Jharkhand 1600 Land Identified
Coal Linkages in progress
In Progress
Mix of LT & ST
* LT – Long term PPA * ST – Short term PPA
Achieve end-to-end integration – Mining to Distribution
Ensure fuel security – Captive Mines/Linkages
Build non-conventional generation assets
Rapid Growth through strategic partnerships
Balanced Off-take arrangements –PPA/ Merchant
Capture the opportunity provided by Power sector
Way forward
24
Creating world class power utility company