1 plant managers-sandblasting painting presentation
TRANSCRIPT
Natural Gas Storage Tanks
Sandblasted & Painted to SSPC Standards Industrial Corrosion Control Surface Preparation Procedures (203)565-8222 [email protected]
1
Epoxy Coating Tanks Sandblasting SSPC
Standards Industrial Corrosion Control Surface Preparation Procedures (203)565-8222 [email protected]
2
Coating & Sandblast Specifications / Safety & Work Procedures Completed By Jerry Higney/ICC
All Pictures Taken & Owned By Jerry Higney/ICC For Display Only Of Work & Specifications Performed By the Same
Industrial Corrosion Control Surface Preparation Procedures (203)565-8222 [email protected]
3 GPS Contract-Jerry Higney/ICC
Coating & Sandblast Specifications / Safety & Work Procedures Completed By Jerry Higney/ICC
All Pictures Taken & Owned By Jerry Higney/ICC For Display Only Of Work & Specifications Performed By the Same
Industrial Corrosion Control Surface Preparation Procedures (203)565-8222 [email protected]
4 Sandblasting & Coating Procedures Jerry Higney/ICC
Coating & Sandblast Specifications / Safety & Work Procedures Completed By Jerry Higney/ICC
All Pictures Taken & Owned By Jerry Higney/ICC For Display Only Of Work & Specifications Performed By the Same
Industrial Corrosion Control Surface Preparation Procedures (203)565-8222 [email protected]
5
Sandblasting & Coating of Silo’s Interior & Exterior Pipe Staging was Erected through manhole under confine space regulations procedures
Coating & Sandblast Specifications / Safety & Work Procedures Completed By Jerry Higney/ICC
All Pictures Taken & Owned By Jerry Higney/ICC For Display Only Of Work & Specifications Performed By the Same
Industrial Corrosion Control Surface Preparation Procedures (203)565-8222 [email protected]
Jerry Higney/ICC has been a Technical Consultant and Certified Contractor Applicator for Belzona Molecular for over 20years
6
All Pictures Taken & Owned By Jerry Higney/ICC For Display Only Of Work & Specifications Performed By the Same
Coating & Sandblast Specifications / Safety & Work Procedures Completed By Jerry Higney/ICC
Turbine Generator Plants Painted & Sandblasted
Major Painting Projects * Safety Identification Labeling
Larg
e O
r Sm
all
7
Industrial Corrosion Control Surface Preparation Procedures (203)565-8222 [email protected]
All Pictures Taken & Owned By Jerry Higney/ICC For Display Only Of Work & Specifications Performed By the Same
Coating & Sandblast Specifications / Safety & Work Procedures Completed By Jerry Higney/ICC
Large Storage Tank NU Power Plant
Vacuum Blasting Large Sandblasting Projects Middletown Power Plant Tanks
8
Industrial Corrosion Control Surface Preparation Procedures (203)565-8222 [email protected]
All Pictures Taken & Owned By Jerry Higney/ICC For Display Only Of Work & Specifications Performed By the Same
Coating & Sandblast Specifications / Safety & Work Procedures Completed By Jerry Higney/ICC
Industrial Corrosion Control Surface Preparation Procedures (203)565-8222 [email protected]
All Pictures Taken & Owned By Jerry Higney/ICC For Display Only Of Work & Specifications Performed By the Same
Coating & Sandblast Specifications / Safety & Work Procedures Completed By Jerry Higney/ICC
9 Large Sandblast Procedure Of Tanks-Transfer of Grit to Trailer For 8 Ton Sandblast Pot
Industrial Corrosion Control Surface Preparation Procedures (203)565-8222 [email protected]
All Pictures Taken & Owned By Jerry Higney/ICC For Display Only Of Work & Specifications Performed By the Same
Coating & Sandblast Specifications / Safety & Work Procedures Completed By Jerry Higney/ICC
10 Western Mass Electric Tank Painting
Industrial Corrosion Control Surface Preparation Procedures (203)565-8222 [email protected]
All Pictures Taken & Owned By Jerry Higney/ICC For Display Only Of Work & Specifications Performed By the Same
Coating & Sandblast Specifications / Safety & Work Procedures Completed By Jerry Higney/ICC
11 Tank Painting
Co
atin
g &
San
db
last
Sp
ecif
icat
ion
s /
Safe
ty &
Wo
rk P
roce
du
res
Co
mp
lete
d B
y Je
rry
Hig
ney
/IC
C
Industrial Corrosion Control Surface Preparation Procedures (203)565-8222 [email protected]
All Pictures Taken & Owned By Jerry Higney/ICC For Display Only Of Work & Specifications Performed By the Same
Coating & Sandblast Specifications / Safety & Work Procedures Completed By Jerry Higney/ICC
12
Sandblast & Painting Containments Made Anywhere With Confine Space procedure's
Power Plant Rake Clarifiers
GPS Contract With Keeler & Long Devon Ct Power Plant
North East Utilities Devon Connecticut Power Plant project
Dust Collection Enclosure For Sandblasting & Coating Procedures
Completed Rake Clarifier With 10 Year Protection Plan
Trowel Application Of 100% Solids Material To Concrete Substrate
Industrial Corrosion Control Surface Preparation Procedures (203)565-8222 [email protected]
All Pictures Taken & Owned By Jerry Higney/ICC For Display Only Of Work & Specifications Performed By the Same
Co
atin
g &
San
db
last
Sp
ecif
icat
ion
s /
Safe
ty &
Wo
rk P
roce
du
res
Co
mp
lete
d B
y Je
rry
Hig
ney
/IC
C
13
Industrial Corrosion Control Surface Preparation Procedures (203)565-8222 [email protected]
All Pictures Taken & Owned By Jerry Higney/ICC For Display Only Of Work & Specifications Performed By the Same
GPS Contract With Keeler & Long Devon Ct Power Plant
Coating & Sandblast Specifications / Safety & Work Procedures Completed By Jerry Higney/ICC 14
Natural Gas Gate Station
Large or Small Painting Projects-Protective Covering & Air Collection
Natural Gas Gate Station Industrial Corrosion Control Surface Preparation Procedures (203)565-8222 [email protected]
All Pictures Taken & Owned By Jerry Higney/ICC For Display Only Of Work & Specifications Performed By the Same
Coating & Sandblast Specifications / Safety & Work Procedures Completed By Jerry Higney/ICC
15
Industrial Corrosion Control Surface Preparation Procedures (203)565-8222 [email protected]
All Pictures Taken & Owned By Jerry Higney/ICC For Display Only Of Work & Specifications Performed By the Same
Coating & Sandblast Specifications / Safety & Work Procedures Completed By Jerry Higney/ICC
Transmission Natural Gas Lines/Below & Above Ground Coating Specification's
16
Natural Gas Gate Station
Blast & Paint Containments Built In Gate Stations (Natural Gas Piping)
Industrial Corrosion Control Surface Preparation Procedures (203)565-8222 [email protected]
All Pictures Taken & Owned By Jerry Higney/ICC For Display Only Of Work & Specifications Performed By the Same
17
Coating & Sandblast Specifications / Safety & Work Procedures Completed By Jerry Higney/ICC
Industrial Corrosion Control Surface Preparation Procedures (203)565-8222 [email protected]
All Pictures Taken & Owned By Jerry Higney/ICC For Display Only Of Work & Specifications Performed By the Same
Coating & Sandblast Specifications / Safety & Work Procedures Completed By Jerry Higney/ICC
18
Natural Gas Heater Gate Station Industrial Painting NGA-OQ Qualified
Industrial Corrosion Control Surface Preparation Procedures (203)565-8222 [email protected]
All Pictures Taken & Owned By Jerry Higney/ICC For Display Only Of Work & Specifications Performed By the Same
19
Industrial Corrosion Control Surface Preparation Procedures (203)565-8222 [email protected]
Coating & Sandblast Specifications / Safety & Work Procedures Completed By Jerry Higney/ICC
All Pictures Taken & Owned By Jerry Higney/ICC For Display Only Of Work & Specifications Performed By the Same
20
Industrial Corrosion Control Surface Preparation Procedures
All Pictures Taken & Owned By Jerry Higney/ICC For Display Only Of Work & Specifications Performed By the Same
Coating & Sandblast Specifications / Safety & Work Procedures Completed By Jerry Higney/ICC
21 Touchup Epoxy Painting And Drill & Tap flanges For Lightning Arrest System.
Industrial Corrosion Control Surface Preparation Procedures (203)565-8222 [email protected]
All Pictures Taken & Owned By Jerry Higney/ICC For Display Only Of Work & Specifications Performed By the Same
Natural Gas Transmission Compressor Station
Zinc Coatings Being Applied over Fusion Bonded Epoxy System
22
Algonquin Gas Transmission
Valves & Piping
Industrial Corrosion Control Surface Preparation Procedures (203)565-8222 [email protected]
All Pictures Taken & Owned By Jerry Higney/ICC For Display Only Of Work & Specifications Performed By the Same
23
Industrial Corrosion Control Surface Preparation Procedures (203)565-8222 [email protected]
All Pictures Taken & Owned By Jerry Higney/ICC For Display Only Of Work & Specifications Performed By the Same
Coating & Sandblast Specifications / Safety & Work Procedures Completed By Jerry Higney/ICC
24 Natural Gas Transmission Lines-Remote Stations
Industrial Corrosion Control Surface Preparation Procedures (203)565-8222 [email protected]
All Pictures Taken & Owned By Jerry Higney/ICC For Display Only Of Work & Specifications Performed By the Same
Coating & Sandblast Specifications / Safety & Work Procedures Completed By Jerry Higney/ICC
25
26
Industrial Corrosion Control Surface Preparation Procedures (203)565-8222 [email protected]
All Pictures Taken & Owned By Jerry Higney/ICC For Display Only Of Work & Specifications Performed By the Same
Coating & Sandblast Specifications / Safety & Work Procedures Completed By Jerry Higney/ICC
Industrial Corrosion Control Surface Preparation Procedures (203)565-8222 [email protected]
All Pictures Taken & Owned By Jerry Higney/ICC For Display Only Of Work & Specifications Performed By the Same
27
Coating & Sandblast Specifications / Safety & Work Procedures Completed By Jerry Higney/ICC
Natural Gas Natural Gas
All Types Of Piping
10 Year Guarantee On Work
Ind
ust
rial
Co
rro
sio
n C
on
tro
l
Jerry Higney Has Performed Project For Yankee Gas For 25 Yrs.
28
Industrial Corrosion Control Surface Preparation Procedures (203)565-8222 [email protected]
All Pictures Taken & Owned By Jerry Higney/ICC For Display Only Of Work & Specifications Performed By the Same
Pratt & Whitney FT-8 Cogen Project Painting
This stack run through the roof into the Pratt & Whitney power house, over 240 ft. high
During the erecting of the man basket and cables, a 50 ft. ladder was hoisted to the top of the stack so that the main cable could run through the center of the stack and be locked out and shackled out the man hole in the power plant.
240 ‘Stack Inlet & Outlet Stacks Piping In Power plant Ladder Cages Stack Platforms
Scope Of Work Paint & Sandblasting
This Project was headed up by Jerry Higney/ Director Of Operation/ICC
29
Pratt & Whitney FT-8 Cogen Project Painting
Ind
ust
rial
Co
rro
sio
n C
on
tro
l
Industrial Corrosion Control Surface Preparation Procedures (203)565-8222 [email protected]
All Pictures Taken & Owned By Jerry Higney/ICC For Display Only Of Work & Specifications Performed By the Same
Coating & Sandblast Specifications / Safety & Work Procedures Completed By Jerry Higney/ICC Industrial Corrosion Control Blast & Paint Co.
Coating & Sandblast Specifications / Safety & Work Procedures Completed By Jerry Higney/ICC
30
This Project was headed up by Jerry Higney/ Director Of Operation/ICC
Pratt & Whitney FT-8 Cogen Project Painting
Product Used On This Project
“Scope Of Work Paint & Sandblasting”
240 ‘Stack Inlet & Outlet Stacks Piping In Power plant Ladder Cages Stack Platforms
Project performed At
31
Industrial Corrosion Control Surface Preparation Procedures (203)565-8222 [email protected]
All Pictures Taken & Owned By Jerry Higney/ICC For Display Only Of Work & Specifications Performed By the Same
Industrial Corrosion Control Surface Preparation Procedures (203)565-8222 [email protected]
All Pictures Taken & Owned By Jerry Higney/ICC For Display Only Of Work & Specifications Performed By the Same
Coating & Sandblast Specifications / Safety & Work Procedures Completed By Jerry Higney/ICC
32
CT Trash Energy Plant Main Boiler Super Heater Section
Main floor of Trash Energy plant ,small shelter was built for shut down in plant, workers had cots for shifts that were performed through the three days.
These tubes in the boiler were sandblasted to engineers specification so that once the tubes were sandblasted they could be Magnetic particle inspected(MPI) . Looking for cracks in the tubes.
The picture on the bottom left is the main entrance into the boiler , once workers entered this area we were on over a 100ft of pipe scaffolding and had a series of OSHA planks that were clamped to the tubes to gain access to the super heater pipes as the right bottom picture shows. Over 8 story's of stairs had to be climbed just to get to the man hole access area. Blasters had explosion proof radio head set by con-space and were in consist communication with our supervisors.
Industrial Corrosion Control Confine Space Enter By Permit Only
33
All Pictures Taken & Owned By Jerry Higney/ICC For Display Only Of Work & Specifications Performed By the Same
Industrial Corrosion Control
ABB Combustion Engineers Research Furnace
Windsor Locks, Ct. very large Sandblasting and Painting Project all projects specifications and responsibilities were perform by Jerry Higney/Director of Operation. Project included painting and sandblastings, coal silos, storage tanks, structural steel, large boilers, up to 36” piping.
Industrial Corrosion Control Surface Preparation Procedures (203)565-8222 [email protected]
All Pictures Taken & Owned By Jerry Higney/ICC For Display Only Of Work & Specifications Performed By the Same
34
ABB Combustion Engineers Research Furnace 35
Industrial Corrosion Control Surface Preparation Procedures (203)565-8222 [email protected]
All Pictures Taken & Owned By Jerry Higney/ICC For Display Only Of Work & Specifications Performed By the Same
203-565-8222
35yrs. Experience * Sandblasting * Coatings * Painting * Grit Blasting * Rigging * Containments
Email: [email protected]
• Tanks • Towers • Pipelines • Equipment • Floors • Ceilings • Stacks • Silos • Trucks • Tractors • Cranes • Buildings • Trains • Tanks • Ships
Power Point Presentation's
ICC Company Reference's
Safety Programs & Certificates
Environmental Procedures
Click Click Click
ICC Trade Secrets Membership
Confine Space Procedures Blast N Paint
SSPC & NACE Application/Surface Preparation
Surface Preparation Procedures
The Leaders In Sandblasting Procedures
Industrial Corrosion Control
Western Mass Electric Generating Plant
This project was sandblasted and painted by Jerry Higney & another worker, Entire plant was completed in one months time. The plant had four Westinghouse large KW Turbines, Large Inlet and outlet stacks, storage tanks and control rooms for plant operation, stair access to secondary containment holding areas around tanks were also sandblasted and painted to SSPC standards.
Bef
ore
Pic
ture
Of
Pro
ject
B
efore P
icture O
f Pro
ject 36
Industrial Corrosion Control Surface Preparation Procedures (203)565-8222 [email protected]
All Pictures Taken & Owned By Jerry Higney/ICC For Display Only Of Work & Specifications Performed By the Same
Western Mass Electric Generating Plant C
om
ple
ted
Pro
ject
Pic
ture
Co
mp
leted P
roject P
icture
Industrial Corrosion Control The specification on this project were of NACE & SSPC Standards on surface preparation during the sandblast cleaning of rust and old fail paint systems .The stack outlets were over a 1000 degrees and specialized coatings and surface preparation was completed and performed on all substrates described above.
Industrial Corrosion Control Surface Preparation Procedures (203)565-8222 [email protected]
All Pictures Taken & Owned By Jerry Higney/ICC For Display Only Of Work & Specifications Performed By the Same
Coating & Sandblast Specifications / Safety & Work Procedures Completed By Jerry Higney/ICC
37
Co
mp
lete
d P
roje
ct P
ictu
re
Western Mass Electric Generating Plant C
om
pleted
Pro
ject Pictu
re
Safety yellow Urethane was applied over sandblasted epoxy coated ladders and railing systems, small tank and concrete foundations were sandblasted and approved coating systems were applied.
Industrial Corrosion Control Surface Preparation Procedures (203)565-8222 [email protected]
All Pictures Taken & Owned By Jerry Higney/ICC For Display Only Of Work & Specifications Performed By the Same
Coating & Sandblast Specifications / Safety & Work Procedures Completed By Jerry Higney/ICC
38
Industrial Corrosion Control Surface Preparation Procedures (203)565-8222 [email protected]
All Pictures Taken & Owned By Jerry Higney/ICC For Display Only Of Work & Specifications Performed By the Same
Coating & Sandblast Specifications / Safety & Work Procedures Completed By Jerry Higney/ICC
39
Painting & Sandblasting Contractor
Industrial & Commercial Units Completed
Stanley Works Many Projects
Plant Painting and Coating Systems On Various Areas In Plant
Ind
ust
rial
Co
rro
sio
n C
on
tro
l
Work Was Performed At
40
Industrial Corrosion Control Surface Preparation Procedures (203)565-8222 [email protected]
All Pictures Taken & Owned By Jerry Higney/ICC For Display Only Of Work & Specifications Performed By the Same
Coating & Sandblast Specifications / Safety & Work Procedures Completed By Jerry Higney/ICC
Industrial Corrosion Control Surface Preparation Procedures
C
Industrial Surface Prep & Coatings On Natural Gas Lines For Yankee Gas Systems
Coating & Sandblast Specifications / Safety & Work Procedures Completed By Jerry Higney/ICC
All Pictures Taken & Owned By Jerry Higney/ICC For Display Only Of Work & Specifications Performed By the Same
41
Containment Areas For Chemicals
Secondary Containment Coatings Where Chemicals Are Stored
Ind
ust
rial
Co
rro
sio
n C
on
tro
l
Industrial Corrosion Control Surface Preparation Procedures (203)565-8222 [email protected]
All Pictures Taken & Owned By Jerry Higney/ICC For Display Only Of Work & Specifications Performed By the Same
Coating & Sandblast Specifications / Safety & Work Procedures Completed By Jerry Higney/ICC
42
Industrial Corrosion Control Surface Preparation Procedures (203)565-8222 [email protected]
All Pictures Taken & Owned By Jerry Higney/ICC For Display Only Of Work & Specifications Performed By the Same
Coating & Sandblast Specifications / Safety & Work Procedures Completed By Jerry Higney/ICC
43 High Heat Coatings
New
Haven
, Ct. Trash
Transfer Statio
n P
roject
This project consisted of spray paint structural pre primed steel when building was erected, most coatings are pre engineered approved or recommended by our Director of Operation Jerry Higney. With over 30 years experience in the Industrial & Commercial markets.
Industrial Corrosion Control
Industrial Corrosion Control Surface Preparation Procedures (203)565-8222 [email protected]
All Pictures Taken & Owned By Jerry Higney/ICC For Display Only Of Work & Specifications Performed By the Same
44
Coating & Sandblast Specifications / Safety & Work Procedures Completed By Jerry Higney/ICC
Loading Dock Anti Slip Coating Paint & Sandblast Containment Was Built Over Docks
Ind
ust
rial
Co
rro
sio
n C
on
tro
l
45
Industrial Corrosion Control Surface Preparation Procedures (203)565-8222 [email protected]
All Pictures Taken & Owned By Jerry Higney/ICC For Display Only Of Work & Specifications Performed By the Same
Coating & Sandblast Specifications / Safety & Work Procedures Completed By Jerry Higney/ICC
Towers
Removal * Painting * Concrete Pad Repairs *
Industrial Corrosion Control Surface Preparation Procedures (203)565-8222 [email protected]
All Pictures Taken & Owned By Jerry Higney/ICC For Display Only Of Work & Specifications Performed By the Same
Coating & Sandblast Specifications / Safety & Work Procedures Completed By Jerry Higney/ICC
46
Garages * Buildings * Remote Sites
Floors * Walls * Ceilings * Equipment * Doors * Offices * Line Stripes
47
Industrial Corrosion Control Surface Preparation Procedures (203)565-8222 [email protected]
All Pictures Taken & Owned By Jerry Higney/ICC For Display Only Of Work & Specifications Performed By the Same
Blastrac & Floor and lift Painting
Coating & Sandblast Specifications / Safety & Work Procedures Completed By Jerry Higney/ICC
Ceiling Painting & Cleaning
* Walls * Rooms * Buildings * Factory's * Plants * 48
Industrial Corrosion Control Surface Preparation Procedures (203)565-8222 [email protected]
All Pictures Taken & Owned By Jerry Higney/ICC For Display Only Of Work & Specifications Performed By the Same
Coating & Sandblast Specifications / Safety & Work Procedures Completed By Jerry Higney/ICC
Large or Small Factory Ceilings This worker is positioning spray pump into buckets of Latex dyfall ceiling paint so that sprayers can continue spraying above him on man lifts and painter pick planks, no mater how big you manufacturing plant is or no matter how many machines are on the floor, our protective covering and access to spray without any over spray on sensitive equipment is performed to the highest degree. Any of our ceiling painting project can be performed during shutdowns or while operation of the plant.
Industrial Corrosion Control Surface Preparation Procedures (203)565-8222 [email protected]
All Pictures Taken & Owned By Jerry Higney/ICC For Display Only Of Work & Specifications Performed By the Same
49
Ceiling Painting In
du
stri
al C
orr
osi
on
Co
ntr
ol
(203) 565-8222-Jerry Higney
Industrial Corrosion Control Surface Preparation Procedures (203)565-8222 [email protected]
All Pictures Taken & Owned By Jerry Higney/ICC For Display Only Of Work & Specifications Performed By the Same
50
Coating & Sandblast Specifications / Safety & Work Procedures Completed By Jerry Higney/ICC
* Side Walks * Concrete Floors * Cleaning Old Concrete & Elastomer Joints
51
Industrial Corrosion Control Surface Preparation Procedures (203)565-8222 [email protected]
All Pictures Taken & Owned By Jerry Higney/ICC For Display Only Of Work & Specifications Performed By the Same
Industrial Corrosion Control Surface Preparation Procedures (203)565-8222 [email protected]
All Pictures Taken & Owned By Jerry Higney/ICC For Display Only Of Work & Specifications Performed By the Same
52
Construction Equipment Paint & Blasted Ind
ustrial C
orro
sion
Co
ntro
l Paintin
g Pro
jects 53
Coating & Sandblast Specifications / Safety & Work Procedures Completed By Jerry Higney/ICC
Construction Equipment Paint & Blasted
During Completed
Ind
ustrial C
orro
sion
Co
ntro
l Paintin
g Pro
jects
Completed
Completed
During
During
54
Coating & Sandblast Specifications / Safety & Work Procedures Completed By Jerry Higney/ICC
Tractor Trailers & Equipment Painting
Containment Setup On Site Small Or Large
55
Industrial Corrosion Control Surface Preparation Procedures (203)565-8222 [email protected]
All Pictures Taken & Owned By Jerry Higney/ICC For Display Only Of Work & Specifications Performed By the Same
Coating & Sandblast Specifications / Safety & Work Procedures Completed By Jerry Higney/ICC
All Types Of Equipment Painting
Industrial Corrosion Control Surface Preparation Procedures (203)565-8222 [email protected]
All Pictures Taken & Owned By Jerry Higney/ICC For Display Only Of Work & Specifications Performed By the Same
56
Coating & Sandblast Specifications / Safety & Work Procedures Completed By Jerry Higney/ICC
Fleet Painting
Complete Sandblasting & Painting * Logos *
Industrial Corrosion Control Surface Preparation Procedures (203)565-8222 [email protected]
All Pictures Taken & Owned By Jerry Higney/ICC For Display Only Of Work & Specifications Performed By the Same
57
Coating & Sandblast Specifications / Safety & Work Procedures Completed By Jerry Higney/ICC
Industrial Corrosion Control Surface Preparation Procedures (203)565-8222 [email protected]
All Pictures Taken & Owned By Jerry Higney/ICC For Display Only Of Work & Specifications Performed By the Same
58
Coating & Sandblast Specifications / Safety & Work Procedures Completed By Jerry Higney/ICC
Coating & Sandblast Specifications / Safety & Work Procedures Completed By Jerry Higney/ICC
59
Industrial Corrosion Control Surface Preparation Procedures (203)565-8222 [email protected]
All Pictures Taken & Owned By Jerry Higney/ICC For Display Only Of Work & Specifications Performed By the Same
60
Coating & Sandblast Specifications / Safety & Work Procedures Completed By Jerry Higney/ICC
Industrial Corrosion Control Surface Preparation Procedures (203)565-8222 [email protected]
All Pictures Taken & Owned By Jerry Higney/ICC For Display Only Of Work & Specifications Performed By the Same
Swimming Pools Concrete Work Sandblasting & Concrete Repair
Industrial Corrosion Control Surface Preparation Procedures (203)565-8222 [email protected]
All Pictures Taken & Owned By Jerry Higney/ICC For Display Only Of Work & Specifications Performed By the Same
Heritage Village 2300 Units 2300 Porches & Units * Condos * Corn Cob Blasting To Remove Old Stains
Industrial Corrosion Control Surface Preparation Procedures (203)565-8222 [email protected]
All Pictures Taken & Owned By Jerry Higney/ICC For Display Only Of Work & Specifications Performed By the Same
Corn Cob & Walnut Shell Blasting To Remove Paint or Stains
Jerry Higney /Director Of Operations ICC has grit blasted to remove failed stain & Paint jobs on thousands of houses & Condo’s
Protective covering of grass, plants, walkways, gardens etc. our, top concerns for ICC management, our fall protection program is the best.
Log Cabins & Wood Sandblasting with Corn Cob and other Sandblast medias
Whether you have old logs or older grey weathered lumber, Corn Cob or Grit blasting cleans and preserves wood, once theses procedures are completed, you have a new piece of lumber, no matter how long or how bad the surface looks prior to grit blasting. Also while grit blasting on structures, concrete foundations & sidewalks, Etc. can be cleaned. When sidewalks/ concrete foundation are grit blasted, unlike power washing that only cleans 50% of the surface staining, grit blasting cleans 100% and removes a layer that can not be seen by the eye, although leaves a appearance of brand new concrete. The grit absorbs all oils etc. in the procedure.
Old Weathered
Wood Grit Blasted
Protective Covering and Duct Tape masking of
Windows
Industrial Corrosion Control Surface Preparation Procedures (203)565-8222 [email protected]
Sandblasting Wood
Any Types Of Wood Can Be Cleaned By ICC Power Washing Or Sandblasting
*Co
rn C
ob
* Waln
ut Sh
ells * Sand
*
Steel Fence Painting & Sandblasting
Iron Fences & Chain Link Fences
Ind
ust
rial
Co
rro
sio
n C
on
tro
l
Foundations
Sandblasting & Protective Underground Coatings & Insulation
ICC
Gate Stations Transmission & Distribution
Power Plant Chillers
* Trane * Carrier * Westinghouse * Certified in Ceramic Rebuilding Coating Systems
Power Plant Work
Power Plant Work
All Types Of Facilities Work * Concrete * Steel * Wood * Brick * Iron
Industrial Corrosion Control Surface Preparation Procedures
Industrial Corrosion Control
• Request To Be Put On
Vendors List For
Industrial Painting & Sandblasting Graffiti Removal (Many Methods) High Pressure Power Washing Power Plant Maintenance Painting Blastrac Blasting ( Parking Garages ) Bridge Rigging Commercial Painting Floors Walls Ceilings
Lead Abatement Waterproofing Concrete Repairs (All) Pipeline Painting (Gas Oil Water) Tuck Pointing Loading Dock Painting Machine & Equipment Painting
Industrial Corrosion Control Surface Preparation Procedures
Industrial Corrosion Control Surface Preparation Procedures (203)565-8222 [email protected]
Industrial Corrosion Control
Cathode Protection system being installed for Yankee Gas Service Company
Header wires and splice kits were installed by Jerry Higney of ICC-Anodes are designed to protect the gas mains
Industrial Corrosion Control Surface Preparation Procedures (203)565-8222 [email protected]
All Pictures Taken & Owned By Jerry Higney/ICC For Display Only Of Work & Specifications Performed By the Same
Coating & Sandblast Specifications / Safety & Work Procedures Completed By Jerry Higney/ICC
Confine Space Spray Booth/Piping & 125 Spray Nozzles Replaced
Industrial Corrosion Control
This project was completed by Jerry Higney/Director of Operations-ICC- Scope of work was performed at all State Of Ct. Emission's Stations, vehicles were slipping off the high speed rollers, Jerry Higney developed a specification to Vacuum Grit blast rollers to etch the steel for adhesion for the Belzona Ceramic Carbide Polymer aggregate that was applied to the rollers so that the vehicles would stay put…
Bridge Work Containment Gas & Water Hanger Replacement and Fastener Replacement
Co
nfi
ne
Spac
e P
roce
du
res
Core Drilling & Anchoring Anything
Confine Space Areas
All Kinds Of Welding-Mobile Unit With 500ft Of Welding Lines
Ind
ustrial C
orro
sion
Co
ntro
l
Industrial Corrosion Control Surface Preparation Procedures (203)565-8222 [email protected]
Industrial Corrosion Control Surface Preparation Procedures (203)565-8222 [email protected]
Industrial Corrosion Control Surface Preparation Procedures (203)565-8222 [email protected]
Coating & Sandblast Specifications / Safety & Work Procedures Completed By Jerry Higney/ICC
Industrial Corrosion Control
(203) 565-8222-Jerry Higney
Industrial Corrosion Control State Of The Art Confine Space Command Center
Confine space procedure can be run thru this trailer under sandblasting coating procedure. Explosion Proof Equipment.
Video Radio Communication Lighting Fans Breathing
LEL 6 Gas Metering Signaling Lightning Sirens
Confine Space Radios
Industrial Corrosion Control P.O. Box 358
Rocky Hill Ct. 06067
(203)565-8222(Jerry Higney)
Facilities Services Contractor 30 Years Experience
Painting * Sandblasting * Concrete
Technologically Advanced Surface Preparation & Application Contractor
Industrial Corrosion Control P.O. Box 358
Rocky Hill, Ct. 06067 (203)565-8222 (Jerry)
Gas Transmission Co.
Oil Refineries Manufacturing Dams Gates
Pulp & Paper Mills Fossil Power Plants Shipping Steel Mills
Chemical Plants Waste Recovery Plants Cogen Turbine Plants Electrical Sub Stations
Facilities Where Work Was Performed
Types of Units Have Worked On
Storage Tanks (Large & Small) Power Plant Boilers Transporters Tank Farms Piping Air Handling Equipment Clarifiers Ceiling & Floors
Smoke Stacks Turbines Silos Bridges Natural Gas (All) Transformers Barges & Ships Steel
Industrial Corrosion Control
Industrial Painting & Sandblasting Commercial Painting & Sandblasting Graffiti Removal (Many Methods) Scaffolding & Rigging Procedures Bridge work Water Treatment & Trash Energy Coatings High Pressure Washing & Water Jetting ( 1500 psi to 75,000psi) Power Plant Maintenance Painting ( High Tech coating Systems) Blastrac Blasting For Floors Lead Abatement Procedures All Types Of Painting & Solving Failed Paint Projects
(203) 565-8222-Jerry Higney
Industrial Corrosion Control
ICC Safety Training & Certification Programs (Internal Programs & Awarded)
Internal Programs * On Site Training Modules * ICC Procedures Corporation *Certificates
Corporation Certifications (Employees & ICC)
NLB Corporation (High Pressure Water Jetting System) Over 45,000 psi (Certified) Yankee Gas-Lee Ann Housley Training ICC-(Gate Station Awareness) Northeast Utilities System (CLAS) Compliance Leadership Accountability Stewardship The Northeast Gas Association (NGA) Operator Qualification OQ Program Belzona World Wide (ISO/ASME/DOT Installer/Supervisor Training) Only Contractor NE Medtox Federal Drug Testing Program Pratt & Whitney (Contractor Environmental Health & Training) (Level3 Highest) Hamilton Sunstrand (Contractor Environmental Health & Training)-Level 3 Sikorsky (Contractor Environmental Health & Training) – Level 3 UTC (Contractor Environmental Health & Training) American Red Cross (First Aid CPR/AED) Respirator Breathing (MSA/3M/North) Western Technologies (Explosion Proof Lighting Equipment) Fire Equipment Headquarters (Fire Prevention & Action) Fall Protection Program
Industrial Corrosion Control
• ICC Internal Safety Programs
Hearing Conservation Hard hat PPE Eye Ware Protection (Several Types ICC ) PPE For Specific
Task Fall Protection Bridge Rigging Confine Space Procedures Lead Training Asbestos training Gate Station Awareness ICC-Blast n Paint
Industrial Corrosion Control
• ICC Internal Safety Programs
Fire Prevention Equipment PPE Gas Leak Technology Intrinsically Safe Equipment Ladder Safety Respirator & Breathing Apparatus Environmental Policy & Procedures
Industrial Corrosion Control P.O. Box 358 Rocky Hill, CT. 06067 [email protected] (203)565-8222-Jerry (860)526-9360-fax
Thank You For Your Consideration On Bidding Your Next Project