PRESENTATIONBY

Dr. SAVITA ANANDJOINT SECRETARY

DEPARTMENT OF LAND RESOURCES21.05.2012

Page 2: 1 PRESENTATION BY Dr. SAVITA ANAND JOINT SECRETARY DEPARTMENT OF LAND RESOURCES 21.05.2012

2

Performance of IWMP Projects Sanctioned during 2009-10

During 2009-10, a total of 1324 projects covering an area

of 6.31 m.ha. have been sanctioned in 20 States.

All these projects have completed the duration of

preparatory phase and due for 2nd installment.

So far only 151 projects [Nagaland (22 projects), Tripura

(10 projects), and Karnataka (119 projects)] have claimed

2nd installment.

Balance 17 States are yet to submit proposal for 2nd

installment.

Page 3: 1 PRESENTATION BY Dr. SAVITA ANAND JOINT SECRETARY DEPARTMENT OF LAND RESOURCES 21.05.2012

3

Performance of IWMP Projects Sanctioned during 2010-11

During 2010-11, a total of 1865 projects covering an area

of 8.82 m.ha. have been sanctioned in 23 States.

The States of Jharkhand, Mizoram, Sikkim & Tamil Nadu

are yet to claim 14% of Balance 1st installment by

furnishing complete proposals.

These projects have also completed more than 1 year of

project duration and implementation needs to be

expedited to claim 2nd installment in time.

No State has furnished the proposal for 2nd installment till

date.

Page 4: 1 PRESENTATION BY Dr. SAVITA ANAND JOINT SECRETARY DEPARTMENT OF LAND RESOURCES 21.05.2012

4

Performance of IWMP Projects Sanctioned during 2011-12

During 2011-12, a total of 1898 projects covering an area

of 9.08 m.ha. have been sanctioned in 27 States.

All these projects are due for claiming 14% of balance 1st

installment by furnishing complete proposals during 2012-

13.

Except Meghalaya, no State has furnished the proposal for

the balance 14% of 1st installment till date.

Page 5: 1 PRESENTATION BY Dr. SAVITA ANAND JOINT SECRETARY DEPARTMENT OF LAND RESOURCES 21.05.2012

5

IWMP -Proposals for 2012-13

During 2012-13, it is proposed to take up new projects

covering an area of 5 million ha. in the country.

The State-wise target area for taking up new IWMP

projects during 2012-13 was circulated to States in the

month of December, 2011.

So far, no State has furnished PPRs for the appraisal of

the Steering Committee on IWMP.

Appraisal & clearance of projects is linked with the

progress and status of updation of data in MIS.

Page 6: 1 PRESENTATION BY Dr. SAVITA ANAND JOINT SECRETARY DEPARTMENT OF LAND RESOURCES 21.05.2012

6

Major Issues

Non-submission/ delayed submission/ submission of incomplete

release proposals

Online reporting of MPRs at watershedmpr.nic.in & QPRs for

pre-IWMP projects at watershed.nic.in

Regular updation of data entry at http://iwmpmis.nic.in for

IWMP projects

MoU between SLNA and DoLR have not been completed

Pending UCs - 1271 no. amounting to Rs. 795.76 Cr. (as on

31.03.2012)

Unspent balance - Rs. 3587.37 cr. (as on 31.03.2012)

(DPAP-Rs.273.95 cr., DDP- Rs. 211.12 cr., IWDP-Rs. 224.93 cr. &

IWMP – Rs. 2877.37 cr.)

Page 7: 1 PRESENTATION BY Dr. SAVITA ANAND JOINT SECRETARY DEPARTMENT OF LAND RESOURCES 21.05.2012

7

States IWMP DPAP DDP IWDP TOTAL

A.P. 237.53 31.96 7.92 13.24 290.65

Bihar 0.78 6.95 5.51 13.24

Chattisgarh 93.87 22.16 18.81 134.84

Goa 0.82 0.82

Gujarat 326.19 25.70 32.24 7.29 391.42

Haryana 13.58 16.15 2.39 32.12

H.P. 104.45 20.97 13.09 21.42 159.93

J&K 2.29 6.13 8.42

Jharkhand 30.46 8.30 4.63 43.39

Karnataka 131.54 20.06 4.06 5.75 161.41

Unspent Balance (as on 31.03.2012)(Amount – Rs. in crores)

Page 8: 1 PRESENTATION BY Dr. SAVITA ANAND JOINT SECRETARY DEPARTMENT OF LAND RESOURCES 21.05.2012

8

States IWMP DPAP DDP IWDP TOTAL

Kerala 23.13 13.34 36.57

Maharashtra

602.22 65.22 25.27 692.71

M.P. 179.57 14.93 8.43 202.93

Odisha 131.96 16.19 29.93 177.98

Punjab 5.74 1.79 7.53

Rajasthan 594.52 8.98 131.53 3.75 738.78

T.N. 35.53 21.73 14.59 71.85

U.P. 217.69 3.14 3.13 223.96

U’khand 19.86 3.34 8.94 32.14

W.B. 18.21 4.32 3.80 26.33

Unspent Balance (as on 31.03.2012) Contd.(Amount – Rs. in crores)

Page 9: 1 PRESENTATION BY Dr. SAVITA ANAND JOINT SECRETARY DEPARTMENT OF LAND RESOURCES 21.05.2012

99

States IWMP DPAP DDP IWDP TOTAL

NE States      Arunachal Pradesh

15.76 9.43 25.19

Assam 40.07 10.56 50.63

Manipur 21.19 7.43 28.62

Mizoram 0.00 2.81 2.81

Meghalaya 0.00 1.01 1.01

Nagaland 8.85 0.00 8.85

Sikkim 3.57 0.73 4.30

Tripura 18.81 0.13 18.94

TOTAL 2877.37 273.95 211.12 224.93 3587.37

.

Unspent Balance (as on 31.03.2012) Contd(Amount – Rs. in crores)

Page 10: 1 PRESENTATION BY Dr. SAVITA ANAND JOINT SECRETARY DEPARTMENT OF LAND RESOURCES 21.05.2012

10

StatesIWDP DPAP DDP Total

No.Amoun

tNo. Amount No. Amount No. Amount

A.P. 29 13.84 25 24.48 3 12.53 57 50.85

Bihar 5 3.62 5 3.62

Chattisgarh 12 6.88 7 5.61 19 12.49

Goa 2 0.82 2 0.82

Gujarat 19 8.04 21 16.18 8 17.64 48 41.86

Haryana 9 5.01 21 18.48 30 23.49

H.P. 27 13.23 14 12.26 9 13.73 50 39.22

J&K 11 6.37 1 1.62 7 10.69 19 18.68

Jharkhand 10 6.38 15 9.60 25 15.98

Karnataka 57 21.67 66 45.21 22 23.80 145 90.68

Pending UCs (as on 31.03.2012)(Amount – Rs. in crores)

Page 11: 1 PRESENTATION BY Dr. SAVITA ANAND JOINT SECRETARY DEPARTMENT OF LAND RESOURCES 21.05.2012

11

StatesIWDP DPAP DDP Total

No. Amount No. Amount No. Amount No. Amount

Kerala 9 5.77 9 5.77

M.H 43 31.00 59 42.26 102 73.26

M.P. 63 23.19 83 39.26 146 62.45

Odisha 40 20.77 25 18.05 65 38.82

Punjab 6 2.34 6 2.34

Rajasthan 26 9.06 31 16.58 46 73.44 103 99.08

T.N. 51 23.63 53 19.34 104 42.97

U.P. 57 23.63 77 25.55 134 49.18

U’khand 20 13.37 18 10.86 38 24.23

W.B. 15 7.28 6 4.58 21 11.86

Pending UCs (as on 31.3.2012)…. Contd.(Amount – Rs. in crores)

Page 12: 1 PRESENTATION BY Dr. SAVITA ANAND JOINT SECRETARY DEPARTMENT OF LAND RESOURCES 21.05.2012

1212

StatesIWDP DPAP DDP Total

No. Amount No. Amount No. Amount No. Amount

NE States            Arunachal Pradesh

24 8.24         24 8.24

Assam 89 63.25         89 63.25

Manipur 8 4.53         8 4.53

Mizoram 5 3.94         5 3.94

Meghalaya 2 0.97         2 0.97

Nagaland 0 0.00         0 0.00

Sikkim 4 2.91         4 2.91

Tripura 11 4.27         11 4.27

TOTAL 654 334.01 501 291.44 116 170.31 1271 795.76

Pending UCs (as on 31.3.2012)….Contd.(Amount – Rs. in Crore)

Page 13: 1 PRESENTATION BY Dr. SAVITA ANAND JOINT SECRETARY DEPARTMENT OF LAND RESOURCES 21.05.2012

13

Post-project Evaluation and Submission of Completion Report

As on 31.03.2011, 26,646 projects under 3

schemes - completed. However:

Post project evaluation report and completion

report have not been submitted for majority of

these projects.

States should ensure furnishing of completion

report, final UC, ASAs, post-project evaluation

report and refund of unspent balance etc.

immediately.

Page 14: 1 PRESENTATION BY Dr. SAVITA ANAND JOINT SECRETARY DEPARTMENT OF LAND RESOURCES 21.05.2012

14

States DPAP DDP IWDP Total

A.P. 3158 772 66 3996

Bihar 0 0 0

Chhattisgarh 399 36 435

Goa 0 0

Gujarat 1114 2477 45 3636

Haryana 696 11 707

H.P. 266 203 48 517

J&K 29 190 10 229

Jharkhand 19 3 22

Karnataka 1705 1204 80 2989

No. of projects completed as on 31.03.2011-Submission of Completion report etc. for 26,646

projects

Page 15: 1 PRESENTATION BY Dr. SAVITA ANAND JOINT SECRETARY DEPARTMENT OF LAND RESOURCES 21.05.2012

15

States DPAP DDP IWDP Total

Kerala 2 2

Maharashtra 1596 42 1638

M.P. 2690 107 2797

Odisha 688 63 751

Punjab 6 6

Rajasthan 765 4661 83 5509

T.N. 1094 54 1148

U.P. 1612 114 1726

U’khand 271 22 293

W.B. 0 1 1

No. of projects completed as on 31.03.2011-Submission of Completion report etc. for 26,646

projects Cont…

Page 16: 1 PRESENTATION BY Dr. SAVITA ANAND JOINT SECRETARY DEPARTMENT OF LAND RESOURCES 21.05.2012

1616

S. No. States DPAP DDP IWDP Total

  NE States  

1Arunachal Pradesh

69 69

2 Assam 19 19

3 Manipur 18 18

4 Mizoram 25 25

5 Meghalaya 65 65

6 Nagaland 42 42

7 Sikkim 6 6

8 Tripura 0 0

  TOTAL 15406 10203 1037 26,646

No. of projects completed as on 31.03.2011-Submission of Completion report etc. for 26,646

projects cont..

Page 17: 1 PRESENTATION BY Dr. SAVITA ANAND JOINT SECRETARY DEPARTMENT OF LAND RESOURCES 21.05.2012

17

Completion of Ongoing Pre-IWMP Projects

December, 2012 - cut off date for completion of all

ongoing pre-IWMP projects except projects in snow

bound areas.

The States have to claim 3rd installment immediately

and claim balance 4th & 5th installment before Dec.

2012.

In case of 4th & 5th installment, proposals may be

submitted immediately for release of funds.

4642 ongoing pre-IWMP projects are to be completed

by December, 2012.

Page 18: 1 PRESENTATION BY Dr. SAVITA ANAND JOINT SECRETARY DEPARTMENT OF LAND RESOURCES 21.05.2012

18

States

DPAP DDP IWDP

TotalDue for 3rd

instt.

Due for 4th & 5th inst.

Due for 3rd instt.

Due for 4th & 5th

inst.

Due for 3rd instt.

Due for 4th & 5th inst.

A.P. 208 189 0 0 7 23 427

Bihar 3 0 16 3 22Chattisgarh 125 84 13 21 423

Goa 0 0 0

Gujarat 270 71 0 0 8 16 365

Haryana 31 50 3 6 90

H.P. 0 10 0 13 23

J&K 0 48 132 281 12 1 474

Jharkhand 44 0 10 1 55

Karnataka 53 75 0 0 0 5 133

No. of projects to be completed by 31.12.2012 by claiming balance installments

Page 19: 1 PRESENTATION BY Dr. SAVITA ANAND JOINT SECRETARY DEPARTMENT OF LAND RESOURCES 21.05.2012

19

States

DPAP DDP IWDP

TotalDue for 3rd instt.

Due for 4th & 5th

inst.

Due for 3rd

instt.

Due for 4th & 5th inst.

Due for 3rd instt.

Due for 4th & 5th

inst.

Kerala 20 4 24

Maharashtra 240 287 8 24 559

M.P. 47 165 1 12 225

Odisha 17 73 3 19 112

Punjab 2 5 7

Rajasthan 17 89 304 693 0 5 1108

T.N. 45 75 5 22 147

U.P. 11 28 0 2 41

U’khand 126 66 7 16 215

W.B. 157 0 16 8 181

No. of projects to be completed by 31.12.2012 by claiming balance installments Cont…

Page 20: 1 PRESENTATION BY Dr. SAVITA ANAND JOINT SECRETARY DEPARTMENT OF LAND RESOURCES 21.05.2012

2020

S. No.

States

DPAP DDP IWDP

TotalDue for 3rd

instt.

Due for 4th & 5th

inst.

Due for 3rd

instt.

Due for 4th & 5th inst.

Due for 3rd

instt.

Due for 4th & 5th

inst.

  NE States  

1Arunachal Pradesh 21 24 45

2 Assam 46 27 73

3 Manipur 3 3 6

4 Mizoram 4 12 16

5 Meghalaya 4 33 37

6 Nagaland 0 0 0

7 Sikkim 2 6 8

8 Tripura 6 0 6

 TOTAL 1363 1260 467 1024 217 311 4642

.

No. of projects to be completed by 31.12.2012 by claiming balance installments cont..

Page 21: 1 PRESENTATION BY Dr. SAVITA ANAND JOINT SECRETARY DEPARTMENT OF LAND RESOURCES 21.05.2012

Foreclosed Projects

A total 7295 projects have been foreclosed under DPAP, DDP & IWDP.

In order to enable the Department to formally close such projects, following documents are required from States :

Year-wise UC since the sanction of the project.

Activity-wise physical and financial progress made so far.

Details of assets created

Non-embezzlement certificate.

Exit protocol for the maintenance of assets created.

Year-wise ASA since the sanction of the project.

Refund of the unspent balance including the interest accrued in the

form of Demand Draft in favour of PAO, DoLR.

21

Page 22: 1 PRESENTATION BY Dr. SAVITA ANAND JOINT SECRETARY DEPARTMENT OF LAND RESOURCES 21.05.2012

22

States DPAP DDP IWDP Total

Andhra Pradesh 93 0 4 97

Bihar 540 1 541

Chhattisgarh 280 0 280

Goa 0 0 0

Gujarat 549 0 6 555

Haryana 0 216 1 217

H.P. 0 34 1 35

J&K 406 105 0 511

Jharkhand 1532 1 1533

Karnataka 236 262 1 495

No. of projects foreclosed as on 31.03.2012 - Submission of requisite documents

Page 23: 1 PRESENTATION BY Dr. SAVITA ANAND JOINT SECRETARY DEPARTMENT OF LAND RESOURCES 21.05.2012

23

States DPAP DDP IWDP Total

Kerala 0 1 1

Maharashtra 1040 4 1044

M.P. 98 3 101

Odisha 377 1 378

Punjab 0 0 0

Rajasthan 67 208 1 276

T.N. 117 0 117

U.P. 112 6 118

U’khand 335 5 340

W.B. 402 0 402

No. of projects foreclosed as on 31.03.2012 - Submission of requisite documents

Page 24: 1 PRESENTATION BY Dr. SAVITA ANAND JOINT SECRETARY DEPARTMENT OF LAND RESOURCES 21.05.2012

2424

S. No. States DPAP DDP IWDP Total

  NE States  

1 Arunachal Pradesh 25 25

2 Assam 47 47

3 Manipur 17 17

4 Mizoram 11 11

5 Meghalaya 4 4

6 Nagaland 0 0

7 Sikkim 10 10

8 Tripura 16 16

  TOTAL 6184 825 286 7295

No. of projects foreclosed as on 31.03.2012 - Submission of requisite documents

Page 25: 1 PRESENTATION BY Dr. SAVITA ANAND JOINT SECRETARY DEPARTMENT OF LAND RESOURCES 21.05.2012

25

Issues

Regular updation of data entry in MIS for IWMP projects

Unspent balance of Rs. 3587.37 cr. as on 31.03.2012 to

be liquidated by expediting implementation

Positioning of requisite staff & professional experts at all

levels

Uploading information on website of SLNAs - SPSP,

DPRs, photographs etc.,

Annual fund requirement under IWMP on the basis of

AAPs of DPRs

Convergence of IWMP with other related programmes

Page 26: 1 PRESENTATION BY Dr. SAVITA ANAND JOINT SECRETARY DEPARTMENT OF LAND RESOURCES 21.05.2012

26