Rehabilitation of the track formation layer with the RPM 2002 in Romania
Using high-output track formation rehabilitation
machine
![Page 2: 1 Rehabilitation of the track formation layer with the RPM 2002 in Romania Using high-output track formation rehabilitation machine](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649d1a5503460f949efc9f/html5/thumbnails/2.jpg)
2
Rehabilitation of the track formation layer with the RPM 2002 in Romania
![Page 3: 1 Rehabilitation of the track formation layer with the RPM 2002 in Romania Using high-output track formation rehabilitation machine](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649d1a5503460f949efc9f/html5/thumbnails/3.jpg)
3
Rehabilitation of the track formation layer with the RPM 2002 in Romania
Existing Situation:
• the thickness of the ballast prism range between 0,40 – 1,10 m
• formation protection layer range between 0,10 - 0,70 m
• earth in the embankment is mainly mixed with clayey silts
![Page 4: 1 Rehabilitation of the track formation layer with the RPM 2002 in Romania Using high-output track formation rehabilitation machine](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649d1a5503460f949efc9f/html5/thumbnails/4.jpg)
4
Rehabilitation of the track formation layer with the RPM 2002 in Romania
Designed solution:
• improve the plain line
• improve the route geometry in longitudinal profile
• improve the track geometry in cross-section
• increasing the bearing capacity at the formation level
![Page 5: 1 Rehabilitation of the track formation layer with the RPM 2002 in Romania Using high-output track formation rehabilitation machine](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649d1a5503460f949efc9f/html5/thumbnails/5.jpg)
5
Rehabilitation of the track formation layer with the RPM 2002 in Romania
General work schedule:
• Construction period 600 working days
• laying of 600.000 m³ of new formation layers
• laying of 150 new turnouts
• installing of 20.000 tons of rails
• laying of 310.000 new sleepers
• 190 km of complete track renewal
![Page 6: 1 Rehabilitation of the track formation layer with the RPM 2002 in Romania Using high-output track formation rehabilitation machine](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649d1a5503460f949efc9f/html5/thumbnails/6.jpg)
6
Rehabilitation of the track formation layer with the RPM 2002 in Romania
Stations:
![Page 7: 1 Rehabilitation of the track formation layer with the RPM 2002 in Romania Using high-output track formation rehabilitation machine](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649d1a5503460f949efc9f/html5/thumbnails/7.jpg)
7
Rehabilitation of the track formation layer with the RPM 2002 in Romania
RPM 2002 track formation rehabilitation machine
![Page 8: 1 Rehabilitation of the track formation layer with the RPM 2002 in Romania Using high-output track formation rehabilitation machine](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649d1a5503460f949efc9f/html5/thumbnails/8.jpg)
8
Rehabilitation of the track formation layer with the RPM 2002 in Romania
Following works can be carried out in one operation process:
• Excavation of the old ballast layer
• Cleaning the ballast of cohesive material and metal pieces
• Sharpening and cleaning the pre-cleaned ballast
• Excavation of the remaining formation material
• Levelling the sub grade
• Building in the geotextile
• Inserting and compaction of the formation layer
• Inserting the recycled ballast
• track tamping and recording the achieved track geometry
![Page 9: 1 Rehabilitation of the track formation layer with the RPM 2002 in Romania Using high-output track formation rehabilitation machine](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649d1a5503460f949efc9f/html5/thumbnails/9.jpg)
9
Rehabilitation of the track formation layer with the RPM 2002 in Romania
Ballast excavation chain:
![Page 10: 1 Rehabilitation of the track formation layer with the RPM 2002 in Romania Using high-output track formation rehabilitation machine](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649d1a5503460f949efc9f/html5/thumbnails/10.jpg)
10
Rehabilitation of the track formation layer with the RPM 2002 in Romania
Recycling equipment
![Page 11: 1 Rehabilitation of the track formation layer with the RPM 2002 in Romania Using high-output track formation rehabilitation machine](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649d1a5503460f949efc9f/html5/thumbnails/11.jpg)
11
Rehabilitation of the track formation layer with the RPM 2002 in Romania
Sub grade excavation chain
![Page 12: 1 Rehabilitation of the track formation layer with the RPM 2002 in Romania Using high-output track formation rehabilitation machine](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649d1a5503460f949efc9f/html5/thumbnails/12.jpg)
12
Rehabilitation of the track formation layer with the RPM 2002 in Romania
Formation layer insertion and compaction devices
![Page 13: 1 Rehabilitation of the track formation layer with the RPM 2002 in Romania Using high-output track formation rehabilitation machine](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649d1a5503460f949efc9f/html5/thumbnails/13.jpg)
13
Rehabilitation of the track formation layer with the RPM 2002 in Romania
Tamping unit
![Page 14: 1 Rehabilitation of the track formation layer with the RPM 2002 in Romania Using high-output track formation rehabilitation machine](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649d1a5503460f949efc9f/html5/thumbnails/14.jpg)
14
Rehabilitation of the track formation layer with the RPM 2002 in Romania
Quality Control
![Page 15: 1 Rehabilitation of the track formation layer with the RPM 2002 in Romania Using high-output track formation rehabilitation machine](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649d1a5503460f949efc9f/html5/thumbnails/15.jpg)
15
Rehabilitation of the track formation layer with the RPM 2002 in Romania
Quality Control Proctor
![Page 16: 1 Rehabilitation of the track formation layer with the RPM 2002 in Romania Using high-output track formation rehabilitation machine](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649d1a5503460f949efc9f/html5/thumbnails/16.jpg)
16
Rehabilitation of the track formation layer with the RPM 2002 in Romania
Inserting geo synthetic materials
![Page 17: 1 Rehabilitation of the track formation layer with the RPM 2002 in Romania Using high-output track formation rehabilitation machine](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649d1a5503460f949efc9f/html5/thumbnails/17.jpg)
17
Rehabilitation of the track formation layer with the RPM 2002 in Romania
Transport Logistics:
Rail bonded transport with MFS spoil wagons
![Page 18: 1 Rehabilitation of the track formation layer with the RPM 2002 in Romania Using high-output track formation rehabilitation machine](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649d1a5503460f949efc9f/html5/thumbnails/18.jpg)
18
Rehabilitation of the track formation layer with the RPM 2002 in Romania
The following advantages can be achieved by using high output track formation rehabilitation machines like RPM 2002:
• Insertion of the new formation layer without removal of existing track
• Recycling of old ballast
• No movements on the substructure formation with machines
• Compaction and levelling of substructure formation by RPM 2002
![Page 19: 1 Rehabilitation of the track formation layer with the RPM 2002 in Romania Using high-output track formation rehabilitation machine](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649d1a5503460f949efc9f/html5/thumbnails/19.jpg)
19
Rehabilitation of the track formation layer with the RPM 2002 in Romania
The following advantages can be achieved by using high output track formation rehabilitation machines like RPM 2002:
• Performance of the machine from 40 up to 70 m/h, depending on the thickness of the track formation layer
• On 2-tracks sections the train operation on the open track is possible
• Short, open excavation pit (approx. 6m long and 1m deep)
• Possibility of simultaneous insertion of geotextile and /or geogrid and formation layer
![Page 20: 1 Rehabilitation of the track formation layer with the RPM 2002 in Romania Using high-output track formation rehabilitation machine](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649d1a5503460f949efc9f/html5/thumbnails/20.jpg)
20
Rehabilitation of the track formation layer with the RPM 2002 in Romania
The following advantages can be achieved by using high output track formation rehabilitation machines like RPM 2002:
• Reducing the line closure time
• No construction of temporary access roads
• Assuring a hand back speed of 40 km/h on the rehabilitated track
• Saving up to 50% new material by mixing recycled material