Preparing a “Foundational Transmission Project List” that WECC can use a starting point for their 10-year plan.
The “Foundational Transmission Project List” will not provide sufficient transmission additions for the 10-year time frame
WECC will build on SCG foundation to meet resource policy goals and mitigate congestion
WECC may also remove or change projects that are in the SCG list
The SCG will also provide a list of “Potential” Projects that WECC can utilize to integrate resources and mitigate congestion
3
Draft Document - Ver. 4.0, May 11, 2010
CAISO
•CAISO02- Sunrise
•CAISO03- Midpoint (CA)-Devers
SSPG
•SSPG01- SWIP
SSPG03- SNIP (Phase 2)
•SSPG06 – TCP Harry Allen - Northwest
•SSPG07 – TCP Northwest – Armagosa
•SSPG09 – SWIP South
SWAT
•SWAT01-PV-NG#2
•SWAT06- Pinal Central – Tortolita
•SWAT07- Southeast Valley (SEV)
•SWAT08 – PV - Morgan
CCPG
•CCPG02 – Pawnee – Smoky Hill
•CCPG03 – Waterton- Midway
•CCPG04 – San Luis Valley
Hemingway
NTTG01
NTTG02
Populus
NTTG03
NTTG01
NTTG03
Boardman
Bethel
NTTG06
Townsend
NTTG07
WyomingWyoming
MontanaMontana
IdahoIdahoOregonOregon
WashingtonWashington
ColoradoColoradoUtahUtah
NevadaNevadaCalifornia
California
ArizonaArizona
New MexicoNew Mexico
Comanche
Waterton
Midway
Smoky Hill
PawneeCCPG02
CCPG03
CCPG04SLV
Palo Verde
SWAT01
North Gila II Pinal Central
Midpoint
TortolitaSWAT06
BrowningSWAT07
FOUNDATIONAL PROJECTS BY 2020FOUNDATIONAL PROJECTS BY 2020 NTTG
•NTTG01 –Gateway South Phase 1
•NTTG02 – Gateway Central Phase 1
•NTTG03 – Gateway West Phase 1
•NTTG05 – Hemingway – Boardman
•NTTG06 – Cascade Crossing
•NTTG07- Mountain States Intertie
CG
•CG01 – I-5 Corridor
•CG02- West McNary
•CG03 - Big Eddy – Knight
•CG04 – Little Goose Area Reinforcement
BCTC
•BCTC01- Nicola – Meridian
•BCTC03- BC-US Intertie
Alberta AESO
•AESO03 1202L Conversion
•AESO04 Heartland
•AESO05 West HVDC
•AESO06 East HVDC
•AESO07 Fort McMurray - East Line
•AESO08 Fort McMurray - West Line
Mona
Aeolus
SSPG01
Harry Allen
NTTG05
Eldorado
SSPG03
SSPG06
Northwest
Amargosa
Devers
CAISO03ImperialPeňesquitos
CAISO02
SSPG07
Midpoint (CA)MorganSWAT08
McNary
John Day
Sigurd
Red Butte
Bridger
Castle Rock
TroutdaleCG01 CG02
NicolaMeridian
BCTC01
OquirrhLimber
Terminal
Coyote Spgs
Legend
500 kV Single Circuit Line345 kV Single Circuit Line500 kV Double Circuit Line345 kV Double Circuit LineDC Circuit (various voltage)Termination SubstationsIntermediate Substations
(1) Map does not reflect 230kV lines that are included in the Foundational Transmission Project List.(2) Internal reinforcements projects not shown for clarity.(3) Lines shown are for illustrative purposes only and may not reflect final line routing.
AESO04
AESO05
AESO06
AESO03
AESO08AESO07
Langdon
AlbertaAlberta
Heartland
Ellerslie
West Brooks
Genesee
NTTG014
MidColumbia
Ingledow
CusterBCTC03
DRAFT
CAISO
•CAISO01- C3ET
SSPG
•SSPG04 – Harry Allen – Mead (line #2)
•SSPG05 – Mead- Eldorado
•SSPG08- Blackhawk - Armagosa
SWAT
•SWAT02-PV-Colo. River
•SWAT03- Navajo Transmission Project
•SWAT04- SunZia
•SWAT05- High Plains Express
CCPG
•CCPG01 – WCI
•CCPG05 – Lamar Front Range
•CCPG07 – Pawnee - Daniels Park
•CCPG08 – Pawnee – Story
Hemmingway
NTTG01
Crystal
Populus WindstarCaptain Jack
NTTG01
NTTG04
Townsend
WyomingWyoming
MontanaMontana
IdahoIdahoOregonOregon
WashingtonWashington
ColoradoColorado
UtahUtah
NevadaNevada
California
California
ArizonaArizona
New MexicoNew Mexico
Daniels Park
Missile Site
Pawnee
Palo Verde
SWAT02
Pinal Central
Midpoint
Springerville
POTENTIAL PROJECTS BY 2020POTENTIAL PROJECTS BY 2020NTTG
•NTTG01 –Gateway South Phase 2
•NTTG02 – Gateway Central Phase 2
•NTTG03 – Gateway West Phase 2
•NTTG04 – Hemingway-Captain Jack
•NTTG08 – Chinook
•NTTG09 – Zephyr
•NTTG10 – Overland
•NTTG11 – Transwest Express
•NTTG13 – Colstrip Upgrade
CG
•CG05 – Juan De Fuca Cable #1
•CG06 – Juan De Fuca Cable #2
•CG07 – West Coast Cable
BCTC
•BCTC02- CNC including Devils Gap
Alberta ESO
•AESO02- Northern Lights
•AESO09 – Edmonton - CalgaryMona
Aeolus
Marketplace
Amargosa
CAISO01
Colo. River
Buckley
Sigurd
Red Butte
Bridger
CG07
Selkirk
BCTC02
LRS
Wray
Boone
Lamar
Vilas
Gladstone
BlackwaterCorona
SunZia East
SunZia Midpoint
Comanche
Blackhawk
SWAT04
SWAT05
SWAT03
ShiprockRed Mesa
Moenkopi
StoryCCPG 07
CCPG 05
CCPG 01
CCPG 08
SSPG08
Midway
Gregg
BCTC02
Edmonton
Calgary
AESO02
NTTG03
Collinsville
Eldorado
NTTG08
NTTG09
NTTG10
NTTG11Limber
Terminal
NTTG02
Mead
Harry Allen
SWAT05
(1) Map does not reflect 230kV lines that are included in the Foundational Transmission Project List.(2) Internal reinforcements projects not shown for clarity.(3) Lines shown are for illustrative purposes only and may not reflect final line routing.
Draft Document - Ver. 4.0, May 11, 2010
AESO09
CG05 CG06
MidColumbia
NTTG013
DRAFT
Legend
500 kV Single Circuit Line345 kV Single Circuit Line500 kV Double Circuit Line345 kV Double Circuit LineDC Circuit (various voltage)Termination SubstationsIntermediate Substations
Screened projects for regional significance based on voltage level• All proposed 500 kV and higher projects• 345 kV projects unless the project is
deemed not to be a backbone facility • Projects above 200 kV that are deemed to
be backbone facilities Applied criteria to screened projects
to assess the level of certainty of project construction
6
Must Meet at least one of the following:1) Sponsor is required to build project to
reliably serve load or to meet firm commitments for transmission service
2) Project is necessary to integrate WECC LRS Class 0 or Class 1 resources
3) Project sponsor(s) has a firm commitment to fund project construction.
SCG is currently using eleven indicators, including: Are major equipment orders placed? Is permitting actively underway or completed? Are there executed project participation contracts?