100 scale nc 105 from us 321 to nc 105 bypass …...oct 09, 2018  · -y6- pot sta. 10+00.00-l- pot...

1
B OON E MUN I C I P A LB OUNDA R Y B O O N EMUN I C I P A LB OUNDA R Y BOON E M UN I CI PAL BOUNDARY B O O N E MUN I C I P A LB OUNDA R Y B OON EMUN I C I P A LB OUN D A R Y PROJECT 45831.1.2 (U-5603) DESIGN DATA ROLL OF 2 INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS FUNCTIONAL CLASSIFICATION = URBAN MAJOR ARTERIAL 0’ 100’ 200’ 50’ 100’ (GRAPHIC SCALE) WATAUGA COUNTY DESIGN SPEED = 40 MPH MAX. SUPERELEV. = 0.04 NC 105 FROM US 321 TO NC 105 BYPASS PROPOSED UPGRADE OF PUBLIC MEETING MAP MARCH 10, 2014 NC ONE MAP IMAGERY DATE: OCTOBER 2018 WLB WLB 1 0 15 -Y2- PC Sta. 16+38.81 -Y2- POT Sta. 10+00.00 -Y2- PC Sta. 10+20.39 -Y2- PT Sta. 10+91.51 -Y2- PC Sta. 11+62.03 -Y2- PT Sta. 13+08.55 -Y2- PC Sta. 13+55.63 -Y2- PT Sta. 14+32.63 -Y2- PT Sta. 17+82.28 1 ROADWAY TYPICAL NC 105 BYPASS -Y1- POPLAR GROVE RD SR 1552 -Y2- AMBLING WAY -Y3- SR 1102 POPLAR GROVE RD -Y4- SR 1148 HOMESPUN HILLS RD -Y5- COMERCIAL DW -L- NC 105 -L- NC 105 142 172 11 12 131 160 170 258 290 406 271 389 13 20 2 6 11 14 31 40 6 20 37 60 39 89 13 21 26 68 9 10 6 7 1 1 1 1 3 3 2 2 305 417 292 370 253 320 256 324 TRAFFIC VOLUMES IN HUNDREDS EST. 2015/2040 0.02 GRADE POINT 0.02 2’-0" 12’-0" 12’-0" 0.02 1’-6" 0.02 0.02 1’-6" 6’-0" LANE BIKE 5’-0" 2’-0" 12’-0" 12’-0" 0.02 6’-0" LANE BIKE 5’-0" C L -L- NC 105 2 : 1 2 : 1 2 : 1 2 : 1 VARIES 23’ to 6’ LEGEND 0000 0000 AND GUTTER PROPOSED STRUCTURES, ISLAND, CURB PROPOSED ROADWAY EXISTING ROADWAY TO BE RESURFACED EXISTING ROADWAY EXISTING ROADWAY PROPOSED RIGHT OF WAY EXISTING RIGHT OF WAY BUILDINGS TO BE REMOVED LAKES, RIVER, STREAMS AND PONDS PROPOSED CONTROL OF ACCESS PRESENT ADT FUTURE ADT PROPERTY LINES EXISTING TRAFFIC SIGNAL PROPOSED TRAFFIC SIGNAL WETLAND LIMITS BOUNDARY AND UTILITY) PROPOSED EASEMENTS (DRAINAGE, CONSTRUCTION, C A PROPOSED RETAINING WALL MUNICIPAL BOUNDARY EXISTING STRUCTURES, ISLAND, CURB TO BE RETAINED AND GUTTER PI Sta 71+43.50 D L = 320.18’ T = 160.24’ R = 3,000.00’ 1 5 20 25 30 35 40 45 50 55 60 65 70 -L- PT Sta. 17+60.35 -L- POT Sta. 26+86.08 -Y1- POT Sta. 19+85.02 -L- POT Sta. 33+25.56 -Y2- POT Sta. 18+60.92 -Y3- POT Sta. 15+78.05 -Y3- PT Sta. 15+29.51 -Y3- PC Sta. 13+10.96 -Y3- PT Sta. 12+32.88 -Y3- PC Sta. 11+06.64 -L- POT Sta. 33+31.25 -Y3- POT Sta. 10+00.00 -L- PC Sta. 35+80.89 -Y4- PT Sta. 12+59.12 -Y4- PI Sta. 13+80.59 -Y4- PC Sta. 14+83.13 -Y4- PT Sta. 16+38.08 -Y4- PC Sta. 16+92.29 -Y4- PT Sta. 17+77.43 -L- POC Sta. 39+67.48 -Y4- POT Sta. 18+14.82 -L- PT Sta. 45+11.46 -L- PC Sta. 45+58.89 -L- POT Sta. 46+25.95 -Y5- POT Sta. 15+33.16 -Y5- PT Sta. 13+64.65 -Y5- POT Sta. 10+00.00 -Y5- PC Sta. 10+90.17 -L- PT Sta. 58+40.33 -Y6- POT Sta. 10+00.00 -L- POT Sta. 60+27.74 -Y6- POT Sta. 12+66.71 -Y7- POT Sta. 10+00.00 -Y7- PC Sta. 10+91.45 -Y7- PT Sta. 12+80.56 -L- POT Sta. 62+64.38 -Y7- POT Sta. 14+54.87 -Y8- POT Sta. 10+00.00 -Y8- PC Sta. 11+80.77 -Y8- PT Sta. 12+53.19 -L- POT Sta. 69+27.02 -Y8- POT Sta. 12+61.10 -L- PC Sta. 69+83.25 -L- PT Sta. 73+03.44 -Y7- Sta. 13+00.00 BEGIN CONSTRUCTION 45 45 -Y5- Sta. 13+15.00 BEGIN CONSTRUCTION BEGIN CONSTRUCTION -Y3- Sta. 12+60.00 BEGIN CONSTRUCTION -Y2- Sta. 14+00.00 BEGIN CONSTRUCTION -Y1- Sta. 11+90.00 -Y8- Sta. 10+50.00 BEGIN CONSTRUCTION -Y6- Sta. 10+00.00 BEGIN CONSTRUCTION -Y4- Sta. 12+39.75 BEGIN CONSTRUCTION -L- Sta. 15+00.00 BEGIN CONSTRUCTION S T A 74 + 00 . 0 0 M A T C HL I N E S HE ET 2 1 5 20 25 30 35 40 45 50 55 60 65 70 1 0 1 5 10 15 10 15 10 15 1 0 15 10 1 0 PI Sta 13+83.36 D L = 760.35’ T = 383.36’ R = 2,410.00’ PI Sta 40+63.19 D L = 930.56’ R = 1,435.00’ PI Sta 52+02.63 D L = 1,281.44’ T = 643.74’ R = 5,400.00’ PI Sta 10+56.19 D L = 71.13’ T = 35.80’ R = 250.00’ PI Sta 12+45.99 D L = 146.53’ T = 83.97’ R = 120.00’ PI Sta 13+94.44 D L = 77.00’ T = 38.81’ R = 250.00’ PI Sta 16+04.85 D L = 143.47’ T = 87.24’ R = 100.00’ PI Sta 11+79.73 D L = 126.24’ T = 73.09’ R = 100.00’ PI Sta 14+32.59 D L = 218.54’ T = 121.62’ R = 200.00’ 10 PI Sta 12+03.60 D L = 189.12’ T = 112.15’ R = 140.00’ -Y1- POT Sta. 10+00.00 45 -L- -Y2- -Y2- PI Sta 11+43.10 D L = 232.30’ T = 116.28’ R = 2,000.00’ PI Sta 15+61.38 D L = 154.95’ T = 78.25’ R = 450.00’ PI Sta 17+35.51 D L = 85.14’ T = 43.23’ R = 200.00’ -Y4- PI Sta 12+27.96 D L = 274.48’ T = 137.79’ R = 1,250.00’ -Y5- -Y7- PI Sta 12+17.04 D L = 72.42’ T = 36.28’ R = 500.00’ -Y8- P OP L A R GR OV E R OAD S OU T H NC 105 B Y P A SS N C 1 05 N C 1 05 A M B L I NG W AY P O P L A R GR O V E R O A D HO M E S P UN HI LL S R O AD M A R Y AH D R I V E S NAGGY M OUN T A I N B OU LE VA R D DOGW O O D R O A D BUILDING SUPPLY NEW RIVER CONSIGNMENT CURIOSITY E X P R E SS KANGA R O O C A RWA S H B U BB LE S T O WNHO M E S F O R R E S TE DG E WH EEL S F UN N H I L L S MO TEL H I GH L AND SP EE D WAY K E DN E Y C A R E F R E S E N I U S BB & T P R O P E R T I E S H E R I T AG EC OU R T J EE PD O DG E R O S SC H R Y S L E R S U P E R8 C OMMON S H I G H L AND F U R N I T U R E B A D C O C K HO M E T O F O S C O E - L - P O C S t a . 15 + 00 . 00 B E G I N T I PP R O J E C T U - 5603 ~32 LENGTH PROPOSED (2) 78" CMP RCBC 1’ PROPOSED (2) 7’X5’ ~32’ LENGTH EXTEND CULVERT PROPOSED (2) 84"RCP 92 110 81 81 93 50 45 5 3 53 60 N E W R I V E RB U I L D I N GS U PP L Y WWW HO L D I NG S LL C D E WE YCWR I GH T M A R G I E WR I GH T A N D R E W FD I NK I N E. F . COE LEE Q McMILLAN JOHN H CAMPBELL SHELLY M CAMPBELL GARY W DEITZ HJRR HOLDINGS LLC DEWEY C WRIGHT MARGIE WRIGHT HIGH COUNTRY LLC CHANDLER CONCRETE DEWEY C WRIGHT MARJORIE WRIGHT FRANK E PROCTOR APPALACHIAN STUDENT HOUSING TP LAND HOLDINGS LLC DANIELLE S WADE ANDREW B WADE POPLAR 105 LLC JOHN R HOUSER BETTY T LITTLE FRANCES H HENSON BARBARA A DEAL INVESTMENTS LLC COLUMBUS HOWARD LYNN R HUBBARD GLADYS BIDDIX BROWN IRREVOCABLE TRUST FOR L BLAIR JR FREDERICK OWNERS ASSOCIATION INC HERITAGE COURT PROPERTIES JKL PROPERTIES LLC B L ROBINSON LLC INVESTMENTS LLC COLUMBUS HOWARD PROPERTIES LLC A&R MOUNTAIN DATED 03-29-1994 REVOCABLE TRUST JAMES H LESTER JOHN P FIDLER BARBETTA LLC JILL A PATEL BARBARA B DE LEO SAM ABDIN RAMSEY W ABDIN HIGHLAND COMMONS BOONE LLC NOCHE LLC LUCIANO LUZI TEMPLETON PROPERTIES LP TEMPLETON PROPERTIES LP GARY M HENSON JOYCE C HENSON HAROLD M HENSON GARY M HENSON JOYCE C HENSON HAL S VANNOY NELL ABSHER ROBERT D LEE SHARON J LEE TEMPLETON PROPERTIES LP KENNETH D HAYES BETTY S HAYES VULCAN LANDS INC GOODMAN FREDA R ENTERPRISES INC PAUL BROWN HENSON HAROLD M JOHNSON JR HOWARD B ASSOCIATION INC CONDO DOGWOOD PLAZA HARWOOD YVETTE PIPES LENORE N LLC PROPERTIES KES 10-26-2005 TRUST DATED REVOCABLE FISCHER JOHN WARREN RICE JOHN E RICE MARY J RICE JOHN E RICE JOHN E RICE MARY J ROCK RD LLC 644 BLOWING PROPERTIES LLC BOONE MEDICAL ENTERPRISES INC AMP INVESTMENTS II SODALIS INVESTORS RSP and are subject to change. The designs shown on these maps, including utility easements, are preliminary maps is limited to locations of major existing and potential utility easements. on these maps or on other displays. The utility information shown on these To provide greater visual clarity, existing and proposed utilities are not shown UTILITY INFORMATION: F C F C F C F F F F F F F F F F F C C C C F C F C C F C F C C F F C F C F C C C F C F C F C F C F C C C C C C C F C C F C F C C C C C C C C C C F F F C C C C C C C C F C F C F C F C F F C F C F C F C C C F C C F C F F F F C F F F F F F F F F C F C F F F F F F F F C C C C C C C C C C C C C C C C C C C C C F C F C F C F C F C F F F F F F F F F F F F F F F F F F F F F F F C F F F F F F F F F F C F C F C F C F C F C F F F C F C F C F C F C F C F C F C F C F C F C F C C C C C F C F C F C F C F C F C F C F C F C F C C C F C F C F C F C F C C C F C F C C C C C C C F F F F F F F F F C C F F F F F F F F F C C F F F

Upload: others

Post on 30-Sep-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 100 Scale NC 105 FROM US 321 TO NC 105 BYPASS …...Oct 09, 2018  · -y6- pot sta. 10+00.00-l- pot sta. 60+27.74-y6- pot sta. 12+66.71-y7- pot sta. 10+00.00 ... t = 83.97’ r = 120.00’

BOONE MUNICIPAL BOUNDARY

BOONE MUNICIPAL BOUNDARY

BO

ON

E M

UNIC

IPA

L B

OU

ND

AR

Y

BOONE MUNICIPAL BOUNDARY

BOONE MUNICIPAL BOUNDARY

PROJECT 45831.1.2 (U-5603)

$$$$$$

SY

STIM

E$$$$$

$$$$$$$$$$$$$$$$

DG

N$$$$$$$$$$$$$$$$

$$$$

US

ER

NA

ME$$$$

DESIGN DATA

ROLL OF 2

(4 LANE TRADITIONAL ALT.)

INCOMPLETE PLANSDO NOT USE FOR R/W ACQUISITION

DO NOT USE FOR CONSTRUCTIONPRELIMINARY PLANS

F. A. PROJECT

FUNCTIONAL CLASSIFICATION = URBAN MAJOR ARTERIAL

0’ 100’ 200’

50’

100’

(GRAPHIC SCALE)

WATAUGA COUNTY

DESIGN SPEED = 40 MPH

MAX. SUPERELEV. = 0.04

NC 105 FROM US 321 TO NC 105 BYPASS

PROPOSED UPGRADE OF

PUBLIC MEETING MAP

MARCH 10, 2014

NC ONE MAP IMAGERY DATE:

OCTOBER 2018

WLBWLB

10

15

-Y2- PC Sta. 16+38.81

-Y2- POT Sta. 10+00.00

-Y2- PC Sta. 10+20.39

-Y2- PT Sta. 10+91.51

-Y2- PC Sta. 11+62.03

-Y2- PT Sta. 13+08.55

-Y2- PC Sta. 13+55.63

-Y2- PT Sta. 14+32.63

-Y2- PT Sta. 17+82.28

1

ROADWAY TYPICAL

NC 105 BYPASS

-Y1-

POPLAR GROVE RD

SR 1552

-Y2-

AMBLING WAY

-Y3-

SR 1102 POPLAR GROVE RD

-Y4-

SR 1148 HOMESPUN HILLS RD

-Y5-

COMERCIAL DW

-L- NC 105 -L- NC 105

142

172

11

12

131

160170

258

290

406

271

389

13

20

2

6

11

14

31

40

6

20

37

60

39

89

13

21

26

68

9

10

6

7

1

1

1

1

3

3

2

2

305

417

292

370

253

320

256

324

TRAFFIC VOLUMES IN HUNDREDS

EST. 2015/2040

0.02

GRADE

POINT

0.02

2’-0"12’-0"12’-0"

0.02

1’-6"

0.02 0.02

1’-6"6’-0"

LANE

BIKE

5’-0"2’-0"

12’-0" 12’-0"

0.02

6’-0"

LANE

BIKE

5’-0"

CL -L- NC 105

2:1

2:1

2:1

2:1

VARIES 23’ to 6’

LEGEND

0000

0000

AND GUTTER

PROPOSED STRUCTURES, ISLAND, CURB

PROPOSED ROADWAY

EXISTING ROADWAY TO BE RESURFACED

EXISTING ROADWAY

EXISTING ROADWAY

PROPOSED RIGHT OF WAY

EXISTING RIGHT OF WAY

BUILDINGS

TO BE REMOVED

LAKES, RIVER, STREAMS AND PONDS

PROPOSED CONTROL OF ACCESS

PRESENT ADT

FUTURE ADT

PROPERTY LINES

EXISTING TRAFFIC SIGNAL

PROPOSED TRAFFIC SIGNAL

WETLAND LIMITS BOUNDARY

AND UTILITY)PROPOSED EASEMENTS (DRAINAGE, CONSTRUCTION,

C

A

PROPOSED RETAINING WALL

MUNICIPAL BOUNDARY

EXISTING STRUCTURES, ISLAND, CURB

TO BE RETAINEDAND GUTTER

PI Sta 71+43.50

D

L = 320.18’

T = 160.24’

R = 3,000.00’

15

20

25

30

35

40

45

50

55

60

65

70

-L- PT Sta. 17+60.35

-L- POT Sta. 26+86.08

-Y1- POT Sta. 19+85.02

-L- POT Sta. 33+25.56

-Y2- POT Sta. 18+60.92

-Y3- POT Sta. 15+78.05

-Y3- PT Sta. 15+29.51

-Y3- PC Sta. 13+10.96

-Y3- PT Sta. 12+32.88

-Y3- PC Sta. 11+06.64

-L- POT Sta. 33+31.25

-Y3- POT Sta. 10+00.00

-L- PC Sta. 35+80.89

-Y4- PT Sta. 12+59.12

-Y4- PI Sta. 13+80.59

-Y4- PC Sta. 14+83.13

-Y4- PT Sta. 16+38.08

-Y4- PC Sta. 16+92.29

-Y4- PT Sta. 17+77.43

-L- POC Sta. 39+67.48

-Y4- POT Sta. 18+14.82

-L- PT Sta. 45+11.46

-L- PC Sta. 45+58.89

-L- POT Sta. 46+25.95

-Y5- POT Sta. 15+33.16

-Y5- PT Sta. 13+64.65

-Y5- POT Sta. 10+00.00

-Y5- PC Sta. 10+90.17

-L- PT Sta. 58+40.33

-Y6- POT Sta. 10+00.00

-L- POT Sta. 60+27.74

-Y6- POT Sta. 12+66.71

-Y7- POT Sta. 10+00.00

-Y7- PC Sta. 10+91.45

-Y7- PT Sta. 12+80.56

-L- POT Sta. 62+64.38

-Y7- POT Sta. 14+54.87

-Y8- POT Sta. 10+00.00

-Y8- PC Sta. 11+80.77

-Y8- PT Sta. 12+53.19

-L- POT Sta. 69+27.02

-Y8- POT Sta. 12+61.10

-L- PC Sta. 69+83.25

-L- PT Sta. 73+03.44

-Y7- Sta. 13+00.00

BEGIN CONSTRUCTION

45

45

-Y5- Sta. 13+15.00

BEGIN CONSTRUCTION

BEGIN CONSTRUCTION

-Y3- Sta. 12+60.00

BEGIN CONSTRUCTION

-Y2- Sta. 14+00.00

BEGIN CONSTRUCTION

-Y1- Sta. 11+90.00

-Y8- Sta. 10+50.00

BEGIN CONSTRUCTION

-Y6- Sta. 10+00.00

BEGIN CONSTRUCTION

-Y4- Sta. 12+39.75

BEGIN CONSTRUCTION

-L- Sta. 15+00.00

BEGIN CONSTRUCTION

STA 74+

00.0

0

MATC

HLIN

E SH

EET 2

15

20

25

30

35

40

45

50

55

60

65

70

10

15

10

15

10

15

10

15

10

15

10

10PI Sta 13+83.36

D

L = 760.35’

T = 383.36’

R = 2,410.00’

PI Sta 40+63.19

D

L = 930.56’

R = 1,435.00’

PI Sta 52+02.63

D

L = 1,281.44’

T = 643.74’

R = 5,400.00’

PI Sta 10+56.19

D

L = 71.13’

T = 35.80’

R = 250.00’

PI Sta 12+45.99

D

L = 146.53’

T = 83.97’

R = 120.00’

PI Sta 13+94.44

D

L = 77.00’

T = 38.81’

R = 250.00’

PI Sta 16+04.85

D

L = 143.47’

T = 87.24’

R = 100.00’

PI Sta 11+79.73

D

L = 126.24’

T = 73.09’

R = 100.00’

PI Sta 14+32.59

D

L = 218.54’

T = 121.62’

R = 200.00’

10

PI Sta 12+03.60

D

L = 189.12’

T = 112.15’

R = 140.00’

-Y1- POT Sta. 10+00.00

45

-L-

-Y2-

-Y2-

PI Sta 11+43.10

D

L = 232.30’

T = 116.28’

R = 2,000.00’

PI Sta 15+61.38

D

L = 154.95’

T = 78.25’

R = 450.00’

PI Sta 17+35.51

D

L = 85.14’

T = 43.23’

R = 200.00’

-Y4-

PI Sta 12+27.96

D

L = 274.48’

T = 137.79’

R = 1,250.00’

-Y5- -Y7-

PI Sta 12+17.04

D

L = 72.42’

T = 36.28’

R = 500.00’

-Y8-

POPL

AR GRO

VE R

OAD SO

UTH

NC 10

5 BYPASS

NC 105

NC 105

AM

BLIN

G

WAY

PO

PLA

R

GR

OVE R

OA

D

HO

MESPU

N

HIL

LS RO

AD

MARYAH DRIVE

SNAGGY MOUNTAIN BOULEVARD

DO

GW

OO

D

RO

AD

BUILDING SUPPLYNEW RIVER

CONSIGNMENTCURIOSITY

EXPRESSKANGAROO CAR WASH

BUBBLES

TOWNHOMES

FORREST EDGE

WHEELS

FUN ’N’

HILLS MOTEL

HIGHLAND

SPEEDWAY

KEDNEY CARE

FRESENIUS

BB&T

PROPERTIES

HERITAGE COURT

JEEP DODGE

ROSS CHRYSLER

SUPER 8

COMMONS

HIGHLAND

FURNITURE

BADCOCK HOME

TO FOSCOE

-L- POC Sta. 15+00.00BEGIN TIP PROJECT U-5603

~32 LENGTHPROPOSED (2) 78" CMP

RCBC 1’PROPOSED (2) 7’X5’

~32’ LENGTHEXTEND CULVERT

PROPOSED (2) 84"RCP

92’

110’

81’

81’

93’

50’

45’

53’

53’

60’

NEW RIVER BUILDING SUPPLY

WWW HOLDINGS LLC

DEWEY C WRIGHTMARGIE WRIGHT

ANDREW F DINKINS

E. F. C

OE

LEE Q McMILLAN

JOHN H CAMPBELL

SHELLY M CAMPBELL

GARY W DEITZ

HJRR HOLDINGS LLC

DEWEY C WRIGHT

MARGIE WRIGHT

HIGH COUNTRY LLCCHANDLER CONCRETE

DEWEY C WRIGHTMARJORIE WRIGHT

FRANK E PROCTOR

APPALACHIAN STUDENT HOUSING

TP LAND HOLDINGS LLC

DANIELLE S WADEANDREW B WADE

POPLAR 105 LLC

JOHN R HOUSER

BETTY T LITTLE

FRANCES H HENSON

BARBARA A DEAL

INVESTMENTS LLCCOLUMBUS HOWARD

LYNN R HUBBARDGLADYS BIDDIX BROWN

IRREVOCABLE TRUST FOR

L BLAIR JRFREDERICK

OWNERS ASSOCIATION INCHERITAGE COURT PROPERTIES

JKL PROPERTIES LLC

B L ROBINSON LLC

INVESTMENTS LLCCOLUMBUS HOWARD

PROPERTIES LLCA&R MOUNTAIN

DATED 03-29-1994REVOCABLE TRUST

JAMES H LESTER

JOHN P FIDLER

BARBETTA LLC

JILL A PATEL

BARBARA B DE LEO

SAM ABDIN

RAMSEY W ABDIN

HIGHLAND COMMONS BOONE LLC

NOCHE LLC

LUCIANO LUZI

TEMPLETON PROPERTIES LP

TEMPLETON PROPERTIES LP

GARY M HENSON

JOYCE C HENSON

HAROLD M HENSON

GARY M HENSONJOYCE C HENSON

HAL S VANNOYNELL ABSHER

ROBERT D LEE

SHARON J LEETEMPLETON PROPERTIES LP

KENNETH D HAYES

BETTY S HAYES

VULCAN LANDS INC

GOODMANFREDA R

ENTERPRISES INCPAUL BROWN

HENSONHAROLD M

JOHNSON JRHOWARD B

ASSOCIATION INCCONDO

DOGWOOD PLAZA

HARWOODYVETTE

PIPESLENORE N

LLCPROPERTIES

KES

10-26-2005TRUST DATEDREVOCABLE

FISCHER JOHN WARREN

RICEJOHN E

RICEMARY J

RICEJOHN E

RICEJOHN E

RICEMARY J

ROCK RD LLC644 BLOWING

PROPERTIES LLCBOONE MEDICAL

ENTERPRISES INCAMP

INVESTMENTS IISODALIS

INVESTORSRSP

100 Scale34"x60"

and are subject to change.The designs shown on these maps, including utility easements, are preliminary maps is limited to locations of major existing and potential utility easements. on these maps or on other displays. The utility information shown on these To provide greater visual clarity, existing and proposed utilities are not shown UTILITY INFORMATION:

F

C

F

C

F

C

F

F

F

F

F

F

F

F

F

F

F

C

C

C

C

F

C

F

C

C F

C

F

C

C

F

F

C

F

C

F

C

C

C

F

C

F

C

F

C

F

C

F

C

C

C

C

C

C

C

F

C

C

F

C

F

C

C

C

C

C

C

C

C

C

C F

F

F

C

C

C

C

C

C

C

C

F

C

F

C

F

C

F

C

F

F

C

F

C

F

C

F

C

C

C

F

C

C

F

C

F

F

F

F

C

F

F

F

F

F

F

F

F

F

C

F

C

FF

F

F

F

F

FF

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

CC

F

C

F

C

F

C

F

C

F

C

F

F

FF F

F

F F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

C

F

F

F

F

F

F

F

F

F

F

C

F

C

F

C

F

C

F

C

F

C

F

F

F

C

F

C

F

C

F

C

F

C

F

C

F

C

F

C

F

C

F

C

F

C

F

C

C

C

C

C

F

C

F

C

F

C

F

C

F

C

F

C

F

C

F

C

F

C

F

C

C

C

F

C

F

C

F

C

F

C

F

C

C

C

F

C

F

C

C

C

C

C

C

C

F

F

F

F

F

F

F

F

F

C

C

F

F

F

F

F

F

F

F

F

C

C

F

F

F