1 11 th EuroMed Avation Working Group 11 th Aviation Working Group meeting Overview Nicolas Zvéguintzoff Team Leader 15 th of October 2014

Upload: others

Post on 08-Jul-2021

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 11 Aviation Working Group meeting Overviewgalileo.cs.telespazio.it/medusa/public/7th Euromed GNSS... · 2014. 11. 28. · 11th EuroMed Working Group 3Avation Key objective : the Roadmap

1 11th EuroMed Avation Working Group

11th Aviation Working Group meeting

Overview Nicolas Zvéguintzoff – Team Leader

15th of October 2014

Page 2: 11 Aviation Working Group meeting Overviewgalileo.cs.telespazio.it/medusa/public/7th Euromed GNSS... · 2014. 11. 28. · 11th EuroMed Working Group 3Avation Key objective : the Roadmap

2 11th EuroMed Avation Working Group

Key objective: the RTAP

The Regional Transport Action Plan

► The Project supports the beneficiary countries with the implementation of RTAP actions on aviation namely:

► action 14 on the opening of the aviation market and

► actions 15 and 16 on making air transport safer and secure

► The Project also supports the RTAP in establishing the EuroMediterranean Common Aviation Area (EMCAA) a long-term strategic objective in relation to extending the EU's Common Aviation Area to all its Neighbours.

Page 3: 11 Aviation Working Group meeting Overviewgalileo.cs.telespazio.it/medusa/public/7th Euromed GNSS... · 2014. 11. 28. · 11th EuroMed Working Group 3Avation Key objective : the Roadmap

3 11th EuroMed Avation Working Group

Key objective : the Roadmap

The Roadmap

► The Road Map was adopted by the Aviation Working Group at its 6th meeting, on 24th November 2009

► The Road Map is made up of 60 high level objectives

► For all these objectives the Road Map defines a planning for gradual implementation

► The detailed contents of the Project supports the Road Map

Page 4: 11 Aviation Working Group meeting Overviewgalileo.cs.telespazio.it/medusa/public/7th Euromed GNSS... · 2014. 11. 28. · 11th EuroMed Working Group 3Avation Key objective : the Roadmap

4 11th EuroMed Avation Working Group

The expectations from the Project :

Specific results to be achieved per domains

► Market: further promotion of liberalization of the air transport market and the gradual removal of competition distortive measures;

► ATM: Enhancing the participation of the beneficiaries into the Single European Sky initiative (notably Functional Airspace Blocks initiatives); support the current regional initiatives (AEFMP) and participation of the beneficiaries and cooperate with Eurocontrol to ensure the proper implementation of the three pan-European functions;

► Safety: for those countries that are not participating in the EASA managed MASC initiative, a further promotion of the EU safety acquis and standards;

► Security: Enhancing security awareness and implementation of effective measures to ensure this;

► Environmental protection: among the actors involved with air transport to stimulate awareness to the environmental issues.

Page 5: 11 Aviation Working Group meeting Overviewgalileo.cs.telespazio.it/medusa/public/7th Euromed GNSS... · 2014. 11. 28. · 11th EuroMed Working Group 3Avation Key objective : the Roadmap

5 11th EuroMed Avation Working Group

The Work Plan of the Project:

► Entry into effect

► The Workplan was approved in May 2012, available on the web

► Orientation

► The Project is made up of a series of individual fiches, « result oriented »

► Approach in steps

► In most domains activities will be performed in steps: typically a workshop would lauch an activity and an action plan will be put together; missions of assistance follow; one or more events would be organised thereafter for improvement and progress towards completion of the objective

► Living document

► The Work Plan is a living document updated on a regular basis (as a minimum every six months) to account for facts finding, progress actually achieved and changes to priorities.

► Conplementary orientation

► The Project was directed by end-2013 to shift focus on requests made on a case by case basis by beneficiary countries

Page 6: 11 Aviation Working Group meeting Overviewgalileo.cs.telespazio.it/medusa/public/7th Euromed GNSS... · 2014. 11. 28. · 11th EuroMed Working Group 3Avation Key objective : the Roadmap

6 11th EuroMed Avation Working Group

Key Facts & Figures

► 9 countries - Syria excluded throughout the duration of the Project for political reasons and Libya included in February 2012

► Budget of 2M€ first allocated across domains, then continuously monitored:

Safety(0.3 M), Security (0.2 M), ATM (0.8 M), Market Access (0.3 M), Environment (0.2 M), Regional Visibility (0.2 M)

► 69 technical assistance activities carried out:

20 regional activities, including 4 AWG meetings

49 bilateral activities

► Over 500 persons participated to the activities

► 24 experts involved

► Around 1350 days of work performed

► Cooperation with key stakeholders: EASA, ECTL, Blue Med, AEFMP

Page 7: 11 Aviation Working Group meeting Overviewgalileo.cs.telespazio.it/medusa/public/7th Euromed GNSS... · 2014. 11. 28. · 11th EuroMed Working Group 3Avation Key objective : the Roadmap

7 11th EuroMed Avation Working Group

11th Aviation Working Group meeting

Market Access Nicolas Zvéguintzoff Key expert

15th of October 2014

Page 8: 11 Aviation Working Group meeting Overviewgalileo.cs.telespazio.it/medusa/public/7th Euromed GNSS... · 2014. 11. 28. · 11th EuroMed Working Group 3Avation Key objective : the Roadmap

8 11th EuroMed Avation Working Group

Market Access: high level objective

► A further promotion of liberalization of the air transport market and the gradual removal of competition distortive measures.

Page 9: 11 Aviation Working Group meeting Overviewgalileo.cs.telespazio.it/medusa/public/7th Euromed GNSS... · 2014. 11. 28. · 11th EuroMed Working Group 3Avation Key objective : the Roadmap

9 11th EuroMed Avation Working Group

Market Access: detailed objectives

► Reinforcement or establishment of an independent economic regulator in the field of air transport and a regulatory framework to handle competition issues.

► Ensuring that each partner country converges with EU principles established in Regulation EC 1008/2008 so that air carriers operating in the EMCAA are subject to equivalent financing requirements and similar conditions related to the granting / withdrawal of operating licenses.

► Reinforcement or establishment of an independent regulator and an accompanying regulatory framework for Passenger protection.

► Airport operations and ground handling:

To promote the opening-up of the ground-handling sector in the beneficiary countries in view of allowing self-handling of the airlines and the possibility for airlines to choose between several third-party handlers;

to promote the implementation of an airport charges scheme based on the principles of transparency, non-discrimination, consultation of the stakeholders and cost-relatedness.

Page 10: 11 Aviation Working Group meeting Overviewgalileo.cs.telespazio.it/medusa/public/7th Euromed GNSS... · 2014. 11. 28. · 11th EuroMed Working Group 3Avation Key objective : the Roadmap

10 11th EuroMed Avation Working Group

Market Access: independent regulator

► To that effect a high level workshop presented:

► the general framework of competition law in EU about: Abuse of dominant position, antitrust,

State aids to firms in difficulties,

State financing at airports,

State start-up aid to airlines,

► and subject matters for the economic regulator: Air carriers licensing, Passengers protection, Ground handling, Airport charges schemes

► And participants commented the impact assessments carried out in those countries where competition is in place, with the case of Morocco as an example

► Results: Participants received an overview of the comprehensive material governing competition law, and a framework for subsequent EuroMed Aviation activities

Page 11: 11 Aviation Working Group meeting Overviewgalileo.cs.telespazio.it/medusa/public/7th Euromed GNSS... · 2014. 11. 28. · 11th EuroMed Working Group 3Avation Key objective : the Roadmap

11 11th EuroMed Avation Working Group

Market Access: Passengers’ protection

► To that effect ad-hoc missions took place about

► The promotion of the ratification of the Montreal convention

► The adoption of legislation similar to :

► (EU) 261/2004 on passengers rights

► (EU) 1008 / 2008 on price transparency

► (EU) 1107/2006 on the rights of disabled persons and persons with reduced mobility when travelling by air

► Results

When the legislation and a dedicated service / unit will be in place it is expected that passengers will receive adequate compensation and assistance; there will be no discrimination between persons; straightforward rules on carrier liability will apply; non-compliant carriers will be exposed to sanctions that are efficient, proportionate and dissuasive.

Page 12: 11 Aviation Working Group meeting Overviewgalileo.cs.telespazio.it/medusa/public/7th Euromed GNSS... · 2014. 11. 28. · 11th EuroMed Working Group 3Avation Key objective : the Roadmap

12 11th EuroMed Avation Working Group

Market Access: ground handling

► To that effect a high level workshop presented:

► A high level analysis of the impact of adopting 96/67 (or successor) performed when the Directive was put in place

► The rationale for a revision of the Directive, contents of the draft revision and shift from a Directive to a Regulation

► Views, experience and expectations of European stakeholders:

Air France: the expectations of a based carrier; the case of self- handling

Aviapartner: the expectations of a supplier

Toulouse airport: the expectations of the airport managing body

Detailed presentations by beneficiary countries participants

► Further to the workshop participants were requested to perform a detailed gap analysis based on a common matrix; the Project offered follow-on assistance for convergence based on specific situations.

Page 13: 11 Aviation Working Group meeting Overviewgalileo.cs.telespazio.it/medusa/public/7th Euromed GNSS... · 2014. 11. 28. · 11th EuroMed Working Group 3Avation Key objective : the Roadmap

13 11th EuroMed Avation Working Group

11th Aviation Working Group meeting

Security Nicolas Zvéguintzoff Team Leader

15th of October 2014

Page 14: 11 Aviation Working Group meeting Overviewgalileo.cs.telespazio.it/medusa/public/7th Euromed GNSS... · 2014. 11. 28. · 11th EuroMed Working Group 3Avation Key objective : the Roadmap

14 11th EuroMed Avation Working Group

Security: high level objective

► Enhancing security awareness and implementation of effective measures to ensure this

Page 15: 11 Aviation Working Group meeting Overviewgalileo.cs.telespazio.it/medusa/public/7th Euromed GNSS... · 2014. 11. 28. · 11th EuroMed Working Group 3Avation Key objective : the Roadmap

15 11th EuroMed Avation Working Group

Security: Detailed objectives

► Harmonization of the regulations and national programmes

► To be reflected under the National Civil Aviation Security Programme, the National Civil Aviation Security Quality Control Programme and Training Programme with regulator separated from the entity that implements the security measures.

► Activity 3b: Passengers and baggage screening

► Measures equivalent to EC requirements in this matter should be implemented as they are more detailed as the applicable ICAO Annex 17 SARP.

► For each of the two topics the project should organise a workshop at regional or subregional level and in addition technical expert missions in those beneficiary countries where this is deemed necessary – as defined in the different national action plans developed under EuroMed Aviation I.

Page 16: 11 Aviation Working Group meeting Overviewgalileo.cs.telespazio.it/medusa/public/7th Euromed GNSS... · 2014. 11. 28. · 11th EuroMed Working Group 3Avation Key objective : the Roadmap

16 11th EuroMed Avation Working Group

Harmonisation & separate regulator

► To that effect a high level workshop:

supported the implementation of the action plans regarding the harmonization of national legislation and national security programs of Beneficiary countries with EU regulations and requirements and strengthening of the enforcement powers of the appropriate authority.

Found out that main requests concentrate on “Security Equipment”, “Cargo” and “Assistance on organizational separation of the appropriate authority”.

Made it possible for the experts to put together then maintain over site specific missions a description on a country basis of identified differences and guide for assistance activities proposed by Beneficiaries countries to foster convergence.

► Thereafter ad-hoc missions took place

Page 17: 11 Aviation Working Group meeting Overviewgalileo.cs.telespazio.it/medusa/public/7th Euromed GNSS... · 2014. 11. 28. · 11th EuroMed Working Group 3Avation Key objective : the Roadmap

17 11th EuroMed Avation Working Group

Pax & baggage screening; other areas of

interest

► Missions ran on an ad-hoc basis with beneficiary countries: Algeria, Egypt and Lebanon. In selecting the countries due consideration was also given to the status of the twinning programme, to avoid any risk of overlap.

► Algeria: the purpose of assistance was twofold:

calibrating the capacity, resources and enforcement powers of the authority

extension of the certification of acc3 (air carrier cargo third country)/ra3 (regulated agent third country) / kc3 (known consignor third country)

► Egypt: assistance was designed to enhance: National Security & Security Quality Control Programme standards on Recruitment, Training and Certification for Screeners, Instructors and

Security Managers standards and licensing for cargo, ACC·3, airport and in-flight supplies facilities standards on practical training for screeners

► Lebanon: Out of a comprehensive support programme circumstances dictated to concentrate efforts on developping the Airport Security Programme

Page 18: 11 Aviation Working Group meeting Overviewgalileo.cs.telespazio.it/medusa/public/7th Euromed GNSS... · 2014. 11. 28. · 11th EuroMed Working Group 3Avation Key objective : the Roadmap

18 11th EuroMed Avation Working Group

11th Aviation Working Group meeting

Safety Nicolas Zvéguintzoff Team Leader

15th of October 2014

Page 19: 11 Aviation Working Group meeting Overviewgalileo.cs.telespazio.it/medusa/public/7th Euromed GNSS... · 2014. 11. 28. · 11th EuroMed Working Group 3Avation Key objective : the Roadmap

19 11th EuroMed Avation Working Group

Safety: high level objective

► For those countries that are not participating in the EASA managed MASC initiative, a further promotion of the EU safety acquis and standards.

► Those countries were at that time: Algeria, Egypt and Palestine

Note: MASC is a dedicated EU project set-up with EASA (2M€) parallel to EuroMed Aviation on aviation safety and specifically for those partners that expressed at that time a wish to collaborate intensively with the EU on aviation safety.

Page 20: 11 Aviation Working Group meeting Overviewgalileo.cs.telespazio.it/medusa/public/7th Euromed GNSS... · 2014. 11. 28. · 11th EuroMed Working Group 3Avation Key objective : the Roadmap

20 11th EuroMed Avation Working Group

Safety: Detailed objectives for non-MASC

countries

► To assist the Mediterranean partners in aligning their ramp inspection regime with the common European procedures as established under the EC SAFA programme;

► To ensure a smooth and efficient implementation of the "Third Country Operator" authorisation as established by Regulation(EC) 216/2008;

► The other road map objectives and actions identified in the national actions plans notably an enhanced focus on the establishment of an independent safety regulator and harmonisation of certification rules applicable to aeronautical products and staff.

Page 21: 11 Aviation Working Group meeting Overviewgalileo.cs.telespazio.it/medusa/public/7th Euromed GNSS... · 2014. 11. 28. · 11th EuroMed Working Group 3Avation Key objective : the Roadmap

21 11th EuroMed Avation Working Group

Safety: Actions performed under the

Workplan

► From the very beginning however EuroMed and MASC cooperated to provide joint support to all beneficiary countries. This took the form of seven workshops, giving maximum value for money and contributing to an « EMCAA spirit ».

► Five workshops ran by EuroMed: SAF 204-02 - Workshop - New European Regulation on Air Operations SAF 204-01 - Workshop - New European Regulation on Aircrew SAF 204-03 - Workshops on the requirements for Continuing Airworthiness SAF 201-02 - SAFA Training SAF 204-05 - Part 147 and Part 66 Training

► ►Two workshops ran by MASC: SAF 204-04 - Part 145 Training - Theory and practical OJT SAF 204-06 - Part M Training - Theory and practical OJT

► This gave beneficiaries inter alia a comprehensive view over the full compendium of EU legislation on continuous airworthiness and the new « AIR OPS » regulation.

Page 22: 11 Aviation Working Group meeting Overviewgalileo.cs.telespazio.it/medusa/public/7th Euromed GNSS... · 2014. 11. 28. · 11th EuroMed Working Group 3Avation Key objective : the Roadmap

22 11th EuroMed Avation Working Group

Safety: Other actions performed

► End 2013 EC signed an agreement with EASA such that EASA would take care of “non-MASC” countries.

► Lybia Further to a request from EC, and although an activity whose scope is close to

an audit does not fall within the remits of the Project, the Project volunteered to assess the core capabilities of the Libyan Civil Aviation Authority (7 to 11 February 2014).

Experts performed within tight timing limits and under the stress of a demanding security environment and diplomatic warnings.

► Israel

Further to a discussions with the Civil Aviation Authority of Israel (CAAI) and although Israel is not a non-MASC country the Project assisted CAAI across 2014 in producing its State Safety Programme (SSP), with support from EASA through:

Two sessions in Israel on several components of the SMS A session in Spain dedicated to the Occurrence Reporting System and Continuous support (back-office)

Page 23: 11 Aviation Working Group meeting Overviewgalileo.cs.telespazio.it/medusa/public/7th Euromed GNSS... · 2014. 11. 28. · 11th EuroMed Working Group 3Avation Key objective : the Roadmap

23 11th EuroMed Avation Working Group

11th Aviation Working Group meeting

Air Traffic Management (ATM) Gilles Fartek ATM Key expert

15th of October 2014

Page 24: 11 Aviation Working Group meeting Overviewgalileo.cs.telespazio.it/medusa/public/7th Euromed GNSS... · 2014. 11. 28. · 11th EuroMed Working Group 3Avation Key objective : the Roadmap

24 11th EuroMed Avation Working Group

ATM Background

EUROMED Aviation II Terms of References (ToRs) for ATM:

- Directly derived from Nov 2009 Road Map (§ 8.2);

- Objectives: facilitate Single European Sky legislation convergence in six main domains identified by the 2009 Road:

• Institutional aspects;

• Service Provision & certification aspects;

• Organisation and use of the airspace;

• Human Factors aspects;

• ATM Safety aspects;

• Interoperability, and Pan-European functions;

Page 25: 11 Aviation Working Group meeting Overviewgalileo.cs.telespazio.it/medusa/public/7th Euromed GNSS... · 2014. 11. 28. · 11th EuroMed Working Group 3Avation Key objective : the Roadmap

25 11th EuroMed Avation Working Group

ATM Work Package characteristics

Work Package ATM developed taking into account:

EUROMED Roadmap (§8.2) and national action plans;

EUROMED Aviation II Terms of Reference;

Analysis of situation and specific needs in each beneficiary depicted in EUROMED I fact findings and technical assistance reports;

Work package aiming to:

• Fostering legislative harmonization with the SES acquis;

• Enhancing national supervisory authorities capabilities (NSA);

Phasing efficiently activities with realistic step-wise approach;

Setting appropriate structures, documentation and training before running more specific activities (i.e. audit, certification, etc).

Page 26: 11 Aviation Working Group meeting Overviewgalileo.cs.telespazio.it/medusa/public/7th Euromed GNSS... · 2014. 11. 28. · 11th EuroMed Working Group 3Avation Key objective : the Roadmap

26 11th EuroMed Avation Working Group

ATM - Interactions ToRs & Activities

Legislative

alignment

(approximation)

ATM 501

NSA

ATM 502

Certified

ANSP

ATM 503

Effective

safety

Oversight

ATM 504

Functional

Airspace

Blocs (FAB)

ATM 505

Flexible use

of Airspace

(FUA)

ATM 506

ToR Activity 5a

Institutional actions

Tor Activity 5b

Service provision & certification

ToR Activity 5c

Airspace organisation and use

ToR Activity 5d

ATM Safety

ToR Activity 5e

Training

ToR Activity 5f

Interoperability

•Maximised implementation of Single European Sky legislation

Page 27: 11 Aviation Working Group meeting Overviewgalileo.cs.telespazio.it/medusa/public/7th Euromed GNSS... · 2014. 11. 28. · 11th EuroMed Working Group 3Avation Key objective : the Roadmap

27 11th EuroMed Avation Working Group

ATM – Adapted incremental approach

• Off-site evaluation of countries’ convergence;

• Questionnaires (SES, FUA, SAR, Airspace design, etc.);

• On-site visit to:

o Complement initial evaluations and adapt national actions;

o Support approximation;

o Transfer knowledge (SES legislation and standards);

• Adapted support for each beneficiary, fit sizing contents and

methodology;

o Analyze approximation/convergence level;

o Identify specific national needs for ATM training within or outside

Work Plan;

o Agree with DGCAs on actions, priorities and timelines;

o Perform on-site training and support ;

Page 28: 11 Aviation Working Group meeting Overviewgalileo.cs.telespazio.it/medusa/public/7th Euromed GNSS... · 2014. 11. 28. · 11th EuroMed Working Group 3Avation Key objective : the Roadmap

28 11th EuroMed Avation Working Group

ATM – Adapted approach

• Maintain general objectives contained in EUROMED Work Plan;

• Adapt activities to national situation and environment;

• Establish & adopt national Regulatory and Technical Plans ;

• Support specific requests (Airspace design, SAR, COM DATA);

• Cooperate with other programs (BlueMed, AEFMP) engaged;

• Transfer knowledge and specific support (i.e. in advance to ICAO audits or to accommodate specific needs);

• Objectives for on-site activities :

- Maximize national staff participation;

- Favour knowledge transfer and technical support;

- Better adaptation to local requirements vs general workshops;

- Favour participation of staff from other Beneficiaries;

- Allow replication in other Beneficiaries;

Page 29: 11 Aviation Working Group meeting Overviewgalileo.cs.telespazio.it/medusa/public/7th Euromed GNSS... · 2014. 11. 28. · 11th EuroMed Working Group 3Avation Key objective : the Roadmap

29 11th EuroMed Avation Working Group

ATM Regional activities

• ATM kick off meeting (Sept 2012);

• Interoperability workshop in cooperation with AEFMP & BlueMed in Madrid in connection with Word ATM 2014 (March 2014);

• COM/DATA training courses developed in cooperation with AEFMP (2013 and 2014);

• Participation to GNSS II / MEDUSA final event on GNSS for aviation;

• Training course on SES Performance Scheme, in cooperation with BlueMed ISIS II project (Lebanon + Jordan) – Sept. 2014;

• Search and Rescue Training in ENAC, organized in cooperation with French DGAC (9 participants, all countries) – Nov. 2014;

Page 30: 11 Aviation Working Group meeting Overviewgalileo.cs.telespazio.it/medusa/public/7th Euromed GNSS... · 2014. 11. 28. · 11th EuroMed Working Group 3Avation Key objective : the Roadmap

30 11th EuroMed Avation Working Group

Capacity Building of NSAs

Objectives

Support setting up of independent, well established and well staffed NSAs;

Knowledge transfer to NSA staff where required;

Facilitate fit-sizing of documentation to national requirement (NSA Handbook and procedures);

Prepare Separation between Regulator and ANSP;

Activities

On-site (mainly) assistance by KE ATM with off-site preparation;

Knowledge transfer (SES regulations and best practices);

ATM Safety oversight (On site training);

Documentation - NSA Handbook + procedures;

Page 31: 11 Aviation Working Group meeting Overviewgalileo.cs.telespazio.it/medusa/public/7th Euromed GNSS... · 2014. 11. 28. · 11th EuroMed Working Group 3Avation Key objective : the Roadmap

31 11th EuroMed Avation Working Group

ANSP certification

Objectives

• Support NSAs in establishing tools for certification of different providers, including identifying the organizations to be certified and building up the capabilities of the NSAs with regard to certification and safety oversight;

• Support the ANSP in understanding the requirements to be introduced by certification processes and be prepared for them;

Activities

• Training of ANSP on certification requirements;

• Support to MET service provider certification;

• Support to

Page 32: 11 Aviation Working Group meeting Overviewgalileo.cs.telespazio.it/medusa/public/7th Euromed GNSS... · 2014. 11. 28. · 11th EuroMed Working Group 3Avation Key objective : the Roadmap

32 11th EuroMed Avation Working Group

Air Traffic Management activities

Air Navigation Services (ANS) common requirements and certification (Reg. EU 1035/2011):

• Phase 1 - Knowledge transfer Phase 1:

Tunisia (Dec 2013), Morocco (Feb. 2014), Egypt (May 2014);

• Phase 2 - Audit and evaluation process in support to CAA staff

Tunisia (January 2014);

• Assistance to METSP for certification and oversight

Tunisia (July 2014);

• Assistance to ATCO Training Center certification and oversight

Phase 1 : Initial training and support, Morocco (Feb. 2014);

Phase 2 : On-the-job training, Morocco (Oct. 2014);

Page 33: 11 Aviation Working Group meeting Overviewgalileo.cs.telespazio.it/medusa/public/7th Euromed GNSS... · 2014. 11. 28. · 11th EuroMed Working Group 3Avation Key objective : the Roadmap

33 11th EuroMed Avation Working Group

Other activities

Communication and Data Link (COM/DATA training)

Activity organized in cooperation with AEFMP:

o Morocco:

Rabat, March 2014 – 15 participants (civil & military);

o Tunisia

Tunis, August 2014 – 16 participants;

o Egypt

Cairo, April 2014 – 36 participants;

Safety oversight (Reg. EU 1034/2011)

• Jordan:

Amman, February 2014 – 16 participants;

Page 34: 11 Aviation Working Group meeting Overviewgalileo.cs.telespazio.it/medusa/public/7th Euromed GNSS... · 2014. 11. 28. · 11th EuroMed Working Group 3Avation Key objective : the Roadmap

34 11th EuroMed Avation Working Group

Overview of participation

Activity Participants

On-site knowledge transfer of SES legislation and standards 76

ANSP Certification (Reg. EU 1035/2011) 118

• Phase 1 - Theory (68)

• Phase 2 - Implementation (08)

• ATCO Training Centre (Morocco) - Phase 1 + 2 (30)

• INM – Support to Certification (12)

Safety oversight (Reg. EU 1035/2011) - Phase 1 - Theory 17

COM-DATA Training 67

Interoperability Seminar 13

SAR Training - in cooperation with ENAC France 09

Training of trainers – in cooperation with ENAC France 04

Total 304

Page 35: 11 Aviation Working Group meeting Overviewgalileo.cs.telespazio.it/medusa/public/7th Euromed GNSS... · 2014. 11. 28. · 11th EuroMed Working Group 3Avation Key objective : the Roadmap

35 11th EuroMed Avation Working Group

Gilles Fartek Euromed Aviation II ATM Expert Email: [email protected] Tel: +32 (0) 494545569