    CANGES AND EXTRAWORK

  • 8/10/2019 11. Change & Extra Work.ppt

    2/25

    CHANGES AND EXTRA WORK

    Contract modification Changes in the work Type of changes Elements of a change order

    Evaluating the need Consideration for evaluation Change order for differing site conditions Starting the change order process

    Cost delays caused by change orders

  • 8/10/2019 11. Change & Extra Work.ppt

    3/25

    Contract Modification

    Change Orders (CO) adalah suatu kesepakatan tertulis yang dirubah,ditambah, atau alternatif lain dari bentuk pekerjaan yang sudah ditandatangani sesuai dengan dokumen yang disampaikan pada tender,dengan perubahan skop pekerjaan, untuk itu diperlukan modifikasikontrak (addendum)

    Secara fungsional, suatu perubahan permintaan (CO) dapat dipenuhisetelah persetujuan pelaksanaan dan spesifikasi disepakati dantertuang dalam bentuk adendum, kalau tidak ada perubahan hargatetapi termasuk dalam perubahan permintaan (CO)

    Dalam praktek yang baku pada kontrak konstruksi dimungkinkanpemilik untuk melakukan perubahan pekerjaan setelah kontrakditandatangani dan sepanjang periode konstruksi. Tergantung padakontrak dan terminologi yang spesifik, perubahan seperti itu mungkinmenyebabkan penambahan atau penghapusan dari pekerjaan,

    perubahan metode konstruksi atau cara mengukur prestasi kerja,perubahan dalam finising bahan atau fasilitas, atau perubahan waktukontrak atau pesanan pekerjaan.

  • 8/10/2019 11. Change & Extra Work.ppt

    4/25

    CHANGES IN THE WORK

    Impact costs Oral change orders Change orders:

    Bilateral change orders Unilateral change orders

  • 8/10/2019 11. Change & Extra Work.ppt

    5/25

    The Terminology Used for The Various ChangeDocuments

    Type ofchange

    Public (nonfederal) contractsand privatecontracts

    Federal contractsonly (Far 43.101and 43.103

    Contractmodification

    Bilateral Change order Contract

    amendment (orsupplementalagreement)

    Unilateral Work changedirective

    (sometimes calledother names)

    Change order

  • 8/10/2019 11. Change & Extra Work.ppt

    6/25

    The Handling of All Types of Change Orders

    Pekerjaan tidak termasuk atau di luar lingkup kontrak dasar,terutama sekali pada kontrak-kontrak pekerjaan umum

    Pihak-pihak atau individu yang diberi hak untukmengajukan dan menyetujui perubahan pekerjaan harusdisepakati dari awal pekerjaan. Informasi harusdisampaikan kepada mandor atau pengawas pemborongdan RPR owner

    Selama konfrensi pra konstruksi, perlu ada pertemuanuntuk menetapkan prosedur penanganan CO

    Semua perubahan dalam pekerjaan harus ditulis sebelum

    pelaksanaan dilakukan dengan segala perubahannya

  • 8/10/2019 11. Change & Extra Work.ppt

    7/25

    The Handling of All Types of Change Orders (cont)

    Lingkup CO harus jelas, dan CO disampaikan dengan berisiinformasi yang cukup jelas agar kontraktor dapat mengestimasipekerjaan secara baik dan realistis

    Kontraktor harus mengajukan proposal untuk pelaksanaan COsecepat mungkin setelah menerima permintaan CO dan penolakanatau persetujuan pemilik diperlukan sebelum pelaksanaannya

    Proposal harus wajar. Untuk itu perlu diberikan hak-hak untukkontraktor meliputi ongkos exploitasi dan persentase laba dalamperkiraan CO dan waktu yang diperlukan untuk mengajukanperubahan daftar pesanan material. Kontraktor berhak atas ganti-rugi untuk keterlambatan waktu, pengolahan dari pengurangan CO,biaya-biaya dari membongkar material dan pemindahannya, dansemua biaya-biaya sah lain yang terjadi pada pelaksanaanperubahan

  • 8/10/2019 11. Change & Extra Work.ppt

    8/25

    TYPES OF CHANGES

    Directed changes , easy to identify the owner directs the contractorto perform work that differs from the specified in the contract or isan addition to the work specified. A directed change may also bedeductive in nature: that is, may reduce the scope of work calledfor the contract

    Constructive changes , is an informal act authorizing or directing a

    modification to the contract caused by an act or failure to act. Incontrast to the mutually recognized need for a change, certain actof failure to act by the owner that increase the contractors costand/or time of performance may also be considered grounds for achange order. This is termed a constructive change and must beclaimed in writing by the contractor within the time specified in thecontract documents in order to be considered. The owner shouldevaluate a change order proposal based on such a claim and canuse the same reasoning process as with any other proposal.

  • 8/10/2019 11. Change & Extra Work.ppt

    9/25

    The Type of Constructive Change

    Defective plans and specifications Engineers interpretation Higher standard of performance than specified

    Improper inspection and rejection Change in method of performance Change in the construction sequence Owner nondisclosure

    Impossibility/impracticability of performance

  • 8/10/2019 11. Change & Extra Work.ppt

    10/25

    Elements of A Change Order

    Identification of change order Description of change Reason for change Change in contract price

    Change in unit prices (if applicable) Change to contract time Statement that secondary impacts are included Approval by owners and contractors

    representative

  • 8/10/2019 11. Change & Extra Work.ppt

    11/25

    AGC Recommended for Discussion Include

    Percentage for overhead and profit Length of time that a change order proposal price is to

    considered as firm Determination of the individual representative of the

    owner who is authorized to approve change orders

    Procedures to be followed in the submittal of changeorder proposals Change order forms to be used

  • 8/10/2019 11. Change & Extra Work.ppt

    12/25

    AGC Recommended for Discussion Include (cont)

    Time extensions required, if any-requests made by

    contractors due to changes in the plans or specifications The detail required of contractors when submitting

    change order proposals-will a complete breakdown of allcosts be required? Brief description-descriptive drawings

    Overtime necessary due to change orders. Considerationof decreased productivity

    When materials or equipment is to be removed due tochange, which party owns the removed items, and whoremoves them from the site of the job

    Responsibility for record drawings brought about due tochange orders

  • 8/10/2019 11. Change & Extra Work.ppt

    13/25

    Evaluating The Need

    To change contract plans or to specify the method andamount of payment and changes in contract time there from

    To change contract specifications, including changes inpayment and contract time that may result from suchchanges

    To effect agreements concerning the order of the work,including any payment or changes in the contact that mayresult

    For administrative purposes, to establish the method ofextra work payment and fun for work already stipulated in

    the contract

  • 8/10/2019 11. Change & Extra Work.ppt

    14/25

  • 8/10/2019 11. Change & Extra Work.ppt

    15/25

    Consideration for Evaluation

    Differing site condition Errors and omissions in plans

    and specs Change instituted by regulatory

    agencies Design changes Overruns/underruns in quantities

    beyond limits

    Factors affecting time completion

  • 8/10/2019 11. Change & Extra Work.ppt

    16/25

    Evaluation of Delays in The Work

    Was the cause of the delay beyond the contractors control?Did the contractor fail to take normal precaution?

    Was the contractor ready and able to work Did the contractor submit a detailed schedule projecting

    project completion within the allocated time? Was theschedule updated regularly? Did the updated schedule

    justify a time extension? Did this schedule contain a critical path analysis or

    equivalent? Has the contractor, maintained sufficient forces in those

    operation along the critical path where needed to meettarget dates?

  • 8/10/2019 11. Change & Extra Work.ppt

    17/25

    Evaluation of Delays in The Work (cont)

    How have causes, other than normal weather, beyond thecontrol and without the fault or negligence of the contractoraffected the target dates along the critical path?

    Has the contractor provenunusually severe weather withsuch information as climatological data, return probability ofsevere storms, or flood depth data?

    Did the weather phenomenon actually delay operation alongthe critical path or in secondary operations?

    Was the contractor shut down for other reasons?

    Guidelines to be evaluated prior to issuance of a Change

  • 8/10/2019 11. Change & Extra Work.ppt

    18/25

    Guidelines to be evaluated prior to issuance of a Changeorder to cover extra work resulting from a differing siteconditions

    What is the differing site condition? What is the site condition shown on the plans? What sections of the specifications are applicable? Do the parties have the latest revised issues of the plans

    and specifications?

    Have the parties checked all of the plan references? Plansare usually grouped by specialty: architectural, siteplumbing, mechanical, electrical, structural, special andstandard details. A critical note or dimension on one of thespecialty drawings may solve the whole puzzle of need and

    responsibility

  • 8/10/2019 11. Change & Extra Work.ppt

    19/25

    Guidelines to be evaluated prior to issuance of a Changeorder to cover extra work resulting from a differing siteconditions (cont)

    Has the inspection staff provided adequate data? If note, correct thatsituation immediately. The next claim could be much larger

    Why was the condition shown differently by the design? Was provision made for this situation in the contract documents? Did the construction contractor encounter unstable soils, rock

    excavation, or sub surface structures where no careful pre-bid siteinspection and contract documents could have predicted theirexistence?

    Was the construction contractor forced to employ unusual constructiontechniques and equipment to overcome the obstacles encountered?

    Can the construction contractors performance, selection of constructionprocedures, responses to site conditions be evaluated by the A/E (orpossibly a third party) experienced in modern construction techniques?

  • 8/10/2019 11. Change & Extra Work.ppt

    20/25

    Change Order for Differing Site Conditions

    Subsurface investigation

    Inclusion of soil reports in contract documents Evaluation of a claim of differing site condition Other influences on change order justification:

    Did the construction contractor promptly and before such conditionswere disturbed comply with the owners modification requirements

    Did the construction contractor make a site inspection and evaluation ofconditions prior to bidding?

    Is the construction layout correct? Who performed the constructionstaking: who checked the staking?

    Did utility companies respond and locate their respective facilities? Didthe construction contractor protect or obliterate utility reference stakesand use suitable construction techniques to protect structures and

    utilities

  • 8/10/2019 11. Change & Extra Work.ppt

    21/25

    Starting The Change Order Process

    Initiation of change order, CO di inisiasi oleh personalkontruksi diproyek, yang mana perubahan juga ataspermintaan berbagai pihak seperti owner, perencana,kontraktor, diluar lembaga pemerintah, atau individu. Secarasingkat banyak pihak dapat menajukan CO, hanya owneryang mendapat kewenangan. Sebuah usulan CO ditulis

    hanya sesudah perencana memberikan pertimbangan Chang order preparation

  • 8/10/2019 11. Change & Extra Work.ppt

    22/25

    Cost Delays Caused by Change Orders

    Kadang-kadang penyelesaian CO lambat atau dapat menunda

    operasi kontraktor CO selalu akan mengganggu pikiran kontraktor dan CO memerlukan

    biaya ekstra bagi kontraktor seperti biaya perbaikan Di dalam US Court of Claim di atur kontraktor yang bekerja pada

    proyek pemerintah berhak atas biaya-biaya ekstra yang terjadisebagai hasil spesifikasi yang cacat, sekalipun hanya bagian daripekerjaan ditunda

    Ini menunjukan pentingnya kewajiban inspektur untuk merekamsemua peralatan dan pekerja di lapangan, dan untuk mencatatapakah peralatan itu digunakan pada hari itu atau bukan. Informasiseperti itu sebagai dasar untuk mengantisipasi klaim dari tuntutanberlebihan atas keterlambatan disebabkan oleh kerja tambah

    i )

  • 8/10/2019 11. Change & Extra Work.ppt

    23/25

    perspective)

    Surat Pernyataan Change Order