11/08/2001
FSW/GS Splinter Meeting 3rd FSW/GS SplinterNovember 8, 2001 @ BallCOS
WFC3
(morning session, auditorium)
O. Lupie, WFC3 STScI
Review of Goals and Action Items from last time (O. Lupie)--5 min
WFC3 and COS Instrument Development Status (G. Blue)--10 min
WFC3 FSW Status and Schedule (G. Blue)--20 min
WFC3 MOU & Ground System Development Status (O. Lupie & W. Baggett)--15 min
Consolidated WFC3 Schedule (B. Rehm) --20 min
Break 20 minutes
COS FSW Status and Schedule (G. Blue) --20 min
COS MOU & Ground System Development Status (C. Keyes & Wayne Baggett)--15 min
WFC3 ICAL Status and Schedule (D. Fineberg) – 15 minutes
Transition Planning (Grant Blue) --15 min
Discussion & Lunch
Agenda
1
![Page 2: 11/08/2001 FSW/GS Splinter Meeting 3 rd FSW/GS Splinter November 8, 2001 @ Ball COS WFC3 (morning session, auditorium) O. Lupie, WFC3 STScI Review of Goals](https://reader036.vdocuments.net/reader036/viewer/2022072005/56649cd85503460f949a0c4e/html5/thumbnails/2.jpg)
11/08/2001
FSW/GS Splinter Meeting 3rd FSW/GS SplinterNovember 8, 2001 @ BallCOS
WFC3
(morning session, auditorium)
O. Lupie, WFC3 STScI
Schedule and schedule drivers review.
Provide forum for discussion.
Linkages and Interface clarification.
Improve Information flow.
Next splinter meeting planning.
Talk directly with team counterparts.
Establish perspective – how each piece fits into whole.
Renew commitment for timely information exchange.
Revisit Goals:
2
![Page 3: 11/08/2001 FSW/GS Splinter Meeting 3 rd FSW/GS Splinter November 8, 2001 @ Ball COS WFC3 (morning session, auditorium) O. Lupie, WFC3 STScI Review of Goals](https://reader036.vdocuments.net/reader036/viewer/2022072005/56649cd85503460f949a0c4e/html5/thumbnails/3.jpg)
11/08/2001
FSW/GS Splinter Meeting 3rd FSW/GS SplinterNovember 8, 2001 @ BallCOS
WFC3
(morning session, auditorium)
O. Lupie, WFC3 STScI
Schedule and schedule drivers review.
Provide forum for discussion.
Linkages and Interface clarification.
Improve Information flow.
Next splinter meeting planning.
Talk directly with team counterparts.
Establish perspective – how each piece fits into whole.
Renew commitment for timely information exchange.
Revisit Goals:
3
![Page 4: 11/08/2001 FSW/GS Splinter Meeting 3 rd FSW/GS Splinter November 8, 2001 @ Ball COS WFC3 (morning session, auditorium) O. Lupie, WFC3 STScI Review of Goals](https://reader036.vdocuments.net/reader036/viewer/2022072005/56649cd85503460f949a0c4e/html5/thumbnails/4.jpg)
11/08/2001
FSW/GS Splinter Meeting 3rd FSW/GS SplinterNovember 8, 2001 @ BallCOS
WFC3
(morning session, auditorium)
O. Lupie, WFC3 STScI
Action Items from March 27th Splinter1. Plan for WFC3 and COS splinter at Ball Summer 2001 CLOSED2. Initiate Tracking of WFC3 FSW and Ground System Development CLOSED (Brian, Grant, Olivia, Wayne)
[tracking and dependencies now included in Thai’s development schedule]3. Initiate Tracking of COS FSW and Ground System Development OPEN (unassigned)4. WFC3 and COS need updated schedules for the delivery of test data suites CLOSED (G. Blue)5. Investigate merging of stimulus keywords with science data keywords – CLOSED – Plan OK (ICAL)6. WFC3 MOU updated to reflect new schedules and March 27 splinter CLOSED - O. Lupie7. WFC3 MOU to address real-time TV support and connection to STScI CLOSED – O. Lupie8. Investigate COS and WFC3 Transition Plan Requirements IN WORK B. Friedman to present @ splinter.9. Scrub DRD Delivery Dates CLOSED (G. Blue)10. Get COS and WFC3 Timing Tests on Grant’s Schedule – Grant to work with Tom Wheeler INWORK 11. Address Fire-Wall issues for remote access to COS and WFC3 Telemetry CLOSED
Closed Actions from previous splinters:Have SISEs participate in WOWG and COWG CLOSED (R. Henry, STScI)Address details of Tom Wheelers’ support of ACS, COS< and WFC3 timing tests CLOSED (C. Blades, STScI)Link from GSFC Private WFC3 pages to GSFC FSW/OPS site CLOSED (Ball)Provide Instructions to Ball and GSFC for accessing the STScI OPR system CLOSED (W. Baggett, STScI)DM-05 to be placed on Web CLOSED (M. Draugelis, Ball)
![Page 5: 11/08/2001 FSW/GS Splinter Meeting 3 rd FSW/GS Splinter November 8, 2001 @ Ball COS WFC3 (morning session, auditorium) O. Lupie, WFC3 STScI Review of Goals](https://reader036.vdocuments.net/reader036/viewer/2022072005/56649cd85503460f949a0c4e/html5/thumbnails/5.jpg)
11/08/2001
FSW/GS Splinter Meeting 3rd FSW/GS SplinterNovember 8, 2001 @ BallCOS
WFC3
(morning session, auditorium)
O. Lupie, WFC3 STScI
STScI - WFC3 Achievements since last time:
Ops Telecon support: New error message review process is working well.Ground System: functionality available for basic UVIS Accum, IR Multi-
Accum, Lamp Operation, Darks/Biases (Mike Robinson, Wayne Baggett).
WFC3 Pipeline and Archive CDR – held on 10/16/2001 (Howard Bushouse)Delivery of AV-03 (Calibration Requirements) – October, 2001.
TV Science Calibration report submission (Neill Reid, Frank Bartko).
TV software support information gathering meeting – 08/2001.
Recommendation for TV Data Handling System submission – 10/2001.
ICA
LF
ron
t-en
dP
ipel
ine
5
![Page 6: 11/08/2001 FSW/GS Splinter Meeting 3 rd FSW/GS Splinter November 8, 2001 @ Ball COS WFC3 (morning session, auditorium) O. Lupie, WFC3 STScI Review of Goals](https://reader036.vdocuments.net/reader036/viewer/2022072005/56649cd85503460f949a0c4e/html5/thumbnails/6.jpg)
11/08/2001
FSW/GS Splinter Meeting 3rd FSW/GS SplinterNovember 8, 2001 @ BallCOS
WFC3
(morning session, auditorium)
O. Lupie, WFC3 STScI
STScI WFC3 Memorandum of Understanding:
Driven by Thermal Vac.
Documents interfaces/dependencies Ball, STScI, GSFC,
ICAL.
Now focuses on two categories of STScI support:
Long-Term – OPUS Pipeline processing and long term Hubble Archive Storage.
Time-Critical- Specialized system for quick-look analysis with real-time archive.
recent addition
6
![Page 7: 11/08/2001 FSW/GS Splinter Meeting 3 rd FSW/GS Splinter November 8, 2001 @ Ball COS WFC3 (morning session, auditorium) O. Lupie, WFC3 STScI Review of Goals](https://reader036.vdocuments.net/reader036/viewer/2022072005/56649cd85503460f949a0c4e/html5/thumbnails/7.jpg)
11/08/2001
FSW/GS Splinter Meeting 3rd FSW/GS SplinterNovember 8, 2001 @ BallCOS
WFC3
(morning session, auditorium)
O. Lupie, WFC3 STScI
5. Delivery of WFC3 OPS Test Bench Images – March 1, 2002 Source: Grant Blue, Ball
Recipient: WFC3 Science IPT
6. Completion of Code and Unit Test Build 3.0 – March 30, 2002Source: Grant Blue, BallRecipient: STScI – ESS (T. Wheeler & FSET )
7. Delivery of Images from the Integrated Optical Bench - June 1, 2002.Source: Grant Blue, BallRecipient: WFC3 Science IPT
8. Delivery of TV-Specific and Optical Stimulus Keywords Initial version –October 31, 2001, Complete version – May, 2002
Source: WFC3 ICAL Recipient: WFC3 Science IPT
Key MOU Items – version 10/15/2001
7
![Page 8: 11/08/2001 FSW/GS Splinter Meeting 3 rd FSW/GS Splinter November 8, 2001 @ Ball COS WFC3 (morning session, auditorium) O. Lupie, WFC3 STScI Review of Goals](https://reader036.vdocuments.net/reader036/viewer/2022072005/56649cd85503460f949a0c4e/html5/thumbnails/8.jpg)
11/08/2001
FSW/GS Splinter Meeting 3rd FSW/GS SplinterNovember 8, 2001 @ BallCOS
WFC3
(morning session, auditorium)
O. Lupie, WFC3 STScI
9. Delivery of TV-Specific and Optical Stimulus Keywords Initial version 10/31/2001, Complete version 05/2002. Source: WFC3 ICAL Recipient: WFC3 Science IPT (H. Bushouse, WFC3 Pipeline and Archive)
11. OPUS Staging Disk Implementation – December, 2002 Source: WFC3 ICAL Recipient: STScI OPUS
12. Delivery of Beta Version of OPUS - June 1, 2002 (Final Version October 2002) Source: STScI OPUS Recipient: WFC3 Science IPT and WFC3 ICAL
Key MOU Items – version 10/15/2001
8
![Page 9: 11/08/2001 FSW/GS Splinter Meeting 3 rd FSW/GS Splinter November 8, 2001 @ Ball COS WFC3 (morning session, auditorium) O. Lupie, WFC3 STScI Review of Goals](https://reader036.vdocuments.net/reader036/viewer/2022072005/56649cd85503460f949a0c4e/html5/thumbnails/9.jpg)
11/08/2001
FSW/GS Splinter Meeting 3rd FSW/GS SplinterNovember 8, 2001 @ BallCOS
WFC3
(morning session, auditorium)
O. Lupie, WFC3 STScI
Thermal VAC
Beta OPUS
Final OPUS
TV Readiness Test
Test Bench “Early” Images
Test Bench Image Suite
Build 3 C/U Complete
ICAL ProtoTesting
DM-06 – snapshot telemetry and internal header data
SMGT
Integrated Optical Bench Images
Archive
OPUSKeywords
JUN, 2003
DEC, 2002
JUN, 2002
DEC, 2001
MAR, 2002
SEPT, 2002
MAR, 2003
SEPT, 2001
Science SMS Testing Begins
Complete SMS Testing for SMGT
OS, TV Keywords
ICAL Development
Version October 15, 2001
Pipeline/Archive Front End
TV Cal SupportTV
KEY
SMS timing trials
9
![Page 10: 11/08/2001 FSW/GS Splinter Meeting 3 rd FSW/GS Splinter November 8, 2001 @ Ball COS WFC3 (morning session, auditorium) O. Lupie, WFC3 STScI Review of Goals](https://reader036.vdocuments.net/reader036/viewer/2022072005/56649cd85503460f949a0c4e/html5/thumbnails/10.jpg)
11/08/2001
FSW/GS Splinter Meeting 3rd FSW/GS SplinterNovember 8, 2001 @ BallCOS
WFC3
(morning session, auditorium)
O. Lupie, WFC3 STScI
STScI Ground System Development Linkages:
1yr between Build 3 C/U & SMGT
2mo between Full Suite Ops Bench Images and Beta OPUS
4mo between Beta OPUS and Final OPUS Deliveries
Final Opus ready for TV Readiness Test – Dec, 2002
2mo from TV Readiness Test to start of TV.
10
![Page 11: 11/08/2001 FSW/GS Splinter Meeting 3 rd FSW/GS Splinter November 8, 2001 @ Ball COS WFC3 (morning session, auditorium) O. Lupie, WFC3 STScI Review of Goals](https://reader036.vdocuments.net/reader036/viewer/2022072005/56649cd85503460f949a0c4e/html5/thumbnails/11.jpg)
11/08/2001
FSW/GS Splinter Meeting 3rd FSW/GS SplinterNovember 8, 2001 @ BallCOS
WFC3
(morning session, auditorium)
O. Lupie, WFC3 STScI
SEPT, 2001
Thermal VAC@ GSFC
TV Readiness Test
DM-06
SMGT
OPUSKeywords
JUN, 2003
DEC, 2002
JUN, 2002
DEC, 2001
MAR, 2002
SEPT, 2002
MAR, 2003
OS, TV Keywords
BETA OPUS
Final OPUS
ICAL ProtoTesting
Archive
Start SMS Testing
Complete SMS Testing
ICAL Development
ICAL limited to test of real-time system
Archive not ready forTV Readiness. No test-time
SMS timing trials
Minimal testing of Final OPUS; no ICAL tests
Test Bench “Early” Images
Test Bench Image Suite
Build 3 C/U Complete
Integrated Optical Bench Images
Version November 1, 2001
Pipeline/Archive Front End
TV Cal SupportTV
KEY
Schedule-Incompatibility
1-2 month slip
Incomplete SMS testing. Risk final Phase development effort. 11