TPFR MASTER DOCUMENT REGISTER Monthly Cut Off Date:BOURIAgip Oil Ltd. (Libya Branch)PM: Yannick Le CarrerDPM: Craig Hanlon % COMPLETION BASIS:DCC : Delphine Godefroy 1 Approved 100% WHEN APPROVED BY THE COMPANY
ISSUE STATUS:2
P = CURRENT LIVE DOC A = FOR APPROVAL 80% WHEN ISSUED FOR COMPANY REVIEWS= SUPERSEDED DOC R = FOR REVIEW 3 Not approved 40% WHEN ISSUED FOR INTERNAL COMMENTSV=CANCELLED, VOID, OR REPLACED DOC 4 Returned with Comments 10% AFTER DOCUMENT ELABORATION START N= NEW DOCUMENT / DRAWING
ORIGORGDSPL DIC IDC DL PM / DPM PLAN ACTUAL TARGET PLAN NEW ACTUAL
COMPISSUE REF COMPANY COMPANY COMPANY COMPANY % CONTRACTOR
Doc
umen
t Ty
pe
DO
C S
TA
T
TITLE CO
MP
AN
Y
ST
AT
US
ENTITY ENG REVIEW REVIEW APPROVALAPPROVAL DISCPL START START COMPLETE ISSUEFORECAST
DATE ISSUE
ACTUAL TRANSMITTAL NOTE
REF. DUE RETURN
ACTUAL RETURN (E-MAIL)
ACTUAL RETURN (FAX)
ISSUE STATUS weight COMP
RE-ISSUEDATE
cl: c
lient
int:
inte
rnal
LOCA UNI D TY ORI PROG Project No. UnitDoc. Type Mat. Code Serial Rev.
cl (PMA) GENERALclclcl (PMA) PLANNING-COST CONTROLclclcl (PMA) PROCUREMENT-EXPEDITING-INSPECTIONclclcl (PMA) QAclclcl (PMA) HSEclclclcl DETAILED DESIGNcl FLEXIBLE PIPEclclcl STRUCTUREcl (DE) UMBILICALclcl (DE) SUBSEAclcl INSTALLATION AIDSclclcl INSTALLATIONclcl MOBILISATION MANUALSclcl INSTALLATION MANUALSclcl TRENCHING PROCEDURESclcl PRE-COMMISSIONING PROCEDURESclcl SURVEY PROCEDURESclclclcl PRE-ENGINEERING SURVEY DRAWINGSclclcl MANUFACTURING AND INTEGRATION TEST PROCEDUREclcl SPOOL FABRICATION PROCEDURES HDV CHA AGR YLCclclcl LE TRAIT MANUFACTURING UNIT TBA FMA DTH/FMA HCO YLCclclcl HAZID REPORTclcl AS BUILT DOCUMENTATION
10
11
12
PROCEDURES AND REPORTS (PR)
Rev. No.:
COMPANY STATUS CODE:
BOURI EAD DEVELOPMENT PROJECT- Work Package #2, Flowline and Riser System and Umbilical Installation / AGIP Doc. No. 3427-000-A-PG-TPF-00010 (The Master Document Register)
Previous Issue Date:
Latest Revision Date:
(1) Ref. AGIP Spec.:3400-000-A-SG-EAM-00001 (2) TECHNIP Ref.: Project Documentation Numbering Procedure- GENP003 Rev. 1
CO
MP
AN
YR
EV
.
PROG: Progressive No.
LOCA: Project Number or Location Number UNI: Facility Unit No.D: DisciplineTY: Document TypeORI: Originator
COMPANY COMMENTS OVERDUE
DOCUMENT STATUS:90% WHEN REISSUED FOR COMPANY REVIEW INCLUDING COMPANY COMMENTS
I = FOR INFO
Technip Document Number
ENGINEERING (E)
PROJECT MANAGEMENT AND ADMINISTRATION (PMA)
AGIP Document Number
Approved on conditions, Doc. must be resubmitted.