    Client Confidential Not to Be Distributed Outside Client Organization Without Prior IDI ConsentClient Confidential Not to Be Distributed Outside Client Organization Without Prior IDI Consent

    Consultative Meeting on Reports of Joint CreditingMechanism Feasibility Studies 2012 in Indonesia

    Small-scale Hydropower Projects

    February 21, 2013

  • 7/28/2019 12 B03 IDI,IDI Infrastructures IndonesiaFSReportingMeeting

    2/12

    Client confidential

    Client Confidential

    Client confidential

    Client Confidential1

    Small Hydro Power Project

    Project Site Location

    Toba

    Lake

    PJ site

    Site Location North Sumatra

    Average Water Flow 21 m3/sec

    Capacity Factor 62%

    Generation Capacity 5MW * 2

    Electricity Generation 57GWh/year

    Project Information

    Waterway

    Headpond

    Penstock

    Powerhouse

    Small Hydro Power Project Structure

    Source: NEDO. Micro Hydro Power Installation Guide Book

  • 7/28/2019 12 B03 IDI,IDI Infrastructures IndonesiaFSReportingMeeting

    3/12

  • 7/28/2019 12 B03 IDI,IDI Infrastructures IndonesiaFSReportingMeeting

    4/12

    Client confidential

    Client Confidential

    Client confidential

    Client Confidential3

    Project Outline (2)- IDIs Support Proposal Util izing Joint Crediting Mechanism

    IDI proposes to utilize J apanese financial and technology support as well as application of simplemechanism for realizing better development of small Hydro & value of emission reductions.

    IDIs Support Proposal

    Creditworthiness ofthe developer

    Few FinancialInstitution takingconstruction risk

    Developer's lack ofexperience in smallhydro /underestimation ofengineering aspect

    Severe cash flowwhen the repaymentof loan is huge

    Issue #1 Issue #2 Issue #3 Issue #4

    Financial SupportJ apanese Financial ProvidersIncluding Energy Fund SharingConstruction Risk withDevelopers

    Joint Crediting Mechanism

    Simple MRV

    Positive Approach (eligibility)

    Japanese TechnologyWell Experienced J apanese

    Consulting Company Providing

    Reliable Technology & Knowhow

  • 7/28/2019 12 B03 IDI,IDI Infrastructures IndonesiaFSReportingMeeting

    5/12

    Client confidential

    Client Confidential

    Client confidential

    Client Confidential4

    Project Outline (3)- Financial Support & Technology Support from Japan

    Asset

    SeniorLoan

    Equity

    Funding Gap

    Asset

    SeniorLoan

    Equity

    Equity orMezzanine

    Financial Support

    Possibility of J apanesefinancial support

    Technology Support

    Permit

    Permit

    Permit

    PPA

    Financing

    Construction

    Operation

    Pre-F/S

    F/S

    Review of

    Designs, etc

    Equipment

    Trouble

    Possible application ofJ apanese technology &knowhow

    Construction

    Trouble

    Senior lender can only provide about 70% of totalproject cost as senior loan in general

    Developers need finance provider to fill the gap as

    they may have project pipeline

    Limit 70%

    Need toredo surveys

    / designs

    Some developers underestimate importance ofengineering, and end up redoing studies/designs

    Experienced J apanese company involvement from

    early stage will help successful development

  • 7/28/2019 12 B03 IDI,IDI Infrastructures IndonesiaFSReportingMeeting

    6/12

    Client confidential

    Client Confidential

    Client confidential

    Client Confidential5

    JCM draft MRV Methodology Proposed by IDI- Reference Scenario

    Eligibility

    Greenfield small hydro power project of 20,000 kW and under that is replacing gridand/or use of diesel power plant and equipped with meters for power generation= Positive Approach

    Reference

    Scenario(1)

    Reference

    Scenario

    (2)

    Reference Scenario can be (1), (2), or combination of (1) & (2)

    GRID

    Small Hydro

    Power Plant

    Operation ofExisting Power Plant

    New Power Plant

    OperationofExisting DieselPowerPlant

    FactorySmall HydroPower Plant

    Substitute for Grid

    Substitute for Diesel

  • 7/28/2019 12 B03 IDI,IDI Infrastructures IndonesiaFSReportingMeeting

    7/12

    Client confidential

    Client Confidential

    Client confidential

    Client Confidential6

    JCM draft MRV Methodology Proposed by IDI- Reference Scenario Calculation

    Reference

    Scenario

    (1)

    Calculation

    ElectricityGeneration(kWh/year)

    EmissionFactor (Grid)(tCO2/kWh)

    EmissionReduction

    (tCO2/year)

    Reference

    Scenario(2)

    Calculation

    Electricity

    Generation(kWh/year)

    Efficiency

    Diesel Power(GJ /kWh)

    Emission

    Reduction(tCO2/year)

    Emission

    Factor (Diesel)(tCO2/GJ )

    Reference

    Calculation

    for F/S PJ

    (1)5,000 kW * 2

    GenerationCapacity

    8,760h

    Hours/year

    62%

    CapacityFactor

    0.000748tCO2/kWh

    EmissionFactor (Grid)

    40,625 tCO2/y

    EmissionReduction

    Electricity Generation (kWh/year)

    Substitute for Grid

    Substitute for Diesel

  • 7/28/2019 12 B03 IDI,IDI Infrastructures IndonesiaFSReportingMeeting

    8/12

    Client confidential

    Client Confidential

    Client confidential

    Client Confidential7

    JCM draft MRV Methodology Proposed by IDI- Important Feature / Early Verification

    Issuesto be

    Addressed

    Early Verification

    Electricity Generated

    for First Three Months(kWh/3months)

    Electricity Generation

    for the Year(kWh/year)

    Emission

    Reduction(tCO2/year)

    ImportantFeature

    Credit TransferMechanism

    Up to G to GDiscussion on the

    Design of mechanism

    Risk of OverVerification

    Early verification may estimatemore/less emission reductionthan actual amount for the year

    Instead of having to wait one or two years for verification,

    this methodology enables to have early verification and possibly early revenue

  • 7/28/2019 12 B03 IDI,IDI Infrastructures IndonesiaFSReportingMeeting

    9/12

    Client confidential

    Client Confidential

    Client confidential

    Client Confidential8

    Early Verification / Approach to Solve Issues Identif ied- In case of substitute for Grid

    Start of

    CommercialOperation Electricity generated:

    (kWh/3months)

    M1 M2 M3Water flow

    monitored (m3/s)

    Historical averageWater flow

    MHA1 MHA2 MHA3

    Emission(tCO2/year)

    Possible Revenue Timing

    within the same year

    Coefficient k takes the minimumnumber of each month rate and 1

    By monitoring 3 months of electricity generation and water flow,this methodology can estimate amount of emission for the year for verification

    Emission per year

    (tCO2/year)Electricity per year

    (kWh/year)Conservative

    coefficient (k)

    Emission Factor(tCO2/kWh)

    Using conservative coefficient reduces the risk of estimatingemission reduction more than the actual reduction amount

    Year 1

  • 7/28/2019 12 B03 IDI,IDI Infrastructures IndonesiaFSReportingMeeting

    10/12

    Client confidential

    Client Confidential

    Client confidential

    Client Confidential9

    Why Early Verification & Possible Early Revenue for Developers Matter?

    Year 1 Year 2 Year 3 Year 4 Year 5 Year 6

    Regular Repayment Schedule by the local banks

    Year 1 Year 2 Year 3 Year 4 Year 5 Year 6

    Balloon Type Repayment Schedule

    Interest

    Principle

    Interest

    Principle

    9 Regular repayment schedule by the local banks start with huge amount of repayment (Year 1)

    making it difficult for developers to repay.9 There are some cases where Indonesian financial institution allows balloon type schedule.

    9 However, it still creates refinance risk at the end year (Year 6).

    9 Our proposed methodology helps developers by providing option to conduct verification within

    the Year 1 and possibly receive revenue within the same year9 Therefore, credit revenue would help developers to finance their project, and the earlier the

    revenue comes in, the more projects can be financed and developed.

    Revenue line Revenue line

  • 7/28/2019 12 B03 IDI,IDI Infrastructures IndonesiaFSReportingMeeting

    11/12

  • 7/28/2019 12 B03 IDI,IDI Infrastructures IndonesiaFSReportingMeeting

    12/12

    Client confidential

    Client Confidential

    Client confidential

    Client Confidential11

    Summary

    Four issues regarding small hydro power developmentare identified based on thelocal stakeholders opinion and IDI assessment

    IDIs support proposal addresses each issue by bringing J apanese finance support,

    J apanese technology and J oint Crediting Mechanism.

    IDI has met with more than 15 respectable developers, and their total capacityexceeds 100MW, which have potential to reduce emission of roughly 400,000tCO2/year

    There are many more small hydro developers and projects in Indonesia, andIndonesia has abundant hydro resources that can be utilized for development

    J CM scheme has the potential to push great number of small hydro power project

    developments

    Thank you