170309 isics board meeting - iowa · built and shipped entire microwave system 8. ... shipped all...

15
MOTOROLA SOLUTIONS March 9, 2017 March 9, 2017 1

Upload: dophuc

Post on 18-Aug-2018

215 views

Category:

Documents


0 download

TRANSCRIPT

MOTOROLA SOLUTIONS

March 9, 2017March 9, 2017

1

48%

2

41%

42%

48%

35%

55%

44%

3

1

23

6

4

1

4 5

6

1

23

6

5

1

4 5

6

1

23

6

6

1

4 5

6

7

8Built and shipped entire microwave systemBuilt and shipped entire microwave system

9Timed battery order to be ready for installTimed battery order to be ready for install

10Built and shipped all generators to warehouseBuilt and shipped all generators to warehouse

11Shipped all LP tanks to warehouseShipped all LP tanks to warehouse

12Shipped all shelters to warehouse for equipment installShipped all shelters to warehouse for equipment install

13Most equipment already installed!Most equipment already installed!

•• ISICS Platform deployment is acceleratingISICS Platform deployment is accelerating

•• PrebuildPrebuild strategystrategy

•• Foundational paperwork readyFoundational paperwork ready

14

•• Foundational paperwork readyFoundational paperwork ready

•• Constant coordinationConstant coordination

•• Getting the word outGetting the word out

15