City of Chicago 121 N. LaSalle Avenue Chicago, IL 60602 City of Chicago South Cicero Corridor Study December 2004 (Updated June 2005) URS Corporation Goodman Williams Group Gonzalez Hasbrouck Architects Capraro Consulting

Upload: others

Post on 26-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 1a South Cicero Corridor Study .PDF,x-default · 2020. 3. 5. · The South Cicero Corridor Study Area (the “Study Area”) is the gateway into the City of Chicago for visitors arriving

City of Chicago121 N. LaSalle AvenueChicago, IL 60602

City of ChicagoSouth Cicero Corridor StudyDecember 2004 (Updated June 2005)

URS CorporationGoodman Williams GroupGonzalez Hasbrouck ArchitectsCapraro Consulting

Page 2: 1a South Cicero Corridor Study .PDF,x-default · 2020. 3. 5. · The South Cicero Corridor Study Area (the “Study Area”) is the gateway into the City of Chicago for visitors arriving

South Cicero Corridor: Final Plan Report ____________________________________________________ Page i June 2005

TABLE OF CONTENTS

INTRODUCTION .....................................................................................................................1

Background to the Plan.....................................................................................................................1Plan Objectives ...................................................................................................................................1The South Cicero Corridor Study Area..........................................................................................2The South Cicero Corridor Planning Process ...............................................................................4Organization of the Plan Report .....................................................................................................4

SECTION 1: EXISTING CONDITIONS ...................................................................................6

Community Setting ............................................................................................................................6Existing Land-Use and Physical Conditions...................................................................................6Public Land Ownership.....................................................................................................................6Traffic, Parking, and Public Transportation ................................................................................ 13

SECTION 2: MARKET OVERVIEW ........................................................................................21

Demographics.................................................................................................................................. 21Existing Issues and Characteristics ............................................................................................... 22New Development Issues and Potentials .................................................................................. 23

SECTION 3: FRAMEWORK PLAN .........................................................................................27

Corridor Appearance and Character .......................................................................................... 27Commercial, Retail and Office Development........................................................................... 27Housing and Residential Areas..................................................................................................... 28Midway Airport and Related Businesses .................................................................................... 28Transportation .................................................................................................................................. 29

SECTION 4: OPPORTUNITY SITES.......................................................................................30

Approach to Improvement and Redevelopment: .................................................................... 30Properties Susceptible to Change................................................................................................ 30Opportunity Sites ............................................................................................................................ 32

SECTION 5: ILLUSTRATIVE PLANS.......................................................................................42

Opportunity Site 8........................................................................................................................... 42Opportunity Site 4........................................................................................................................... 42Note on Graphic Presentation ..................................................................................................... 43

SECTION 6: DESIGN GUIDELINES ......................................................................................49

Purpose of the Design Guidelines ............................................................................................... 49Implementation of the Design Guidelines ................................................................................. 49Commercial, Office and Mixed-Use Development ................................................................. 50Private Landscaping and Site Improvements............................................................................. 55Parking Lots....................................................................................................................................... 56Parking Structures............................................................................................................................ 57Residential Areas ............................................................................................................................. 57Industrial Uses .................................................................................................................................. 59

Page 3: 1a South Cicero Corridor Study .PDF,x-default · 2020. 3. 5. · The South Cicero Corridor Study Area (the “Study Area”) is the gateway into the City of Chicago for visitors arriving

South Cicero Corridor: Final Plan Report ____________________________________________________Page ii June 2005

Auto-Oriented Uses ........................................................................................................................ 59Public Rights-of-Way ....................................................................................................................... 60

SECTION 7: IMPLEMENTATION ..........................................................................................64

Zoning Recommendations............................................................................................................ 64Tax Increment Financing Districts................................................................................................ 66Special Services Areas (SSA) ......................................................................................................... 69Marketing Strategies ....................................................................................................................... 69Property Assembly and Acquisition............................................................................................. 70Transportation and Infrastructure Funding Sources................................................................. 70City of Chicago Department of Aviation/Midway Airport ..................................................... 70

LIST OF FIGURES

Figure 1: Study Area Boundary and Location Map..........................................................................3Figure 2: Selected Uses within and Adjacent to the Study Area...................................................7Figure 3: Existing Conditions, Cicero Avenue - North of 51st Street ...........................................8Figure 4: Existing Conditions, 47th Street ..........................................................................................9Figure 5: Existing Conditions, Archer Avenue................................................................................ 10Figure 6: Existing Conditions, Cicero Avenue - South of 54th Street........................................ 11Figure 7: Existing Conditions, 63rd Street ....................................................................................... 12Figure 8: Properties under Public Ownership................................................................................ 14Figure 9: Existing and Planned Transportation System................................................................. 19Figure 10: Properties Susceptible to Change................................................................................. 31Figure 11: Sub-area Plan and Key Opportunity Sites ................................................................... 33Figure 12: Opportunity Sites, Cicero Avenue - North of 51st Street ........................................ 34Figure 13: Opportunity Sites, 47th Street ....................................................................................... 35Figure 14: Opportunity Sites, Archer Avenue................................................................................ 36Figure 15: Opportunity Sites: Cicero Avenue - South of 54th Street........................................ 37Figure 16: Opportunity Sites, 63rd Street ....................................................................................... 38Figure 17: Concept Site Plan, Opportunity Site # 8 - Scenario A .............................................. 44Figure 18: Perspective View, Opportunity Site #8 - Scenario A ................................................ 45Figure 19: Concept Site Plan, Opportunity Site #8 - Scenario B................................................ 46Figure 20: Perspective View, Opportunity Site #8 - Scenario B................................................. 47Figure 21: Illustrative Examples of Potential Residential Development - 47th Street ............ 48Figure 22: Existing Zoning and Recommendations ...................................................................... 65Figure 23: TIF Districts & Industrial Corridor Boundaries ............................................................ 68

LIST OF TABLES

Table 1: Assessment of Opportunity Sites ...................................................................................... 39Table 2: Summary of Incremental Property Tax Revenue........................................................... 67

Page 4: 1a South Cicero Corridor Study .PDF,x-default · 2020. 3. 5. · The South Cicero Corridor Study Area (the “Study Area”) is the gateway into the City of Chicago for visitors arriving

South Cicero Corridor: Final Plan Report ____________________________________________________Page iii June 2005

APPENDICES

Appendix A: South Cicero Corridor Market Study, August 2004 (Up-dated November 22, 2004 and June 2005)

Appendix B: Community Area Map

Appendix C: Aldermanic Ward Boundary Map

Appendix D: Detailed Incremental Property Tax Revenue Estimates by Opportunity Site and TIF District

Page 5: 1a South Cicero Corridor Study .PDF,x-default · 2020. 3. 5. · The South Cicero Corridor Study Area (the “Study Area”) is the gateway into the City of Chicago for visitors arriving

South Cicero Corridor: Final Plan Report ____________________________________________________Page iv June 2005

ACKNOWLEDGEMENTS

City of Chicago Richard M. Daley, Mayor

Department of Planning & Development Denise M. Casalino, Commissioner Mary Bonome, Deputy Commissioner Juanita Charlton, Former Assistant Commissioner Jim Horan, Assistant Commissioner Albert Acevedo, Project Manager Jody Guidi, Project Manager

Department of Aviation Erin O'Donnell, Deputy Commissioner Adam Rod, Projects Administrator Bill Brogan, Noise Mitigation

Ex Officio Alderman Zalewski, 23rd Ward Alderman Olivo, 13th Ward Office of Congressman Lipinski, Illinois 3rd Congressional District

Chicago Housing Authority Terry Peterson, CEO Carl Byrd, Director Thomas Worthy, Development Manager

Principal Consultant URS Corporation Jon DeVries, Principal Karen Gross, Project Manager Jennifer McNeil, Senior Planner Kevin Polk, Senior Planner

Additional Consultants Goodman Williams Group Gonzalez Hasbrouck Architects Jim Capraro

Page 6: 1a South Cicero Corridor Study .PDF,x-default · 2020. 3. 5. · The South Cicero Corridor Study Area (the “Study Area”) is the gateway into the City of Chicago for visitors arriving

South Cicero Corridor: Final Plan Report ____________________________________________________Page 1 June 2005

INTRODUCTION

The South Cicero Corridor Study Area (the “Study Area”) is the gateway into the City of Chicago for visitors arriving at Midway Airport, which anchors the south end of the Study Area. Once a sleepy and struggling airport in the 1960’s and 1970’s, Midway has now be-come one of the fastest growing airports in the nation, currently serving over 18 million an-nual passengers. Building on Midway’s success, the City recognizes the Study Area’s critical regional role and sees the opportunity to undertake new economic development initiatives.

Political, business, and community leaders have been frustrated that adjacent suburban communities have benefited from Midway Airport activity and the spending power of City of Chicago residents as new spin-off commercial, retail, and hotel development has located in those communities and not in the City of Chicago. The South Cicero Corridor Redevel-opment Plan (the “Plan”) examines demand and supply characteristics of these markets and sets forth recommendations on how future development can be captured within the Study Area and lead to new economic vitality in this key Chicago corridor.

Background to the Plan

There are significant opportunities for reuse and redevelopment in the Study Area. Oppor-tunities for reuse and redevelopment include vacant buildings, vacant storefronts, vacant land parcels, marginal and deteriorated structures, and small, underutilized structures. These properties may be suitable for new commercial and residential development in the future.

Despite the importance of the Study Area as a major gateway into the City of Chicago, sur-rounded by a stable and growing residential community rich in history and culture, there has never been a comprehensive community plan for the improvement and development of the area. In 2000, the City of Chicago established several Tax Increment Financing (TIF) districts in the area to enable financing of coordinated development. This Plan will provide an implementation strategy for specific development opportunities that can utilize the TIF toward the revitalization of this corridor as detailed later in this report.

In conjunction with the City retaining the URS•TPAP Consultant Team to create this corri-dor plan, the Chicago Housing Authority (CHA) retained the same URS•TPAP Consultant Team to create a “Plan for Transformation” at the LeClaire Courts/Extension public housing development, located adjacent to the north end of the Study Area. The intention of this collaboration is that both projects benefit from an inclusive and comprehensive analysis of development opportunities that will benefit the Study Area and improve integration of the LeClaire Courts community with the South Cicero Corridor.

Plan Objectives

The Plan provides a guide for physical improvement and development within the Study Area over the next 10-to 15-year period. The Plan establishes the framework for private de-velopment projects, as well as a basis for public improvement within the Study Area.

Page 7: 1a South Cicero Corridor Study .PDF,x-default · 2020. 3. 5. · The South Cicero Corridor Study Area (the “Study Area”) is the gateway into the City of Chicago for visitors arriving

South Cicero Corridor: Final Plan Report ____________________________________________________Page 2 June 2005

A consulting team comprised of URS•TPAP, Goodman Williams Group, Capraro Consult-ing, and Gonzalez Hasbrouck Architects was engaged by the City of Chicago’s Depart-ment of Planning and Development to assess market and physical site conditions to de-velop both a vision and strategy that is grounded in economic realities to strengthen and guide future development in the area.

The primary objectives of the Plan are to:

1. Identify development opportunities that will capitalize from close proximity to Midway Airport – the economic engine anchoring the south end of the Study Area.

2. Integrate development opportunities with a “Plan for Transformation” for the Le-Claire Courts public housing development located at the north end of the Study Area.

3. Improve the ability of the Study Area to meet the day-to-day needs of residents, employees and businesses.

4. Promote “higher and better” commercial uses along Cicero and Archer Avenues.

5. Establish site-specific opportunities for new economic development within the Study Area.

6. Upgrade the image and appearance of the Study Area, including the public rights-of-way and existing buildings.

7. Establish design guidelines to promote high-quality and compatible improvements and new developments within the Study Area.

8. Establish an implementation strategy to facilitate Study Area revitalization.

The South Cicero Corridor Study Area

The Study Area is located on the southwest side of Chicago, approximately 10 miles from downtown and is anchored on the south end by Midway Airport. The Study Area bounda-ries include four distinct corridors as described below, which are illustrated in Figure 1 on the following page.

• Cicero Avenue between the Stevenson Expressway (I-55) on the north and 67th

Street on the south.

• Archer Avenue between Central Avenue on the west and the Kenton Line railroad tracks on the east (east of Knox Ave).

• 47th Street between Laramie on the west and the Kenton Line railroad tracks on the east (east of Knox Ave).

Page 8: 1a South Cicero Corridor Study .PDF,x-default · 2020. 3. 5. · The South Cicero Corridor Study Area (the “Study Area”) is the gateway into the City of Chicago for visitors arriving

CIC

ER

O

KE

ELE

R

55TH

KO

ST

NE

R

47TH

65TH

KN

OX

ARCHER

KO

LIN

KE

NN

ET

H

CE

NT

RA

L

59TH

48TH

KILP

AT

RIC

K

58TH

45TH

62ND

KE

AT

ING

LEC

LAIR

E

50TH

68TH

54TH

KILD

AR

E

43RD

LON

G

LEA

MIN

GT

ON

TR

IPP

KILB

OU

RN

LAW

LER

63RD

LAP

OR

TE

MARQUETTE

66TH

ANN LURIE

64TH

44TH

51ST

LUN

A

53RD

KO

LMA

RLOT

US

LOC

KW

OO

D

61ST

LOR

EL

60TH

LIND

ER

46TH

CICERO AV I55

42ND

LAT

RO

BE

IB STEVENSON

KE

NT

ON

LAV

ER

GN

E

LA C

RO

SS

EH

ELE

N J M

IKO

LS

LAR

AM

IE

49TH

LAM

ON

41ST

LAV

ER

GN

E

LAP

OR

TE

50TH

KE

AT

ING

55TH

KILP

AT

RIC

K

54TH

62ND

KO

LMA

R

LAP

OR

TE

60TH

44TH

57TH

49TH

LUN

A

KILP

AT

RIC

K

65TH

44TH

LAW

LER

45TH

46TH

LIND

ER

54TH

KN

OX

57TH

LOR

EL

64TH 64TH

64TH

CICERO AV I55

62ND

LEC

LAIR

E

KE

NN

ET

H44TH

51ST

LIND

ER

49T

56TH

44TH

65TH

LOC

KW

OO

D

63RD

64TH

LA C

RO

SS

E

LAT

RO

BE

TR

IPP

53RD

52ND

53RD

KO

LMA

R

KO

LIN

LAW

LER

LA C

RO

SS

E

56TH

LAV

ER

GN

E

LAM

ON

64TH

KN

OX

LAP

OR

TE

KILD

AR

E

56TH

43R

LAM

ON

64TH

61ST

58TH

52ND

KILB

OU

RN

66TH

53RD

KO

LMA

R

KO

LIN

66TH

TR

IPP

63RD

LOT

US

LON

G

48TH

LOR

EL

58TH

57TH

KE

ELE

R

LAR

AM

IE

South Cicero Corridor Study � City of Chicago � June 2005 � Prepared by:

Figure 1:Location Map

Cicero/Archer Study Area

Page 9: 1a South Cicero Corridor Study .PDF,x-default · 2020. 3. 5. · The South Cicero Corridor Study Area (the “Study Area”) is the gateway into the City of Chicago for visitors arriving

South Cicero Corridor: Final Plan Report ____________________________________________________Page 4 June 2005

• 63rd Street between Central Avenue and the Kenton Line railroad tracks on the east.

The South Cicero Corridor Planning Process

The planning process for this Study entailed a three-phase planning process, as outlined below.

Phase 1: Existing Conditions and Market Analysis entailed a) working with City staff to dis-cuss the planning process and review ideas and perceptions of the Study Area and adjoin-ing neighborhoods; and b) collection and analysis of a range of information about existing conditions and future potentials within the Study Area, including land-use, zoning, the physical condition of sites and buildings, transportation, parking, overall image and appear-ance, and market conditions.

Phase 2: Concept Alternatives and Design Guidelines entailed a) the preparation of de-velopment concept plans for select key opportunity sites to illustrate alternative ap-proaches to conservation and redevelopment of the Study Area; b) development of design guidelines for the Study Area; and c) estimating the tax revenue potential of the forecasted development opportunities within the Study Area based on market findings.

Phase 3: Preferred Development Program and Prioritization entailed preparation of the draft and final versions of the South Cicero Corridor Redevelopment Plan document. The report includes long- and short-range recommendations related to land-use, zoning, devel-opment and redevelopment, traffic, urban design, and implementation.

Organization of the Plan Report

The South Cicero Corridor Redevelopment Plan is presented in seven sections, encompass-ing all the phases of the planning process as described below:

Section 1: Existing Conditions presents an overview of existing conditions and potentials within the Study Area, including land use, physical conditions, plans and projects, and transportation and parking.

Section 2: Market Overview summarizes the South Cicero Corridor Market Study com-pleted for this planning assignment, which is included as an appendix item to this report.

Section 3: Revitalization Concept presents: a) a long-range “vision” of the Study Area as it should be 10 to 15 years in the future; and b) a list of principles and objectives that should be used by the City to guide decisions regarding improvements and new developments along the four distinct corridors within the Study Area.

Section 4: Opportunity Sites highlights: a) specific properties that may have potential for improvement and/or redevelopment in the future; and b) preliminary recommendations for the improvement of each site.

Section 5: Illustrative Plans presents a series of concept plans that suggest the type, scale, and intensity of new development to be promoted on select key opportunity sites.

Page 10: 1a South Cicero Corridor Study .PDF,x-default · 2020. 3. 5. · The South Cicero Corridor Study Area (the “Study Area”) is the gateway into the City of Chicago for visitors arriving

South Cicero Corridor: Final Plan Report ____________________________________________________Page 5 June 2005

Section 6: Design Guidelines presents design guidelines that should be used by the City to promote high-quality and compatible improvements and new developments within the Study Area.

Section 7: Implementation outlines the actions and next steps to be undertaken in order to implement the Plan.

Page 11: 1a South Cicero Corridor Study .PDF,x-default · 2020. 3. 5. · The South Cicero Corridor Study Area (the “Study Area”) is the gateway into the City of Chicago for visitors arriving

South Cicero Corridor: Final Plan Report ____________________________________________________Page 6 June 2005

SECTION 1: EXISTING CONDITIONS

The section highlights existing conditions within the Study Area, including: a) community setting; b) existing land-use and physical conditions; c) public ownership; and d) traffic, parking, and public transportation.

Community Setting

The South Cicero Avenue corridor has significant continuity within the Chicago metropoli-tan area. It provides connections to Downtown Chicago, which is located approximately 10 miles northeast of the Study Area. It also provides connections to a number of other major activity centers within Chicago and nearby suburbs.

Cicero Avenue provides access to I-55 (Stevenson Expressway) on the north end of the Study Area and access to several other major arterial streets throughout the corridor. These arterial streets include: 47th Street, Archer Avenue, 55th Street, 63rd Street, and 67th Street.

The Study Area spans or borders several Chicago Community Areas, including Garfield Ridge (#56) and Clearing (#64) on the west side of the corridor; and Archer Heights (#57), West Elsdon (#62), and West Lawn (#65) on the east side of the corridor. A map of these community areas boundaries is located in the appendix of this report.

The Study Area contains sections of two Aldermanic wards. The majority of the Study Area is currently located within the 23rd Ward. Property east of Cicero Avenue and south of 59th

Street is located within the 13th Ward. A map of these ward boundaries is located in the appendix of this report.

Existing Land-Use and Physical Conditions

This section describes existing land-uses and physical conditions in each of the four corri-dors within the Study Area. Within the Study Area, there is a diverse mix of land-uses, in-cluding retail, service uses, offices, auto-oriented commercial uses, industrial facilities, eat-ing and drinking establishments, public and semi-public uses, residential properties, and aviation services associated with Midway Airport.

Figure 2 highlights selected uses within and adjacent to the Study Area. Figures 3 – 7 illus-trate and describe existing land uses and physical conditions of each corridor: Cicero Ave-nue, Archer Avenue, 47th Street, and 63rd Street. The pattern of existing land-uses along the corridor will influence the type and extent of new development and redevelopment within the Study Area.

Public Land Ownership

The City of Chicago and its sister agencies control 77 parcels in the Study Area, totaling approximately 825 acres, of which Midway Airport comprises 766 acres. Please refer to

Page 12: 1a South Cicero Corridor Study .PDF,x-default · 2020. 3. 5. · The South Cicero Corridor Study Area (the “Study Area”) is the gateway into the City of Chicago for visitors arriving

Residential

Retail

Commercial Service

Public/Open Space

Industrial

Midway Airport OperationsFigure 2: Selected Uses Within and Adjacent to Study Area

Cicero

55TH

Ko

stner

59thKen

neth

Cen

tral

Keatin

g

Leamin

gto

n

Kilb

ou

rn

66TH

67TH

LUN

A

Ko

lmarLO

TUS

61st

60th

Lorel

Lavergn

e

La Cro

sse

Laramie

Lamo

n

Lamo

n

Kilb

ou

rn

63rd

Keatin

g

57th

58th

56th

55th

54thLin

der

Ko

lmar

Ken

neth

Lapo

rte

Latrob

e

Stevenson Expressway I55

KILPATR

ICK

Ken

neth

Lockw

oo

d

51st

Archer

Lon

g

45th

La Cro

sse

Lawler64TH 64th

65th

62nd

46th

47th

48th

49th

50th

44th

Kn

ox

Lapo

rte

53RD

La Cro

sse

Kilp

atrick

44th

44th

43rd

53rd

52nd52nd

43rd

42nd

Leclaire

Cen

tral

Lorel

Lavergn

e

La Cro

sse

Laramie

Laramie

Lamo

n

Lind

er

Lapo

rte

Latrob

e

Lockw

oo

d

Lon

g

Lawler

Kn

ox

Kilp

atrick

Leclaire

South Cicero Corridor Study ● Prepared for the City of Chicago ● by ● June 2005

Selected Uses Within and Adjacentto the Study Area:1 - LeClaire Court Public Housing

2 - Renaissance @ Midway Skilled Nursing Center

3 - Phoebe Hurst Elementary School

4 - Sportmans Hotel

5 - UHaul

6 - Los Amantes Restaurant & Starbucks

7 - Car Rental Over Flow

8 - Illinois Department of Employment Security

9 - Dolphin Cartage

10 - Bobak Sausage Company & Restaurant

11 - Skylark Motel

12 - Midway Business Park

13 - Aldi's

14 - Dominick's

15 - Walgreens

16 - State Farm Insurance

17 - Brandy's Restaurant

18 - Public Parking

19 - Midway Terminal/Parking Garage

20 - Southwest Airlines

21 - Signature Fixed Base Operators

22 - Signature Fixed Base Operators

23 - Signature Fixed Base Operators

24 - Army National Guard

25 - Million Air

26 - Atlantic Aviation

27 - Airport Maintenance Center

28 - Air Traffic Controller

29 - Sear's Hanger

30- Signature Fixed Base Operators

31- Dollar/Alamo Car Rental

32 - Ray Buick Dealership

33- Midway Employee Parking

34 - Giordano's Pizzeria

35 - Anthony's Restaurant

36 - Continental Sales

37 - Alamo Rental

38 - CTA Orange Line Terminal

39- Baseball Fields

40- Firestation

41- Autumn Green at Midway Village

42- Public Parking Garage

43- Midway Hotel Center

44- 5/3rd Bank

45- Salvation Army

dd333rrrrrdddrddddrd3rrd3rddrd3rdddddddddddd

1

2

4

3

45

56

7

8 9

1011

12

20

19

38

21

22

23

24 25 40

2628 27

3029

31 44 32 34

33

36

35

37

3941

43

14 13

15

16

1842

17

Page 13: 1a South Cicero Corridor Study .PDF,x-default · 2020. 3. 5. · The South Cicero Corridor Study Area (the “Study Area”) is the gateway into the City of Chicago for visitors arriving

KN

OX

KEA

TIN

G

47TH

45TH

46TH

49TH

48TH

50TH

51ST

KIL

PATR

ICK

44TH

43RD

LAW

LER

LAPO

RTE

LAV

ERG

NE

42ND

CIC

ERO

AV

I-55 STEVENSON

LAMON

LA C

ROSS

E

44TH

LAM

ON

Cic

ero

Ave

nue

isa

maj

orno

rth-

sout

har

teria

lstr

eet

prov

idin

gre

gion

alco

nnec

tions

toD

ownt

own

Chi

cago

,I-5

5,M

idw

ayA

irpor

t,nu

mer

ous

City

ofC

hica

goco

mm

unity

area

san

dne

arby

subu

rbs.

This

corr

idor

betw

een

I-55

and

the

Mid

way

Airp

ort

isch

arac

teriz

edby

adi

vers

em

ixof

uses

,in

clud

ing

reta

il,co

mm

erci

al,

mul

ti-fa

mily

resi

dent

ial,

and

vaca

nt la

nd a

nd b

uild

ings

.

Land

Use

sRetail/Commercial.R

etai

l/C

omm

erci

alus

es c

ompr

ise

the

maj

ority

of t

he C

icer

o A

ve-

nue

Cor

ridor

and

incl

ude

loca

l ret

ail,

serv

ice,

and

limite

d of

fice

uses

. Man

y of

the

reta

ilus

es a

re c

onfig

ured

as

reta

il st

rip c

ente

rs, a

nd

incl

ude

uses

suc

h as

cur

renc

y ex

chan

ges,

cel

l ph

one

reta

ilers

, dru

g st

ores

, res

taur

ants

, fas

tfo

od e

stab

lishm

ents

and

con

veni

ence

reta

il.C

omm

erci

al u

ses

rang

e fr

om h

otel

/m

otel

uses

to h

ealth

car

e fa

cilit

ies

to n

eigh

borh

ood

conv

enie

nce

(dry

cle

aner

s, ta

ilor,

barb

er, a

nd

beau

ty s

hops

). Pr

omin

ent c

omm

erci

al u

ses

in-

clud

e th

e Re

nais

sanc

e Sk

illed

Nur

sing

Fac

ility

,Sp

orts

man

Mot

el, M

idw

ay M

otel

, and

the

Sky-

lark

Hot

el. T

here

is a

hig

h co

ncen

trat

ion

of a

u-to

-orie

nted

com

mer

cial

use

s al

ong

this

seg

-m

ent o

f Cic

ero

Ave

nue,

incl

udin

g ga

s st

atio

ns,

car r

enta

l age

ncie

s' ov

erflo

w lo

ts, a

uto

part

sre

taile

rs, u

sed

car d

eale

rshi

ps, a

nd a

uto

repa

irfa

cilit

ies.

Residential

.The

mos

t pro

min

ent r

esid

entia

lde

velo

pmen

t alo

ng C

icer

o A

venu

e ar

e th

e Le

-C

laire

Cou

rts

and

LeC

laire

Cou

rts

Exte

nsio

nPu

blic

Hou

sing

Dev

elop

men

ts lo

cate

d ju

stou

tsid

e th

e St

udy

Are

a bo

unda

ries-

sout

h of

I-55

on

the

wes

t sid

e of

Cic

ero

Ave

nue,

with

a

tota

l of 6

16 u

nits

.

Bui

ldin

g an

d Ph

ysic

al C

ondi

tions

Alth

ough

Cic

ero

Ave

nue

is n

ot c

hara

cter

ized

by s

ever

e de

terio

ratio

n, a

num

ber o

f low

qua

li-ty

feat

ures

and

con

ditio

ns c

ombi

ned

with

a

sign

ifica

nt n

umbe

r of v

acan

t par

cels

and

bui

ld-

ings

giv

e th

e co

rrid

or a

n ov

eral

l app

eara

nce

of d

eclin

e an

d ne

glec

t. Po

tent

ial n

ew re

-ta

il/co

mm

erci

al d

evel

opm

ent i

s ch

alle

nged

by th

e ex

istin

g lim

ited

lot d

epth

s of

aro

und

100

feet

alo

ng C

icer

o A

venu

e. If

not

cor

rect

-ed

, the

se c

ondi

tions

cou

ld in

hibi

t opp

ortu

ni-

ties

for n

ew in

vest

men

t and

rede

velo

pmen

t in

the

futu

re.

Stre

et E

nvir

onm

ent a

nd A

ppea

ranc

eA

esth

etic

ally

and

phy

sica

lly, C

icer

o A

venu

e

nort

h of

Mid

way

Airp

ort l

acks

the

unifo

rmity

of s

uch

elem

ents

as

qual

ity b

uild

ing

mat

eria

ls,

attr

activ

e si

gnag

e, c

olor

s, b

uilt

form

and

arc

hi-

tect

ural

sty

le th

at o

ther

com

mer

cial

cor

ridor

sha

ve s

ucce

ssfu

lly e

mpl

oyed

. Cic

ero

Ave

nue

is

a he

avily

traf

ficke

d ar

teria

l with

ave

rage

dai

lytr

affic

of o

ver 6

5,00

0 ve

hicl

es w

ith n

omin

al p

e-de

stria

n ac

tivity

. The

sid

ewal

ks a

long

Cic

ero

Ave

nue

are

gene

rally

in g

ood

cond

ition

. H

ow-

ever

, sig

ns o

f det

erio

ratio

n ar

e pr

esen

t on

the

side

wal

ks n

orth

of 4

7th

Stre

et. W

ayfin

ding

sig

-na

ge re

late

d to

the

airp

ort,

park

ing

and

tran

sit

acc

ess

is n

ew a

nd c

urre

nt.

Reta

ilSe

rvic

eO

ffic

eA

uto-

Ori

ente

d Se

rvic

esG

as S

tati

onPa

rkin

gVa

cant

Bui

ldin

gs a

nd S

tore

fron

tsVa

cant

Lan

d

Sout

h Ci

cero

Cor

rido

r Stu

dyCit

y of C

hicag

oJun

e200

5

Figu

re 3

:Ex

istin

g Co

nditi

ons,

Cice

ro A

venu

e-N

orth

of 5

1st S

tree

t

Prepa

red by

:

Page 14: 1a South Cicero Corridor Study .PDF,x-default · 2020. 3. 5. · The South Cicero Corridor Study Area (the “Study Area”) is the gateway into the City of Chicago for visitors arriving

KNOX

KEATING

CICERO

LARAMIE

47TH

46TH

48TH

KILPATRICK

LECLAIRE

LEAMINGTON

LA CROSSE

LAWLER

LAPORTE

LAVERGNE

LAMON

The

47th

Stre

etC

orrid

orbe

twee

nLa

ram

iean

dth

eKe

nton

Line

railr

oad

trac

ksea

sto

fK

nox

Ave

nue

issu

rro

und

edo

nth

eno

rth

and

sout

hby

solid

resi

den

tial

neig

hbor

hood

s.H

owev

er,4

7th

Stre

etis

prim

arily

char

acte

rized

asan

unde

rutil

ized

com

mer

cial

cor

ridor

that

con

tain

s a

sign

ifica

nt n

umbe

r of v

acan

t lot

s an

d bu

ildin

gs.

Land

Use

sCommercial.T

he m

ajor

ity o

f 47t

h St

reet

is

char

acte

rized

by

vaca

nt la

nd a

nd b

uild

ings

, cr

eatin

g m

inim

al c

ontin

uity

and

iden

tity

for

the

corr

idor

. Th

e m

ain

anch

ors

alon

g 47

thSt

reet

incl

ude

the

Phoe

be H

ears

t Ele

men

tary

Scho

ol a

nd th

e Sa

lvat

ion

Arm

y fa

cilit

y on

the

wes

tern

end

of 4

7th

Stre

et.

Reta

il/co

mm

er-

cial

use

s al

ong

47th

Str

eet a

re v

ery

limite

dan

d m

ostly

con

cent

rate

d at

the

inte

rsec

tion

of C

icer

o A

venu

e. T

he m

ost p

rom

inen

t com

-m

erci

al u

ses

incl

ude

auto

ser

vice

rela

ted

busi

-ne

sses

, a U

-Hau

l ren

tal f

acili

ty, t

he L

os

Am

ante

s Re

stau

rant

, and

the

Tres

Rey

nas

Dan

ce H

all.

The

larg

e nu

mbe

r of v

acan

t site

sis

evi

denc

e of

the

curr

ent l

ack

of d

eman

d fo

rad

ditio

nal r

etai

l/co

mm

erci

al b

usin

esse

s al

ong

this

less

traf

ficke

d co

rrid

or, a

s co

mpa

red

tone

arby

Cic

ero

Ave

nue.

Industrial.T

here

are

a c

oupl

e of

ligh

t ind

us-

tria

l use

s lo

cate

d on

the

east

ern

end

of 4

7th

Stre

et b

etw

een

Kno

x A

venu

e an

d th

e ra

ilroa

d,w

hich

incl

ude

Con

tinen

tal W

indo

ws

and

To-

ny's

Truc

k Re

pair.

Residential. I

n ad

ditio

n to

thes

e us

es, t

here

are

a lim

ited

num

ber o

f sin

gle

and

mul

ti-fa

mi-

ly u

nits

on

47th

Str

eet w

est o

f Cic

ero

Ave

nue.

Bui

ldin

g an

d Ph

ysic

al C

ondi

tions

The

47th

Str

eet C

orrid

or is

gen

eral

ly c

hara

cter

-iz

ed b

y un

deru

tiliz

atio

n, s

igni

fican

t vac

ancy

and

defe

rred

mai

nten

ance

, mar

gina

l use

s,

and

func

tiona

l obs

oles

cenc

e. O

ver e

ight

ac

res

of fr

onta

ge p

rope

rty

on 4

7th

Stre

et a

recu

rren

tly v

acan

t and

hol

d th

e po

tent

ial t

otr

ansf

orm

47t

h St

reet

, if r

edev

elop

ed.

Stre

et E

nvir

onm

ent a

nd A

ppea

ranc

e47

th S

tree

t is

not a

s hi

ghly

traf

ficke

d as

Cic

ero

Ave

nue,

with

ave

rage

dai

ly tr

affic

of o

nly

arou

nd 2

0,00

0 ve

hicl

es, a

leve

l whi

ch is

mor

eco

mpa

tible

and

invi

ting

to p

edes

tria

n ac

tivity

.H

owev

er, s

igni

fican

t ped

estr

ian

activ

ity is

not

curr

ently

pre

sent

in th

e ar

ea. T

his

can

be a

ttrib

-ut

ed to

the

sign

ifica

nt n

umbe

r of v

acan

t are

asal

ong

47th

Str

eet,

crea

ting

an e

nviro

nmen

tw

ith n

o cl

ear d

estin

atio

n po

ints

and

atm

os-

pher

e of

lim

ited

safe

ty.

Sing

le-f

amily

resi

dent

ial

Mul

ti-f

amily

resi

dent

ial

Reta

ilSe

rvic

eO

ffic

eLi

ght I

ndus

tria

l

Aut

o-or

ient

ed s

ervi

ces

Publ

ic/S

emi-P

ublic

Ope

n Sp

ace

Park

ing

Vaca

nt b

uild

ings

and

sto

refr

onts

Vaca

nt la

nd

Figur

e 4:

Exist

ing

Cond

ition

s,47

th St

reet

Prepar

ed by:

Sout

h Ci

cero

Corr

idor

Stud

yCit

y of C

hicago

Jun

e 200

5

Page 15: 1a South Cicero Corridor Study .PDF,x-default · 2020. 3. 5. · The South Cicero Corridor Study Area (the “Study Area”) is the gateway into the City of Chicago for visitors arriving

51ST

CICERO

KEATING

KILPATRICK

KNOX

ARC

HER

52N

D

LONG

LUNA

CENTRAL

53RD

LOREL

LOTUS

LINDER

LOCKWOOD

LATROBE

LARAMIE

LEAMINGTON

LECLAIRE

LAWLER

53RD

LAVERGNE

LAPORTE

LAMON

LA CROSSE

The

Arc

her

Ave

nue

Cor

ridor

betw

een

Cen

tral

Ave

nue

and

the

Kent

onLi

nera

ilroa

dtr

acks

just

east

ofKn

oxA

venu

eis

ade

nse

mix

ed-u

seco

mm

erci

alco

rrid

orse

rvin

glo

cal a

nd re

gion

al tr

affic

, car

ryin

g on

ave

rage

ove

r 29,

000

vehi

cles

a d

ay.

Land

Use

sCommercial.M

ixed

-use

com

mer

cial

com

-pr

ise

the

vast

maj

ority

of t

he A

rche

r Ave

nue

Cor

ridor

and

incl

ude

loca

l ret

ail s

ervi

ce a

nd

offic

e us

es. E

xam

ples

of s

ome

of th

e m

ore

prom

inen

t nei

ghbo

rhoo

d co

mm

erci

al/r

etai

lus

es in

clud

e: D

omin

ick'

s, A

ldi's

, Wal

gree

n's,

Bra

ndy'

s Re

stau

rant

, Bob

ak S

ausa

ge &

Res

tau-

rant

, and

loca

l ins

uran

ce, a

ttor

ney,

real

est

ate

and

acco

untin

g of

fices

. Arc

her A

venu

e is

als

o ch

arac

teriz

ed b

y a

num

ber o

f mul

ti-fa

mily

resi

-de

ntia

l bui

ldin

gs a

nd m

ixed

-use

bui

ldin

gs w

ithre

side

ntia

l uni

ts o

n th

e up

per f

loor

s.

Industrial.A

sig

nific

ant p

ortio

n of

the

sout

hsi

de o

f Arc

her A

venu

e en

com

pass

es th

e M

id-

way

Bus

ines

s C

ente

r, lo

cate

d be

twee

n C

icer

oA

venu

e an

d La

ram

ie S

tree

t. Th

is 5

1-ac

re d

evel

-op

men

t con

tain

s ov

er o

ne m

illio

n sq

uare

feet

of in

dust

rial s

pace

, whi

ch is

app

roxi

mat

ely

60

perc

ent v

acan

t and

incl

udes

war

ehou

sing

, of-

fice,

and

pos

t off

ice

oper

atio

ns. T

he h

igh

va-

cant

rate

is la

rgel

y at

trib

uted

to th

e de

part

ure

of A

rchi

bald

Can

dy (F

anni

e M

ay C

andi

es),

Dis

coun

t Car

d an

d th

e O

lym

pic

Oil

Gro

upw

ithin

the

last

yea

r. T

wo

addi

tiona

l ind

ustr

ial

uses

are

loca

ted

on th

e ea

st e

nd o

f Arc

her

Ave

nue,

whi

ch in

clud

e D

olph

in C

arta

ge a

nd

Bob

ak S

ausa

ge C

ompa

ny.

Residential.W

hile

trad

ition

al s

ingl

e fa

mily

resi

dent

ial d

oes

not e

xist

alo

ng th

e A

rche

rA

venu

e fr

onta

ge, l

ow d

ensi

ty tw

o- a

nd th

ree-

flat b

uild

ings

are

vis

ible

alo

ng th

e co

rrid

or.

Mos

t of t

hese

bui

ldin

gs a

re fu

lly o

ccup

ied

and

in g

ood

cond

ition

. Man

y of

the

mix

ed-

use

com

mer

cial

bui

ldin

gs a

lso

have

upp

er

stor

y re

side

ntia

l uni

ts. A

lso

alon

g C

icer

o A

ve-

nue,

just

nor

th o

f Arc

her A

venu

e ar

e m

ulti-

fam

ily re

side

ntia

l uni

ts.

Bui

ldin

g an

d Ph

ysic

al C

ondi

tions

Arc

her A

venu

e is

a h

ealth

y m

ixed

-use

com

mer

-ci

al c

orrid

or w

ith re

lativ

ely

little

to n

o va

can-

cies

. Whi

le th

ere

are

only

a fe

w s

ever

ely

dete

r-io

rate

d bu

ildin

gs a

long

Arc

her A

venu

e, s

ever

alco

mm

erci

al, i

ndus

tria

l, an

d re

side

ntia

l pro

per-

ties

are

char

acte

rized

by

defe

rred

mai

nte-

nanc

e an

d m

inor

con

ditio

n pr

oble

ms.

Whi

le

thes

e co

nditi

ons

may

not

be

sign

ifica

nt a

t the

pres

ent t

ime,

they

do

detr

act f

rom

the

over

all

imag

e an

d pe

rcep

tion

of th

e ar

ea.

Stre

et E

nvir

onm

ent a

nd A

ppea

ranc

eM

ost m

ixed

-use

, ret

ail,

serv

ice

and

offic

eus

es a

re lo

cate

d at

the

side

wal

k lin

e, w

ith n

o se

tbac

k. H

owev

er, t

here

is li

ttle

des

ign

coor

di-

natio

n be

twee

n ad

jace

nt c

omm

erci

al p

rope

r-tie

s in

term

s of

faça

de tr

eatm

ent,

colo

rs, a

nd

sign

age.

A n

umbe

r of e

xist

ing

com

mer

cial

build

ings

hav

e a

tired

and

dat

ed a

ppea

ranc

e.

Ther

e is

no

cons

iste

nt s

tree

tsca

pe tr

eatm

ent

alon

g A

rche

r Ave

nue,

ver

y lit

tle la

ndsc

apin

g w

ithin

the

publ

ic ri

ghts

-of-w

ay, a

nd o

lder

st

reet

ligh

ting.

The

sid

ewal

ks a

re in

fairl

ygo

od c

ondi

tion

but c

ould

be

furt

her i

m-

prov

ed in

sel

ect a

reas

whe

re th

ere

is s

igni

fi-ca

nt d

eter

iora

tion.

Mul

ti-F

amily

Res

iden

tial

Mix

ed-U

se A

part

men

ts o

n U

pper

Flo

ors

Reta

ilSe

rvic

eO

ffic

e

Aut

o-O

rien

ted

Serv

ices

Ligh

t Ind

ustr

ial

Publ

ic/S

emi-P

ublic

Park

ing

Vaca

nt B

uild

ings

and

Sto

refr

onts

Vaca

nt L

and

Figur

e 5:

Exist

ing

Cond

ition

s, A

rche

r Ave

nue

Prepar

ed by:

Sout

h Ci

cero

Corr

idor

Stud

yCit

y of C

hicago

Jun

e 200

5

Page 16: 1a South Cicero Corridor Study .PDF,x-default · 2020. 3. 5. · The South Cicero Corridor Study Area (the “Study Area”) is the gateway into the City of Chicago for visitors arriving

55TH

CIC

ERO

CIC

ERO

KIL

PATR

ICK

59TH

66TH

65TH

61ST

60TH

62NDLA

MO

N

KEN

TON

KN

OX

KEA

TIN

G

LAPO

RTE

LAW

LER

Mid

way

Ho

tel C

ente

r

LAV

ERG

NE

LA C

ROSS

E

MARQUETTE

56TH

58TH

57TH 57TH

64TH

KEA

TIN

G

KIL

PATR

ICK

LAR

AM

IE

55TH

63RD

The

Cic

ero

Ave

nue

Cor

ridor

betw

een

55th

Stre

et(M

idw

ayA

irpor

t)an

d67

thSt

reet

isa

maj

orar

teria

lst

reet

and

prim

arily

char

acte

rized

byai

rpor

tst

ruct

ures

,pa

rkin

gan

dai

rpor

tre

late

dbu

sine

sses

,as

wel

las

mix

ofus

esso

uth

of63

rdSt

reet

,inc

ludi

ngre

tail,

com

mer

cial

, sen

ior h

ousi

ng, a

nd v

acan

t lan

d an

d bu

ildin

gs.

Land

Use

sCommercial.T

he m

ajor

ity o

f thi

s se

gmen

t of

Cic

ero

Ave

nue

is c

ompr

ised

of a

irpor

tst

ruct

ures

and

rela

ted

busi

ness

es, s

uch

as c

ar

rent

al a

genc

ies

and

park

ing

oper

atio

ns. T

here

are

som

e re

tail/

com

mer

cial

bus

ines

ses

sout

hof

63r

d St

reet

, whi

ch p

rimar

ily in

clud

e au

to-

orie

nted

com

mer

cial

use

s, in

clud

ing

a co

uple

of

use

d ca

r dea

lers

hips

. The

mai

n re

tail

an-

chor

s fo

r thi

s co

rrid

or s

egm

ent i

nclu

de C

onti-

nent

al S

ales

(dis

coun

t fur

nitu

re) a

nd G

iord

a-no

's Pi

zza.

The

maj

ority

of t

he p

rimar

y re

tail

node

s in

the

area

are

loca

ted

dire

ctly

sou

th o

f th

e Pr

ojec

t Are

a an

d of

fer p

ower

sho

ppin

g (W

alM

art,

Targ

et a

nd C

ostc

o), c

omm

unity

-ori-

ente

d sh

oppi

ng (C

ub F

oods

, Bes

t Buy

and

Cir-

cuit

City

) and

regi

onal

reta

il (F

ord

City

Sho

p-pi

ng M

all).

Residential.A

new

inde

pend

ent l

ivin

g se

-ni

or h

ousi

ng d

evel

opm

ent i

s cu

rren

tly u

nder

co

nstr

uctio

n at

67t

h St

reet

and

Cic

ero

Ave

-nu

e, w

hich

will

hel

p an

chor

this

seg

men

t of

Cic

ero

Ave

nue.

Thi

s ne

w re

side

ntia

l dev

elop

-m

ent i

s co

mpr

ised

of a

ppro

xim

atel

y 20

0 un

its

of re

ntal

and

for s

ale

hous

ing

with

land

ava

ila-

ble

for f

utur

e ph

ases

.

Industrial.T

here

is o

ne s

igni

fican

t ind

ustr

ial

site

loca

ted

with

in th

is s

ubar

ea.

O&

K o

f A

mer

ica,

whi

ch p

rodu

ces

stee

l coi

ls, i

s lo

cat-

ed e

ast o

f Cic

ero

Ave

nue

at 5

5th

Stre

et a

nd

Kilp

atric

k.

Bui

ldin

g an

d Ph

ysic

al C

ondi

tions

A

lthou

gh C

icer

o A

venu

e is

not

cha

ract

eriz

edby

sev

ere

dete

riora

tion,

a n

umbe

r of l

ow-

grad

e fe

atur

es a

nd c

ondi

tions

com

bine

d w

itha

sign

ifica

nt n

umbe

r of v

acan

t par

cels

and

build

ings

giv

e th

e co

rrid

or a

n ov

eral

l app

ear-

ance

of d

eclin

e an

d ne

glec

t. A

lso,

pot

entia

lne

w re

tail/

com

mer

cial

dev

elop

men

t is

chal

-le

nged

by

the

exis

ting

limite

d lo

t dep

ths

of

arou

nd 1

00 fe

et a

long

Cic

ero

Ave

nue.

If n

otco

rrec

ted,

thes

e co

nditi

ons

coul

d in

hibi

t op-

port

uniti

es fo

r new

inve

stm

ent a

nd re

deve

lop-

men

t in

the

futu

re.

Stre

et E

nvir

onm

ent a

nd A

ppea

ranc

eTh

e po

rtio

n of

Cic

ero

Ave

nue

bord

erin

g M

id-

way

Airp

ort b

etw

een

54th

Str

eet a

nd 6

3rd

Stre

et is

ver

y w

ell m

aint

aine

d an

d fe

atur

es a

t-tr

activ

e st

reet

scap

ing

and

land

scap

ing.

The

reis

min

imal

str

eets

cape

sou

th o

f 63r

d St

reet

.

Mul

ti-f

amily

resi

dent

ial

Reta

ilSe

rvic

eM

idw

ay A

irpo

rtLi

ght I

ndus

tria

lA

uto-

orie

nted

ser

vice

s

Publ

ic/S

emi-P

ublic

Ope

n Sp

ace

Park

ing

Vaca

nt b

uild

ings

and

sto

refr

onts

Vaca

nt la

nd

Figur

e 6:

Exist

ing

Cond

ition

s, Ci

cero

Ave

nue-

Sout

h of

54t

h St

reet

Sout

h Ci

cero

Corr

idor

Stud

yCit

y of C

hicago

Jun

e 200

5

Prepar

ed by:

Page 17: 1a South Cicero Corridor Study .PDF,x-default · 2020. 3. 5. · The South Cicero Corridor Study Area (the “Study Area”) is the gateway into the City of Chicago for visitors arriving

KILPATRICK

Knox

CICERO

TRIPP

63RD

LOREL

62N

D

LAMON

LAPORTE

LAWLER

LAVERGNE

LACROSSE

LARAMIE

LEAMINGTON

LINDER

CENTRAL

LECLAIRE

LOCKWOOD

LONG

62N

D

63RD

LATROBE

63RD

63RD

The

63rd

Stre

etC

orrid

orbe

twee

nC

entr

alA

venu

ean

dth

eKe

nton

Line

railr

oad

trac

ksju

stea

stof

Knox

Ave

nue

ispr

imar

ilya

com

mer

cial

corr

idor

serv

ing

Mid

way

Airp

ort w

hich

is lo

cate

d di

rect

ly n

orth

and

car

ries

clos

e to

19,

000

vehi

cles

a d

ay.

Land

Use

sCommercial.T

he e

ntire

nor

th fr

onta

ge o

f 63

rd S

tree

t wes

t of C

icer

o A

venu

e is

occ

u-pi

ed b

y M

idw

ay A

irpor

t. P

rimar

y us

es a

long

th

e so

uth

fron

tage

incl

ude

auto

-orie

nted

com

-m

erci

al s

ervi

ces,

airp

ort-r

elat

ed b

usin

esse

s an

d as

soci

ated

par

king

, suc

h as

: Dol

lar/

Ala

-m

o C

ar R

enta

l, Fi

fth

Third

Ban

k, R

ay B

uick

Dea

lers

hip,

Sta

te F

arm

Flig

ht In

sura

nce,

and

au

to re

pair

faci

litie

s. A

num

ber o

f clu

ster

edpa

rcel

s ar

e ow

ned

by th

e C

ity o

f Chi

cago

and

ar

e be

ing

held

for f

utur

e ai

rpor

t dev

elop

men

tan

d pr

otec

tion

need

s.

63rd

Str

eet e

ast o

f Cic

ero

Ave

nue

has

a m

ore

dive

rse

mix

of u

ses,

incl

udin

g a

few

rest

aura

ntan

d dr

inki

ng e

stab

lishm

ents

, loc

al o

ffic

e de

vel-

opm

ent,

mul

ti-fa

mily

resi

dent

ial d

evel

opm

ent,

auto

-orie

nted

com

mer

cial

ser

vice

s, a

nd a

few

vaca

nt p

arce

ls.

Residential.T

here

are

a v

arie

ty o

f mul

ti-fa

mi-

ly re

side

ntia

l pro

pert

ies

alon

g th

e 63

rd S

tree

tco

rrid

or. T

hese

pro

pert

ies

are

prim

arily

low

dens

ity, m

ulti-

fam

ily s

uch

as tw

o-an

d th

ree-

flats

and

are

loca

ted

betw

een

Lore

l Ave

nue

and

Latr

obe

Ave

nue.

The

re a

re tw

o la

rger

apar

tmen

t bui

ldin

gs lo

cate

d at

the

inte

rsec

-tio

n of

Kilp

atric

k A

venu

e an

d 63

rd S

tree

t, as

w

ell a

s a

few

upp

er s

tory

uni

ts s

catt

ered

thro

ugho

ut th

e co

rrid

or in

mix

ed-u

se b

uild

-in

gs. T

hese

uni

ts a

re lo

cate

d ea

st o

f Cic

ero

Ave

nue.

Industrial.N

o in

dust

rial u

ses

are

loca

ted

alon

g th

e 63

rd s

tree

t cor

ridor

.

Bui

ldin

g an

d Ph

ysic

al C

ondi

tions

Mos

t com

mer

cial

and

bus

ines

s us

es a

re lo

cat-

ed in

sm

all,

nond

escr

ipt,

one-

stor

y fr

eest

and-

ing

build

ings

. The

re is

litt

le c

oord

inat

ion

be-

twee

n ad

jace

nt c

omm

erci

al p

rope

rtie

s in

te

rms

of b

uild

ing

plac

emen

t and

orie

ntat

ion,

setb

acks

, acc

ess

driv

es, s

igna

ge, a

nd s

ite la

nd-

scap

ing.

A n

umbe

r of e

xist

ing

com

mer

cial

bui

ldin

gs a

l-so

hav

e a

date

d ap

pear

ance

with

sig

ns o

f de-

ferr

ed m

aint

enan

ce.

Stre

et E

nvir

onm

ent a

nd A

ppea

ranc

eG

iven

the

low

-den

sity

cha

ract

er o

f 63r

d St

reet

with

the

num

erou

s pa

rkin

g lo

ts, v

acan

t site

s,an

d op

en s

pace

are

as, t

he 6

3rd

Stre

et c

orrid

orla

cks

a se

nse

of id

entit

y an

d ch

arac

ter.

Mul

ti-f

amily

resi

dent

ial

Mix

ed-U

se a

part

men

ts o

n up

per f

loor

sRe

tail

Serv

ice

Off

ice

Mid

way

Air

port

Aut

o-or

ient

ed s

ervi

ces

Gas

sta

tion

Publ

ic/S

emi-P

ublic

Ope

n Sp

ace

Park

ing

Vaca

nt b

uild

ings

and

sto

refr

onts

Vaca

nt la

nd

Figur

e 7:

Exist

ing

Cond

ition

s, 6

3rd

Stre

et

Prepar

ed by:

Sout

h Ci

cero

Corr

idor

Stud

yCit

y of C

hicago

Jun

e 200

5

Page 18: 1a South Cicero Corridor Study .PDF,x-default · 2020. 3. 5. · The South Cicero Corridor Study Area (the “Study Area”) is the gateway into the City of Chicago for visitors arriving

South Cicero Corridor: Final Plan Report ____________________________________________________Page 13 June 2005

Figure 8 on the next page for an illustration and detailed description of properties under public ownership in the Study Area.

Traffic, Parking, and Public Transportation

This section describes traffic circulation, parking and public transportation within the Study Area. Cicero Avenue (IL Route 50) is a major arterial street with significant continuity through the City of Chicago and adjoining suburbs. It is classified as a Strategic Regional Arterial (SRA). Major roadway improvements and re-construction along Cicero Avenue near Midway Airport have been completed over the past eight years as part of Midway’s $1billion redevelopment initiative. These roadway improvements significantly improved access and traffic circulation throughout and around the airport campus.

Traffic Access and Circulation

Cicero Avenue within the Study Area has two moving lanes in each direction, plus left-turn lanes near intersections and at key activity areas. Parking is not allowed at any time on Cicero Avenue.

Curb cuts are modest along the frontage of Cicero Avenue and Archer Avenue but are very frequent on 47th and 63rd Streets.

Traffic along Cicero Avenue is very heavy, with average daily traffic of 65,700 vehicles per day, based on 2003 Illinois Department of Transportation (IDOT) data. The major east-west streets that intersect with Cicero also carry significant traffic volumes, as highlighted below:

55th Street 33,100 ADT

Archer Avenue 29,200 ADT

47th Street 20,200 ADT

63rd Street 18,700 ADT

Cicero Avenue serves as the main access to Midway Airport. It connects several south Cook County communities such as Bedford Park, Burbank, Hometown, Oak Lawn, and Alsip with I-55 (Stevenson Expressway). North of the Study Area, Cicero Avenue pro-vides connections to the Town of Cicero, I-290 (Eisenhower Expressway), I-90 (Kennedy Expressway), and I-94 (Edens Expressway). South of the Study Area, Cicero Avenue pro-vides connections to I-294 (Tri-State Tollway).

Except for the major streets, most east-west local streets are one-way. These are shown in Figure 9.

Parking

There is no on-street parking along either the east or west sides of Cicero Avenue in the Study Area. On the east-west side streets, on-street parking is permitted on most blocks. On the collector streets, parking restrictions control some on-street parking. Parking in most blocks is not permitted from 7:00 AM to 9:00 AM or from 4:00 PM to 6:00 PM. There are several off-street parking lots serving Midway Airport. Several lots serve airport

Page 19: 1a South Cicero Corridor Study .PDF,x-default · 2020. 3. 5. · The South Cicero Corridor Study Area (the “Study Area”) is the gateway into the City of Chicago for visitors arriving

Cit

y of

Chi

cago

Cit

y of

Chi

cago

Lan

d Le

ase

Chi

cago

Boa

rd o

f Edu

cati

onC

hica

goTr

ansi

t Aut

hori

ty

Cic

ero

55th

56th

57th

58th

60th

56th

61st

62nd

63rd

64th

65th

Ko

stn

er

59th Ken

net

h

Cen

tral

Kea

tin

g

Leam

ing

ton

Kilb

ou

rn

66TH

67TH

LUN

A

Ko

lmar

LOTU

S

61st

60th

Lore

l

Lave

rgn

e

LaC

ross

e

Lara

mie

Lam

on

Kilb

ou

rn

63rd

Kea

tin

g

57th

58th

56th

55th

54th

Lin

der

Ko

lmar

Ken

net

hn

net

hen

net

hen

net

h

Lap

ort

e

Latr

ob

e

Stevenson Expressway I55

KIL

PATR

ICK

Ken

net

h

Lock

wo

od

51st

Archer

Lon

g

45th

La C

ross

e

Law

ler64th

65th

62nd

46th

47th

48th

49th

50th

44th

45th

46th

47th

48th

49th

50th

51st

Lap

ort

e

LaC

ross

e

Kilp

atri

ck

44th

43rd

52nd 2n2n 552n 5dddd52nd

43rd

42nd

Lecl

aire

Cen

tral

Lore

l

Lave

rgn

e

La C

ross

e

Lara

mie

Lara

mie

Lam

on

Lin

der

Lap

ort

e

Latr

ob

e

Lock

wo

od

Lon

g

Law

ler

KR

R

Kilp

atri

ck

Lecl

aire

Ther

e ar

e fiv

e m

ajor

taxi

ng b

odie

s w

ith p

ublic

land

ow

ners

hip

with

in th

eSt

udy

Are

a.

Th

e C

ity o

f Chi

cago

is th

e la

rges

t pub

lic la

ndow

ner,

with

77

parc

els

tota

ling

766

Acr

es.

Mid

way

Airp

ort a

nd th

e su

rrou

ndin

g op

erat

ions

faci

litie

s su

ch a

s pa

rkin

gco

mpr

ise

the

maj

ority

of t

hese

par

cels

. 8

of th

e 77

tota

l par

cels

are

cur

rent

lyle

ased

by

the

City

of C

hica

go to

bus

ines

s in

the

area

.

Th

e C

hica

go B

oard

of E

duca

tion

cont

rols

2 p

arce

ls to

talin

g ap

prox

imat

ely

8 ac

res.

Phoe

be H

ears

t Ele

men

tary

Sch

ool r

epre

sent

s th

e pr

inci

pal p

rope

rty

and

cove

rs25

% o

f the

tota

l site

.

Th

e C

hica

go T

rans

it A

utho

rity

(CTA

) con

trol

s 3

parc

els

tota

ling

appr

oxim

atel

y 5

acre

s. T

he C

TA s

ites

are

scat

tere

d th

roug

hout

the

corr

idor

; how

ever

, its

prin

cipa

lho

ldin

g is

the

Ora

nge

Line

term

inal

and

par

king

loca

ted

on 5

9th

Stre

et, e

ast o

f the

Mid

way

Airp

ort P

arki

ng G

arag

e.

Sout

h Ci

cero

Corr

idor

Stud

yCit

y of C

hicago

Jun

e 200

5

Figur

e 8:

Prop

ertie

s Und

er P

ublic

Ow

ners

hip

Prepar

ed by:

Page 20: 1a South Cicero Corridor Study .PDF,x-default · 2020. 3. 5. · The South Cicero Corridor Study Area (the “Study Area”) is the gateway into the City of Chicago for visitors arriving

South Cicero Corridor: Final Plan Report ____________________________________________________Page 15 June 2005

employees and rental car establishments. The major off-street parking lots are highlighted in Figures 3-7.

A 7-level 6,300 car public parking garage is currently under construction on the north side of 55th Street between Laramie and Cicero Avenues to serve Midway Airport. Phase II is planned to begin construction in 2006 and will include a 5-level consolidated rental car garage facility. This facility will consolidate the eight rental car companies currently located at the existing space-constrained terminal garage on the east side of Cicero Avenue.

Both garages will be served by a dedicated busway system for airport travelers.

Railroad

The Belt Railway of Chicago (BRC) network criss-crosses the Study Area with multiple lines. The Belt Railway is currently owned by six major Class I railroads: Burlington North-ern Santa Fe Corporation; Canadian National; Canadian Pacific Railway; CSX Transporta-tion; Norfolk Southern Corporation; and Union Pacific Railroad. BRC is the largest inter-mediate switching terminal railroad in the United States, employing approximately 520 people. BRC has 28 miles of mainline route with more than 300 miles of switching tracks, allowing it to interchange with every railroad serving the Chicago rail hub. The Belt's Clear-ing Yards in Bedford Park are 5.5 miles wide, cover 786 acres, and support more than 250 miles of track. It contains one of the few remaining “hump” sorting and switching facilities in North America. Major BRC branch lines in the Study Area include:

Kenton Line of the BRC (Kenton Line) Right-of-way is between Knox Avenue and Kolmar Avenue four blocks east of Cicero Avenue .

Runs from Montrose Avenue (4400 N) to the Bedford Park Yard (6700 S).

Union Pacific owns the tracks approximately north of Roosevelt Road (1200 S).

Traffic volumes through the Study Area are approximately 50 - 70 freight trains per day.

59th Street Branch Runs west from the 47th Street rail yards west of the I-94 along 50th Street; jogs south-west at Kimball to Kenton and continues west along 54th Street; at Central Avenue, turns south until 59th Street; ends at the Indiana Harbor Belt (IHB) Argo Yard in Summit.

Canadian National owns the tracks between the 47th Street Yard and Kimball; BRC owns the tracks west of Kenton in the City of Chicago.

Traffic volumes through the Study Area are approximately 40 freight trains per day.

The Illinois Central Railway is now part of Canadian National Railway. The Joliet District subdivision runs from Chicago (Bridgeport) to Pequot, Illinois. In the vicinity of the Study Area, the tracks run along I-55 on the south side of the expressway. There is a rail bridge across Cicero Avenue.

Public Transportation

The Study Area is well served by public transportation, including CTA Orange Line rail ser-vice and numerous bus routes along Cicero Avenue and major intersecting east-west

Page 21: 1a South Cicero Corridor Study .PDF,x-default · 2020. 3. 5. · The South Cicero Corridor Study Area (the “Study Area”) is the gateway into the City of Chicago for visitors arriving

South Cicero Corridor: Final Plan Report ____________________________________________________Page 16 June 2005

streets as listed below and shown in Figure 4. Nearby CTA rail transit stations are located at Pulaski Road near Archer Avenue and at Midway Airport at 59th and Knox Avenue.

CTA Bus Routes

54B South Cicero Avenue 47 47th Street

47N 47th Street Owl Service 62 Archer Avenue

62H Archer/Harlem 62N Archer Avenue Night Owl Service

55A 55th Street/Austin 55N 55th Street/Naragansett

55X Garfield Express 63W West 63rd Street

63 63rd Street

Pace Buses The Study Area and suburbs to the southwest of the Study Area are also well-served by several Pace bus routes, which include:

379 West 79th Street 382 Central Clearing

383 South Cicero 384 Narragansett-Ridgeland

385 87th 111th 127th 386 South Harlem

390 Midway CTA –UPS 831 Joliet Midway

Metra Commuter Rail There are no Metra commuter rail stations within the Study Area. The closest stations are located at:

Burlington Northern Santa Fe Line

Cicero - 26th Street & Cicero Avenue, Village of Cicero

Heritage Corridor Line

Summit - Center Street & Hanover Avenue, Village of Summit (Amtrak service is also provided at this location)

Southwest Service

Wrightwood - 79th Street & Kedzie Avenue, City of Chicago

Ashburn - 83rd Street & Central Park, City of Chicago

Proposed Transportation Infrastructure Improvements

The Study Area contains a tremendous density of transportation and infrastructure rights-of-way, the intersection of which often results in traffic delays and reduced quality of transpor-tation service. Several major initiatives are intended to provide relief to traffic congestion and improve quality of movement and access, and are in various stages of planning. These include:

• Central Avenue Overpass Alternative

Page 22: 1a South Cicero Corridor Study .PDF,x-default · 2020. 3. 5. · The South Cicero Corridor Study Area (the “Study Area”) is the gateway into the City of Chicago for visitors arriving

South Cicero Corridor: Final Plan Report ____________________________________________________Page 17 June 2005

• Chicago Regional Environmental and Transportation Efficiency (CREATE)

• Extension of CTA Orange Line to Ford City Mall

• Midway Express

• Mid-City Transitway

Federal funding for these projects is dependent upon reauthorization of the Transportation Equity Act (TEA-21), for which Congress has approved an extension through May 2005. Location of proposed projects are illustrated on Figure 9.

Central Avenue Overpass Alternative For automobile and truck traffic seeking to avoid congestion on Cicero Avenue and Harlem Avenue, I-55 has a Central Avenue entrance/exit. However, Central Avenue dead -ends into the Belt Railway Company of Chicago Rail Yard and the CSX Intermo-dal Rail Yard at 67th Street. Central Avenue resumes again on the south side of the rail yards at 72nd Street. No north-south roads between Cicero and Harlem currently pro-vide access over the rail yards. Consequently, north and southbound automobile and truck traffic that needs to access the areas north and south of the rail yards must detour around the rail yards via side streets to Cicero, Harlem, or Central Avenues.

The Central Avenue Overpass Alternative project addresses the detour and conse-quent traffic congestion and back-ups caused by the lack of through routes. Thus far, IDOT has conducted public input processes, and analyzed design alternatives. The Central Avenue Overpass is the preferred concept in terms of design, location, and construction costs, where it would create an overpass over the rail yards that will con-nect the two legs of Central Avenue. This design would create a four-lane road with median from 63rd Street in Chicago to 79th Street in Burbank. The overpass would cross over the Belt Railway and CSX railroad tracks, and will pass under the Belt Rail-way’s hump sorting structure. Construction costs are estimated at $220 million, which would be funded by Federal transportation grants. Cook County maintains jurisdiction of Central Avenue from I-55 to 47th Street and Central Avenue south of 63rd Street; the IDOT has jurisdiction of the arterial between 47th and 63rd Streets.

Chicago Regional Environmental and Transportation Efficiency (CREATE) The CREATE program recognizes the significance of Chicago’s role in the North Ameri-can railroad network. Increasing passenger and freight rail volumes on fixed infrastruc-ture are in danger of causing bottlenecks with national economic impacts. Goals of the plan include increased safety, fewer motorist delays, more efficient commuter rail ser-vice, and increased freight rail capacity. These goals would be accomplished by a plan of improved signalization, new road/rail grade separations, rail-to-rail flyovers, and redi-rection of traffic along certain corridors. Specific projects in or near the Study Area in-clude:

At-grade signalization improvements along the Kenton Line 1. 55th Street & Kenton

2. 63rd Street & Kenton

3. 67th Street (Marquette Rd) & Kenton

Page 23: 1a South Cicero Corridor Study .PDF,x-default · 2020. 3. 5. · The South Cicero Corridor Study Area (the “Study Area”) is the gateway into the City of Chicago for visitors arriving

South Cicero Corridor: Final Plan Report ____________________________________________________Page 18 June 2005

Grade separations1. Archer Avenue & Kenton Line

The project would require lowering Archer Avenue to create an underpass under Kenton Line. The grade separation will require construction of a 650-foot retaining wall along Archer at each corner of the intersection. These retaining walls will permanently close Archer intersections with Knox and Kolmar Avenues on either side of the Kenton Line1.

Vehicular access to commercial businesses on Archer that previously used Archer, Kolmar or Knox will be limited to 51st, 52nd or the alleys. No alternatives or busi-ness relocations were discussed in the 2001 Dietz study1. Vehicular access to three impacted residences would be off the alley adjacent to and south of these homes. No alternatives or residential relocations were discussed in that report1.

2. Archer Avenue & Central Avenue

This grade separation would need to be planned in conjunction with the Central-Narragansett Corridor project discussed above and would require the lowering and reconstruction of the entire intersection under the 59th Street Rail Branch.1

Placement of six retainer walls would require closing the intersections at Central Avenue and 53rd Street and at Central Avenue and 54th Street. Several businesses and residences around the Central / Archer intersection would lose access, and would need to be relocated. Others could have access via alleys or via new ease-ments1.

3. 63rd & Harlem Avenue

The 63rd & Harlem Avenue intersection was rebuilt in 1996-1997. This grade im-provement would require the lowering of the entire intersection under the 59th

Street Rail Branch. The placement of retainer walls along 63rd Street and along Har-lem Avenue would require closing the intersection of Nottingham Avenue and 63rd

Street. Several businesses and residences along the north side of 63rd around this intersection would lose vehicular access; no alternatives were discussed in the Dietz report1.

Funding for the CREATE projects will come from a public/private partnership among IDOT, the Chicago Department of Transportation, IHB, BRC, Amtrak, Metra, and the six Class I major freight railroads that operate in the area: Burling-ton Northern Santa Fe (BNSF), CSX, Canadian National (CN), Canadian Pacific (CP), Norfolk Southern (NS), and Union Pacific (UP). The overall program is esti-mated at $1.5 billion, of which $212 million will come from the railroads.

1 Source: Clark Dietz, Inc. “Belt Railway of Chicago Grade Separation Feasibility Study.” August 2001. For the Illinois Department of Transportation, City of Chicago, and The Belt Railway Company of Chicago.

Page 24: 1a South Cicero Corridor Study .PDF,x-default · 2020. 3. 5. · The South Cicero Corridor Study Area (the “Study Area”) is the gateway into the City of Chicago for visitors arriving

Expr

essw

ay

Maj

or A

rter

ial

Min

or A

rter

ial

Col

lec

CCto

r

TrTTaf

fic S

rrig

nals

RTA

/CT

TTA

BTT

us R

oute

s

CTA

OTT

rang

e Li

nerr

Mid

wa

wwy

Agga

irpo

rtTe

rmin

al

At-

grad

e R.

R. C

ross

ings

Pede

stri

an C

ross

ings

Aver

age

Dai

lyTr

affic

(200

3 ID

OT)

Off

-Str

eet P

arki

ng L

ots

(10,

200)

(((((((10,,,,,,,,,, 0000000002000000000))))) 00

(65,

700)

(25,

300)

,400

)

) (20200) 0) 0) 0) 20,200) (20,2000) (20,200)

(33,100)

(18,700 )

(29,200)

(152,500)

(133,100)

63W

386

831

63W

831

55N

55A

55N

62H

54B

47

382

165

165

Cic

ero

55TH

Cen

tral

Kea

tin

g

Leam

ing

ton

LUN

A

Ko

lmar

LOTU

S

Lore

l

Lave

rgn

e

LaC

ross

e

Lara

mie

Lam

on

Lam

on

Kea

tin

g

Lin

der

KKo

lo

llmar

mar

Lap

ort

e

Latr

ob

e

Stevenson Expressway I55

Lock

wo

od

Archer

Lon

g

La C

ross

e

Law

ler 64TH

44th

Lap

ort

e

53RDLa

Cro

sse

44th

52nd

43rd

42nd

Lecl

aire

Cen

tral

Lore

l

Lave

rgn

e

LaC

ross

e

Lara

mie

Lara

mie

Lam

on

Lin

der

Lap

ort

e

Latr

ob

e

Lock

wo

od

Lon

g

Law

ler

Kn

ox

Kilp

atri

ck

Lecl

aire

The

Stud

yA

rea

isa

high

lytr

affic

ked

area

with

maj

orar

teria

lstr

eets

prov

idin

gco

nnec

tions

toD

own-

tow

nC

hica

go,C

hica

go's

inte

rsta

tesy

stem

,Mid

way

Airp

ort,

num

erou

sC

hica

goco

mm

unity

area

san

dne

arby

subu

rbs.

Cic

ero

Ave

nue

isth

em

ost

high

lytr

avel

edw

ith20

03av

erag

eda

ilytr

affic

(AD

T)of

over

65,0

00ve

hicl

es,

follo

wed

by55

thSt

reet

(33,

100

AD

T),

Arc

her

Ave

nue

(29,

200

AD

T), 4

7th

Stre

et (2

0,20

0 A

DT)

and

63r

d St

reet

(18,

700

AD

T).

The

Stud

yA

rea

isse

rved

bynu

mer

ous

CTA

&Pa

ceBu

sRo

utes

,as

wel

las

the

CTA

Ora

nge

Line

Sta-

tion

at M

idw

ay A

irpor

t as

Illus

trat

ed o

n th

e m

ap b

elow

.

Inad

ditio

nto

heav

yve

hicu

lart

raffi

c,th

eSt

udy

Are

ain

clud

esm

ultip

lefr

eigh

trai

llin

esth

atto

geth

erbr

ing

appr

oxim

atel

y10

0fr

eigh

ttr

ains

per

day

thro

ugh

the

Stud

yA

rea.

Giv

enbo

thhe

avy

vehi

cula

ran

dra

iltr

affic

,the

Stud

yA

rea

ishi

ghly

cong

este

dan

dtr

affic

isty

pica

llysl

ow-m

ovin

gan

dba

cked

-up

, par

ticul

arly

at k

ey in

ters

ectio

ns.

Futu

repl

anne

dtr

ansp

orta

tion

impr

ovem

ents

are

expe

cted

tosi

gnifi

cant

lyim

prov

etr

affic

flow

and

cond

ition

sw

ithin

the

Stud

yA

rea.

Thes

epr

ojec

tsar

edi

scus

sed

onth

erig

ht,a

ndar

esu

bjec

tto

pas-

sage

of t

he n

ext F

eder

al T

rans

port

atio

n Bi

ll.

Prop

osed

Cen

tral

Ave

nue

Ove

r-pa

ss a

t 67t

h St

reet

Des

ign,

prim

arily

eng

inee

ring

and

envi

-ro

nmen

tal s

tudi

es fo

r the

pro

pose

d C

en-

tral

Ave

nue

over

pass

are

cur

rent

ly b

eing

pl

anne

d an

d ev

alua

ted

by ID

OT.

The

ov

erpa

ss w

ould

sig

nific

antly

dec

reas

e th

ele

vel o

f tra

ffic

con

gest

ion

on C

icer

o A

ve-

nue,

by

crea

ting

an a

dditi

onal

rout

e th

atw

ould

run

cont

inuo

usly

from

I-55

sou

thin

to th

e ad

jace

nt s

outh

sub

urbs

. Cur

rent

-ly

, Cen

tral

Ave

nue

stop

s at

67t

h St

reet

due

to th

e B

elt R

ailw

ay C

ompa

ny o

f Chi

-ca

go R

ail Y

ard

and

the

CSX

Inte

rmod

alR

ail Y

ard,

forc

ing

traf

fic th

at n

eeds

acc

ess

to a

reas

sou

th a

nd n

orth

of t

he ra

il ya

rds

to u

se e

ither

Cic

ero

or H

arle

m A

venu

es.

The

prop

osed

ove

rpas

s w

ould

ext

end

Cen

tral

Ave

nue

betw

een

63rd

Str

eet a

nd

79th

Str

eet a

t an

estim

ated

con

stru

ctio

nco

st o

f $22

0 m

illio

n.Pl

anne

d A

t-Gra

de K

ento

nRa

ilroa

d Si

gnal

izat

ion

Impr

ove-

men

ts (

CR

EATE

Pro

gram

).

55th

-Cur

rent

ly p

rovi

des

acce

ss to

the

Gar

-fie

ld R

idge

com

mun

ity a

djac

ent t

o th

eM

idw

ay A

irpor

t.

63rd

-Pro

vide

s ac

cess

to m

unic

ipal

ser

v-ic

es s

uch

as th

e 8t

h D

istr

ict C

hica

go P

o-lic

e St

atio

n as

wel

l as

adja

cent

fire

sta

-

tions

and

com

mer

cial

ser

vice

s.

67th

-pro

vide

s co

nnec

tion

for C

hica

go a

nd

wes

t sub

urba

n co

mm

uniti

es s

uch

as B

ed-

ford

Par

k, B

urba

nk, a

nd B

ridge

view

.

Plan

ned

Railr

oad

Cro

ssin

g G

rade

Sepa

ratio

ns (

CR

EATE

Pro

gram

).

Arc

her

Ave

nue/

Ken

ton

Line

- Im

prov

escr

osst

own

truc

k ac

cess

and

traf

fic to

the

Mid

way

ser

vice

are

a.

Arc

her

Ave

nue/

Cen

tral

Ave

nue-

Impr

oves

nort

h/so

uth

acce

ss fo

r tru

ck tr

affic

acc

ess-

ing

the

Bed

ford

Par

k in

dust

rial p

ark.

63rd

Str

eet/

Har

lem

Ave

nue-

Thou

gh n

ot in

th

e St

udy

Are

a, th

is i

mpr

ovem

ent w

ill re

-lie

ve C

icer

o A

venu

e of

a lo

t of M

idw

ay tr

af-

fic g

ener

ated

from

wes

tern

com

mun

ities

.

Pub

lic P

arki

ng G

arag

e (6

,300

sp

aces

) U

nder

Con

stru

ctio

n.

A 7

-leve

l 6,3

00 c

ar p

ublic

par

king

gar

age

is c

urre

ntly

und

er c

onst

ruct

ion

on th

eno

rth

side

of 5

5th

Stre

et b

etw

een

Lara

-m

ie a

nd C

icer

o A

venu

e to

ser

ve M

idw

ayA

irpor

t. Ph

ase

II is

pla

nned

to b

egin

con

-st

ruct

ion

in 2

006

and

will

incl

ude

a 5-

lev-

el c

onso

lidat

ed re

ntal

car

gar

age

faci

lity.

This

faci

lity

will

con

solid

ate

the

eigh

t ren

t-al

car

com

pani

es c

urre

ntly

loca

ted

at th

eex

istin

g sp

ace-

cons

trai

ned

term

inal

ga-

rage

on

the

east

sid

e of

Cic

ero

Ave

nue.

Prop

osed

CTA

Ora

nge

Line

Ex-

tens

ion

The

CTA

Ora

nge

Line

Cur

rent

ly ru

ns b

e-tw

een

dow

ntow

n C

hica

go a

nd M

idw

ayA

irpor

t, w

ith a

term

inal

sta

tion

at 5

9th

Stre

et. T

here

are

cur

rent

ly lo

ng-ra

nge

plan

s m

ovin

g fo

rwar

d to

ext

end

the

Or-

ange

line

to th

e Fo

rd C

ity S

hopp

ing

Cen

-te

r.

Prop

osed

Mid

-City

Tra

nsitw

ay

In 2

003,

CD

OT

eval

uate

d bo

th ri

ght-o

f-way

feas

i-bi

lity

and

pote

ntia

l tra

vel d

eman

d fo

r the

MC

T,w

hich

wou

ld p

rovi

de c

ircum

fere

ntia

l tra

nsit

serv

-ic

e th

roug

hout

the

city

are

a. T

he M

CT

wou

ld fo

l-lo

w th

e ex

istin

g fr

eigh

t rai

l R.O

.W. o

f the

Uni

onPa

cific

Rai

lroad

and

the

Bel

t Rai

lway

of C

hica

go.

This

R.O

.W. p

aral

lels

Cic

ero

Ave

nue

from

Law

-re

nce

Ave

nue

on th

e no

rth

to 6

700

sout

h. T

he

prop

osed

full

build

-out

con

nect

s th

e B

lue

Line

-O

'Har

e B

ranc

h at

Jeffe

rson

Par

k w

ith th

e Re

dLi

ne-D

an R

yan

Bra

nch

at 8

7th

Stre

et.

Sout

h Ci

cero

Corr

idor

Stud

yCit

y of C

hicago

Jun

e 200

5

Figur

e 9:

Exist

ing

and

Plan

ned

Tran

spor

tatio

n Sy

stem

Prepar

ed by:

Page 25: 1a South Cicero Corridor Study .PDF,x-default · 2020. 3. 5. · The South Cicero Corridor Study Area (the “Study Area”) is the gateway into the City of Chicago for visitors arriving

South Cicero Corridor: Final Plan Report ____________________________________________________Page 20 June 2005

CTA Orange Line Extension The CTA Orange Line currently runs between downtown Chicago and Midway Air-port, with a terminal station at 59th Street. Extending the Orange Line to the Ford City Shopping Mall would complete the original Orange Line plan to provide rapid transit access to Chicago’s far southwest side. This extension may include grade separations at 59th Street and Kenton and 63rd Street and Kenton. The primary benefit cited is the connection between downtown and the “strong employment corridor along South Cicero Avenue2.” CTA would seek funding in part from the Federal Transit Agency’s discretionary New Starts program, whose budget currently comes from TEA-21.

Midway Express Service The City and CTA are planning a new express train service from downtown Chicago to both O’Hare and Midway Airports. The service will be designed to appeal to airline passengers. Special cars, dedicated to the service, will include spacious seating, special acoustics, baggage racks, and video monitors with airline departure information.

The Midway Express will operate along the Orange Line tracks, but will include new tracks that bypass local trains, enabling a significant reduction in travel time. A new terminal is proposed at Midway Airport to be located immediately adjacent to the air-port concourse dedicated to the Express. A new Central Area terminal will be designed for baggage check-in and airline ticketing for those passengers boarding the Midway Express from downtown.

Mid-City Transitway Chicago’s transit system is composed of radial rail lines and a system of buses operat-ing primarily on arterial streets. With the 1993 opening of the CTA Orange Line, city-wide radial heavy rail coverage was complete with each rail corridor, and the neighborhoods it serves, linked to downtown Chicago by rail. These radial rapid transit lines are fed by CTA and Pace bus service along the street grid resulting in excellent transit travel times for workers to and from downtown. However, trips that require circumferential movement across the radials may require indirect routes such as pas-sage through downtown or lengthy travel on local cross-town bus routes to get to the destination. A high capacity circumferential transit service would address this existing gap in transit service.

During 2003, CDOT launched a study to evaluate both right-of-way feasibility and po-tential travel demand for the Mid-City Transitway (MCT). The MCT would follow the ex-isting freight rail right-of-way of the Union Pacific Railroad and the Belt Railway of Chi-cago. This right-of-way parallels Cicero Avenue from Lawrence Avenue on the north to 6700 South. At this location the right-of-way (Belt Railway of Chicago) curves east and parallels 75th Street for several miles before turning south and intersecting the Dan Ryan Expressway south of 87th Street. The proposed full build-out Transitway connects the Blue Line – O’Hare Branch at Jefferson Park with the Red Line – Dan Ryan Branch at 87th Street.

2 CTA Press Release, March 14, 2003.

Page 26: 1a South Cicero Corridor Study .PDF,x-default · 2020. 3. 5. · The South Cicero Corridor Study Area (the “Study Area”) is the gateway into the City of Chicago for visitors arriving

South Cicero Corridor: Final Plan Report ____________________________________________________Page 21 June 2005

SECTION 2: MARKET OVERVIEW

The market and demographic conditions within the Study Area and surrounding areas will have a strong influence on development potentials within the Study Area. Presented below are the key conclusions and recommendations of the Market Study completed for this pro-ject, which evaluated the potential for future commercial, hotel/hospitality, residential, air-port related businesses, and industrial development within the Study Area. This analysis is critical to the planning process in that it tempers “blue-sky” creative visions with economic reality, and improves the chances of a plan’s actual implementation. The complete Market Report is included as an appendix item to this Plan.

Political, business, and community leaders have been frustrated that adjacent suburban communities have benefited from Midway Airport activity and the spending power of City of Chicago residents as new spin-off commercial, retail, and hotel development has located in those communities and not in the City of Chicago. This plan examines demand and sup-ply characteristics of these markets and sets forth recommendations on how future devel-opment can be captured within the Study Area and lead to new economic vitality in this key Chicago corridor.

Demographics

The demographic Study Area for the purposes of socio-economic analysis in this project has been defined as the five Chicago Community Areas of: Garfield Ridge (#56) and Clear-ing (#64) on the west side of the Cicero Avenue corridor; and Archer Heights (#57), West Elsdon (#62), and West Lawn (#65) on the east side of the corridor, as well as the five adja-cent communities of Bedford Park, Forest View, Stickney, Berwyn, and Cicero. Together these communities have a total population of approximately 263,000 persons.

The neighborhoods of the five community areas and five municipalities within the market area share a number of common characteristics.

• More than two thirds of the 85,249 households are family households, and most live in owner-occupied housing.

• Median household incomes fall in a fairly narrow range, from a low of $38,044 in Cicero to a high of $49,722 in Bedford Park.

• Almost all the residential neighborhoods in the market area have population densi-ties in excess of 7,500 persons per square mile, the typical threshold of an urban area.

Detailed tables and analysis of the demographic and socio-economic characteristics of the Study Area are provided in Appendix A: Cicero Corridor Market Study, August 2004 (Up-dated November 2004 and June 2005).

Page 27: 1a South Cicero Corridor Study .PDF,x-default · 2020. 3. 5. · The South Cicero Corridor Study Area (the “Study Area”) is the gateway into the City of Chicago for visitors arriving

South Cicero Corridor: Final Plan Report ____________________________________________________Page 22 June 2005

Existing Issues and Characteristics

• The high population density of over 7,500 persons per square mile for almost all the residential neighborhoods in the market area presents a very desirable market for new commercial and residential development. Typically, select national retailers have preferred locations with higher median household income levels as compared to the Study Area; however, many national retailers have recently begun to capital-ize on the significant purchasing power of dense urban populations similar to the Study Area with lower household incomes.

The Study Area’s 2003 median household income is $50,000, which is close to 14% more than the City of Chicago as a whole at $44,000. However, the 2003 Area Median Income (AMI) for a family of four defined by the Department of Hous-ing and Urban Development for the purpose of affordable housing analysis is $75,500. The average household size for the Study Area is 2.9 persons. Based on a per person analysis, the Study Area’s median household income is roughly $1,600 less than the AMI.

• Adjacent suburban communities have benefited from Midway Airport activity and the spending power of City of Chicago residents as the majority of new commer-cial, retail, and hotel development has located in these communities and not in the City of Chicago. These developments range from a multitude of big box retail (i.e. Walmart, Costco, Target, etc.) and the airport hotel cluster at Midway Hotel Center all located in Bedford Park.

• The Study Area has not been successful in capturing the commercial spin-off activ-ity occurring from the airport, largely in part to the lack of adequately configured and sized development sites.

• In terms of spin-off office development related to the Study Area’s proximity to Midway Airport, the market demand is low. As a point-to-point airport, there will never be as much demand for branch offices of regional or national businesses as found near O’Hare Airport.

• Parcels are generally small and lack the depth required to accommodate significant new commercial/retail development.

• The area faces strong competition in terms of new commercial/retail development from established shopping and hotel nodes in nearby communities of Bedford Park and Cicero.

• Current residential development projects in the area demonstrate the strong hous-ing demand for various product types, ranging from condominium/townhomes, single-family homes, rental apartments, and senior housing.

• The one large industrial parcel/development within the Study Area exhibits signs of market weakness. The Midway Business Center, located at the southwest corner of Cicero and Archer Avenues, is 51 acres in size and has 1.3 million square feet of building space. Of this total space, approximately 1 million square feet is industrial warehouse space, which has been 60% vacant this past year. Much of this vacancy

Page 28: 1a South Cicero Corridor Study .PDF,x-default · 2020. 3. 5. · The South Cicero Corridor Study Area (the “Study Area”) is the gateway into the City of Chicago for visitors arriving

South Cicero Corridor: Final Plan Report ____________________________________________________Page 23 June 2005

can be attributed to the site’s location and heavy traffic conditions along Cicero Avenue, making it difficult for truck traffic to access the site.

New Development Issues and Potentials

• Hotel/Conference. As demonstrated by the success of nearby hotel developments, the Study Area has potential for new hotel development in the future. The South Cicero corridor can capture existing and future passenger growth from Midway Airport, as well as capture automobile travelers off of I-55.

Due to the nature of Midway Airport, which caters to the economy business and leisure traveler, limited service hotels with meeting space are forecasted to have a higher demand as compared to higher priced, full-service hotels. However, there is potential to develop a full-service hotel (250 – 300 rooms) near the airport, if it as-sociated with a larger conference facility development, approximately between 40,000 – 60,000 square feet in size. The Midway area could serve as an economi-cal and convenient location for businesses to hold regional business meetings, where conference/meeting attendees could fly directly into Midway Airport. Cur-rently, there are no facilities in the immediate area, which cater to these mid-size to large business/conference events.

The following hotel development program is recommended for the Study Area within the next 10 years:

3 - 7 Limited Service Hotels

120 - 150 rooms per hotel

$80 - $100 average room rates

1,500 - 4,000 square feet of meeting room and event space per hotel

1 Full-Service Hotel

250 – 300 rooms

$120 - $160 average room rates

Associated with larger conference facility, approximately 40,000 – 60,000 square feet in size

• Retail. Based on the socio-economics of the Study Area and current retail coverage in the area as presented in Appendix A: South Cicero Corridor Market Study Report,there is demand for various types of new retail development over the next ten years as detailed below.

In addition to retailers being attracted to the Study Area due to its densely popu-lated neighborhoods as discussed earlier, Cicero Avenue is also strategically lo-cated to attract retailers, with its regional access to I-55, and the heavy airport traf-fic along Cicero Avenue with over 65,000 average vehicles per day. The minimum threshold for daily traffic volumes that national retailers typically require is around 20,000 – 25,000 ADTs. Cicero Avenue well exceeds this threshold.

Page 29: 1a South Cicero Corridor Study .PDF,x-default · 2020. 3. 5. · The South Cicero Corridor Study Area (the “Study Area”) is the gateway into the City of Chicago for visitors arriving

South Cicero Corridor: Final Plan Report ____________________________________________________Page 24 June 2005

Potential Retail Demand

1. Big Box Retail: 100,000 – 200,000 sf (e.g., Lowe’s, Best Buy, Petco)

2. Highway Commercial: 75,000 – 85,000 sf (e.g., casual-dining restaurants, such as Applebee’s, Chili’s, Outback Steakhouse; fast food establishments, conven-ience/auto related)

3. Neighborhood Retail: 50,000 – 60,000 sf (e.g., video/dvd, dry clean-ers/laundromat, and general merchandise store)

Section 4: Opportunity Sites of this report details key sites where retail develop-ment is recommended, helping to create a successful commercial corridor along Cicero Avenue.

Local retail brokers indicated that asking net lease rates for new retail construction in the market trade area range from $18 - $28 per square foot, depending on the size and location of the space. Current asking net rents of existing space within the maket trade area range between $10 - $20 per square foot. According to CB Rich-ard Ellis’ First Quarter 2005 Chicago Retail Market View Report, the City of Chi-cago’s South and North Submarkets are reporting average gross asking lease rates of $22.38 - $22.69 psf and $29.46 - $31.76 psf, respectively, which includes both old and new construction retail space.

Office. Office development for the small business market presents an opportunity to develop replacement space with modern design standards and amenities. Cur-rent establishments should be phased out of their existing older-quality space and into newer facilities, improving both corridor appearance and local office quality. Office development opportunities include:

Professional Services/Small Business Offices

Multi-tenant buildings, 50,000 - 100,000 square feet Gross rents $14 - $18 per square feet

Airport Support Businesses

50,000 – 100,000 square feet Gross rents $14 - $18 per square feet

Office/Flex Space

100,000 - 400,000 square feet Gross rents $8 - $12 per square feet

• Airport. Midway Airport has become one of the fastest growing airports in the na-tion, currently serving over 18 million annual passengers. However, presently it is close to capacity given its physical space constraints being land-locked on all sides. To help facilitate future airport growth, adjacent sites to the airport are recom-mended to be held for future airport-related operations.

• Residential. The primary focus of this study was on the commercial development potential within the Study Area. However, market research indicates that 47th Street

Page 30: 1a South Cicero Corridor Study .PDF,x-default · 2020. 3. 5. · The South Cicero Corridor Study Area (the “Study Area”) is the gateway into the City of Chicago for visitors arriving

South Cicero Corridor: Final Plan Report ____________________________________________________Page 25 June 2005

and other select areas within the Study Area could support additional residential development of various product types and price points as indicated in the following table.

RESIDENTIAL DEVELOPMENT OPPORTUNITIES IN THE SOUTH CICERO CORRIDOR

Demand Segment Product TypeApprox. Size of Potential Demand Potential Locations

Low to Moderate Income Renter HHs (Families)

Affordable rental (Rents < $1,000)

50 - 80 units 47th Street Infill

Higher Income Renter Households

Market rate rental (Rents > $1,000)

20 - 35 units + Midway demand

47th Street Infill

Higher Income Owner Households

Condos or Townhouses ($200,000 - $300,000)

70 - 135 units 47th, 63rd, and 65th Streets

Sources: Goodman Williams Group and URS Corporation

• Industrial. Given current market conditions and site and access characteristics of the Study Area, future industrial development is generally not recommended as the most strategic use for the Study Area.

The cargo business at Midway Airport is minor, compared to commercial and gen-eral aviation activities. Major cargo carriers and freight forward services such as FedEx, Airborne/DHL and UPS AirCargo operate out of O’Hare Airport. Given Midway’s current capacity constraints, cargo services at Midway Airport are not expected to grow in the future. Existing levels of cargo business currently at Mid-way may actually decrease in response to potential security changes by the Trans-portation Security Agency (TSA) which may require security screening of individual packages resulting in increased space needs for screening technology and staff.Such factors will likely minimize current and any new demand within the Study Area for warehouse/distribution space.

Currently, there is limited industrial development within the Study Area. The largest concentration of industrial space is located along Archer Avenue and 55th Street north of the airport (the Midway Business Center), which is currently underutilized.

The approximately one million square feet of industrial/warehouse space has been about 60% vacant this past year due to the departure of several key tenants. Little demand exists for this space due to increased congestion in the area and difficult truck access.

Development of new industrial facilities within the Study Area is not recommended as the most strategic use. Locating new establishments or relocating existing estab-lishments with expansion/relocation needs to nearby industrial corridors will likely

Page 31: 1a South Cicero Corridor Study .PDF,x-default · 2020. 3. 5. · The South Cicero Corridor Study Area (the “Study Area”) is the gateway into the City of Chicago for visitors arriving

South Cicero Corridor: Final Plan Report ____________________________________________________Page 26 June 2005

provide the facilities, infrastructure and collaborative relationships they need to re-main competitive.

Section 4 of this Plan report incorporates these market findings and recommendations with the physical assessment of select opportunity redevelopment sites within the Study Area.

Page 32: 1a South Cicero Corridor Study .PDF,x-default · 2020. 3. 5. · The South Cicero Corridor Study Area (the “Study Area”) is the gateway into the City of Chicago for visitors arriving

South Cicero Corridor: Final Plan Report ____________________________________________________Page 27 June 2005

SECTION 3: FRAMEWORK PLAN

While the basic land-use patterns of the Study Area are essentially established, the Frame-work Plan includes a range of goals and objectives which provide the basis for guiding fu-ture improvements and development projects within the Study Area.

These goals and objectives, listed below, are intended to assist the community in achieving commercial and residential revitalization and improve the overall appearance and function of these important corridors.

Corridor Appearance and Character

Goal: An attractive and distinctive image for each of the corridors responding to the differ-ent nature and use of the corridors.

Objectives:

1. Identify Cicero Avenue as a “gateway” corridor through the use of distinct pylons, street lighting, banners, landscaping, and other design features.

2. Upgrade the image and appearance of existing commercial areas, including buildings, parking lots, signage, and the public right-of-way.

3. Promote high standards of design and construction for all development within the Study Area.

4. Create a sense of place through the use of streetscaping techniques and design guide-lines.

Commercial, Retail and Office Development

Goal: New commercial, retail, and office development that provides local residents with employment opportunities and needed goods and services, increases the City’s sales and property taxes, and enhances the image and appearance of the Study Area.

Objectives:

1. Maintain, improve and expand the range of retail, commercial, and office establish-ments within the Study Area.

2. Improve access, parking, traffic circulation, signage, and other operational conditions within all existing commercial areas in the Study Area.

3. Improve and upgrade Cicero Avenue as a retail and business area serving the immedi-ate neighborhoods, Midway Airport, and the surrounding region.

4. Improve the Cicero Avenue/Archer Avenue intersection as a new commercial focal point, helping to create a sense of place and improved identity for the Study Area.

5. Maximize commercial potential along Cicero Avenue given the high traffic volumes, and proximity to I-55, Midway Airport, and surrounding dense urban population.

Page 33: 1a South Cicero Corridor Study .PDF,x-default · 2020. 3. 5. · The South Cicero Corridor Study Area (the “Study Area”) is the gateway into the City of Chicago for visitors arriving

South Cicero Corridor: Final Plan Report ____________________________________________________Page 28 June 2005

6. Encourage the corrective maintenance and rehabilitation of older commercial proper-ties in poor condition.

7. Promote the redevelopment of marginal, obsolete, and vacant commercial properties.

8. Encourage compatible new office, retail, and commercial development in selected lo-cations.

9. Promote creative site and building design and development solutions that can offset the limited depth site sizes and other constraints present within the Study Area.

10. Encourage new office, retail, and commercial uses that will utilize the local labor force.

11. Encourage new office, retail, and commercial uses that will help strengthen and support Midway Airport.

12. Minimize and mitigate any negative impact of office, retail, and commercial activities on neighboring land-use areas.

13. Discourage additional “strip” commercial development within the Study Area.

14. Encourage the combination and consolidation of small commercial and vacant lots to enhance opportunities for coordinated improvements and new developments.

Housing and Residential Areas

Goal: A housing inventory and living environment that supports the local population, at-tracts new households, and enhances the overall quality and character of the Study Area.

Objectives:

1. Discourage residential development along the highly trafficked Cicero Avenue unless incorporated into a mixed-use development with residential on the upper floors.

2. Encourage the “de-commercialization” of 47th Street and promote residential develop-ment to fill the void left by commercial businesses that are no longer viable along 47th

Street. Recommended residential development along 47th include: attractive town-homes, 3 - 6 unit walk-ups, 3 – 5 story condominium and/or rental buildings, and mixed-use buildings at key intersections with neighborhood retail/services on the ground floor.

3. Protect and strengthen residential neighborhoods through utilization of the City’s Resi-dential Sound Insulation Program to provide noise mitigation to homes in the vicinity of Midway Airport.

Midway Airport and Related Businesses

Goal: A healthy, growing, and viable airport, which generates significant economic activity for the Study Area, the City, and the region..

Page 34: 1a South Cicero Corridor Study .PDF,x-default · 2020. 3. 5. · The South Cicero Corridor Study Area (the “Study Area”) is the gateway into the City of Chicago for visitors arriving

South Cicero Corridor: Final Plan Report ____________________________________________________Page 29 June 2005

Objective:

1. Promote and protect the continued growth of the Midway Airport and supporting businesses.

2. Protect land immediately south of Midway Airport for future airport and related opera-tional needs.

3. Discourage encroachment of incompatible land uses near the airport.

Transportation

Goal: A balanced transportation system that provides for safe and efficient movement of vehicles, pedestrians, and trains, reinforces surrounding development patterns, and enhances regional transportation facilities.

Objectives:

1. Use traffic calming and other design techniques to minimize localized traffic conges-tion, address safety and operational problems, reduce neighborhood traffic speeds and encourage pedestrian activity within the Study Area.

2. Minimize non-local and commercial traffic within residential neighborhoods.

3. Improve the flow of rail traffic (CREATE Program) within the Study Area and reduce the traffic delays, noise impacts, and safety concerns.

4. Support proposed at-grade and grade-separated rail crossing improvements and Cen-tral Ave/Narragansett overpass to relieve traffic congestion within Study Area.

5. Maintain and improve the condition of street and sidewalk surfaces throughout the Study Area.

6. Encourage the provision of adequate parking for all activity areas.

7. Promote continued improvement and enhancement of the CTA rail and bus routes as an important community asset.