1st technical meeting - wp5

17
Project SLOPE 1 WP 5 – Forest information system development

Upload: slope-project

Post on 14-Feb-2017

176 views

Category:

Education


0 download

TRANSCRIPT

Page 1: 1st Technical Meeting - WP5

Project SLOPE1

WP 5 – Forest information systemdevelopment

Page 2: 1st Technical Meeting - WP5

TreeMetrics

‘The Flaw of Averages’

Page 3: 1st Technical Meeting - WP5

RTFI: Harvest Production Monitoring & Control100% 2 Way Communications via Satellite & GPRS

In Vehicle Display with GPS Tracking & Boundary Controls

Page 4: 1st Technical Meeting - WP5

Million's of harvested trees are stored for real time analysis

Page 5: 1st Technical Meeting - WP5

Tree Size Distribution Mapping Pre & Post Harvesting

Page 6: 1st Technical Meeting - WP5

SATMODO (RTFI) Harvest Machine Control Fleet Management Production & Positioning Information

Page 7: 1st Technical Meeting - WP5

New Stand Analytics – Harvester Head Raw Data Stem File Profiles

• Stem data from harvesters, measured in m3

• Accurate and independant• Stem Totals• Diameter distribution• Volume cut, wasted,

unclassified• Log cut per stem, per ha• Average dbh, SED, LED,

Length and volume• Product breakout and log vol

percentages

Stem Totals : , Count : 8319 (100%) : total volume = 2414.76276739781 : average volume = 0.2902707978600565 : average dbh = 0.203437913210722 : average length = 10.723476379372606 : average LED = 0.22343791321072132 : average SED = 0.11167423969227086 : Num of Stems with 0 logs : 0 : Num of Stems with 1 logs : 1188 : Num of Stems with 2 logs : 1151 : Num of Stems with 3 logs : 1080 : Num of Stems with 4 logs : 1209 : Num of Stems with 5 logs : 1471 : Num of Stems with 6 logs : 1278 : Num of Stems with 7 logs : 665

Page 8: 1st Technical Meeting - WP5

New Stand Analytics – Log and tree size distribution

Page 9: 1st Technical Meeting - WP5

Quote…..

“The stronger the linkages between the primary and secondary producer the greater the source of competitive advantage for all”

Michael Porter

Page 10: 1st Technical Meeting - WP5

WP5. Forest information system development

Kick-off Meeting 8-9/jan/2014

•Task 5.1 Database to support novel inventory data content – MHG• Partners: GRAPHITECH, CNR, COAST, FLY, TRE, ITENE• MHG Portal Platform as a basis• M08-M17

• Task 5.2 Platform for near real time control of operations–TRE• Partners: GRAPHITECH, CNR, MHG, TRE, ITENE• M11-M22

Task’s objective is to develop a system (MHG) for near real time control of operations that integrates the information about the timber material origin, quality and quantities being processed along the supply chain in order to optimize procedures and avoid delay times in operations (i.e. manage transport fleet in order to avoid saturation of storage areas at the cable crane landing).This will be achieved by the implementation of a series of different interfaces to access the FIS and allow a number of different operations• Note! Utilization of features and scalability of current services like the Forest Warehouse, MHG Biomass Manager, MHG Mobile, Iptim, Boku´s, Itene´s and Graphitech´s solutions

Page 11: 1st Technical Meeting - WP5

WP5. Forest information system development

Kick-off Meeting 8-9/jan/2014

• Task 5.3 Online purchasing/invoicing of industrial timber and biomass – MHG• Partners: GRAPHITECH, CNR, TRE, ITENE• M19-M28• Huge field for development!

• Task 5.4 Short-term optimization–BOKU• Partners: CNR, MHG, TRE, ITENE• M18-M27• Note! Utilization of Iptim´s features and scalability

• Task 5.5 Mid-long term optimization; strategic and tactical planning - MHG• Partners: GRAPHITECH, FLY, TRE, ITENE• M18-M27• Note! Utilization of Iptim´s features and scalability

Page 12: 1st Technical Meeting - WP5

T.5.3. Online purchasing/invoicing of industrial timber and biomass

Kick-off Meeting 8-9/jan/2014

Partners: GRAPHITECH, CNR, TRE, ITENE• Most important operational (and with commercial launch) tool for SLOPE

pilots?! • Activities performed:• Initial benchmarking ecommerce solutions in Finland, Russia, USA, and

Europe • Met platform developers in Brussels (Aebiom btob event) , Jönköping

Sweden (Worldbioenergy 2014 – matchmaking event), Lahti , Suomen Metsäkeskus

• Closed deal with VerdantéBioenergy Services, North Carolina, USA• The deal covers collaboration in ecomerce services• Workshop in Mikkeli 4-6 of August

• Planed a conference participation in the USA, compensation of costs?• PlugIn concept developed for easy integration

Page 13: 1st Technical Meeting - WP5

T.5.3. Online purchasing/invoicing of industrial timber and biomass

Kick-off Meeting 8-9/jan/2014

Continue• Vision; Easy to use mobile application a key to bring timber and biomass more

to market up to requirements of end-users• Mobile app for forest owners and other players in the ecommerce under

construction; android (1st) + HTML5• To be downloaded free of charge for SLOPE users• Works also on Windows (2nd ) and Apple platforms (3rd)• Prototype ready week 32/2014• Forest owners and others can document and position easily on Slope

system what/what kind they´ve to offer• Negotiation and transaction platform under research• Other ongoing collaboration negotiations (Finnish Forest management

associations, Metla)• Recruitment process ongoing

Page 14: 1st Technical Meeting - WP5

Initiative features and players 2

Kick-off Meeting 8-9/jan/2014

Data LayersGeospatial Fields and Forests WMS (Web Map Service)

DatabasesConversion FacilitiesTimber&biomassProducersEquipment and Service Vendors?

PartnersInsurance?LegalLogisticsLaboratories?Sustainability?Phytosanitary?

- One or two Demo areas?- Who are the real users/playersin the area and distance of end-use?- To be organized interview and involment of pilot users from the very beginning (iterativeapproach, use of MHG Mobile app for documentation and reporting of timber/biomassavailable) - And all over feedback duringdevelopment phase

Page 15: 1st Technical Meeting - WP5

Initiative features and players. Vision

Kick-off Meeting 8-9/jan/2014

Group sell

Contractors/Service

providers

Buy Timber &Feedstock

Sell Timber& Feedstock

Equipment

Profile matching

Price Info

Climatic DataSocial

Networking

Phytosanitary

Commerce Platform Information hub

SustainabilityMobile

Application

Buy/sell Estates/

Cutting areas

Subscriptions/Transactions

Taxation

Resource/Volume/Quality

Analysís

Pre-sales/Auctions

Certification Etc.

Etc.

Page 16: 1st Technical Meeting - WP5

Kick-off Meeting 8-9/jan/2014

Communication and risk control

• Timeframe months: M08-M28• real-time information sharing needed once a month

• Communication• Skype in 3-4 weeks & physical meetings if needed• Communication platform?• Immediate access to current services for key persons in

order to innovate; MHG Biomass Manager, MHG Mobile, Iptim, Forest Warehouse, Graphitech´s, Itene´s, and Boku´ssolutions

Page 17: 1st Technical Meeting - WP5

Kick-off Meeting 8-9/jan/2014

Timeline and deliverables

August 2014 January 2015 January 2016

WP5. Forest information system development M08 M09 M10 M11 M12 M13 M14 M15 M16 M17 M18 M19 M20 M21 M22 M23 M24 M25 M26 M27 M28

T.5.1. Database to support novel inventory data content x x x x x x x x xX

D5.01 Inventory module for the FIS: MHG

T.5.2. Database to support novel inventory data content x x x x x x x x x xx

x

D5.02 Real-time supply chain control module of the FIS: TRE

T.5.3. Online purchasing/invoicing of timber and biomass x x x x x x xx

x x

D5.03 Platform for purchasing/invoicing: MHG

T.5.4. Short-term optimization: operational planning x x x x x x x x x x

D5.04 Short-term optimization module of the FIS: BOKU

T.5.5.Mid-long-term optimization: strategic and tactical x x x x x x x x x x

D5.05 Mid-long-term optimization module of the FIS: MHG

Annual meeting

Project meeting

Skype