2 3 4 5 cpdlc expected stakeholders 6 cpdlc integration team (cit) government/industry/union team...
TRANSCRIPT
2
3
4
5
CPDLC Expected Stakeholders
6
CPDLC Integration Team (CIT)
• Government/Industry/Union Team Providing Coordinated Management and Oversight of the Project• Integrated Schedule• Risk Management• Action Item Tracking• Problem Tracking and Resolution
• CIT Meets Monthly
• Agenda• Restricted to CPDLC Build I
7
• American Airlines• Allied Pilots Association
• Rockwell Collins
• ARINC
• FAA• Free Flight Program Office (AOZ)
• En Route Systems (AUA-200)
• Miami ARTCC (ZMA)
• W. J. Hughes Technical Center (ACB-510, AOS-310)
• National Air Traffic Controllers Association (NATCA)
• Flight Standards (AFS-400)
• Aircraft Certification (AIR-130)
• Air Traffic Procedures (ATP-410)
• Delta Air Lines• Air Line Pilots Association
• Teledyne Controls
CPDLC Integration Team (CIT)
8
• Miami ARTCC
• Airspace: 1,300,000 sq. kilometers
• Ranking: 7th busiest US ARTCC (out of 20)
• Annual Operations: 2 million+
• Record Day Operations: 8,245 (3/23/02)
9
• Miami ARTCC
• Flight Strips per Year: 9 million+• Long Range Radar: 8• Discrete Frequencies: 101
10
CPDLC Build 1 Schedule
11
9 VDL-2 Ground Stations from
Northern Florida to the Caribbean
12
20 CPDLC Certified B757/767s By End Of 2002
13
CMU-900
Message RouterATS End System
•CPDLC•CM
Message CommunicationDisplay Unit - MCDU
Shared Functionality• CPDLC Message Display• Downlink Composition• ACARS• FMS• Advisories
VHF-920
14
4 CPDLC Certified B767-400s by Spring 2003
15
• Multiple Interface Control Display Unit - MICDU• Communications Management Unit - CMU• Sextant VHF Data Radio - VDR
16
Service Certification Suite (SCS)
Service Certification Suite Allows Miami Technicians to Perform End-to-end Testing and Certification of the CPDLC System. The SCS Sends and Receives Signals From ARINC’s VDL-2 Station Located a Few Miles Away at Miami International Airport
17
FAA Menu Build Work Station
Allows the Air Traffic supervisorsto compose free text messages for assignment to individual Sectors
18
Data Link Application ProcessorsContext Management Processors
• DLAP
•CPDLC system application software
•Interfaces with FAA Host computer system
•Database management
•Data recording
•Menu build
•User Interface
• CMA
•ICAO-9705 CM logon service
•Allows CPDLC-equipped aircraft to logon to CM server
•Address data retrieved by DLAP
19
FAA Technical Center Testing
83,344 Total Testing Labor Hours for
CPDLC Build I Prior to Delivery to Miami
20
21
FAA Convair 580 Test Bed
• ATN/AOA Testing• 1st Test Flight January 2002
• 5,000 Messages Exchanged
• 80 Hours of Testing
22
FAA B727 Test Bed
• CPDLC Testing• 1st Test Flight - March 2002
• 1,000+ Messages Exchanged
• 45 Hours of Testing
23
Airways Facilities Technician Training
• 6-day Training Course• Software Troubleshooting• Hardware Remove & Replace
24
FAA Air Traffic Controller Training
• 4-day training program• Classroom/lecture• Computer Based Instruction• ATC Radar Training Lab (DYSIM)
25
CPDLC Build 1 Message Set
• Transfer of Communication• Initial Contact• Altimeter Setting• Menu Text
26
First CPDLC Message
27
For Further Information About Our Program, Please Contact:
Timothy R. [email protected]
FAA Free Flight Program Office
28
29