20 th National Trails Symposium. The Long and Short of Trail Maintenance. Bike Trail Operations and Maintenance. Maintenance Premise. Good maintenance begins with good design. Drainage is the most critical element in the life of your surface. - PowerPoint PPT PresentationTRANSCRIPT
2020thth National Trails Symposium National Trails Symposium
The Long and Short of The Long and Short of Trail MaintenanceTrail Maintenance
Bike TrailBike Trail Operations and Maintenance Operations and Maintenance
Maintenance PremiseMaintenance Premise
Good maintenance begins with good Good maintenance begins with good design.design.
Drainage is the most critical element in the Drainage is the most critical element in the life of your surface.life of your surface.
With proper maintenance you can extend With proper maintenance you can extend the life of your surface beyond the the life of your surface beyond the averages.averages.
Operations ManualOperations Manual
WhatWhat
WhenWhen
HowHow
How oftenHow often
WhoWho
Maintenance CostsMaintenance Costs
$500 - $5,000 per mile per year$500 - $5,000 per mile per year
FactorsFactors– Level of careLevel of care– Site of trailSite of trail– Surface of trailSurface of trail
Columbia, Missouri Columbia, Missouri Trail Maintenance CostsTrail Maintenance Costs
Presentation by Steve Saitta and Mike Snyder in Presentation by Steve Saitta and Mike Snyder in October 2010 American Trails Newsletter:October 2010 American Trails Newsletter:
ConcreteConcrete $2,980/mile$2,980/mile
AsphaltAsphalt 8,672/mile 8,672/mile
Aggregate (in non-washout area)Aggregate (in non-washout area) 5,280/mile 5,280/mile
Aggregate (in washout area)Aggregate (in washout area) 16, 904/mile16, 904/mile
Trail SurfacesTrail Surfaces
AggregateAggregate
ConcreteConcrete
AsphaltAsphalt
Types of CareTypes of Care
Routine MaintenanceRoutine Maintenance
Periodic MaintenancePeriodic Maintenance
Long Term CareLong Term Care
Routine MaintenanceRoutine Maintenance
MowingMowingCleaningCleaning
TrimmingTrimming
Vandalism repairVandalism repair
Litter controlLitter control
Routine MaintenanceRoutine Maintenance
MowingMowing
CleaningCleaningTrimmingTrimming
Vandalism repairVandalism repair
Litter controlLitter control
Blower vs. Sweeper vs. VacuumBlower vs. Sweeper vs. Vacuum
Vacuum creates major dust in dry Vacuum creates major dust in dry
weatherweather
Low profile makes vacuum hard toLow profile makes vacuum hard to
get over bollardsget over bollards
Sweeper only gets debris off Sweeper only gets debris off
immediate trail surfaceimmediate trail surface
Leaves piles where sweeper stopsLeaves piles where sweeper stops
Blower gets clippings, leaves, twigs,Blower gets clippings, leaves, twigs,
rocks and debris way off of trailrocks and debris way off of trail
Routine MaintenanceRoutine Maintenance
MowingMowing
CleaningCleaning
TrimmingTrimmingVandalism repairVandalism repair
Litter controlLitter control
Routine MaintenanceRoutine Maintenance
MowingMowing
CleaningCleaning
TrimmingTrimming
Vandalism repairVandalism repair
Litter controlLitter control
Periodic Periodic MaintenanceMaintenance – all Surfaces – all Surfaces
Clearance pruning – maintain 3’ Clearance pruning – maintain 3’
setbacksetback
Tree trimming- maintain 12’ heightTree trimming- maintain 12’ height
clearanceclearance
Brush cutback – keep shrubs fromBrush cutback – keep shrubs from
encroaching into bermencroaching into berm
Periodic Maintenance - Aggregate TrailsPeriodic Maintenance - Aggregate Trails
Control encroaching vegetationControl encroaching vegetation
Scarify areas to be correctedScarify areas to be corrected
Add aggregate if neededAdd aggregate if needed
Grade and compactGrade and compact
Periodic Maintenance - Concrete TrailsPeriodic Maintenance - Concrete Trails
EdgingEdging
Seal CracksSeal Cracks
Re-stripe annually (if using paint)Re-stripe annually (if using paint)
Periodic Maintenance – Asphalt TrailsPeriodic Maintenance – Asphalt Trails
Edge pavement to prevent vegetation Edge pavement to prevent vegetation encroachment.encroachment.
Restripe annually (if using paintRestripe annually (if using paint))
Long Term MaintenanceLong Term Maintenancefor asphalt surfacesfor asphalt surfaces
Crack sealingCrack sealing
Seal CoatingSeal Coating
Pavement RepairPavement Repair
Asphalt Maintenance Asphalt Maintenance StrategyStrategy
Retard progressive failureRetard progressive failure
Arrest light deteriorationArrest light deterioration
Reduce need for reactive Reduce need for reactive maintenancemaintenance
Crack SealingCrack Sealing
Prevents debris build-up in cracks.Prevents debris build-up in cracks.
Prevents water from entering base Prevents water from entering base
and sub-base. and sub-base.
Prevents continued deterioration.Prevents continued deterioration.
Perform every 2 years.Perform every 2 years.
Recommend use of a rubberized sealant.Recommend use of a rubberized sealant.
Crack SealingCrack Sealing
Purpose of Seal CoatingPurpose of Seal Coating
Arrest deteriorationArrest deterioration
Prevent water infiltrationPrevent water infiltration
Restore oils to upper surfaceRestore oils to upper surface
Prevent loss of finesPrevent loss of fines
Seal Coat ProductsSeal Coat Products
ReclamiteReclamiteGSB 88GSB 88Agricultural oil based sealersAgricultural oil based sealers
ReplayReplayBio-Re-StorBio-Re-Stor
Do Not Use Coal Tar based ProductsDo Not Use Coal Tar based Products
– Cost - $4,500 – 5,000/mileCost - $4,500 – 5,000/mile
ReclamiteReclamite
Chemical composition productChemical composition product
Goes on nearly clearGoes on nearly clear
Requires 24-hour penetration timeRequires 24-hour penetration time
Requires sand coat to absorb excessRequires sand coat to absorb excess
Sand must be swept off before re-openSand must be swept off before re-open
Questions on friction co-efficientQuestions on friction co-efficient
GSB - 88GSB - 88
Asphalt emulsionAsphalt emulsion
Goes on blackGoes on black
Requires masking or re-stripingRequires masking or re-striping
Dries 1- 2 hoursDries 1- 2 hours
Adds silica sand to fill fines, increase Adds silica sand to fill fines, increase frictionfriction
Agricultural OilsAgricultural Oils
Agricultural base, not AsphaltAgricultural base, not Asphalt
Green productGreen product
Restores oils to upper 3/8” of asphalt surfaceRestores oils to upper 3/8” of asphalt surface
Prevents loss of finesPrevents loss of fines
Goes on virtually clear; no need for re-stripingGoes on virtually clear; no need for re-striping
Maintains co-efficiency of frictionMaintains co-efficiency of friction
Replay ApplicatorsReplay Applicators
Replay ApplicationReplay Application
Pavement Repair - AggregatePavement Repair - Aggregate
Correct underlying IssuesCorrect underlying Issues
Use ripper tines to penetrate into Use ripper tines to penetrate into
existing surfaceexisting surface
Add new aggregate to match Add new aggregate to match
existingexisting
Grade to blend into existing surfacesGrade to blend into existing surfaces
Compact with vibratory rollerCompact with vibratory roller
Pavement Repair - ConcretePavement Repair - Concrete
Saw-cut all jointsSaw-cut all joints
Make sure drainage can occurMake sure drainage can occur
Install porous stone baseInstall porous stone base
Form new concrete to match existingForm new concrete to match existing
Finish surface to match existingFinish surface to match existing
Provide for expansion of new concreteProvide for expansion of new concrete
Pavement Repair - AsphaltPavement Repair - Asphalt
Avoid cuts at all costsAvoid cuts at all costs Develop tight specifications for repairDevelop tight specifications for repair Saw-cut all edgesSaw-cut all edges Properly compact all fillsProperly compact all fills
Specify compaction rates for fill and asphaltSpecify compaction rates for fill and asphalt Apply AC-20 to sides of cutsApply AC-20 to sides of cuts Consider re-heating techniquesConsider re-heating techniques
Asphalt Surfacing AlternativesAsphalt Surfacing Alternatives
Slurry sealSlurry seal
Skim coatsSkim coats
Micro-surfacingMicro-surfacing
Chip and sealChip and seal
Asphalt Re-surfacingAsphalt Re-surfacing
Consider grinding and repavingConsider grinding and repaving
May be more cost effectiveMay be more cost effective
Requires no re-bermingRequires no re-berming
Requires no re-seedingRequires no re-seeding
Always add at least a 1 ¼” course ofAlways add at least a 1 ¼” course of
asphaltasphalt
??
Trail SolutionsTrail Solutions
Jim SchneiderJim Schneiderwww.trail-works.comwww.trail-works.com3904 Rockfield Dr.3904 Rockfield Dr.Beavercreek, OH 45430Beavercreek, OH 45430Ph (937) 750-1109Ph (937) 750-1109Fax (937) 320-1109Fax (937) [email protected]@trail-works.com