20070529101407

72
Norm Workshop (Pdo - Oman) 21 - 24 February 2005 TIM ELEY - SCOTOIL GROUP plc, ABERDEEN MARK RITCHIE - OES, CAIRO, EGYPT

Upload: bose-thambidurai

Post on 18-Apr-2015

10 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 20070529101407

Norm Workshop (Pdo - Oman)

21 - 24 February 2005

TIM ELEY - SCOTOIL GROUP plc, ABERDEEN

MARK RITCHIE - OES, CAIRO, EGYPT

Page 2: 20070529101407

AGENDA• Introduction to Scotoil Group & Scotoil Services

• Equipment subject to NORM - ‘Rogue’s Gallery’

• Equipment Decontamination Procedure Step by Step, Aberdeen

• Disposal Route - Compliance with Regulations

• Scotoil - Oilfield Environmental Services

Equipment Decontamination Procedure Step by Step, Cairo

QUESTIONS ?

Page 3: 20070529101407

EUROPE

Scotoil Group plc headquarters in Aberdeen, Scotland

MIDDLE EAST

Alliance between Scotoil Services (Middle East) Ltd and Gulf Environmental Company LLC (GENCO), based in Abu Dhabi, UAE

NORTH AFRICA

Oilfield Environmental Services (OES) - JV company based in Cairo, Egypt

INTERNATIONAL

Page 4: 20070529101407

• More than 20 years’ experience

• SCOAA Environment award recognising “world class standards”

• Operations meet exacting standards of regulatory and assessment bodies

• ISO 9001:2000, ISO 14001

• FPAL

• Scotland’s Health at Work Gold Award

OUR CREDENTIALS

Page 5: 20070529101407

OUR CLIENTS

Page 6: 20070529101407

• Equipment decontamination

• Removal and disposal of NORM

• Instrumentation

• Onshore and offshore RPS

• Emerging technologies in water purification and land remediation

OUR SERVICES

Page 7: 20070529101407

EQUIPMENT DECONTAMINATION

• High Pressure

Generally for component parts and tubulars

• Ultra High Pressure - Trials

More efficient tubular cleaning

Increased throughput

More effective cleaning of lead contaminated tubulars

Page 8: 20070529101407

REMOVAL AND DISPOSAL OF NORM

• Disposal facility regulated by SEPA

• Environment controls through independent impact assessments and monitoring

• Accountability - operational controls and licensed disposal route

• UK’s first authorised NORM removal and disposal facility

Page 9: 20070529101407

INSTRUMENTATION SERVICES

• Scotoil Services offers a complete radiological instrumentation package:

Equipment training Sales Rental Repair Calibration Certification

ELECTRA CONTAMINATION METERMINI 900 SERIES MONITOR

Page 10: 20070529101407

RPS SERVICES

• Radiological surveys

• RPS control during workovers etc.

• Induction training

• Personnel monitoring

• Documentation

• Supply of appropriate PPE

Page 11: 20070529101407

• Formation water contains naturally-occurring mineral salts

• These salts can come out of solution in contact with injected water

• Radium may be present in minute concentrations

WHAT IS NORM SCALE?

• Naturally radioactive, radium may mean the scale is classified as radioactive

Page 12: 20070529101407

UNITS OF MEASUREMENT

• Specific Activity Activity per gram i.e. Bq/gram

• Surface Contamination Activity per cm squared

i.e. Bq/cm2 A contamination monitor can

measure surface activity

Page 13: 20070529101407

DOSE RATES

• Measured in sieverts { large unit} - usually prefix sub multiplier e.g.1 µSv {micro sievert}

• Dose rates greater than 2.5 µSv/hr mark supervised areas

• Dose rates greater than 7.5 µSv/hr mark controlled areas

Page 14: 20070529101407

• Naturally occurring radioactive material is a major issue for field operation decommissioning

• NORM scale build up can render equipment inoperable

• Classed as radioactive, its removal and disposal must be carefully controlled

WHAT IT MEANS FOR THE INDUSTRY

Page 15: 20070529101407

• Colour varies from white through to brown

• Barium Sulphate scale is most common

• Spongy open appearance if large quantities of scale inhibitor used

TYPES OF EQUIPMENT SUBJECT TO NORM - ‘ROGUES GALLERY’

Page 16: 20070529101407

• Radiation dose

• Inhalation

• Ingestion

• Cuts and abrasions

THE HAZARDS

Page 17: 20070529101407

VALVE

Page 18: 20070529101407

VALVE

Page 19: 20070529101407

MISCELLANEOUS VALVES

Page 20: 20070529101407

VALVES & ACTUATORS

Page 21: 20070529101407

PIPEWORK

Page 22: 20070529101407

HEAT EXCHANGER

Page 23: 20070529101407

HEAT EXCHANGER CLEANED & DE-SCALED

Page 24: 20070529101407

OIL COOLER PLATES

Page 25: 20070529101407

LOOSE SCALE

Page 26: 20070529101407

PERFORATED TUBING - INTERNAL & EXTERNAL CONTAMINATION

Page 27: 20070529101407

PUMP IMPELLER ASSEMBLY

Page 28: 20070529101407

DOWNHOLE ESP PUMP - STRIPPED DOWN

Page 29: 20070529101407

DOWNHOLE ESP PUMP PARTS - DIFFUSERS & IMPELLERS

Page 30: 20070529101407

ESP PUMP DIFFUSERS

Page 31: 20070529101407

MECHANICAL SEALS & DOWNHOLE SAFETY VALVE

Page 32: 20070529101407

XMAS TREES

Page 33: 20070529101407

CASING

Page 34: 20070529101407

PITTED TUBULAR

Page 35: 20070529101407

SPIRAL SCALE

Page 36: 20070529101407
Page 37: 20070529101407

EQUIPMENT DECONTAMINATION PROCEDURE

Step by Step

Page 38: 20070529101407

EQUIPMENT DECONTAMINATION

• Written notification from the Operator of NORM consignment

• Identified offshore by platform/rig RPS• Scotoil authorised to accept contaminated

equipment • Contamination levels monitored on arrival

Page 39: 20070529101407

• Unload equipment into Controlled Area

• Enter job details on computerised Job Register

Page 40: 20070529101407

• Scale sample passed to Laboratory

• Radiological analysis, total activity, type of scale

Page 41: 20070529101407

Arrival, Documentation Check & Inspect

Tubulars - check internal, external pin, box, scale thickness, activity for each joint

• Unique Job No - waterproof tag, client, location• Complete monitoring records for each item or

component part• All joints capped or re-wrapped

Page 42: 20070529101407

Decontamination of Equipment

• Pre-cleaning prior to stripdown• Stripdown if required• Soluble abrasives can be used to assist decontamination• Full decontamination• Post, Final & QC Inspection

Page 43: 20070529101407

Ultra High Pressure Pump Unit

• 36,000 psi working pressure at 42 litres per minute

High Pressure Aqua Pumps• 10,000 psi working pressure at 82 litres per minute

Page 44: 20070529101407

Tubular Decontamination System

• High Pressure jetting combined with lance mounted cutter ‘Rattler head’

Page 45: 20070529101407

Tubular Ends - Fully Enclosed Hoods

• All Scale & cleaning water collected to sump

Page 46: 20070529101407

Tubular Ends - Fully Enclosed Hoods

Page 47: 20070529101407

Lance Mounted Cutter Head‘Rattler’

• Machine with hardened cutting surfaces

Page 48: 20070529101407

All Scale ground down to less than <250 microns

• All Scale passed through screens

• Oil Separator - two stage

• Controlled discharged to sea regulated by SEPA

• Post Cleaning Monitor Record

• Final Check Monitor Record

Page 49: 20070529101407

• Results of radiochemical analysis on computerised Job Register

• Certificate of Scale Disposal - master job file

• Quarterly Scale Disposal computerised records

• Quarterly Sea Survey - results, particle size analysis to radiation specialists at SEPA (Scottish Environment Protection Agency)

SCALE DISPOSAL

Page 50: 20070529101407

Compliance with HSE Regulations

• Ionising Radiation Regulations 1999• Control of Pollution Act 1974*• Radiation Substances Act 1993• Environmental Pollution Act 1990• Registered under the pipeline Act 1962• Authorisation for the Accumulation and Disposal of Radioactive Waste*

* Regulated by SEPA (Scottish Environment Protection Agency)

Page 51: 20070529101407

Davidson House, Miller Street, Aberdeen, AB11 5AN, Scotland, UK

Telephone +44 (0) 1224 571491 Fax +44 (0) 1224 580861

[email protected] www.scotoil.co.uk

DECONTAMINATION PROCESS DECONTAMINATION PROCESS FOR NORM FOR NORM

CONTAMINATED OILFIELD CONTAMINATED OILFIELD EQUIPMENTEQUIPMENT

6th OCTOBER CITY - EGYPT6th OCTOBER CITY - EGYPT

Page 52: 20070529101407

Oilfield Environmental Services is a joint Venture company between Scotoil (UK) and Minaoil (Egypt).

Scotoil, bringing 20 years of North Sea NORM decontamination experience and Minaoil, bringing 20 years of Egyptian oil and gas industry expertise joined forces in 2001 to combat the NORM problem in Egypt.

Oilfield Environmental Services was formed and is now operational and fully licensed by the Egyptian Authorities including EGPC, AEA, MOE and GAFI.

Page 53: 20070529101407

The following presentation, details the basic decontamination process of NORM contaminated equipment at Oilfield Environmental Services decontamination facility, situated in 6th October City, Egypt.

For the purpose of this presentation we will follow a contaminated ESP and resulting waste from arrival at OES until the equipment is despatched to the client in a safe, certified and contamination free state.

Page 54: 20070529101407

ON ARRIVAL, THE CONTAMINATED ITEM IS OFFLOADED AND DIRECTED TO OES RADIATION CONTROLLED AREA.

Page 55: 20070529101407

THE EQUIPMENT IS ALLOCATED AN OES JOB NUMBER, MONITORED AND TAGGED.

Page 56: 20070529101407

THE ACCESSIBLE SURFACES ARE PRE-CLEANED PRIOR TO DISMANTLING.

Page 57: 20070529101407

THE EQUIPMENT IS DISMANTLED BY EITHER OES PERSONNELOR A SPECIALIST THIRD PARTY;

RADIOLOGICALLY SUPERVISED BY OES.

Page 58: 20070529101407

EACH PART IS GIVEN AN INDIVIDUAL IDENTIFICATION NUMBER,MONITORED AND TAGGED.

Page 59: 20070529101407

THE BREAKDOWN AREA IS DECONTAMINATED, FLUSHING ALLCONTAMINENTS INTO THE CLOSED LOOP DRAINAGE AND

FILTRATION SYSTEM.

Page 60: 20070529101407

EACH PART IS INDIVIDUALLY DECONTAMINATED

BY MEANS OF…..

Page 61: 20070529101407

STATE OF THE ART UHP WATER JETTING EQUIPMENT.

Page 62: 20070529101407

RESULTING RADIOACTIVE WASTE IS COLLECTED INA CLOSED LOOP SIX STAGE FILTRATION AND

WATER RECYCLING SYSTEM.

Page 63: 20070529101407

FOLLOWING DECONTAMINATION, EQUIPMENT IS MONITOREDAND SURVEYED FOR VISUAL SCALE. IF ACCEPTED, INTERIM

CHECK TAPE IS ATTACHED TO THE EQUIPMENT.

Page 64: 20070529101407

EQUIPMENT IS NOW MONITORED BY A HEALTH PHYSICISTAT THE QUALITY CONTROL STAGE.

Page 65: 20070529101407

FOLLOWING ACCEPTANCE BY THE QC DEPARTMENT AND CLIENT, THE EQUIPMENT IS SUITABLY WRAPPED AND EITHER

BOXED, PALLETISED OR RETURNED TO ITS ORIGINAL CONTAINER.

Page 66: 20070529101407

THE EQUIPMENT IS CLEAN, SAFE, CERTIFIED AND READY FORCUSTOMER UPLIFT.

Page 67: 20070529101407

THE FILTRATION SYSTEM IS CLEANED, TRANSFERRING ALLWASTE TO THE CLIENTS NORM STORAGE CONTAINER.

Page 68: 20070529101407

THE ENTIRE CONTROLLED AREA IS SURVEYED BY A QUALIFIEDHEALTH PHYSICIST TO ENSURE THAT IT IS FREE OF

CONTAMINATION.

Page 69: 20070529101407

WHEN EITHER THE QUANTITY OF NORM WASTE OR THE DOSE RATE HAS EXCEEDED A CERTAIN LEVEL, OES REQUEST THAT THE CLIENT AND THE EGYPTIAN ATOMIC ENERGY REMOVE THE WASTE FROM OES.

THE SECURED CONTAINERS ARE TRANSFERRED BY SPECIALISED AEA TRANSPORTATION FOR FINAL DISPOSAL.

Page 70: 20070529101407

AT THE TIME OF EQUIPMENT DESPATCH, A FULL REPORT IS SUBMITTED TO THE CLIENT WITH ALL RELEVANT DOCUMENTATION. THIS TYPICALLY INCLUDES :

- EQUIPMENT / PART RECORDS- WORK SUMMARY- DISMANTLING DETAILS- RADIATION ANALYSIS RESULTS FROM EACH STAGE IN THE

PROCESS- RADIATION SUMMARY- QC DOCUMENTATION- NORM WASTE DATA- DECONTAMINATION CERTIFICATE

Page 71: 20070529101407
Page 72: 20070529101407

QUESTIONS?