Beneficial Reuse ofLegacy Management Sites and Renewable
Energy InitiativesJohn Elmer, S.M. Stoller Corporation
2010 Long-Term Surveillance and Maintenance ConferenceNovember 16, 2010
2
20
10
Lon
g-T
erm
Su
rveilla
nce a
nd
Main
ten
an
ce
20
10
Lon
g-T
erm
Su
rveilla
nce a
nd
Main
ten
an
ce
Con
fere
nce
Con
fere
nce
2
Legacy Management’s (LM) Mission Manage U.S. Department of Energy’s (DOE) post-
closure responsibilities and ensure the future protection of human health and the environment.
LM has control and custody for legacy land, structures, and facilities and is responsible for maintaining them at levels consistent with DOE’s long-term plans.
3
20
10
Lon
g-T
erm
Su
rveilla
nce a
nd
Main
ten
an
ce
20
10
Lon
g-T
erm
Su
rveilla
nce a
nd
Main
ten
an
ce
Con
fere
nce
Con
fere
nce
3
LM’s Goals Protect human health and the environment through effective and
efficient long-term surveillance and maintenance Preserve, protect, and make accessible legacy records
and information Support an effective and efficient work force structured to
accomplish DOE missions and assure contractor worker pension and medical benefits
Manage legacy land and assets, emphasizing protective real and personal property reuse and disposition
Improve program effectiveness through sound management
4
20
10
Lon
g-T
erm
Su
rveilla
nce a
nd
Main
ten
an
ce
20
10
Lon
g-T
erm
Su
rveilla
nce a
nd
Main
ten
an
ce
Con
fere
nce
Con
fere
nce
LM Sites
5
20
10
Lon
g-T
erm
Su
rveilla
nce a
nd
Main
ten
an
ce
20
10
Lon
g-T
erm
Su
rveilla
nce a
nd
Main
ten
an
ce
Con
fere
nce
Con
fere
nce
5
Legacy Land and Assets
LM manages 87 sites in 28 states and Puerto Rico 12,968 acres of DOE-owned sites and land
(i.e., permanent radioactive disposal cells) 10,886 acres of non-DOE-owned sites/land with rights to
conduct activities (i.e., groundwater monitoring at former uranium ore–processing sites owned by states, tribes)
33,227 acres of land withdrawn with rights to conduct activities (25,545 for uranium leasing program)
6
20
10
Lon
g-T
erm
Su
rveilla
nce a
nd
Main
ten
an
ce
20
10
Lon
g-T
erm
Su
rveilla
nce a
nd
Main
ten
an
ce
Con
fere
nce
Con
fere
nce
6
Renewable Energy Initiatives –
Two Paths Explore ways to implement renewable energy options for legacy sites LM beneficial reuse program
Specific targets for reuse projects include renewable energy, commercial and industrial uses, conservation uses, and agricultural uses
Dispositions, other types of reuse, and number of acres Careful review of existing site for dispositions to reduce DOE’s footprint
and for other types of reuse
Renewable energy initiative through the Environmental Management System (EMS)
Renewable energy to power existing facilities Tuba City, Arizona, solar project Weldon Spring, Missouri, and Fernald, Ohio, demonstration projects
Concerted efforts to identify opportunities in both programs
7
20
10
Lon
g-T
erm
Su
rveilla
nce a
nd
Main
ten
an
ce
20
10
Lon
g-T
erm
Su
rveilla
nce a
nd
Main
ten
an
ce
Con
fere
nce
Con
fere
nce
Edgemont, South Dakota Beneficial Reuse – Grazing
8
20
10
Lon
g-T
erm
Su
rveilla
nce a
nd
Main
ten
an
ce
20
10
Lon
g-T
erm
Su
rveilla
nce a
nd
Main
ten
an
ce
Con
fere
nce
Con
fere
nce
8
Beneficial Reuse-Process to Identify Renewable Energy Projects National Renewable Energy Laboratory (NREL) report
Information about NREL can be found at http://www.nrel.gov/ NREL screened all current and transitioning LM sites for solar- and
wind-energy potential at http://www.nrel.gov/docs/fy08osti/41673.pdf
Wind power Appears feasible at two current LM sites and several future
sites in Wyoming Challenges include lack of infrastructure, site size, lack of regulation
at the state level, and distance to the end users
Solar power Solar photovoltaic (PV) projects most feasible in the western states
such as New Mexico, Colorado, Utah, Arizona, and Wyoming
9
20
10
Lon
g-T
erm
Su
rveilla
nce a
nd
Main
ten
an
ce
20
10
Lon
g-T
erm
Su
rveilla
nce a
nd
Main
ten
an
ce
Con
fere
nce
Con
fere
nce
9
Beneficial Reuse – Solar Power Initiative Current administration and LM goals focus on
renewable energy sources LM has few facilities or buildings requiring energy, but
has open land where private systems can be placed to generate power that can be sold
Solar power opportunities are more advanced than other options with decreased cost and increased efficiency
LM is primarily interested in leasing land to another party to construct solar power systems and not making an economic return off leasing the land
Feasibility of large solar PV systems is based on incentives and utilities
10
20
10
Lon
g-T
erm
Su
rveilla
nce a
nd
Main
ten
an
ce
20
10
Lon
g-T
erm
Su
rveilla
nce a
nd
Main
ten
an
ce
Con
fere
nce
Con
fere
nce
10
Example of Large-Scale Solar Project – City of Rifle, Colorado, Wastewater Treatment Facility
11
20
10
Lon
g-T
erm
Su
rveilla
nce a
nd
Main
ten
an
ce
20
10
Lon
g-T
erm
Su
rveilla
nce a
nd
Main
ten
an
ce
Con
fere
nce
Con
fere
nce
11
Beneficial Reuse – Solar Power Incentives Most states have some form of tax incentives and some have
legislated renewable energy goals New Mexico Renewable Energy Act of 2004 requires
increased use of renewable energy sources through 2020 State also has energy tax credit against personal and
corporate income tax liabilities American Recovery and Reinvestment Act of 2009
stimulus act provides investment tax credit equal to 30 percent of the capital cost (expires in 2010) Loan program administered by DOE
Tax benefits to depreciate cost over 5 years versus 20 years
12
20
10
Lon
g-T
erm
Su
rveilla
nce a
nd
Main
ten
an
ce
20
10
Lon
g-T
erm
Su
rveilla
nce a
nd
Main
ten
an
ce
Con
fere
nce
Con
fere
nce
12
Beneficial Reuse – Process to Work with Utilities Some states (Colorado, New Mexico, Arizona, and
California) require utilities to purchase a certain percentage of power from renewable sources
Public Service of New Mexico (PNM) issued a 2008 Request for Proposals
Received bids from firms with solar projects Queue established to evaluate bids No project has been awarded a contract yet PNM reevaluating request for proposals/queue process
13
20
10
Lon
g-T
erm
Su
rveilla
nce a
nd
Main
ten
an
ce
20
10
Lon
g-T
erm
Su
rveilla
nce a
nd
Main
ten
an
ce
Con
fere
nce
Con
fere
nce
13
Process to Work with Utilities (continued) Federal Energy Regulatory Commission regulates
energy grid “Study process” developed for projects from 2 MW up
to 20 MW; expedited compared to large projects over 20 MW
Studies required for fast track process include: Feasibility study System impact study Distribution study Facilities study
14
20
10
Lon
g-T
erm
Su
rveilla
nce a
nd
Main
ten
an
ce
20
10
Lon
g-T
erm
Su
rveilla
nce a
nd
Main
ten
an
ce
Con
fere
nce
Con
fere
nce
14
Beneficial Reuse – New Mexico Solar Project LM evaluated sites near Grants, New Mexico (Ambrosia Lake,
L-Bar, and Bluewater, New Mexico) Assessed available land and buffer areas outside disposal cells for
onsite or nearby electrical infrastructure Sites screened for
Slope not to exceed 5 percent No arroyos or waterways No potential shading Available access and infrastructure
Conceptual designs yielded potential for 9 MW at Ambrosia Lake, 3 MW at L-Bar, and 20 MW at Bluewater
Bluewater site chosen for further study due to its large amount of open land, large transmission lines, onsite substation, and proximity to a large community
15
20
10
Lon
g-T
erm
Su
rveilla
nce a
nd
Main
ten
an
ce
20
10
Lon
g-T
erm
Su
rveilla
nce a
nd
Main
ten
an
ce
Con
fere
nce
Con
fere
nce
1515
New Mexico Solar Project
16
20
10
Lon
g-T
erm
Su
rveilla
nce a
nd
Main
ten
an
ce
20
10
Lon
g-T
erm
Su
rveilla
nce a
nd
Main
ten
an
ce
Con
fere
nce
Con
fere
nce
16
Bluewater, New Mexico, Site and PV System Former uranium processing and disposal site [Uranium
Mill Tailings Radiation Control Act (UMTRCA) Title II] Tri-State Generation and Transmission Association, Inc.
substation and 13.2 kv transmission lines on site Good site access 800 acres of flat land for 20 MW PV solar system Groundwater is approximately 100 feet below
earth’s surface No other land use
17
20
10
Lon
g-T
erm
Su
rveilla
nce a
nd
Main
ten
an
ce
20
10
Lon
g-T
erm
Su
rveilla
nce a
nd
Main
ten
an
ce
Con
fere
nce
Con
fere
nce
Bluewater, New Mexico, Site
18
20
10
Lon
g-T
erm
Su
rveilla
nce a
nd
Main
ten
an
ce
20
10
Lon
g-T
erm
Su
rveilla
nce a
nd
Main
ten
an
ce
Con
fere
nce
Con
fere
nce
18
Bluewater Site –Challenges to Implementation The utility doesn’t need the power right now Remaining transmission line capacity committed to
other projects The cost will be millions of dollars to upgrade
transmission line to Albuquerque Working through site-use restrictions with regulators
[Nuclear Regulatory Commission (NRC)] Addressing federal real property regulations to
grant a long-term lease
19
20
10
Lon
g-T
erm
Su
rveilla
nce a
nd
Main
ten
an
ce
20
10
Lon
g-T
erm
Su
rveilla
nce a
nd
Main
ten
an
ce
Con
fere
nce
Con
fere
nce
19
Beneficial Reuse – Durango, Colorado, Site Solar Project Disposal cell site (UMTRCA Title I) LM approached to consider installation on top of
the disposal cell Smaller site than Bluewater, New Mexico, site Close to city of Durango (1 mile southwest) LM focus on this project due to greater potential
for near-term implementation
20
20
10
Lon
g-T
erm
Su
rveilla
nce a
nd
Main
ten
an
ce
20
10
Lon
g-T
erm
Su
rveilla
nce a
nd
Main
ten
an
ce
Con
fere
nce
Con
fere
nce
Durango Disposal Site
21
20
10
Lon
g-T
erm
Su
rveilla
nce a
nd
Main
ten
an
ce
20
10
Lon
g-T
erm
Su
rveilla
nce a
nd
Main
ten
an
ce
Con
fere
nce
Con
fere
nce
21
Durango Solar Project – Benefits Site is on a hillside facing south Flat disposal cell cover with vegetation and
soil/rock matrix Surrounded by public lands Infrastructure is available onsite Located one-fourth of a mile from the nearest substation Available capacity in adjacent transmission lines Potential for partnering with other entities such as the
local utility cooperative
22
20
10
Lon
g-T
erm
Su
rveilla
nce a
nd
Main
ten
an
ce
20
10
Lon
g-T
erm
Su
rveilla
nce a
nd
Main
ten
an
ce
Con
fere
nce
Con
fere
nce
22
Durango Solar Project – Challenges Revised Long-Term Surveillance Plan submitted to
Colorado Department of Public Health and Environment (CDPHE) and NRC to allow panels on top of cover
Maintaining integrity of the disposal cell and associated structures against obstacles Erosion from large storms Maintaining existing vegetation Security fencing versus accommodating wildlife Minimizing penetration of surface with foundations, utilities
Developing lease that protects the federal government yet entices developers
23
20
10
Lon
g-T
erm
Su
rveilla
nce a
nd
Main
ten
an
ce
20
10
Lon
g-T
erm
Su
rveilla
nce a
nd
Main
ten
an
ce
Con
fere
nce
Con
fere
nce
23
Durango Solar Project Challenges (continued) Adequately addressing all concerns as suggested in
meetings with NRC, CDPHE, Colorado Division of Wildlife, La Plata County
Develop an Environmental Assessment; work with County, NRC, local stakeholders
Preliminary Final EA is being reviewed with the plan to issue a Final EA in December
24
20
10
Lon
g-T
erm
Su
rveilla
nce a
nd
Main
ten
an
ce
20
10
Lon
g-T
erm
Su
rveilla
nce a
nd
Main
ten
an
ce
Con
fere
nce
Con
fere
nce
24
EMS – Renewable Energy Initiatives LM EMS goal is to replace 3.75 percent of its on-site
power consumption with renewable energy sources Inventoried each site that utilizes power; most LM sites
do not have operating facilities Best opportunities are at several large facilities
(Tuba City, Arizona; Fernald, Ohio; Grand Junction, Colorado)
Utility companies typically allow a maximum on-site renewable energy source equal to 125 percent of existing power demand
25
20
10
Lon
g-T
erm
Su
rveilla
nce a
nd
Main
ten
an
ce
20
10
Lon
g-T
erm
Su
rveilla
nce a
nd
Main
ten
an
ce
Con
fere
nce
Con
fere
nce
25
Examples of EMS Renewable Energy Initiatives A 51 kw solar PV system built at Tuba City, Arizona, site
to offset purchase of electricity off-grid Solar hot-water heating system at Tuba City to heat
groundwater before treatment (reduced energy consumption 10 percent)
Small PV systems at Rocky Flats, Colorado, to power remote pumping stations and instruments
Demonstration projects at Fernald, Ohio, using PV system to power pump station and lights, and at Weldon Springs, Missouri, to operate a windmill that powers a display
26
20
10
Lon
g-T
erm
Su
rveilla
nce a
nd
Main
ten
an
ce
20
10
Lon
g-T
erm
Su
rveilla
nce a
nd
Main
ten
an
ce
Con
fere
nce
Con
fere
nce
Tuba City, Arizona Solar Photovoltaic Panels