CAPP's Steward of Excellence Awards were created to foster improvement in environment, health and safety, and social performance. This award nominee booklet helps celebrate the success of these projects.TRANSCRIPT
In April 2009, ARC launched its Eco-Efficiency Program. Field operators are asked to submit projects based on the needs and operating conditions of each of their facilities. This promotes project ownership and helps avoid project implementation barriers like accountability, buy-in and access to contractors.
The initiative focuses on funding the development and implementation of energy efficiency projects and emerging technologies throughout ARC’s operations. This includes any project that can reduce greenhouse gas (GHG) emissions, reduce fuel and electricity consumption, and utilize wasted products, while maintaining reliability and maximum production.
In April 2009, ARC launched its Eco-Efficiency Program. Field operators are asked to submit projects based on the needs and operating conditions of each of their facilities. This promotes project ownership and helps avoid project implementation barriers like accountability, buy-in and access to contractors.
The initiative focuses on funding the development and implementation of energy efficiency projects and emerging technologies throughout ARC’s operations. This includes any project that can reduce greenhouse gas (GHG) emissions, reduce fuel and electricity consumption, and utilize wasted products, while maintaining reliability and maximum production.
Boreal Habitat Conservation Initiative
HighlightsPerformance:• Results to date: 40 projects
submitted for evaluation; 23 projects approved; 6 complete projects
caPacity Building: • Two new technology “pilot projects”
are currently being explored for 2010 – using flare gas to generate electricity, and a natural gas separator that eliminates the use of glycol and fuel
Stakeholder relationS & rePutation: • The program contributes economic,
social and environmental benefits to local communities by hiring local contractors, demonstrating industry responsibility, and reducing pollution.
Eco-Efficiency Program
EnvIronmEnt
HighlightsPerformance:• Results to date: 40 projects
submitted for evaluation; 23 projects approved; 6 complete projects
caPacity Building: • Two new technology “pilot projects”
are currently being explored for 2010 – using flare gas to generate electricity, and a natural gas separator that eliminates the use of glycol and fuel
Stakeholder relationS & rePutation: • The program contributes economic,
social and environmental benefits to local communities by hiring local contractors, demonstrating industry responsibility, and reducing pollution.
EnvIRonmEnT | HEAlTH & SAFETy | SoCIAl
StEwardSHIP today | tomorrow
Steward of Excellence awards 20 10
As we all know, the actions we take today have a profound effect tomorrow, and long into the future. Stewardship requires that we work collaboratively towards a better future through performance improvement to earn the confidence of Canadians. Through our joint efforts − innovation and continuous improvement in our environmental, health and safety, and social performance − CAPP members illustrate their dedication to the vision and principles of Stewardship. our commitment is particularly well demonstrated in the projects nominated for the 2010 Steward of Excellence Awards.
Stewardship also means the responsible development of Canada’s energy resources. open exchange, listening, and accountability are
examples of our responsibility in action with an aim of continuing to reduce environmental footprints, ensuring the safety of our workers and contractors, and building strong, positive relationships in the communities where we operate. As a significant force in the responsible development of Canadian energy resources, CAPP members are dedicated to a balanced approach – advancing environmental protection, economic growth, including jobs for Canadians, and a secure and reliable energy supply.
It is important to remember that behind each of the nominated projects, programs, and innovations stands a group of motivated employees who have shown personal leadership and commitment to
the goal of true Stewardship. Without the individual motivation and personal responsibility, the projects proudly displayed here might never have come to be. We thank and honour them for their work and their high standards.
Canada’s oil and gas industry is dedicated to continuous improvement in our performance, an important part of which will be realized by the ongoing development of our Stewardship efforts.
tom huffaker vice President, Policy & Environment
mESSaGE
HEaltH & SafEtyEnvIronmEnt SoCIal
CaPP IS PlEaSEd to PrESEnt
the 2010 Steward of Excellence Award Nominees
HighlightsPerformance:• Results to date: 40 projects
submitted for evaluation; 23 projects approved; 6 complete projects
caPacity Building: • Two new technology “pilot projects”
are currently being explored for 2010 – using flare gas to generate electricity, and a natural gas separator that eliminates the use of glycol and fuel
Stakeholder relationS & rePutation: • The program contributes economic,
social and environmental benefits to local communities by hiring local contractors, demonstrating industry responsibility, and reducing pollution.
EnvIronmEnt
HighlightsPerformance:• Results to date: 40 projects
submitted for evaluation; 23 projects approved; 6 complete projects
caPacity Building: • Two new technology “pilot projects”
are currently being explored for 2010 – using flare gas to generate electricity, and a natural gas separator that eliminates the use of glycol and fuel
Stakeholder relationS & rePutation: • The program contributes economic,
social and environmental benefits to local communities by hiring local contractors, demonstrating industry responsibility, and reducing pollution.
ARC Resources ltd. has developed a process to treat, recycle, and reuse water used in the production of tight gas reserves, becoming the first operator to successfully apply water recycling to fracturing operations in northeast British Columbia.
This joint effort with Amperage Energy treats flow-back water on standards including H2S, acidity, salinity, total disolved solids, and bacteria. Project results include decreased demand on local water supply and reduced need for transportation and disposal of flow-back water.
The City of Dawson Creek and ARC are discussing the application of this technology to a municipal water recycling facility.
The Eco-Efficiency Program, launched in April 2009, focuses on funding energy efficiency projects and emerging technologies throughout ARC Resources ltd.’s operations. This includes projects that reduce greenhouse gas (GHG) emissions, reduce fuel and electricity consumption, and utilize wasted products, while maintaining reliability and maximum production.
Field operators are asked to submit projects based on the needs and operating conditions of their facilities. This promotes project ownership and helps avoid project implementation barriers like accountability, buy-in, and access to contractors.
frac-water recycling Program
HighlightsPerformance:• Successfully filtered flow-back
water on seven horizontal montney wells
• 1,384 m3 of water has been re-used to date
• 20 – 25 per cent savings on disposal, trucking, and fluid purchases
• Improved stakeholder relations
Eco-Efficiency Program
EnvIronmEnt
HighlightsPerformance:• To date: 40 projects submitted for
evaluation; 23 projects approved; 6 projects completed
• Cumulative reduction of 3,200 tonnes of Co2e
caPacity Building: • Two technology “pilot projects” being
explored for 2010 – using flare gas to generate electricity, and a natural gas separator that eliminates use of glycol and fuel
Stakeholder relationS & rePutation: • Contributes economic, social,
and environmental benefits to local communities by hiring local contractors, demonstrating responsibility, and reducing pollution
In 2009, Canadian natural implemented a leading edge bird deterrent system. Evaluation to date has proved the system has been 97.5 per cent effective in detecting birds that enter the area and no bird flocks have landed on the company’s tailings ponds.
The system employs a radar detection system, long Range Acoustic Devices (lRAD), and lasers in addition to conventional scare methods such as propane canons, scarecrows, air horns, and hazing. The system was developed under the leadership of senior management with the target of zero impacts to wildlife.
Bird deterrent Innovationthe noel Project: responsible resource development
BP Canada Energy Company has significantly reduced the environmental impacts of a project in the noel area of British Columbia.
The project’s reductions can be broken down into two categories: carbon and ecological. Carbon reductions involved a near-zero emissions well site design using solar energy and electrifying compressors where 84 per cent of the power is hydro-generated. Ecological reductions included reducing the number of wells and pipelines, drilling multiple wells on a single lease site, and use of a water storage system collecting spring-run off and drawing from underground aquifers.
EnvIronmEnt
HighlightsPerformance:• Carbon footprint reduction of
85 per cent
• Land use reduction of 2,300 hectares
• Water use reduced to 0.03 per cent of annual watershed flow
• Number of well pads reduced by 85 per cent from 592 to 85
innoVation: • Near-zero emission well site design
• Long reach horizontal well drilling and completion technology
• Sophisticated water storage system
• Fully automated well sites
HighlightsPerformance:• Promotes project ownership through
the development of a diverse and integrated team with a shared goal of zero impact
• Detection of 97.5 per cent of birds and zero bird flock landings
• Effective nighttime use of lasers that scatter light across the ponds deterring birds from landing
caPacity Building: • Encourages collaboration of
environment staff and system operators and increased operational awareness
• Best practices shared with other companies
In Senlac Saskatchewan, Canadian natural proposed a drilling program to access oil in the Cummings Dina Formation, partially located on Wildlife Habitat Protection Act (WHPA) protected land. Several field visits were conducted including an independent inspection by ministry of Environment Personnel. Since the project required the drilling of large well pads that exceeded regulation, an Environment Protection Plan was submitted for approval in September 2009. Cooperation between the project team resulted in a high level of environmental protection and Canadian natural received approval to proceed with drilling.
Cenovus Energy Inc. recognized the opportunity to improve energy efficiency and reduce emissions, and also identified the challenge of economic and conventional project hurdles. The Energy Efficiency in operations program was designed to provide access to funding for energy-efficiency projects.
In addition, the program encourages staff involvement by making company business units responsible for project initiation. Business units are allowed to commit capital to approved projects without penalty on budget results. Energy efficiency improvements are then reported to enhance departmental performance.
Photo 2: Important wildlife movement corridor avoided by project (note moose shed).
Photo 1: Looking west towards hill supporting 16-10-40-26 W3M lease.
HighlightsPerformance:• To date, more than 397 MMCF of
natural gas has been conserved
• Reduction of over 46,300 tonnes of Co2e emissions in 2009
• Energy efficiency improvements enhance overall performance measures of business unit.
Stakeholder relationS & rePutation: • Fund created to support research
and development of energy efficient equipment
• Information shared with industry representatives to increase project implementation rate, reduce emissions performance improvement, and foster industry cooperation
EnvIronmEnt
HighlightsPerformance:• Incorporated a six month field
assessment program to ensure pertinent and valid information
• Mitigation strategies employed to reduce environmental impact
• Estimated up to 30 per cent of the lease area disturbed will be reclaimed in summer 2010
Stakeholder relationS & rePutation: • Open invitation extended to
regulators to visit the project site at any stage
• Staff worked closely with all stakeholders to maintain transparency
Senlac multi-well Pad drilling Energy Efficiency in operations
Five oil sands companies are working with a local forestry company (AlPac) on the implementation of an accelerated reclamation program in the Athabasca region of Alberta. The ultimate goal of the program is to speed up the reforestation of oil sands exploration sites. These sites have traditionally been reclaimed using government standardized “natural restoration” or “native grass” methods.
The program involves planting living tree seedlings, allowing the natural process to be shortened and tree re-growth to occur sooner. The program will be expanded in the future to focus on opportunities for local contractors, rehabilitating wildlife habitat, and working with local Aboriginal groups to improve the reclaimed land’s traditional value.
ConocoPhillips’ Western Canada Gas Group (WCG) has implemented a program to improve efficiency and reduce emissions in our operations. A key focus area has been to help develop reliable, robust and economically viable small-scale technologies that can be widely applied as standard designs across the upstream oil and gas industry. Staff across the company are committed to the program and use internal tools to track successes, share knowledge, and develop best practices. To date, 250 projects have been completed.
Energy Efficiency and Emissions reduction Program
HighlightsPerformance:• Emissions reduction of 95,000
tonnes of Co2e to date
• Fifteen new technologies have been evaluated for use and seven of these have been tested at field sites
• WCGreen, an internal newsletter used to communicate upstream environmental activities and issues
Stakeholder relationS & rePutation: • ConocoPhillips works closely with
industry partners and local vendors to assist in testing and development of new technology
aggressive reclamation
EnvIronmEnt
HighlightsPerformance:• Approximately 180,000 seedlings
planted in Fort mcmurray region on old seismic areas and unrealized oil leases
• Leases are converted back to their natural state faster than traditional reclamation
caPacity Building: • Encourages collaboration of oil
sands companies to re-establish the land and leverage restoration best practices to create healthy forests
Stakeholder relationS & rePutation: • Program will expand to create work
opportunities for local Aboriginal contractors
ConocoPhillips Canada has used innovative solutions to reclaim a landfill in Turner valley.
In early 2008, reclamation of the site stopped due to odorous compounds generating concern for nearby communities. After shutting down the site, ConocoPhillips developed a strategy to remove the soils without creating off-site issues. With no commercial solution available, the company’s reclamation team developed an odour containment and treatment system to contain the smells. odours were captured and treated without affecting the residents of the town. The project was completed successfully within two months.
Devon has minimized environmental disturbance by reducing the width of access roads in forested areas as much as 50 per cent. Waste wood is then turned in to mulch and used for road construction instead of being burned. The technique was developed to reduce the permanent environmental impact of traditional roads. Construction and reclamation costs are also reduced. once the road is no longer required, the mulch is collected and reused on another project.
Devon is a founding member of the Evergreen Centre for Resource Excellence and Innovation to promote minimal disturbance techniques.
minimal disturbance techniques
HighlightsinnoVation:• Operation time extended by three
to four weeks through frost retention
• Heavy equipment weighing over 100,000 pounds can drive safely over the mulch
Performance: • Piloted successfully on conventional
lease sites and in the oil sands
• Conserves plant and wildlife habitat and doesn’t introduce new species
Stakeholder relationS & rePutation: • Demonstrating technique to other
companies, stakeholders, and government
turner valley landfill reclamation
EnvIronmEnt
HighlightsPerformance:
• The project was completed with no safety incidents
• Approximately 15,000 tonnes of impacted soil and materials were removed and transported to a licensed waste management facility
Stakeholder relationS & rePutation: • The approach was so successful
that a local environmental activist contacted the town’s paper to compliment the work.
Devon has developed a comprehensive integrity management plan to reduce the incidences of pipeline failures in the Swan Hills area. The company’s interest in this area includes more than 600 pipelines, some of which date back to the 1960’s. Pipeline failures were becoming more frequent and, after extensive research, the company developed a remediation plan for the area.
Created through a prioritization matrix, the plan accounts for inspections and replacements, and makes provisions for strategy validations, and ongoing risk assessment and monitoring. By the end of 2009, Devon’s pipeline failures in the area had dropped to less than half from the year before. The company expects this number to continue declining over the next few years as the management plan evolves.
In an effort to reduce flaring in EnCana’s Greater Sierra development program, the company developed a new underbalanced drilling technology that uses natural gas.
The technique enables the recovery of produced gas that is directed back to the pipeline rather than flaring it, converts boilers on site to use natural gas instead of diesel fuel, and converts diesel engines on the rig and drilling equipment to run on a bi-fuel system. This system substitutes up to 70 per cent of the energy requirement with natural gas, reducing EnCana’s overall emissions.
Underbalanced drilling with natural Gas
HighlightsPerformance:• To date, 39,800 tonnes of CO2
emissions avoided in 2009
• Approximately 741MMscf of natural gas conserved during drilling of first 33 wells in 2009
Stakeholder relationS & rePutation: • Collaboration with a service provider,
Weatherford, developed the process for drilling with a focus on safety
• Pipeline corrosion mitigation strategy designed by EnCana’s Pipeline Integrity group
EnvIronmEnt
HighlightsPerformance:• Failure rates of company-maintained
pipelines in Swan Hills area reduced by half in 2009 compared to previous years
• Compilation and review of detailed ground disturbance plans allowed the company to complete over 220 excavations with zero recordable line hits
caPacity Building: • Plan is adaptable to change
• AccuMap file shares information
• Concept is transferable to other areas
innoVation: • Management plan using prioritization
matrix allows for continual input and adaptability
Pipeline Integrity: a new Plan for an old asset
Suncor has initiated a technology to assist in the timely recovery of their mine site tailings ponds in northern Alberta, by rapidly converting fine tailings into a solid landscape suitable for use in reclamation.
mixing mature fine tailings with polymer flocculent yields a dry material that is capable of being reclaimed in place or moved to another location. The drying process occurs over a matter of weeks instead of years, and will improve tailings management. Tailings reduction operations have been successfully implemented in a series of increasingly large pilot programs in Suncor’s oil sands since 2003.
Talisman Energy Inc. recently commissioned a Waste Heat Recovery Unit (WHRU) at its Bigstone natural gas plant. The WHRU project was implemented by the company’s production operations team in Edson, Alberta and has been successful in reducing fuel gas consumption and GHG emissions.
The purpose of the WHRU is to recover and reuse the waste heat from one of the plant’s gas turbine compressor exhausts to heat two separate process fluids: glycol for utility heating and hot oil for gas processing. To date, the WHRU has been performing with zero downtime.
HighlightsPerformance:• Fuel gas consumption savings
of 0.3 mmCF per day, a fifteen per cent reduction
• Potential reduction of 5,900 tonnes of GHG emissions per year
• Cost savings of approximately $500,000 per year
caPacity Building:• Talisman currently looking at
applying technology to other compressor units
EnvIronmEnt
HighlightsPerformance:• Project will significantly reduce
need to build more tailings ponds and accelerate reclamation
• Pending regulatory approvals, Suncor will apply Tailings Reduction operations to an area of approximately 180 km2
Stakeholder relationS & rePutation: • Consultion with stakeholders such
as the Fort mcKay First nation before proceeding with the process
• Company hopes to influence other oil sands developers to adopt the technology
waste Heat recovery tailings reduction operations
While planning remediation and reclamation of native prairie under oil and gas leases, Cenovus Energy Inc. discovered an issue related to the historical application of an industrial residual soil sterilant called tebuthiuron. Detrimental concentrations of this chemical prevented vegetation growth on some leases.
To overcome this problem, Cenovus developed standards that were protective of native plant species and used a unique method to separate the sterilant from the soil using heat. Approximately 15,000 tonnes of sterilant affected soil has been successfully treated to date.
The Horn River Basin Producers Group has been created as a joint initiative to responsibly develop a shale gas play in British Columbia. The group involves 11 companies that collaborate to facilitate open communication in the region by collectively understanding stakeholder and First nation concerns, minimizing environmental impacts, and maximizing benefits to the region.
Through education and awareness, the group has helped to support economic development and employment in the area. Consultation on proposed operations will ensure development is done in a responsible manner.
Horn river Basin Producers Group
HighlightsStakeholder relationS & rePutation:• Effective and efficient consultation a
key driver in the creation of the group
• Pro-actively engages with community through events. Activities include presentations to the Fort nelson Chamber of Commerce and at community forums to ensure stakeholder concerns are heard and development plans shared
caPacity Building: • Held Energy Expos for past two
years to share career opportunities and business networking
• Partnered with Energy Services BC to provide funding for local procurement specialist
EnvIronmEnt
HighlightsPerformance:• To date, 15,000 tonnes of sterilant
affected soil has been treated
innoVation:• Pioneered a unique application of
thermal treatment technology
• A new laboratory method (provided by Access Analytical laboratories Inc.) used to detect lower concentrations than current lab methods
native Prairie Grassland reclamation
SoCIal
In 2009, after two years of participating in a community clean-up program, staff at ARC Resources ltd’s Drayton valley office developed the Clean Sweep program to create a cleaner, safer, working environment and a sense of pride in community work. The program involved company volunteers cleaning ARC leases over two days in may and June.
Efforts were recognized by the community with the mayor presenting the company with the City’s Stewardship award. Staff has made a long-term commitment and are planning to extend efforts to cleaning once a month during the summer.
ConocoPhillips Canada has worked with Thrive! Canada to create a youth development program. Gen Y: We Care equips stakeholder communities in northeastern Alberta, many of which are Aboriginal, with the framework and tools to empower their children and youth.
Through components such as self esteem training, self defense, and traditional healing, the program provides long-term and consistent best practices in engaging youth. A Community Champions network has also been established providing a gathering opportunity for all leaders and agencies in the communities.
Gen y: we Care – youth Empowering Program
HighlightsStakeholder relationS & rePutation: • Multiple training sessions held with
70 participants receiving in-depth training on assets of the program
• Community Champions Network provides gathering opportunity for all leaders and agencies in the community
leaderShiP & commitment:• Program developed to be applied
universally to youth development in all local communities
HighlightsPerformance:• Staff collected 35 pick-up trucks
full of trash
Stakeholder relationS & rePutation: • Incorporated team building exercises,
allowing staff to come together and develop working relationships on a regular basis
• Received Drayton Valley’s “Stewardship” award for promoting responsible business operations in the community
leaderShiP & commitment:• Program sets a standard for industry
operators in the Drayton valley area
SoCIal
Clean Sweep: Community Clean-Up Program
EnCana’s Water Stewardship program began in 2008 as a means of establishing water management initiatives by partnering with government and not-for-profit organizations. The program’s key focus was to deliver water education to employees and to provide resources to educators in Alberta and British Columbia.
In 2009, EnCana expanded their program to provide funding to advanced water education and research, and share knowledge with industry and other organizations. EnCana has continued to educate employees on everyday decisions that impact water in their operations.
over the last few years, Imperial oil received feedback from Cold Lake area residents on three areas of concern: light pollution, venting emissions, and noise pollution. The company worked collaboratively with the community to choose effective strategies to solve each concern.
By late 2009, 11 field operations vehicles were fitted with external lighting, allowing main lighting sources to be turned off at 95 per cent of field pads. Fugitive emissions detection technology and venting capture and control equipment reduced venting by 40 per cent. minimizing use of air horns and implementing noise mitigation equipment has reduced site noise.
you Spoke, we listened
HighlightsPerformance:• To date, electricity consumption
reduced by approximately 1,855,000 kWh, equivalent to approximately 1,800 tonnes of greenhouse gas emissions (based on Alberta Grid Average)
• Venting reduced by approximately 40 per cent, from 107 km3 since 2007 to 63 km3 in 2009
• Created oil sands verification (OV) rig noise model to proactively predict noise contours
Stakeholder relationS & rePutation: • Imperial Oil’s Neighbour Night Open
House and other feedback sessions allow for regular stakeholder engagement and increased understanding
water Stewardship
HighlightsStakeholder relationS & rePutation: • Company participates in Watershed
Planning and Advisory Counsel
• Extensive funding directed to several water stewardship projects and partnerships
Performance• Conference partner and presenter
to over 120 participants at WatersEd West Conference
• Collaborated with Ducks Unlimited Canada to deliver Project Webfoot, an education initiative that targets students in Alberta and British Columbia
• Strong internal staff education component added to program to ensure staff best practices
SoCIal
In 2009, Penn West Energy Trust ran 10 innovative, multi-stakeholder major Emergency Response Exercises across Western Canada. The exercises were modeled after the company’s Emergency Response Plan (ERP) Advisory and a 2007 Conference Board of Canada report on security and public safety. The ERP Advisory Committee is dedicated to organizing Emergency Response exercises which include personnel from Health and Safety, Regulatory Affairs, Community Relations, and operations.
This initiative assisted in identifying key stakeholder learnings, building relationships in the community, and increasing rapport and confidence with municipalities and other stakeholders.
Penn West Energy created a new Community Investment Program that shifts from a reactive approach to one that ties clear investment guidelines to strategic corporate goals.
Creating a culture that focuses on philanthropy, Penn West has worked with numerous partners including the Calgary Stampede’s Indian Village and hosting a field trip for Alberta 4-H to the Canadian Petroleum Discovery Centre. The program has also encouraged employees to increase donations and become engaged in volunteer activities, resulting in strengthened relationships within the company and in outreach efforts to the community.
Community Investment Program
HighlightsPerformance:• Increased participation in United
Way Campaign by 89 percent over 2008. Penn West received “Quantum Leap” award at United Way Spirits of Gold Awards
• Increased contributions to the Match and Magnify Program (employee matching) by 64 per cent
Stakeholder relationS & rePutation:• Employees volunteering in
communities and shaping corporate culture
leaderShiP & commitment:• Incorporating on-line system for
ease-of-use for both employees and community members to access funding
Catalyst for Collaboration
HighlightsStakeholder relationS & rePutation: • The 10 exercises were attended by
340 personnel; this included local fire fighters, EmS, and police officers
• Municipalities and provincial agencies requested additional training from Penn West
leaderShiP & commitment: • Two ERP program audits and
14 major Emergency Response exercises are planned for 2010
SoCIal
As part of its community engagement activities in the Horn River Basin, Quicksilver Resources Canada Inc. partnered with Acho Dene Koe First nations, employing four sawmill operators to assist in clearing operation areas of timber. Instead of burning the timber, it was used to repair or build approximately 70 trapper cabins in the area.
Remaining timber was trucked to Trans north Timber. This local Fort nelson company employed three to four workers for two months to build over 200 rig mats, which were in turn purchased by Quicksilver Resources Canada Inc. to be used in its operations.
Syncrude Canada ltd. and the Fort mcKay Group of Companies host a bi-annual Bison Harvest at the Fort mcKay First nation, with animals from the Beaver Creek Wood Bison Ranch. The harvest started in 2006 as a way to revive tradition and provide meat to members of the Fort mcKay First nation.
overseen by the Fort mcKay Elders, the harvest has evolved into events of great cultural significance and is used by educators to teach the community’s children about historical traditions. Syncrude is expanding the harvests into other Aboriginal communities in 2010.
HighlightsleaderShiP & commitment:• Reclaimed land used for Beaver
Creek Wood Bison Ranch as advised by Fort mcKay First nation
• Ranch operates as a joint venture with a herd of 300 purebred bison
Stakeholder relationS & rePutation: • Syncrude supported staff at Fort
mcKay School to develop curriculum in 2010 about wood bison harvests
• Between 2000 and 3000 pounds of bison meat distributed during each harvest
HighlightsleaderShiP & commitment:• Encouraged the use of local material
and reduced the burning of timber
Stakeholder relationS & rePutation: • Fostered positive relationships with
First nations community members
• Increased short-term employment for First nations and other local stakeholders
• Avoided additional timber harvests for future cabin repairs
SoCIal
Community Bison Harvesttimber Utilization Program
Talisman created the Good neighbour Program as a way to manage the social impacts of operations. These impacts can include increased traffic and road use, dust, noise, and lease maintenance issues.
The program outlines Talisman’s commitment to local communities to proactively address the key impacts of operations. The program is a field-driven initiative that shares ownership between staff located in the field and those in Calgary. Initiatives associated with establishing the program include drafting of key commitments, primary research of stakeholders, development and distribution of a program brochure, and a toll-free phone number that community members can use to report operational concerns.
In 2009, BP successfully completed a 3D seismic program in the Beaufort Sea. Despite significant challenges of the Arctic environment, including ice-covered waters and sensitive ecosystems, the project was accomplished with no injuries and no environmental damage.
Contributing to project success included hiring a team of experts, using a modern seismic vessel, assembling a real-time ice monitoring system, and securing a dedicated Search and Rescue (SAR) helicopter that was continually on stand-by. The project team also committed to fostering a culture where health, safety, and environment were top priorities.
Pokak 3d Seismic Program
HighlightsPerformance:• Over 1500 km2 of seismic data
and 1400 km of 2D seismic data acquired
• Comprehensive marine seismic hazard identification workshop held with contractors and subcontractors
leaderShiP & commitment• Search and Rescue (SAR) helicopter
on stand-by throughout project duration and used once to transport ill crew member to hospital in Inuvik for treatment
Stakeholder relationS & rePutation:• Partnerships formed with agencies,
including Fisheries and oceans Canada, to share data
HighlightsPerformance:• Stakeholder calls tracked and
monthly reports received, detailing orientation and concerns of each call
• Program success defined by ability to address all concerns received
Stakeholder relationS & rePutation: • Contributes to positive relationships
by outlining clear expectations of behaviour from the company
• Key stakeholders had input in development stages of program through participation in surveys and providing feedback
SoCIal
Good neighbour Program
HEaltH & SafEty
In early 2009, ConocoPhillips Canada initiated a program to improve safety performance. At year-end the company’s Western Canada Gas Drilling Team achieved significant objectives including a 61 per cent reduction in its Total Recordable Injury Rate.
The program, developed by safety management expert, Dr. Bruce Staley, is based on active leadership in the workplace and reinforcing expected behaviors. Program initiatives included training frontline leaders on having “high impact” safety conversations with their teams, enhancing the role of field safety coaches, and demonstrating leadership support through training session videos.
HighlightsPerformance:• 61 per cent reduction in Total
Recordable Injury Rate (WCG drilling team)
• Overall safety performance improved by 24 per cent over 2008
• To date, over 240 managers and front line supervisors trained
caPacity Building: • Dr. Staley brought in to speak
to 150 of ConocoPhillips’ major service providers
• ASA knowledge shared across the company’s world-wide business units
• Safety the first topic in all meetings
leaderShiP & commitment: • Year round leadership presence in
the field
HEaltH & SafEty
advanced Safety auditing
After months of planning in 2009, ConocoPhillips Canada shut down their Surmont site for a complete maintenance turnaround.
The 16-day cycle involved over 400 employees and contractors and over 80,000 work hours to complete. The result was a successful turnaround that accomplished the full scope and was completed on time. ConocoPhillips Canada attributes much of their success to their “extreme open door” policy – a standing commitment to effective, transparent communication. Also critical to the success, is the company’s contractor selection policy, which hires contractors whose health and safety policies parallel their own.
HighlightsPerformance:• Total Recordable Injury Rate of
0.75 for 2009
• Contractors’ downtime used to complete additional safety training
• Leadership participated in contractors’ safety meetings during every shift
• External turnaround expert brought on board to allow personnel to focus on turnaround preparation
Stakeholder relationS & rePutation:• Assisted in turnaround of another
ConocoPhilips Canada facility by inviting them to observe Surmont turnaround
Surmont turnaround
In the upstream oil and gas industry, competency of employees and site supervisors play a key role in safe operations, productivity, and environmen tal protection. To build workforce skills, Penn West has committed to building an effective training and competency system. The company understands that the key to success is building the skills and leader ship of site supervisors and through Site Super visor Competency initiatives.
Penn West has evolved their training and competency system since 2005. By 2009, the company developed their program into one of the most in tegrated systems in the industry.
HEaltH & SafEty
Building a Competent workforce
HighlightsPerformance:• Demonstrated increased competency
of production operators
• In 2009, 12,795 competency assessments were conducted with 729 operators
• Gained sup port for the Site Supervisor Competency assessment
program from Penn West’s leadership
Stakeholder relationS & rePutation• Plans to share system with others to
protect workers and benefit industry
In an effort to decrease work related injuries, Shell’s leadership Team implemented the 12 life-Saving Rules in 2009. Shell identified the 12 most high-risk situations at work and created rules to help employees and contractors improve safety compliance.
leaders incorporated the rules into Shell’s culture through employee training and enforcement. The rules have encouraged employees to hold each other accountable for personal safety and the safety of others. Since program inception, the number of lost Time Incidents (lTI) and Total Recordable Case Frequency (TRCF) has been dramatically reduced.
HighlightsPerformance:• Athabasca Oil Sands Project (AOSP)
Expansion 1 surpassed 40 million hours without an lTI
• Groundbirch Venture improved safety performance by 40 per cent in one year
• TRCF improved from 3.57 reported cases per million hours, to 2.79 in 2009
caPacity Building: • Trained all employees and 2,000
contracting companies
• Reminder card is attached to every employee’s I.D.
• Ongoing safety sessions with contracting companies to solicit feedback and discuss performance
the 12 life-Saving rules
The Buddy manager Program began in november 2007, as an initiative to improve the safety of contractors. Syncrude executives and senior managers were partnered with contractors to improve overall safety performance.
Syncrude provides monthly reports for every contractor in the program that outline the number of paired observations by the buddy managers, voICE cards filed by employees (highlighting potential safety risks or commending safe behaviour), near-miss incidents, and injuries suffered. The program has successfully reduced the Total Recordable Injury Rate by half from 2008 to 2009.
HEaltH & SafEty
Buddy manager Program
HighlightsPerformance:• Contractors with poor safety
performance required to come up with safety strategies
• Buddy Managers provide access to safety-related resources
• To date, Total Recordable Injury Rate for contractors reduced from 0.67 in 2008 to 0.37 in 2009
innoVation:• Shifted the status quo on Syncrude’s
relationships with contractors
Stakeholder relationS & rePutation: • Holding management, supervisors,
staff, contractors and sub-contractors accountable ensures total compliance with the rules
The Canadian Association of Petroleum Producers (CAPP) represents companies, large and small, that explore for, develop and produce natural gas and crude oil throughout Canada. CAPP’s member companies produce about 90 per cent of Canada’s natural gas and crude oil. CAPP’s associate members provide a wide range of services that support the upstream crude oil and natural gas industry. Together CAPP’s members and associate members are an important part of a $110-billion-a-year national industry that provides essential energy products.
2100, 350 – 7th Avenue S.W. Calgary, Alberta Canada T2P 3n9
403, 235 Water Street St. John’s, newfoundland & labrador
Canada A1C 1B6
www.capp.ca Printed copies of this booklet are available upon request, while supplies last. An electronic version is available for wide distribution at www.capp.ca. For more information contact [email protected]
march 2010 2010-0011