A-1 Western Area Power Administration Sierra Nevada Region 2011 Annual Ten-Year Transmission Plan Assessment Report Report Attachment 4 NERC Planning Standard TPL-002 November 11, 2011 For information or questions regarding this Transmission Assessment Report, please contact Larry Tobias via (916) 353-4766 or email at [email protected]

Upload: others

Post on 23-May-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 2011 WAPA SNR Study Report Attachment4- - OATI€¦ · 2011 Annual Ten-Year Transmission Plan Assessment Report Report Attachment 4 NERC Planning Standard TPL-002 November 11, 2011

A-1

Western Area Power Administration Sierra Nevada Region

2011 Annual Ten-Year Transmission Plan Assessment

Report

Report Attachment 4 NERC Planning Standard TPL-002

November 11, 2011

For information or questions regarding this Transmission Assessment Report, please contact Larry Tobias via (916) 353-4766 or email at [email protected]

Page 2: 2011 WAPA SNR Study Report Attachment4- - OATI€¦ · 2011 Annual Ten-Year Transmission Plan Assessment Report Report Attachment 4 NERC Planning Standard TPL-002 November 11, 2011

A-2

Attachment 4: Category B (NERC Planning Standard TPL-002): Single Element Outage, (N-1) Includes Power Flow, Post-Transient and Dynamic Stability Plots)

Page 3: 2011 WAPA SNR Study Report Attachment4- - OATI€¦ · 2011 Annual Ten-Year Transmission Plan Assessment Report Report Attachment 4 NERC Planning Standard TPL-002 November 11, 2011

A-3

Figure 4-1 2012 Summer Peak One Shasta-Cottonwood 230 kV Line Outage

One Shasta Bus

Page 4: 2011 WAPA SNR Study Report Attachment4- - OATI€¦ · 2011 Annual Ten-Year Transmission Plan Assessment Report Report Attachment 4 NERC Planning Standard TPL-002 November 11, 2011

A-4

Figure 4-2 2012 Summer Peak One Shasta-Cottonwood 230 kV Line Outage Split Shasta Bus

Page 5: 2011 WAPA SNR Study Report Attachment4- - OATI€¦ · 2011 Annual Ten-Year Transmission Plan Assessment Report Report Attachment 4 NERC Planning Standard TPL-002 November 11, 2011

A-5

Figure 4-3 2012 Summer Peak One Shasta-Flanagan 230 kV Line Outage One Shasta Bus – Normal Rating

Page 6: 2011 WAPA SNR Study Report Attachment4- - OATI€¦ · 2011 Annual Ten-Year Transmission Plan Assessment Report Report Attachment 4 NERC Planning Standard TPL-002 November 11, 2011

A-6

Figure 4-4 2012 Summer Peak One Shasta-Flanagan 230 kV Line Outage

One Shasta Bus – Emergency Rating

Page 7: 2011 WAPA SNR Study Report Attachment4- - OATI€¦ · 2011 Annual Ten-Year Transmission Plan Assessment Report Report Attachment 4 NERC Planning Standard TPL-002 November 11, 2011

A-7

Figure 4-5 2012 Summer Peak One Shasta-Flanagan 230 kV Line Outage

One Shasta Bus – Cottonwood Jumpers Replaced – Normal Rating

Page 8: 2011 WAPA SNR Study Report Attachment4- - OATI€¦ · 2011 Annual Ten-Year Transmission Plan Assessment Report Report Attachment 4 NERC Planning Standard TPL-002 November 11, 2011

A-8

Figure 4-6 2012 Summer Peak Captain Jack-Olinda 500 kV Outage

Max. Northern Calif. Hydro Gen

Page 9: 2011 WAPA SNR Study Report Attachment4- - OATI€¦ · 2011 Annual Ten-Year Transmission Plan Assessment Report Report Attachment 4 NERC Planning Standard TPL-002 November 11, 2011

A-9

Figure 4-7 2012 Summer Peak Captain Jack-Olinda 500 kV Outage

70% Northern Calif. Hydro Gen

Page 10: 2011 WAPA SNR Study Report Attachment4- - OATI€¦ · 2011 Annual Ten-Year Transmission Plan Assessment Report Report Attachment 4 NERC Planning Standard TPL-002 November 11, 2011

A-10

Figure 4-8 2012 Summer Peak Sutter Power Plant out – B1 Outage

Page 11: 2011 WAPA SNR Study Report Attachment4- - OATI€¦ · 2011 Annual Ten-Year Transmission Plan Assessment Report Report Attachment 4 NERC Planning Standard TPL-002 November 11, 2011

A-11

Figure 4-9 2012 Summer Peak Keswick-Olinda 230 kV out – B2 Outage

Page 12: 2011 WAPA SNR Study Report Attachment4- - OATI€¦ · 2011 Annual Ten-Year Transmission Plan Assessment Report Report Attachment 4 NERC Planning Standard TPL-002 November 11, 2011

A-12

Figure 4-10 2012 Summer Peak Tracy 500/230 kV Bank out – B3 Outage

Page 13: 2011 WAPA SNR Study Report Attachment4- - OATI€¦ · 2011 Annual Ten-Year Transmission Plan Assessment Report Report Attachment 4 NERC Planning Standard TPL-002 November 11, 2011

A-13

Figure 4-11 2016-17 Winter Peak Sutter PP out – B1 Outage

Page 14: 2011 WAPA SNR Study Report Attachment4- - OATI€¦ · 2011 Annual Ten-Year Transmission Plan Assessment Report Report Attachment 4 NERC Planning Standard TPL-002 November 11, 2011

A-14

Figure 4-12 2016-17 Winter Peak Keswick-O’Banion 230 kV B2 Outage

Page 15: 2011 WAPA SNR Study Report Attachment4- - OATI€¦ · 2011 Annual Ten-Year Transmission Plan Assessment Report Report Attachment 4 NERC Planning Standard TPL-002 November 11, 2011

A-15

Figure 4-13 2016-17 Winter Peak Tracy 500/230 kV Bank B3 Outage

Page 16: 2011 WAPA SNR Study Report Attachment4- - OATI€¦ · 2011 Annual Ten-Year Transmission Plan Assessment Report Report Attachment 4 NERC Planning Standard TPL-002 November 11, 2011

A-16

Figure 4-14 2016 Summer Peak Sutter PP Unit Outage B1 Outage

0.8

0.85

0.9

0.95

1

1.05

‐600 ‐500 ‐400 ‐300 ‐200 ‐100 0 100

2016 Summer PeakElverta 230 kV Bus Voltage ‐ Sutter PP Outage

Elverta 230 kV Bus Voltage ‐ Sutter PP Outage

Page 17: 2011 WAPA SNR Study Report Attachment4- - OATI€¦ · 2011 Annual Ten-Year Transmission Plan Assessment Report Report Attachment 4 NERC Planning Standard TPL-002 November 11, 2011

A-17

Figure 4-15 2016 Summer Peak Keswick_O’Banion 230 kV line Outage – B2 Outage

0.82

0.84

0.86

0.88

0.9

0.92

0.94

0.96

0.98

1

1.02

‐600 ‐500 ‐400 ‐300 ‐200 ‐100 0

2016 Summer Peak Keswick‐O'Banion 230 kV Line Outage

2016 Summer Peak Keswick‐O'Banion 230 kV Outage

Page 18: 2011 WAPA SNR Study Report Attachment4- - OATI€¦ · 2011 Annual Ten-Year Transmission Plan Assessment Report Report Attachment 4 NERC Planning Standard TPL-002 November 11, 2011

A-18

Figure 4-16 2016 Summer Peak Tracy 500/230 kV Transformer bank Outage – B3 Outage

0.8

0.85

0.9

0.95

1

1.05

‐700 ‐600 ‐500 ‐400 ‐300 ‐200 ‐100 0

2016 Summer PeakElverta 230 kV Bus Voltage ‐ Tracy 500/230 kV Bank Outage

Elverta 230 kV Bus Voltage ‐ Tracy 500/230 kV Bank Outage

Page 19: 2011 WAPA SNR Study Report Attachment4- - OATI€¦ · 2011 Annual Ten-Year Transmission Plan Assessment Report Report Attachment 4 NERC Planning Standard TPL-002 November 11, 2011

A-19

Figure 4-17 2021 Summer Peak Sutter PP Unit Outage B1 Outage

0.85

0.86

0.87

0.88

0.89

0.9

0.91

0.92

0.93

0.94

0.95

0.96

‐80 ‐70 ‐60 ‐50 ‐40 ‐30 ‐20 ‐10 0

2021 Summer PeakElverta 230 kV Bus Voltage ‐ Sutter PP Outage

Elverta 230 kV Bus Voltage ‐Sutter PP Outage

Page 20: 2011 WAPA SNR Study Report Attachment4- - OATI€¦ · 2011 Annual Ten-Year Transmission Plan Assessment Report Report Attachment 4 NERC Planning Standard TPL-002 November 11, 2011

A-20

Figure 4-18 2021 Summer Peak Keswick_O’Banion 230 kV line Outage – B2 Outage

0.84

0.86

0.88

0.9

0.92

0.94

0.96

0.98

‐180 ‐160 ‐140 ‐120 ‐100 ‐80 ‐60 ‐40 ‐20 0

2021 Summer PeakKeswick‐O'Banion 230 kV Line Outage

2021 Summer Peak Keswick‐O'Banion 230 kV Line Outage

Page 21: 2011 WAPA SNR Study Report Attachment4- - OATI€¦ · 2011 Annual Ten-Year Transmission Plan Assessment Report Report Attachment 4 NERC Planning Standard TPL-002 November 11, 2011

A-21

Figure 4-19 2021 Summer Peak Tracy 500/230 kV Transformer bank Outage – B3 Outage

0.84

0.86

0.88

0.9

0.92

0.94

0.96

0.98

1

‐250 ‐200 ‐150 ‐100 ‐50 0 50

2021 Summer PeakElverta 230 kV Bus Voltage Tracy 500/230 kV Bank Outage

2021 Summer Peak Elverta 230 kV Bus Voltage Tracy 500/230 kV Bank Outage

Page 22: 2011 WAPA SNR Study Report Attachment4- - OATI€¦ · 2011 Annual Ten-Year Transmission Plan Assessment Report Report Attachment 4 NERC Planning Standard TPL-002 November 11, 2011

A-22

Figure 4-20 2016 Light Autumn Sutter PP Unit Outage B1 Outage

0.6

0.7

0.8

0.9

1

1.1

‐1200 ‐1000 ‐800 ‐600 ‐400 ‐200 0 200

2016 Light Autumn Elverta 230 kV Voltage ‐ Sutter PP Unit Outage

2016 Light Autumn Elverta 230 kV Voltage ‐Sutter PP Unit Outage

Page 23: 2011 WAPA SNR Study Report Attachment4- - OATI€¦ · 2011 Annual Ten-Year Transmission Plan Assessment Report Report Attachment 4 NERC Planning Standard TPL-002 November 11, 2011

A-23

Figure 4-21 2016 Light Autumn Keswick-O’Banion 230 kV Line Outage B2 Outage

0.6

0.7

0.8

0.9

1

1.1

‐1400 ‐1200 ‐1000 ‐800 ‐600 ‐400 ‐200 0

2016 Light Autumn Keswick‐O'Banion 230 kV Line Outage

2016 Light Autumn Keswick‐O'Banion 230 kV Line Outage

Page 24: 2011 WAPA SNR Study Report Attachment4- - OATI€¦ · 2011 Annual Ten-Year Transmission Plan Assessment Report Report Attachment 4 NERC Planning Standard TPL-002 November 11, 2011

A-24

Figure 4-22 2016 Light Autumn Tracy 500/230 kV Bank Outage B3 Outage

0.6

0.7

0.8

0.9

1

1.1

‐1400 ‐1200 ‐1000 ‐800 ‐600 ‐400 ‐200 0

2016 Light Autumn Elverta 230 kV Bus Voltage Tracy 500/230 kV Bank Outage

2016 Light Autumn Elverta 230 kV Bus Voltage Tracy 500/230 kV …

Page 25: 2011 WAPA SNR Study Report Attachment4- - OATI€¦ · 2011 Annual Ten-Year Transmission Plan Assessment Report Report Attachment 4 NERC Planning Standard TPL-002 November 11, 2011

A-25

Figure 4-23 2016 Summer Peak Sutter PP Unit Outage B1 Outage

Page 26: 2011 WAPA SNR Study Report Attachment4- - OATI€¦ · 2011 Annual Ten-Year Transmission Plan Assessment Report Report Attachment 4 NERC Planning Standard TPL-002 November 11, 2011

A-26

Figure 4-24 2016 Summer Peak Keswick_O’Banion 230 kV line Outage – B2 Outage

Page 27: 2011 WAPA SNR Study Report Attachment4- - OATI€¦ · 2011 Annual Ten-Year Transmission Plan Assessment Report Report Attachment 4 NERC Planning Standard TPL-002 November 11, 2011

A-27

Figure 4-25 2016 Summer Peak Tracy 500/230 kV Transformer bank Outage – B3 Outage

Page 28: 2011 WAPA SNR Study Report Attachment4- - OATI€¦ · 2011 Annual Ten-Year Transmission Plan Assessment Report Report Attachment 4 NERC Planning Standard TPL-002 November 11, 2011

A-28

Figure 4-26 2021 Summer Peak Sutter PP Unit Outage B1 Outage

Page 29: 2011 WAPA SNR Study Report Attachment4- - OATI€¦ · 2011 Annual Ten-Year Transmission Plan Assessment Report Report Attachment 4 NERC Planning Standard TPL-002 November 11, 2011

A-29

Figure 4-27 2021 Summer Peak Keswick_O’Banion 230 kV line Outage – B2 Outage

Page 30: 2011 WAPA SNR Study Report Attachment4- - OATI€¦ · 2011 Annual Ten-Year Transmission Plan Assessment Report Report Attachment 4 NERC Planning Standard TPL-002 November 11, 2011

A-30

Figure 4-28 2021 Summer Peak Tracy 500/230 kV Transformer bank Outage – B3 Outage

Page 31: 2011 WAPA SNR Study Report Attachment4- - OATI€¦ · 2011 Annual Ten-Year Transmission Plan Assessment Report Report Attachment 4 NERC Planning Standard TPL-002 November 11, 2011

A-31

Figure 4-29 2016 Light Autumn Sutter PP Unit Outage B1 Outage

Page 32: 2011 WAPA SNR Study Report Attachment4- - OATI€¦ · 2011 Annual Ten-Year Transmission Plan Assessment Report Report Attachment 4 NERC Planning Standard TPL-002 November 11, 2011

A-32

Figure 4-30 2016 Light Autumn Keswick-O’Banion 230 kV Line Outage B2 Outage

Page 33: 2011 WAPA SNR Study Report Attachment4- - OATI€¦ · 2011 Annual Ten-Year Transmission Plan Assessment Report Report Attachment 4 NERC Planning Standard TPL-002 November 11, 2011

A-33

Figure 4-31 2016 Light Autumn Tracy 500/230 kV Transformer Bank Outage B3 Outage