2012 STGEC 2012 Southeastern Transportation Geotechnical Engineering Conference Design and Installation of Mi il F d ti f B id Geotechnical Engineering Conference Micropile Foundations for a Bridge in Karst Topography Prepared by: Jim Sheahan HDR Engineering, Inc. Chaz Weaver VDOT Aaron Zdinak HDR Engineering, Inc.

Upload: others

Post on 01-Sep-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 2012 Southeastern Transportation Geotechnical Engineering … STGEC... · 2017. 1. 24. · 2012 STGEC 2012 Southeastern Transportation Geotechnical Engineering Conference Design and

2012 STGEC

2012 Southeastern Transportation Geotechnical Engineering Conference

Design and Installation of Mi il F d ti f B id

Geotechnical Engineering Conference

Micropile Foundations for a Bridge in Karst Topography

Prepared by:Jim Sheahan HDR Engineering, Inc.Chaz Weaver VDOTAaron Zdinak HDR Engineering, Inc.

Page 2: 2012 Southeastern Transportation Geotechnical Engineering … STGEC... · 2017. 1. 24. · 2012 STGEC 2012 Southeastern Transportation Geotechnical Engineering Conference Design and

2012 STGEC

Presentation OverviewPresentation Overview• Project Location• KarstKarst• Geotechnical Explorations• Foundations Type Selection Considerations• Design and Construction Considerations

• Lateral Loading• LRFD• LRFD• Installation and Testing

• Construction and Observations• Load Testing• Concluding Comments

Page 3: 2012 Southeastern Transportation Geotechnical Engineering … STGEC... · 2017. 1. 24. · 2012 STGEC 2012 Southeastern Transportation Geotechnical Engineering Conference Design and

2012 STGEC

Route 340 Project Location/Geology MapRoute 340 Project Location/Geology Map

P j tProject

Page 4: 2012 Southeastern Transportation Geotechnical Engineering … STGEC... · 2017. 1. 24. · 2012 STGEC 2012 Southeastern Transportation Geotechnical Engineering Conference Design and

2012 STGEC

Page 5: 2012 Southeastern Transportation Geotechnical Engineering … STGEC... · 2017. 1. 24. · 2012 STGEC 2012 Southeastern Transportation Geotechnical Engineering Conference Design and

2012 STGEC

This is Karst !

Project Site GeologyProject Site Geology•Highly Soluble, Carbonate, Sedimentary Rocks(B k t G )(Beekmantown Group)

Page 6: 2012 Southeastern Transportation Geotechnical Engineering … STGEC... · 2017. 1. 24. · 2012 STGEC 2012 Southeastern Transportation Geotechnical Engineering Conference Design and

2012 STGEC

Boring Location PlanBoring Location Plan

Boring Location

Page 7: 2012 Southeastern Transportation Geotechnical Engineering … STGEC... · 2017. 1. 24. · 2012 STGEC 2012 Southeastern Transportation Geotechnical Engineering Conference Design and

2012 STGEC

B i L Ab t t ABoring Logs – Abutment A

630

610

620

90

610

600

590

580

560

570

Abutment AAbutment A

Page 8: 2012 Southeastern Transportation Geotechnical Engineering … STGEC... · 2017. 1. 24. · 2012 STGEC 2012 Southeastern Transportation Geotechnical Engineering Conference Design and

2012 STGEC

B i L Pi 2Boring Logs – Pier 2

610

620

590

600

610

590

580

570

560

550

530

540

Pier 2

Page 9: 2012 Southeastern Transportation Geotechnical Engineering … STGEC... · 2017. 1. 24. · 2012 STGEC 2012 Southeastern Transportation Geotechnical Engineering Conference Design and

2012 STGEC

B i L Ab t t BBoring Logs – Abutment B

650

630

640

600

620

610

590

580

570

560

550 Abutment BAbutment B

Page 10: 2012 Southeastern Transportation Geotechnical Engineering … STGEC... · 2017. 1. 24. · 2012 STGEC 2012 Southeastern Transportation Geotechnical Engineering Conference Design and

2012 STGEC

Foundation Type Selection ConsiderationsFoundation Type Selection Considerations

Variable Conditions (i.e.; erratic and intermittent ( ;quality of rock; soil layers and infilling; possible voids)

Verification of Support Conditions;Design for Axial Loads;Design for Lateral Loads;Settlement and Possible NSF at Abutment Fills

Driven Piles, Drilled Shafts and Micropiles ConsideredMicropiles Selected

Page 11: 2012 Southeastern Transportation Geotechnical Engineering … STGEC... · 2017. 1. 24. · 2012 STGEC 2012 Southeastern Transportation Geotechnical Engineering Conference Design and

2012 STGEC

Possible Applications of MicropilesPossible Applications of MicropilesRestricted Access/Headroom or A Remote Area;Support System Close to Existing Structure;Supplemental Support For An Existing Structure (e.g. Settlement Control);Difficult Ground Conditions (e g karstDifficult Ground Conditions (e.g., karst, mines, boulders, uncontrolled fill);Risk of Liquefaction From Pile Driving;Need To Minimize Vibration And/Or Noise;Need To Reduce Or Eliminate Spoil At Hazardous Or Contaminated SitesHazardous Or Contaminated SitesAs Alternate Deep Foundation Type, Especially Where Piles Penetrate Rock;p y ;Where Spread Footings Are Feasible but There Is Potential For Erosion or Scour Ref: FHWA-NHI-05-039

Page 12: 2012 Southeastern Transportation Geotechnical Engineering … STGEC... · 2017. 1. 24. · 2012 STGEC 2012 Southeastern Transportation Geotechnical Engineering Conference Design and

2012 STGEC

Micropiles in Karst

• FHWA-NHI-05-039 (Dec,2005)“Micropile Design and Construction”Micropile Design and Construction

AASHTO LRFD Bridge Design Specifications 4th Edition 2007Specifications 4th Edition, 2007, 2008 Interim Section 10.9;

Other Experiences and PublishedOther Experiences and Published Resources

Page 13: 2012 Southeastern Transportation Geotechnical Engineering … STGEC... · 2017. 1. 24. · 2012 STGEC 2012 Southeastern Transportation Geotechnical Engineering Conference Design and

2012 STGEC

Micropile Construction in Karst TerrainMicropile Construction in Karst Terrain•Drill cased hole through soil, boulders and voids;•Drill through full bond zone to verify conditions;•No open hole drilling – Drill casing through bond zone;

(Use rotary percussive, eccentric duplex method)

•Monitor drilling rates and use to verify bond zone;•Water testing and seal grouting.

(in highly broken/fractured rock or voided karstic rock)

Page 14: 2012 Southeastern Transportation Geotechnical Engineering … STGEC... · 2017. 1. 24. · 2012 STGEC 2012 Southeastern Transportation Geotechnical Engineering Conference Design and

2012 STGEC

Design and Construction ConsiderationsDesign and Construction Considerations

Bond Zone Design (Nominal & Factored Resistance)g ( )Provide Preliminary Micropile Design Structural Design of MicropilesDesign for NSF Loads at AbutmentsDesign for Possible Void (20' Unsupported Length)Specifications for Construction

Experience of Specialty Contractor and Personnel D illi M th dDrilling MethodsAllow Alternate Designs Installation Plan including MP DocumentationInstallation Plan including MP DocumentationLoad Testing (Verification and Proof Load Tests)

Page 15: 2012 Southeastern Transportation Geotechnical Engineering … STGEC... · 2017. 1. 24. · 2012 STGEC 2012 Southeastern Transportation Geotechnical Engineering Conference Design and

2012 STGEC

Mi il t Ab t tMicropiles at Abutments

Micropile Grouted Inside Vertical 16-inch ODMicropile Grouted Inside Vertical 16 inch OD Casings for Lateral Load Design

Page 16: 2012 Southeastern Transportation Geotechnical Engineering … STGEC... · 2017. 1. 24. · 2012 STGEC 2012 Southeastern Transportation Geotechnical Engineering Conference Design and

2012 STGEC

Alternate Micropile PositionsAlternate Micropile Positions,If Needed

Micropiles at Piersp

Page 17: 2012 Southeastern Transportation Geotechnical Engineering … STGEC... · 2017. 1. 24. · 2012 STGEC 2012 Southeastern Transportation Geotechnical Engineering Conference Design and

2012 STGEC

PiersAbutmentsN80 CasingCasing OD 7"x 0.453" Wall

N80 Grade

A

16" OD Ext Casing

A D

ABottom of Pile Cap

B

Bond Zone

BB

C

CasingPlunge Length 2'

Top of Competent Rock

7.75" Dia MinLBZ = 18'

C CC

Grout, fc = 5 ksi

Alternate Micropile Design D

Page 18: 2012 Southeastern Transportation Geotechnical Engineering … STGEC... · 2017. 1. 24. · 2012 STGEC 2012 Southeastern Transportation Geotechnical Engineering Conference Design and

2012 STGEC

Micropile Axial Load Design (LRFD)Micropile Axial Load Design (LRFD)Foundation Design

CaseFactored

Design LoadNominal

ResistanceCase Design Load Resistance

Compression

Abutments I 295k 536kII 170k 309k

Piers III 392k 713kTension Load – 0 kips

Grout-to-Ground αBond, Nominal Resistance = 19.2ksf [135psi]Resistance Factor (RF) = 0.55

Design Case - Refers to Pile Locations in Foundation

Page 19: 2012 Southeastern Transportation Geotechnical Engineering … STGEC... · 2017. 1. 24. · 2012 STGEC 2012 Southeastern Transportation Geotechnical Engineering Conference Design and

2012 STGEC

Micropile Installation and TestingMicropile Installation and Testing

Abutment A

Pier 1

Pier 2

Page 20: 2012 Southeastern Transportation Geotechnical Engineering … STGEC... · 2017. 1. 24. · 2012 STGEC 2012 Southeastern Transportation Geotechnical Engineering Conference Design and

2012 STGEC

Numa T-150 Eccentric Percussive Drill BitNuma T 150 Eccentric Percussive Drill Bit

OD Casing = 7.000"

ID Casing = 6.094"

D Retracted Bit = 5.905"

D Expanded Bit = 7.750"

D Hole min = 7.750"Hole min

Page 21: 2012 Southeastern Transportation Geotechnical Engineering … STGEC... · 2017. 1. 24. · 2012 STGEC 2012 Southeastern Transportation Geotechnical Engineering Conference Design and

2012 STGEC

Pi 2 MP I t ll tiPier 2 MP Installation

Page 22: 2012 Southeastern Transportation Geotechnical Engineering … STGEC... · 2017. 1. 24. · 2012 STGEC 2012 Southeastern Transportation Geotechnical Engineering Conference Design and

2012 STGEC

Communication During DrillingCommunication During Drilling

Page 23: 2012 Southeastern Transportation Geotechnical Engineering … STGEC... · 2017. 1. 24. · 2012 STGEC 2012 Southeastern Transportation Geotechnical Engineering Conference Design and

2012 STGEC

ExampleMicropile LogMicropile Log

553.33

Abutment B - Pile 14•Drilling•Drilling•Initial Grouting

Page 24: 2012 Southeastern Transportation Geotechnical Engineering … STGEC... · 2017. 1. 24. · 2012 STGEC 2012 Southeastern Transportation Geotechnical Engineering Conference Design and

2012 STGEC

ExampleMicropile LogMicropile Log

Abutment B - Pile 14•Re Drilling•Re-Drilling•Re-Grouting

Page 25: 2012 Southeastern Transportation Geotechnical Engineering … STGEC... · 2017. 1. 24. · 2012 STGEC 2012 Southeastern Transportation Geotechnical Engineering Conference Design and

2012 STGEC

Page 26: 2012 Southeastern Transportation Geotechnical Engineering … STGEC... · 2017. 1. 24. · 2012 STGEC 2012 Southeastern Transportation Geotechnical Engineering Conference Design and

2012 STGEC

COMPETENT ROCK?

Page 27: 2012 Southeastern Transportation Geotechnical Engineering … STGEC... · 2017. 1. 24. · 2012 STGEC 2012 Southeastern Transportation Geotechnical Engineering Conference Design and

2012 STGEC

Page 28: 2012 Southeastern Transportation Geotechnical Engineering … STGEC... · 2017. 1. 24. · 2012 STGEC 2012 Southeastern Transportation Geotechnical Engineering Conference Design and

2012 STGEC

Load Testing Arrangement

Page 29: 2012 Southeastern Transportation Geotechnical Engineering … STGEC... · 2017. 1. 24. · 2012 STGEC 2012 Southeastern Transportation Geotechnical Engineering Conference Design and

2012 STGEC

Verification Load Test – Pier 1Verification Load Test Pier 1

For 18‘ x 7 75” Dia Bond Zone (No EB)For 18  x 7.75  Dia Bond Zone (No EB)•700k is 19.2 ksf [133 psi]

Page 30: 2012 Southeastern Transportation Geotechnical Engineering … STGEC... · 2017. 1. 24. · 2012 STGEC 2012 Southeastern Transportation Geotechnical Engineering Conference Design and

2012 STGEC

Verification Load Test (Supplemental) – Pier 1Verification Load Test (Supplemental) – Pier 1

For 18‘ x 7 75” Dia Bond Zone (No EB)For 18  x 7.75  Dia Bond Zone (No EB)• 910k is 25.2 ksf [173 psi]

Page 31: 2012 Southeastern Transportation Geotechnical Engineering … STGEC... · 2017. 1. 24. · 2012 STGEC 2012 Southeastern Transportation Geotechnical Engineering Conference Design and

2012 STGEC

Verification Load Test – Pier 2Verification Load Test Pier 2

Verification Load Test – Pier 2For LBZ 18‘ x 7.75” Dia Bond Zone (No EB)•630k is 17.3 ksf [120 psi] < 700k 

Proof Test – Pier 2 (w increased  LBZ)For 20‘ x 7.75” Dia Bond Zone (No EB)

Casing only to rock

•490k is 12.1 ksf [84 psi] < 700k 

Modify MP Design at Pier 2Use 9.625” OD CasingUse 9.625  OD Casing10.4” Dia Bond Zone; 84 psi; LBZ = 22’ Casing + Stinger in Bond Zone

Increase bond zone length 10%...get a 20% reduction in capacity!

Page 32: 2012 Southeastern Transportation Geotechnical Engineering … STGEC... · 2017. 1. 24. · 2012 STGEC 2012 Southeastern Transportation Geotechnical Engineering Conference Design and

2012 STGEC

Schematic Sections with Micropile Bond ZonesSchematic Sections with Micropile Bond Zones

Abutment A Pier 1

32

Page 33: 2012 Southeastern Transportation Geotechnical Engineering … STGEC... · 2017. 1. 24. · 2012 STGEC 2012 Southeastern Transportation Geotechnical Engineering Conference Design and

2012 STGEC

Schematic Sections with Micropile Bond ZonesSchematic Sections with Micropile Bond Zones

Abutment BPier 2

Page 34: 2012 Southeastern Transportation Geotechnical Engineering … STGEC... · 2017. 1. 24. · 2012 STGEC 2012 Southeastern Transportation Geotechnical Engineering Conference Design and

2012 STGEC

Alternate Load Testing MethodsAlternate Load Testing Methods [Review for Limitations]

GRL’s AppleBirminghammer – AFT

GRL s Apple Statnamic

Page 35: 2012 Southeastern Transportation Geotechnical Engineering … STGEC... · 2017. 1. 24. · 2012 STGEC 2012 Southeastern Transportation Geotechnical Engineering Conference Design and

2012 STGEC

View from Abutment A – looking north.

Page 36: 2012 Southeastern Transportation Geotechnical Engineering … STGEC... · 2017. 1. 24. · 2012 STGEC 2012 Southeastern Transportation Geotechnical Engineering Conference Design and

2012 STGEC

View south, Pier 2, with Pier 1 in background.

Page 37: 2012 Southeastern Transportation Geotechnical Engineering … STGEC... · 2017. 1. 24. · 2012 STGEC 2012 Southeastern Transportation Geotechnical Engineering Conference Design and

2012 STGEC

Concluding CommentsConcluding Comments• Design and construction in karst geology is uniquely

challengingchallenging.• Micropiles are a feasible deep foundation supportelements in karst.elements in karst.

• Care must be taken to sufficiently characterizesubsurface conditions during design and confirmduring construction.

• Contract documents need to be developed to capturethe design intent without being overly restrictive;the design intent without being overly restrictive;karst demands the ability to adapt to erratic andvarying conditionsvarying conditions.

• Experience is essential.

Page 38: 2012 Southeastern Transportation Geotechnical Engineering … STGEC... · 2017. 1. 24. · 2012 STGEC 2012 Southeastern Transportation Geotechnical Engineering Conference Design and