www.schnabel.comWe Support the Earth®

Ohio River Tunnel:Secant Pile Shafts

Page 2: Ohio River Tunnel: Secant Pile Shafts - STGEC

www.schnabel.comWe Support the Earth®

CSO Concept

Page 3: Ohio River Tunnel: Secant Pile Shafts - STGEC

www.schnabel.comWe Support the Earth®

Problems withCombined Sewer Overflows

Page 4: Ohio River Tunnel: Secant Pile Shafts - STGEC

www.schnabel.comWe Support the Earth®

Nationwide CSOs

Page 5: Ohio River Tunnel: Secant Pile Shafts - STGEC

www.schnabel.comWe Support the Earth®

Local Sewer Systems

Page 6: Ohio River Tunnel: Secant Pile Shafts - STGEC

www.schnabel.comWe Support the Earth®

Overall Project Plan View

Page 7: Ohio River Tunnel: Secant Pile Shafts - STGEC

www.schnabel.comWe Support the Earth®

Secant Pile Shaft Locations

Page 8: Ohio River Tunnel: Secant Pile Shafts - STGEC

www.schnabel.comWe Support the Earth®

Tunnel Profile

Page 9: Ohio River Tunnel: Secant Pile Shafts - STGEC

www.schnabel.comWe Support the Earth®

Tunnel Profile

Page 10: Ohio River Tunnel: Secant Pile Shafts - STGEC

www.schnabel.comWe Support the Earth®

Secant Shaft Profiles

Page 11: Ohio River Tunnel: Secant Pile Shafts - STGEC

www.schnabel.comWe Support the Earth®

Basic Design Concept

• Rigid Wall• Minimal deflection• Use Ko

• Water table• Ground surface

• Tolerance• Piles – 0.5%• Out of Round – 0.25%

Page 12: Ohio River Tunnel: Secant Pile Shafts - STGEC

www.schnabel.comWe Support the Earth®

Effective Thickness

Page 13: Ohio River Tunnel: Secant Pile Shafts - STGEC

www.schnabel.comWe Support the Earth®

Effective Thickness

Page 14: Ohio River Tunnel: Secant Pile Shafts - STGEC

www.schnabel.comWe Support the Earth®

Effective Thickness

Page 15: Ohio River Tunnel: Secant Pile Shafts - STGEC

www.schnabel.comWe Support the Earth®

Hoop Stresses

Page 16: Ohio River Tunnel: Secant Pile Shafts - STGEC

www.schnabel.comWe Support the Earth®

Design: Finite Element Analysis

• FEM to analyze:• Unbalanced loading

• Crane• Conveyor Belt Footings

Page 17: Ohio River Tunnel: Secant Pile Shafts - STGEC

www.schnabel.comWe Support the Earth®

Quality Control:Verticality Monitoring

Page 18: Ohio River Tunnel: Secant Pile Shafts - STGEC

www.schnabel.comWe Support the Earth®

Quality Control:Concrete Strength

Page 19: Ohio River Tunnel: Secant Pile Shafts - STGEC

www.schnabel.comWe Support the Earth®

Quality Control: Cores of Cores

Page 20: Ohio River Tunnel: Secant Pile Shafts - STGEC

www.schnabel.comWe Support the Earth®

Quality Control: Concrete Volume

Page 21: Ohio River Tunnel: Secant Pile Shafts - STGEC

www.schnabel.comWe Support the Earth®

Construction: Template

Page 22: Ohio River Tunnel: Secant Pile Shafts - STGEC

www.schnabel.comWe Support the Earth®

Construction: Large Drill Rig, Casing and Support Equipment

Page 23: Ohio River Tunnel: Secant Pile Shafts - STGEC

www.schnabel.comWe Support the Earth®

Construction: Overburden, Rock Drilling

Page 24: Ohio River Tunnel: Secant Pile Shafts - STGEC

www.schnabel.comWe Support the Earth®

Construction: Weather Extremes

Winter – 0o Summer 100o

Page 25: Ohio River Tunnel: Secant Pile Shafts - STGEC

www.schnabel.comWe Support the Earth®

Finished Face of Secant Piles

Page 26: Ohio River Tunnel: Secant Pile Shafts - STGEC

www.schnabel.comWe Support the Earth®

Secant Pile Shafts: A Means to an End (or start of a Tunnel)

Page 27: Ohio River Tunnel: Secant Pile Shafts - STGEC

www.schnabel.comWe Support the Earth®

Credits