Forward-looking Statement Disclaimer

This presentation and subsequent discussion may contain forward-looking

statements that involve risks and uncertainties. These statements typically use

"believe," "expects," "expect," "estimate," "plans," "anticipates," "target," "may,"

"will," forward-looking terminology to express or may be described as possible or

expected results of operations will occur in the future. You should not place undue

reliance on these apply only to the date of the forward-looking statements in this

report. These forward-looking statements based on our own information from the

sources which we believe is reliable. Such statements related to future events or

our future financial, business or other performance and are subject to a number

may cause actual results to differ materially from the uncertainties.

3

Table of Contents

3 Prospects in the Latter Half of 2013

2 Status Quo of Core Business Development

1 The Overall State of Operation

4

1 The Overall State of Operation

5

1.2 Operating Performance in the First Half of 2013

New Energy

Equipment

Hydro power and

environmental protection Equipment

Engineering projects and services

Principle Operating Indexes 2012(Jan. to June. ) 2013 (Jan. to June.)

operating revenue RMB 20. 011billion RMB 20.467billion

Year-on-year increase/decrease of operating revenue 1.28% 2.28%

Net profit attributable to shareholders of the company RMB 1.244 billion RMB 1.186 billion

Year-on-year increase/decrease of net profit -19.11% -4.65%

Consolidated gross profit margin 19.35% 19.05%

Electric power equipment production volume 16551 MW 17705 MW

Earnings per share RMB 0.62 RMB 0.59

Cash and cash equivalents RMB 8.123 billion (by the end of June) RMB 9.959 billion (by the end of June)

The 2013 Interim Results Maintained Stable

High-efficient and clean energy generating equipment

6

1.2 Highlights

3. Actual effect from tight control 1. Fair results despite adversity 2. Cash flow improved markedly

Steady Progress in Revenue

2.28%

Production Output Remain High

Unit: RMB Billion

Unit:10MW

7.0%

Year-on-year Up of Cash Flow

Year-on-year Up of Net Cash Flow

18.36亿

Costs Maintain Steady

YoY Down of Assets Depreciation loss

0.09亿

0.56亿

Unit: RMB Billion Unit: RMB Billion

Unit: RMB Billion Unit: RMB Billion

1H2012 1H2013 1H2012 1H2013 1H2012 1H2013

1H2012 1H2013

1H2012 1H2013

1H2012 1H2013

7

1.3 Achievements in Market Expansion

High efficiency and clean energy generation equipment

New energy equipment

Hydro power and environmental protection Equipment

Engineering projects and services

2013 Interim New Orders and Orders in Hand

66.8%

6.3%

22.2%

4.7%

59.5%

7.3%

19.2%

14%

• Highlights achieved in the nuclear

markets where a series of VIP orders were settled;

• Gas power market maintained the leading position;

• 1000MW High-efficient-parameter boiler market maintained the leading position

• Duyen Hai Thermal Power Plant Phase III

realized EOC;

• Kazakhstan BTPP 2×660MW project symbolized DEC’s first entry into markets of Kazakhstan.

Domestic Markets

International Markets

New orders

Unit: RMB 100 million

8

1.4 Accelerated Technological Innovation

Gas Power: R&D of 50MW F-class HD gas turbine is smoothly progressing

Thermal Power: the 600MW ultra-supercritical CFB Boiler was put into operation in Baima Power Plant.

• The first half of 2013, the

company applied and obtained 54

patents of which patents for

invention amounts to 26;

• Obtained 47 patent licensing, of

which patents for invention

amounts to 15

Hydro Power:Xiluodu Power Plant with 770MW per unit capacity of large-scale hydro turbine was officially put into operation

风电:5.5MW海上风机实现并网发电 Nuclear Power : R&D of TG package of SNPTC Large-scale Advanced PWR CAP1400 demonstration projects entered into development stage of substance.

Wind Power : 5.5MW offshore wind power project accomplished combination to the grid

9

1.5 Steady Progress In Manufacturing And Engineering Projects

All the major engineering projects have witnessed marked progress and substantial breakthrough;

19 power plant projects are under construction with a total output capacity of 14518MW, of which 4 are

EPC projects.

• Two units of RABEC project obtained PAC

• The stator of the world largest per unit capacity-Taishan 1750MW Nuclear Project unit 1 finished manufacturing and delivered to the site

• HYH nuclear power plant phase I has been put into commercial operation

• Self-develped Xianyou pumped storage 300MW hydro power unit 1 and 2 successfully put into operation

• Bosnia Stanari project held kick-off meeting in May 2013.

• Indian Kalisindh project unit 1 was sucessfully combined to the grid

10

2 Status Quo of Core Business Development

11

2.1 Business Segments—Overall Review

2012 interim gross profit margin by segment

Analysis of revenue and gross profit margin by segment

10.33% 14.63%

14.50%

-5.83%

Unit:RMB100 Million High-efficient and clean energy generation equipment

• Revenue: down 5.83% YoY(thermal power down 2.68%、gas power down 23.13%、CI of Nuclear power down 18.94%)

• Gross margin: down 2.39% YoY (mainly attributable to downturn of gross margin in boiler and steam turbine)

New Energy

• Revenue:up 14.50% YoY(wind power up 23.51%)

• Gross margin:down 1.57% YoY (mainly due to downturn of price in wind power equipments )

Hydro power and environmental protection equipment

• Revenue : up 19.96% YoY(mainly due to upturn of environmental protection equipments)

• Gross margin :down 0.68%(mainly due to downturn of hydro power equipments)

Engineering projects and services • Revenue :up 10.33% YoY(projects up 4.56%、services up

27.18%) • Gross margin :up 3.76%(mainly due to margin increase in

services)

1H2012 1H2013

1H2012 1H2013

High efficiency and clean energy generation equipment

New energy equipment

Hydro power and environmental

protection equipment

Engineering projects and

services Consolidated

12

2.2 High-efficient and Clean Energy Generating Equipments

清洁高效发电板块产品收入及毛利率 板块产品发展情况 Projects such as 2×1000MW

Shenhua Wanzhou phase II and 2×1000MW Shenhua Anqing boiler contracts became effective

1X660MW Indonesia Cilacap Phase II main contract signified the breakthrough in high-moisture supercritical lignitous coal boiler.

HYH nuclear power plant phase I has been put into commercial operation;

The stator of the world largest per unit capacity-Taishan 1750MW Nuclear Project unit 1 finished manufacturing and delivered to the site.

Mass production of gas power products have formed scale;

Despite a downturn of order intake YoY; the new order valued still over RMB 1 Billion.

-2.68%

-23.13% -18.94%

Revenue, breakdown and gross profit margin of high efficient and clean energy generating equipments

Segment product development achievements

1H2012

1H2013

1H2012 1H2013

Unit:RMB100 Million

Gas turbine equipment Nuclear power conventional island Thermal power equipment

Thermal power equipment

Nuclear power conventional island

Gas turbine equipment

13

新能源板块产品收入及毛利率 板块产品发展情况

Obtained all the contracts from

restart of nuclear power program.

Capable of R&D 3rd Generation

nuclear power equipment

(EPR/AP1000/CAP1000)

simultaneously.

5.5MW offshore wind power

turbine put into operation;

Overall uplifting product quality

and after-sale services。

23.51%

-27.18%

Revenue, breakdown and gross profit margin of new energy equipments

Segment product development achievements

2.3 New Energy Equipments

1H2012 1H2013

1H2012

1H2013

Unit:RMB100 Million

Wind Power Nuclear power island

Wind Power

Nuclear power island

14

水能与环保板块产品收入及毛利率 板块产品发展情况

Self-develped Xianyou pumped

storage 300MW hydro power unit

1 and 2 successfully put into

operation;

Xiluodu Power Plant with 770MW per

unit capacity of large-scale hydro

turbine was officially put into

operation

Marked increase in environmental protection industry;

Signed Henan Hebi 2×600MW units boiler denitration devices contract;

Orders of environmental protection devices in hand valued RMB 4.5 Billion

149.49%

-6.65%

Revenue, breakdown and gross profit margin of new energy equipments

Segment product development achievements

2.4 Hydro Power and Environmental Protection Equipments

Unit:RMB100 Million

1H2012

1H2013

1H2012 1H2013

Hydro power Environmental

protection equipment

Hydro power

Environmental protection equipment

15

工程与服务板块产品收入及毛利率 板块产品发展情况

All the major engineering projects have witnessed marked progress and substantial breakthrough ;

Indian Kalisindh project unit 1 was sucessfully combined to the grid;

Two units of RABEC project obtained PAC ;

Bosnia Stanari project held kick-off meeting in May 2013.

Signed india MUNDRA power plant spare parts overhaul contracts and made VIP breathrough in overseas service market;

Orders of service contract in hand valued over RMB 1 Billion.

4.56%

27.18% 86.12%

Revenue, breakdown and gross profit margin of new energy equipments

Segment product development achievements

2.5 Engineering Projects And Services

Unit:RMB100 Million

1H2012 1H2013

1H2012

1H2013

Engineering Power plant services Others

Engineering

Power plant services

Others

16

3 Prospects in the Latter Half of 2013

17

3.1 Industry Development Trends

单位:万千瓦

World:emerging markets and developing economies lead a pickup in growth

By 2020, the world total installed power generating

capacity is to reach 5470GW, with new orders of 830

GW(IEA);

Main sources of growth comes from China,

India, Indonesia, Vietnam and Brazil.

Brazil: hydro power

projects enjoy greater prospects

Indonesia: newly planned installed capacity in 2013 is 23.44GW

Vietnam: total Installed capacity of

51GW by 2015

India: “12th 5-year”plan

(2012-2017)electrical power capacity to reach 100GW,20GW annually on average

能源发展“十二五”规划(电力装机容量) China:sustained and stable growth in energy development

Energy development

“12th 5-year” plan

(installed power

generating capacity )

Unit:10MW

Breakdown of installed power

generating capacity plan

2010 2015

2010 2015

18

3.2 Opportunities and Challenges Chinese Market Overseas Market

Opportunities

• Seek improvement while maintaining stability

• Clean energy, environmental protection devices

and power plant services shall welcome quicker

development.

Challenges • Demands for conventional power generation

equipments stay at low-level;

• The overall demand of power generation equipment shall witness a further downfall;

• A fierece competition in thermal power market; limited number of market orders in nuclear power; kick-off and promotion of gas power is constrained by price issues; wind power saw an excess production volume and still suffering adjustment.

机 遇

• A sluggish recovery of the global economy;

• Favorable exploration prospects in certain

countries or regions.

挑 战

• A flattened demand in overseas market for power generation equipments;

• Shortage of finance;

• Project safety, commercial and technical issues

• A heightened difficulties in overseas market exploration.

Opportunities

Challenges

19

3.3 Prospects in the Latter Half of 2013 To highlight efficiency; to emphasize transformation; to manage risks; to guarantee sustainable development; The Company is expected to finish power generating equipments with total capacity of 33,000MW in 2013.

Measures taken to achieve the annual target

2 Strive to make technological breakthrough and accelerate R&D of critical products

1 Dedicated to expand markets home and abroad

5 To strengthen risk control and heighten project execution

4 To enhance capital management by increasing revenue and cutting expenditure

3 To reinforce quality control and uplift product quality

20

Strive to build a world-class energy equipment

manufacturing enterprise with technology of international

competitive edge