TRANSFORMING THE SYOSSET PUBLIC LIBRARY To expand the existing 18,000 square foot Syosset Public Library by 25,000 square feet, GBds designed an addition that extends behind the original structure, and also over the top of it. Working with the structural engineering firm of Thornton Tomasetti, an ingenious solution was developed by the team to modify the existing structure of 8” steel posts to allow the required area to be added above the building.

TRANSCRIPT

Page 1: 2014 First Friday Feature - Transforming The Syossett Public Library

Gallin Beeler Design Studio Transforms the Syossett Public Library

Page 2: 2014 First Friday Feature - Transforming The Syossett Public Library

Existing one story Syosset Public Library

Page 3: 2014 First Friday Feature - Transforming The Syossett Public Library

Library interior with existing 8” steel columns

Page 4: 2014 First Friday Feature - Transforming The Syossett Public Library

Temporary bracing of the structure in the Basement allowing larger foundations to be placed under the columns

Page 5: 2014 First Friday Feature - Transforming The Syossett Public Library

Formwork for concrete to be added to the steel columns

Page 6: 2014 First Friday Feature - Transforming The Syossett Public Library

Complete Basement columns ready to take the added load of a new third level

Page 7: 2014 First Friday Feature - Transforming The Syossett Public Library

Main level steel columns prepared for addition of concrete

Page 8: 2014 First Friday Feature - Transforming The Syossett Public Library

New steel structure being installed at the addition behind the existing building

Page 9: 2014 First Friday Feature - Transforming The Syossett Public Library

Steel beams being installed

Page 10: 2014 First Friday Feature - Transforming The Syossett Public Library

Structure of the addition behind and above the existing library

Page 11: 2014 First Friday Feature - Transforming The Syossett Public Library

Concrete encased columns extend through the existing roof with a new steel structure above. An interstitial Mechanical level, between the existing roof and the new third floor, has been incorporated for great HVAC efficiency

Page 12: 2014 First Friday Feature - Transforming The Syossett Public Library

The completed Syosset Public Library expansion