farocdimage.emnrd.state.nm.us/imaging/filestore/aztec/wf/... · 2015. 9. 24. · see attached for...
TRANSCRIPT
Form 3160-5 (August 2007)
RECEIVED UNITED STATES
DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT
FarSUNDRY NOTICES AND REPORTS ON WELLS Do not use this form for proposals to drill or to re-enter an
abandoned well. Use Form 3160-3 (APD) for such proposals.
FORM APPROVED OMB No. 1004-0137 Expires: July 31,2010
5. Lease Serial No. NM-01366
6, If Indian, Allottee or Tribe Name
SUBMIT IN TRIPLICATE - Other instructions on page 2.
1 Type of Well
| [ Oil Well f x ] Gas Well | ] Other
7. If Unit of C A/Agreement, Name and/or No. Huerfano Unit
8. Well Name and No. Huerfano Unit 12
2. Name of Operator 9. API Well No. Burlington Resources Oil & Gas Company LP 30-045-06021
3a. Address
PO Box 4289, Farmington, NM 87499 3b. Phone No. (include area code)
(505) 326-9700 10. Field and Pool or Exploratory Area
Basin Fruitland Coal
4. Location of Well (Footage, Sec, T.,R.,M, or Survey Description) Surface UNIT M (SWSW), 990' FSL & 990' FWL. Sec. 04, T26N, R10W
11. Country or Parish, State San Juan New Mexico
12. CHECK THE APPROPRIATE BOX(ES) TO INDICATE NATURE OF NOTICE, REPORT OR OTHER DATA
TYPE OF SUBMISSION TYPE OF ACTION
| X | Notice of Intent ~2 Acidize 2 Deepen 2 Production (Start/Resume) 2 Water Shut-Off
A 2 Alter Casing 2 Fracture Treat 2 Reclamation 2 Well Integrity
| Subsequent Report I ) ~2 Casing Repair 2 New Construction 2 Recomplete | | Other
2 Change Plans | X | Plug and Abandon 2 Temporarily Abandon
2 Fin3' Abandonment Notice "2 Convert to Injection ] ] Plug Back 2 Water Disposal
13. Describe Proposed or Completed Operation: Clearly state all pertinent details, including estimated starting date of any proposed work and approximate duration thereof. If the proposal is to deepen directionally or recomplete horizontally, give subsurface locations and measured and true vertical depths of all pertinent markers and zones. Attach the bond under which the work will be performed or provide the Bond No. on file with BLM/BIA. Required subsequent reports must be filed within 30 days following completion of the involved operations. If the operation results in a multiple completion or recompletion in anew interval, a Form 3160-4 must be filed once Testing has been completed. Final Abandonment Notices must be filed only after all requirements, including reclamation, have been completed and the operator has determined that the site is ready for final inspection.)
Burlington Resources requests permission to P&A the subject well per the attached procedure, current & proposed wellbore schematics. The Pre-Disturbance oniste was held on 7/29/15 with Bob Switzer/BLM. The re-vegetation plan is attached. A closed loop system will be utilized for this P&A.
OIL CONS. DIVDIST. 3
SEE ATTACHED FOR CONDITIONS OF APPROVAL
SEP 11 2015
Notify NMOCD 24 hrs prior to beginning
operations
APPROVAL ORACCEil ACTION DOES i OPERATOR FROA! ( AUTHORIZATKJ ON FEDERALAND IN
14. I hereby certify that the foregoing is true and correct. Name (Printed/Typed)
Arleen White Staff Regulatory Technician Title
Signature Date Z W \ 15
THIS SPACE FOR FEDERAL OR STATE OFFICE USE
Approved by
1sa% &*Vjfs$£ Title P t Date * Conditions of approval, irany, are attached Approval of this notice does not warrant or certify that the applicant holds legal or equitable title to those rights in the subject lease which would entitle the applicant to conduct operations thereon.
Office
Title 18 U.S.C. Section 1001 and Title 43 U.S.C. Section 1212, make it a crime for any person knowingly and willfully to make to any department or agency of the United States any false, fictitious or fraudulent statements or representations as lo any matter wilhin its jugsd Wbcu (Instruction on page 2)
ConocoPhillips HUERFANO UNIT 12
Expense - P&A
Lat 36°30'45.396" N Long 107° 54' 23.184" W PROCEDURE NOTE: This project requires the use of an A-Plus steel tank to handle waste fluids circulated from the well and cement wash up.
1. Hold pre-job safety meeting. Comply with all NMOCD, BLM, and COPC safety and environmental regulations. Test rig anchors prior to moving in rig. Before RU, run WL remove downhole equipment. If an obstruction is found, set a locking-3-slip-stop in the tubing.
2. MIRU workover rig. Check casing, tubing, and bradenhead pressures and record them in Wellview. If there is pressure on the BH, contact the Wells Engineer.
3. Remove existing piping on casing valve. RU blow lines from casing valves and begin blowing down casing pressure. Kill well as necessary. Ensure well is dead or on a vacuum.
4. ND wellhead and NU BOPE. Pressure and function test BOP to 250 psi low and 1,000 psi over SICP high to a maximum of 2,000 psi held and charted for 10 minutes as per COP Well Control Manual. PU and remove tubing hanger
5. TOOH with tubing (per pertinent data sheet). Tubing size: 2-3/8" 4.7# J-55 EUE Set Depth: 2,230' KB: 11'
6. PU 4-3/4" bit and watermelon mill and round trip as deep as possible above top perforation at 2,010'.
7. PU 5-1/2" CR on tubing, and set at 1,960'. Pressure test tubing to 1,000 psi. Sting out of CR. Load hole, and pressure test casing to 800 psi. If casing does not test, then spot or tag subsequent plugs as appropriate. POOH w/ tubing.
All cement volumes use 100% excess outside pipe and 50' excess inside pipe. The stabilizing wellbore fluid will be 8.3 ppg, sufficient to balance all exposed formation pressures. All cement will be ASTM Class B mixed at 15.6 ppg with a 1.18 cf/sk yield.
8. Plug 1 - Fruitland Perforations and Fruitland Formation Top, 1,652-1,960', 42 Sacks Class B Cement Mix 42 sx Class B cement and spot a balanced plug inside the casing from 1,652' to 1,960'. POOH.
9. Plug 2 - Ojo Alamo and Kirtland Formation Tops, 1,211 -1,443', 102 Sacks Class B Cement RIH and perforate 3 squeeze holes at 1,443'. Establish injection rate into squeeze holes. RIH with a 5-1/2" CR and set at 1,393'. Mix 102 sx Class B cement. Squeeze 69 sx outside the casing, leaving 33 sx inside the casing to cover the Ojo Alamo and Kirtland formation tops. POOH.
10. Plug 3 - Surface Shoe and Surface Plug, 0' -160', 75 Sacks Class B Cement RU WL and perforate 4 big hole charge (if available) squeeze holes at 160'. TOOH and RD wireline. Observe well for 30 minutes per BLM regulations. RU pump, close blind rams and establish circulation out bradenhead with water. Circulate BH clean. TIH with 5-1/2" CR and set at 110'. Mix 50 sx Class B cement and squeeze until good cement returns to surface out BH valve. Shut BH valve and squeeze to max 200 psi. Sting out of CR and reverse circulate cement out of tubing. TOOH and LD stinger. TIH with open ended tubing to 110'. Mix 25 sx Class B cement and pump inside plug. TOOH and LD Tubing. SI well and WOC.
11 . Nipple down BOP and cut off casing below the casing flange. Install P&A marker with cement to comply with regulations. Rig down, move off location, cut off anchors, and restore location.
ConocoPhillips Basic- Schematic - Current
HUERFANO UNIT #12 mm USm [ B S N ( F T L D COAL)
mnm— #3046 3004506021
District
S O U T H
Original Spud Oatt
M / t t / 1 9 5 2
Ea i l 'Wei t Pittance (It) lEa t lWest Reference
990.00 FWL
County
SAN J U A N
State.'Ptovince
NEW MEXICO Surface Legal Location
004-026N-OIOW-M North.'South Distance |R} NorttVSouth Reference
990.CO FSL
Original Hole. 6/3/2015 10:09:44 AM Vertical schematic (actual ! F o r m a t i o n T o p s
Tubing: 2 3/B in: 4.70 IMS: J-S5: 11.0 ftKB: 42.3 ftKB.
Tubing Pup Joint: 2 3/8 in: 4.70 Itvft: J-S5: 42.3 ftKB: 44.3 ftKB
Tubing: 2 3/8 in; 4.70 I M t J-55: 44.3 ftKB: 2.207.7 ftKB
Acid Wash; 8/12/1990: Perfs spotted w/200 gals 15% HCL and washed w/440-.
_ gals 7 1/2% HCL J Hydraulic Fracture: 11 /20/1993; Frac'd w/15.463 gals 30* linear gel. 782.000
SCF N2 70O Foam, and 110.000* n
Arizona Sand iFruitland Coai; 2 010 0-2.230 Q- 8 / l2 ' l 5Ml -
=rofile Nipple: 2 31$ in: 2.207 7 ftKB: 2.208 7 ftKB
Tubing Pup Joint; 2 3/8 in; 4.70 lb/ft; J-55: 2.208.7 ftKB: 2.228.7 ftKB
1 1/2 X 2 3/8 SWAGE: 2 3/3 in; 2.228.7 ftKB: 2.229 4 ftKB
.!uie Shoe. 2 1/16 in: 2.229.4 ftKB: 2.22°8 ftKB
I PBTD 2 2401
ISndce P iuc - Pe rmanen t 2 240 0-2 245 Cl
Hydraulic Fracture: 11/20/1952: Open Hole Frac'd w/1,20O*sand. 2.000 gallons
#2 diesel fuel f/2245-2275
1: Surface; 9 6/8 in; 9.001 in:11.0ftKB: ' 110.0 ftKB Surface Casing Cement: 11.0-110.0:
• 11/12/1952:75 sxs: TOC © surface (75% eff calc)
Production Casing Cement: 1.658 0-2.245.0:11/17/1952: 75 sxs: Hard TOC © 1670 (CBL 8/11/1990). cement to 165S'. could no: squeeze below 1658' 2: Production:51/2 in;5.012 in: 11.0 ftKB: 2.245.0 ftKB
112
42.3
44.3
108.9
109.9
1.261.2
1.393.0
1.658.1
1,702 1
2.009.8
2.207.7
2.208 7
2.226.7
2.2293
2229 7
2.230 0
2.2402
2 2441
2.245 1
2.2461
22749
OJO ALAMO
KIRTLAND
FRUITLAND
PICTURED CLI..
Page 1/1 Report Printed: 6/3/201S
ConocoPhillips Well Name: HUERFANO UNIT #12
Proposed Schematic
3004506021 isiract .JOB J C I T
CO4-026N-010W-M
1 *3\WTt
i i \ ;rrl£ COAJ erg ' 3 * T £ M r , t : j p--o ; isrc*
6.672.00 6.683.00
•KJS 01366 NEW MEXICO
11.00 6.683.00 E.5S3.00
Original Hole. 1/1/2020
Vertical schematic (actual) Formation Tops
ICemert Rea rer 11C0-113
ICement Retainer: 1 3=3 0-1.396 Ct-
ICement Retainer: 1 550 0-1.963 Ct-Acid Wash: 6/12/1990: Perfs
spotted w/200gals 15%HCLand-. washed w/440gals 71/2% HCL \ Hydraulic Fracture: 11/20/1993: '
Frac'd w/15.468 gals 30* linear gel. _ 782.000 SCF N2 7CO Foam, and
110.000* Arizona Sand
I PBTD 2.240 B -
BfidgePlug - Permanent: 2.240.0-22450
- Hydraulic Fracture: 11/20/1952:-Open Hole Frac'dw/i,200*sand.
2.000gallons *2 diesel fuel f/2245-" 2275
3Pluq*3 11 0-1S0D 1 / 1 ^ 0 2 0 1 ^ " 1; Surface: 9 5/8 in: 9 001 in; 11.0
r f tKB: 110 0 ftKB Surface Casing Cement; 11.0-110 0:11/12/1952: 75 sxs: TOC © surface 175% eff calc) Plug *3: 11.0-160.0; 1/1/2020; Mix 50 sx Class B cement squeeze until good cement returns to surface Mix 25 sx Class E cement pum insidepluQ PERF . OTHER 1650 I,'1/20201
-|Piuqs2: 1 211 0-1 443 0; 1/1.20201 Plug*2: 1.244 0-1.443.0: 1/1/2020 Mix 102 sx Class B cement Squeeze 69sx outside casing leaving 33 sx inside casing lo cove Ojo Alamo & Kirtland formation lops •£Rr - OTHER 1 4J3 0 1/1/20201
PlugSl : 1.652 0-1.960.0:1/1/2020: Mix 42 sx Class B cement spot balanced plug insidecasmg to cover Fruitland perfs & Fruitland formation top.
Fruitland Coal: 2.010.0-2.230.0 8/12/1990
Production Casing Cement 1.658 0-2 245 0: 11/17/1952: 7 sxs: Hard TOC © 1670' (CBL 8/11(1990). cement to 1658'. coulc not squeeze below 1658 2; Production; 51/2 in: 5.012 in;
"11.0 ftKB: 2.245.0 RKB
11 2
1089
109.9
112.9
160 1
1.211 0
1.244 1
1,2612
1.3930
1.356.0
1.442 9
1.651.9
1.658.1
1.702.1
1 9600
1.962 9
2.009.8
2.230.0
2240.2
2.2441
2.2451
2.246.1
2274.9
OJO ALAMO
KIRTLAND
FRUITLAND
PICTURED CLIFFS
Page 1/1 Report Printed: 6/9/2015
UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT FARMINGTON DISTRICT OFFICE
6251 COLLEGE BLVD. FARMINGTON, NEW MEXICO 87402
Attachment to notice of Intention to Abandon:
Re: Permanent Abandonment Well: Huerfano Unit 12
CONDITIONS OF APPROVAL 1. Plugging operations authorized are subject to the attached "General Requirements for Permanent Abandonment of Wells on Federal and Indian Lease."
2. Farmington Office is to be notified at least 24 hours before the plugging operations commence (505) 564-7750.
Operator will run a CBL to verify cement top. Submit the electronic copy of the log for verification to the following addresses: [email protected] Brandon.Powell©state.nm.us
You are also required to place cement excesses per 4.2 and 4.4 of the attached General Requirements.
Office Hours: 7:45 a.m. to 4:30 p.m.